FY 25 PWS -Total Fire Extinguishers Maintenance Final_4.docx

DOCX document 88 KB Posted

Attached to
LGA Fire Extinguisher Service Contract Federal contract opportunity
Solicitation number
W912EF25Q0019
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This Performance Work Statement (PWS) details the U.S. Army Corps of Engineers, Walla Walla District's requirements for annual fire extinguisher maintenance at Little Goose Lock and Dam in Dayton, Washington. The contract covers a base year from 4 August 2025 to 3 August 2026, with four potential one-year option periods extending through 3 August 2030. The scope includes servicing 219 fire extinguishers of various classes and sizes (CO2, ABC, D, and K types), ranging from 2.5 to 50 pounds, located throughout the facility. Services will include annual servicing, six-year internal inspections, and hydrostatic testing in accordance with National Fire Protection Association (NFPA) 10 standards.

The contract requires the contractor to provide all personnel, materials, and equipment necessary to maintain fire extinguishers, with specific requirements for technician qualifications, safety training, and quality control reporting. Work will be performed Monday through Thursday between 0700-1630, excluding federal holidays, with strict protocols for employee identification, safety, and environmental compliance. The solicitation (W912EF25Q0019) is classified under NAICS code 541990 with a small business size standard of $19,000,000, indicating potential small business participation. Contractors must complete specific pre-work submittals, including technician credentials, safety certifications, and a detailed quality control plan.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

LITTLE GOOSE DAM ANNUAL FIRE EXTINGUISHER SERVICE CONTRACT

1.0 GENERAL. This Performance Work Statement is for a firm-fixed-price, performance-based service contract where desired outcomes are defined and measured while contractor methods are generally not constrained or directed. The Contractor shall provide personnel, materials, supplies, consumables, equipment, and other items and services necessary for maintaining all fire extinguishers at Little Goose Lock and Dam as outlined in this Performance Work Statement (PWS).

1.1 SCOPE. Based on their production date and class of fire extinguisher, a contractor will provide either a hydrostatic test, or six-year internal inspection, or annual servicing to all portable fire extinguishers at Little Goose Lock and Dam. All fire extinguishers will be serviced by the contractor in accordance with the National Fire Protection Association (NFPA) 10 Standard for Portable Fire Extinguishers. It is the responsibility of the contractor to collect and arrange transportation to and from the site. Any replacement parts used must meet or exceed the specifications set by the manufacturer. Upon completion of the service, all fire extinguishers must be returned to their original locations.

1.2 PERIOD OF PERFORMANCE. The period of performance will be for one (1) Base year of 12 months and four (4) option years of 12 months at the discretion of the Government Contracting Officer (KO) giving written notice of renewal. The period of performance reads as follows:

Base Year4 August 2025 to 3 August 2026
Option Year 14 August 2026 to 3 August 2027
Option Year 24 August 2027 to 3 August 2028
Option Year 34 August 2028 to 3 August 2029
Option Year 44 August 2029 to 3 August 2030

1.2.1 HOURS OF OPERATION. 0700-1630 Monday – Thursday. Schedule hours are to be approved by the Contracting Officer Representative (COR) prior to work being performed.

1.2.2 FEDERAL HOLIDAYS. The Contractor shall not be permitted to work on these days unless an emergency exists.

New Years Martin Luther King Day Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

1.3 CONTRACTOR PERSONNEL. The Contractor shall perform all work under this contract with their own forces. Employees who perform this work shall be qualified persons on the contractor’s own payroll. All Contractor employees shall be at least 18 years of age and must be able to read, write, speak, and understand English fluently.

1.4 APPEARANCE. Contractor employees are expected to present a professional appearance and wear the official Contractor-furnished uniform and name tags. Contractor and subcontractor employees must wear official clothing that identifies them as employee of the Contractor, OR each must wear, visibly on their person, a Contractor-provided laminate badge with employee name, photo, and Contractor’s company identification. In any case, all employees must always have valid photo identification on their person while on the Project. Note: The Government reserves the right to obtain digital photographs of all Contractor personnel performing work onsite as part of the Project access control program.

