Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction
FOR OFFICIAL USE ONLY
November 2018 FOR OFFICIAL USE ONLY Page 1 of 2
Is this a brand-name justification? Yes No
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: 374 CONS/PKBA
Purchase Request / Local ID Number: F4G3A39079AW01
Program Name (and Program Element, if applicable): Project No. ZNRE19-1073 Repair by Securing Mooring Points for RQ-4
Estimated Cost/Price of the Order (including options): $348,921.71
Type Program (see AFFARS 5302.101 for definitions): PEO Program Other Contracting
Fair Opportunity Exception: FAR 16.505(b)(2)(i), subparagraph (A) (B) (C) (E)(D)
Type of D etermination: Individual Class Expires: [ click and select ]
Click here for instructions to complete the boxes below.
(1) Contracting Activity:
374th Contracting Squadron, Base Support Flight, Team A
(2) Nature and/or description of the action being approved:
Repair by Securing Mooring Points for RQ-4
(3) Description of the supplies/services required to meet the agency's needs:
1. Mooring points for RQ-4 (#): Install eight (8) new mooring points at four (4) aircraft parking locations: G-3, G-5, G-6 and G-7. The new mooring points are located on the turf area and shall be installed with a new concrete foundation.
Please refer to ZNRE 19-1073 RQ-4 DWG sheets SV-002, SV-004, SV-005 and SV-006 respectively for the new mooring point locations (coordinates).
2. Static Grounding Points (GP): Install five (5) static grounding points at the following aircraft parking locations: G-3, G-4, G-5, G-6 and G-7. Please refer to ZNRE 19-1073 RQ-4 DWG for locations (coordinates) of these static grounding points.
3. Anchoring system (AP): Install anchoring system at G-4 to support the RQ-4 during engine run. Please refer to ZNRE 19-1073 RQ-4 DWG sheet SV-003 for the anchoring system location (coordinates).
(4) Identification of the exception to fair opportunity and the supporting rationale:
This requirement is urgent because there is no existing hangar space for the RQ-4 aircrafts on the flight line. Due to mission needs, Yokota AB requires temporary hangar space for inbound RQ-4 aircraft. Aircraft arrival dates cannot be modified. This project was originally requested to be completed by the end of May but market research determined this was not possible due to the scope of work required. A more realistic completion date is 30 June because Seikitokyu has previous experience (ZNRE 16-1064) executed under the Yokota AB MACC Contract and left over material on hand. Since material has to imported from the United States, awarding to another company would cause significant delays to this project and the two follow on projects (AE design and installation of the temporary hangar).
(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:
Seikitokyu have previous experience (ZNRE 16-1064) executed under the Yokota MACC Contract performing this type of work MACC Contract. Furthermore, material for this project needs to be imported from the United States and Seikitokyu has some left over materials from the previous project on hand. Therefore, any fees associated with importing material from the United States will be reduced.
Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction
FOR OFFICIAL USE ONLY
November 2018 FOR OFFICIAL USE ONLY Page 2 of 2
(6) Other facts supporting the justification:
Seikitokyu has excellent past performance and a history of timely project completion.
(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:
The contracting activity has briefed the end user on the importance of submitting requirements in accordance with published acquisition timelines.
(8) Program Manager's certification that supporting data is accurate and complete:
As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
(9) Contracting Officer's certification that the justification is accurate and complete:
As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.
(10) Approving Official's determination that one of the circumstances in FAR 16.505(b)(2)(i) applies to the order.
As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.
Date
04 Apr 2019
Contracting Officer Oniqua White-Muldrow
374 CONS PKAB/ 315-225-5438
Signature
Date
05 Apr 2019
Approval Authority (Flight Chief - One Level Above) Joshua B. Grubb
374 CONS PKS / 225-7499
Signature
WHITEMULDROW.ONIQ
UA.RENEE.1258540286
Digitally signed by
WHITEMULDROW.ONIQUA.RENEE.125854
Date: 2019.04.04 17:04:36 +09'00'
Digitally signed by
GRUBB.JOSHUA.B.1290196163
Date: 2019.04.05 11:34:50 +09'00'
1264923707U Typewritten Text Program Manager
NOBUHIKO NISHIMURA
374 CES/CENMP / 225-6576
| 2019-04-05T14:57:11+0900 | |
| NISHIMURA.NOBUHIKO.1291403367 |