1.5 QUALITY CONTROL/QUALITY ASSURANCE. The Contractor shall develop and maintain an effective Quality Control Plan to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program ensures the work complies with the requirements of the contract.

1.5.1 QUALITY CONTROL REPORT. At a minimum, the Contractor shall submit a report for each day of work performed. These reports shall be provided to the COR or designee within three business days of performance. The report will include, but is not limited to, the following information:

· Compliance with the service/repair schedule

· Reasons for non-compliance with the service schedule

· All service/repair work performed.

· Parts repaired or replaced.

· Safety problems identified.

· Corrective actions taken to correct safety problems.

· Repairs required that are outside the scope of this contract.

1.5.2 PRE-WORK MEETING. A Pre-work meeting will be scheduled within 5 business days after contract award. At this meeting, the COR will establish lines of authority and Government procedures for contractual, administrative, and work issues. The Contractor must provide all documentation identified as a post-work submittal at or prior to this meeting.

1.5.3 POST AWARD SUBMITTALS. The Contractor shall complete and submit the following items to the COR within (5) days prior to the pre-work meeting.

· Copies of Fire Extinguishers Technician credentials or equivalent.

· Certificates for Safety Training and Qualification of Contractor Crew Supervisor

· Copy of employee’s driver’s license

· Copy of E-Verify certification.

· Copies of current HECP certificates

· Little Goose Project Access Form

· Name, address, and contact info for Contract Supervisor

· List of all employees that will be working on the contract.

· Detailed Quality Control and Inspection Checklist.

2.0 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES. The Contractor is responsible for providing:

· Labor

· Supplies & materials

· Tools to maintain fire extinguishers in compliance with NFPA 10 Standards.

· All training to their employees required by applicable safety, health, or licensing requirements.

2.1 MATERIALS. The Contractor shall be responsible for furnishing the parts and supplies in accordance with the materials listed in the scope of the PWS.

2.1.1 MATERIALS AND SERVICES

All materials provided and services performed under this contract shall be free from defects and conform to ASME A17.1. The Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

2.1.2 SPECIFIC TASKS: The contractor must follow NFPA 10 Standard for Portable Fire Extinguishers for the inventory listed below.

Floor
Location
Serial #
Class
Size (lbs)
Production Date
Six Yr.
Hydro
Current Year’s

Services Need Notes

3
D/S wall Diesel Generator
I-27700107
CO2
50
2022
2027
Annual
4
Between Units 3 & 4
I- 27700108
CO2
50
2022
2027
Annual
5
U/S wall next to the Battery Room
I-27700110
CO2
50
2022
2027
Annual
7
U/S wall across from the Nitrogen Cylinders
I-27700109
CO2
50
2022
2027
Annual
4
Upstream Gallery Entrance DS Wall
AX-164179
D
30
2021
2027

Annual

5
Safety Cage
AX-164177
D
30
2021
2027

Annual

4
Machine Shop by phone
AX-152578
D
30
2021
2027

Annual

4
Welding Shop D/S Wall
AX-164072
D
30
2021
2027

Annual

JFF
Shop East Wall
AX-164082
D
30
2021
2027

Annual

1
Oil Purification Room
G-09116230
ABC
20
2021
2027

Annual

1
Outside the Oil Purification Room
G-09116186
ABC
20
2021
2027

Annual

1
Oil Tank Room
G-09116207
ABC
20
2021
2027

Annual

1
Oil Tank Room
G-09116206
ABC
20
2021
2027

Annual

1.5
Fish Pump Room U/S North Column
G-09116203
ABC
20
2021
2027

Annual

1.5
Fish Pump Room U/S South Column
G-09116204
ABC
20
2021
2027

Annual

2
South of Sewage Room Entrance
G-09116199
ABC
20
2021
2027

Annual

3
Service Bay, U/S Wall, North of Air Comp Entr
G-09116219
ABC
20
2021
2027

Annual

3
Bay 1, U/S Wall
G-09116209
ABC
20
2021
2027

Annual

3
Electrician Service Shop
G-9116228
ABC
20
2021
2027

Annual

3
Bay 2, U/S Gallery
G-09116213
ABC
20
2021
2027

Annual

3
Bay 2, U/S Wall
G-09116232
ABC
20
2021
2027

Annual

3
Bay 3, U/S Wall
G-09116191
ABC
20
2021
2027

Annual

3
Bay 4, U/S Wall
G-09116192
ABC
20
2021
2027

Annual

3
Bay 5, U/S Wall
G-09116218
ABC
20
2021
2027

Annual

3
Bay 6, U/S Wall
G-09116177
ABC
20
2021
2027

Annual

3
D/S Gallery, South of Paint Booth
G-09116221
ABC
20
2021
2027

Annual

3
Service Bay, D/S Gallery, South of Emerg Diesel
H-99555988
ABC
20
2023
2029

Annual

3
Bay 1, D/S Gallery, North of Emergency Diesel
G-09116229
ABC
20
2021
2027

Annual

4
J Grade Elect Office
G-09116215
ABC
20
2021
2027

Annual

4
Generator Balcony, Bay 6
G-09116193
ABC
20
2021
2027

Annual

4
Generator Balcony, Bay 5
G-09116222
ABC
20
2021
2027

Annual

4
Generator Balcony, Bay 4
G-09118282
ABC
20
2021
2027

Annual

4
Generator Balcony, Bay 3
G-09116195
ABC
20
2021
2027

Annual

4
Generator Balcony, Bay 2
G-09118324
ABC
20
2021
2027

Annual

4
Generator Balcony, Bay 1
G-09118281
ABC
20
2021
2027

Annual

4
D/S of men’s locker room
G-09118320
ABC
20
2021
2027

Annual

5
Inside Rollup Door South Wall
G-09118322
ABC
20
2021
2027

Annual

5
U/S Wall, South of Elevator Entrance
G-09116231
ABC
20
2021
2027

Annual

5
BPA Room
G-09116180
ABC
20
2021
2027

Annual

5
Gallery Bay 1
G-09116183
ABC
20
2021
2027

Annual

5
Gallery Bay 2
G-09116173
ABC
20
2021
2027

Annual

5
Gallery Bay 3
G-09116181
ABC
20
2021
2027

Annual

5
Gallery Bay 4
G-09116185
ABC
20
2021
2027

Annual

5
Gallery Bay 5
G-09116196
ABC
20
2021
2027

Annual

5
Gallery Bay 6
G-09116202
ABC
20
2021
2027

Annual

5
Tech Cage
F-51678630
ABC
20
2021
2027

Annual

5
Safety Cage
H-99555994
ABC
20
2023
2029

Annual

5
Safety Cage
H-99555987
ABC
20
2023
2029

Annual

5
Safety Cage
H-99555989
ABC
20
2023
2029

Annual

6
Control Room (South kitchen wall)
H-28947291
K
20
2022
2027
Annual
7
XJ2
G-09116194
ABC
20
2021
2027

Annual

7
XJ3
G-09116223
ABC
20
2021
2027

Annual

7
XJ4
G-09116187
ABC
20
2021
2027

Annual

7
XJ5
G-09116225
ABC
20
2021
2027

Annual

8
XJ6
G-09116189
ABC
20
2021
2027

Annual

8
East of Elevator Entrance
G-09116200
ABC
20
2021
2027

Annual

8
North of Drinking Fountain
G-09116233
ABC
20
2021
2027

Annual

9
Kitchen, Installed U/S Countertop
H-32962538
K
20
2022
2027
Annual
NL
R/S Gallery North of Fill Valve Room
G-09116216
ABC
20
2021
2027

Annual

NL
Outside Entrance to R/S Tainter Gate Room
G-09116172
ABC
20
2021
2027

Annual

NL
North Wall of NL Drain Valve Room
G-09116171
ABC
20
2021
2027

Annual

NL
South Miter Gate Room, D/S Wall
G-09116211
ABC
20
2021
2027

Annual

NL
North Miter Gate Room, D/S Side
G-09116205
ABC
20
2021
2027

Annual

NL
Lower Bascule Bridge Pit
G-09116190
ABC
20
2021
2027

Annual

NL
L/S Gallery U/S of Tainter Gate 2 Entrance
G-09116235
ABC
20
2021
2027

Annual

NL
Upper Bascule Bridge Pit North Wall D/S
G-09116224
ABC
20
2021
2027

Annual

NS
Lunch room under sink
H-28947295
K
20
2022
2027
Annual
NS
N/S Drainage Pump Room
G-09118321
ABC
20
2021
2027

Annual

NS
North Shore Elevator Machinery Room
G-09118315
ABC
20
2021
2027

Annual

4
Machine Shop US
G09116201
ABC
20
2021
2027

Annual

4
Machine Shop DS
G09116170
ABC
20
2021
2027

Annual

4
Hot Work Extinguisher (tool room) Yellow band
G09116214
ABC
20
2021
2027

Annual

4
Hot Work Extinguisher (tool room) Yellow band
G09116182
ABC
20
2021
2027

Annual

4
Welding Shop u/s, North Corner in Shop
G09116174
ABC
20
2021
2027

Annual

4
Welding Shop, U/S Wall
G09116175
ABC
20
2021
2027

Annual

6
Bridge Crane South bridge D/S
G09116178
ABC
20
2021
2027

Annual

6
Bridge Crane South bridge U/S
G09118285
ABC
20
2021
2027

Annual

6
Bridge Crane in Cab
G09118258
ABC
20
2021
2027

Annual

6
Bridge Crane U/S South
G09118283
ABC
20
2021
2027

Annual

6
Bridge Crane U/S North
G09116676
ABC
20
2021
2027

Annual

6
Bridge Crane U/S North Bridge
G09118317
ABC
20
2021
2027

Annual

6
Bridge Crane U/S Trolley
G09118284
ABC
20
2021
2027

Annual

6
Control Room (Main Room)
G09118323
ABC
20
2021
2027

Annual

9
Bridge Crane D/S Trolley
G09118314
ABC
20
2021
2027

Annual

TR
Resource Fuel Station
G09116226
ABC
20
2021
2027

Annual

TR
North of flammable storage behind all hands trailer
G09116227
ABC
20
2021
2027

Annual

TR
Flammable Storage Building
G09116498
ABC
20
2021
2027

Annual

TR
D/S Fishway South of Oil Containment
G09116198
ABC
20
2021
2027

Annual

TR
Diesel Fuel Tank on Tailrace Deck
G9116176
ABC
20
2021
2027

Annual

JFF
JFF Kitchen
H28944799
K
20
2022
2027
Annual
JFF
JFF 1st Floor Hall
G091116184
ABC
20
2021
2027

Annual

JFF
JFF 2nd Floor Hall
G091118316
ABC
20
2021
2027

Annual

JFF
Wet Lab
G091118312
ABC
20
2021
2027

Annual

JFF
Shop South Wall
G09118311
ABC
20
2021
2027

Annual

JFF
Mechanical Room
G091116499
ABC
20
2021
2027

Annual

JFF
Resource yard shop back door
G09118276
ABC
20
2021
2027

Annual

JFF
Resource Yard shop Front Door
G09118279
ABC
20
2021
2027

Annual

JFF
Resource Yard Shop Middle door
G09118280
ABC
20
2021
2027

Annual

JFF
Storage Room
G09118271
ABC
20
2021
2027

Annual

JFF
Barge Dock
G091116500
ABC
20
2021
2027

Annual

2
Down Stream Wall
F-49814257
CO2
15
2018
2023
5 Yr hydro
3
Service Bay, U/S Wall, North of Air Comp Entr
F-49813014
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 1, U/S Wall
F-49814254
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 2, U/S Wall
F-49814263
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 3, U/S Wall
F-49814268
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 4, U/S Wall
F-49814256
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 5, U/S Wall
F-49814264
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Unit 6, Lower Turbine Pit, Bottom of Stairs
F-49814258
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 5, D/S Wall
F-49813012
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Unit 5, Lower Turbine Pit, Bottom of Stairs
F-49813019
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 4, D/S Wall
F-49813022
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Unit 4, Lower Turbine Pit, Bottom of Stairs
F-49813025
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 3, D/S Wall
F-49814260
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Unit 3, Lower Turbine Pit, Bottom of Stairs
F-49814262
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 2, D/S Wall
F-49813018
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Unit 2, Lower Turbine Pit, Bottom of Stairs
F-49814261
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Bay 1, D/S Wall
F-49814248
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Unit 1, Lower Turbine Pit, Bottom of Stairs
G-49814250
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Service Bay, North of Entr to Emergency Diesel
F-49814252
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Service Bay, South Middle Column, North Side
F-49814259
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Service bay in-between office's
F-49813027
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
5
East of Battery Room Entrance
F498142266
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
5
Safety Cage
H-99254588
CO2
15
2022
2027
Annual
Hydro will be adjusted to 2025
5
Safety Cage
H-99254585
CO2
15
2022
2027
Annual
Hydro will be adjusted to 2025
5
Safety Cage
F- 49813013
CO2
15
2022
2027
Annual
Hydro will be adjusted to 2025
5
Safety Cage
H-99254587
CO2
15
2022
2027
Annual
Hydro will be adjusted to 2025
9
North of Elevator Entrance
F-49813023
CO2
15
2018
2024
5 Yr hydro
Hydro will be adjusted to 2025
6
Inside SF-1 Room, U/S Wall
F-49813017
CO2
15
2018
2024
5 Yr hydro
Hydro will be adjusted to 2025
6
Control Room ER Room
F-9813020
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
D/S Wall inside Rf-1 Room
F-49814247
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
South Side of Telephone Room
F-49814245
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
U/S of XJ1 Reactor
F-49814246
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
XJ2
F-49814249
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
XJ3
F-49814255
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
XJ4
F-49814253
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
XJ5
F-49814251
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
7
XJ6
F-49813010
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
8
U/S Wall, North End Gate Repair Pit in Safety Cage
F-49813013
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
NL
Gallery Outside LSP-2 Room
F-49813024
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
NL
U/S of LSP-1 Substation Room Entrance
F-49814265
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
9
Outside Elevator North Lunchroom Ent
F-49814269
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
10
Powerhouse Elevator Penthouse Entrance
F-49814267
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
10
Powerhouse Elevator Machinery Room
F-49813015
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
NS
N/S Substation Room, South of Elevator Entr.
F-49813016
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
NS
N/S Substation Room, Between Rooms
F-49813026
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
TR
Diesel Fuel Tank on Tailrace Deck
F-49813028
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
JFF
Air Compressor Room
F-498113021
CO2
15
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
3
Electrical Office
G-23239661
ABC
10
2021
2027

Annual

4
Warehouse Main Office Behind Purchaser
G-23239632
ABC
10
2021
2027

Annual

4
Warehouse Bay 3
G-23239659
ABC
10
2021
2027

Annual

4
Warehouse Bay 4
G-23239705
ABC
10
2021
2027

Annual

4
Warehouse Bay 5
G-23239633
ABC
10
2021
2027

Annual

5
5th floor mezzanine in-between offices by stair
G-23239639
ABC
10
2021
2027

Annual

5
Safety Cage
H-27850905
ABC
10
2022
2028

Annual

7
Entrance to Conference Room
G-23239650
ABC
10
2021
2027

Annual

9
Lunchroom west wall
F-50589459
ABC
10
2018
2024

6 Yr Main.

NS
North Shore Elevator
E-955957288
CO2
10
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
Outside the elevator
E-95956735
CO2
10
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
4
Welding Trailer
H -27789428
ABC
10
2022
2028

Annual

4
Semi-Truck (G820541U)
D-01963278
ABC
10
2017
2024

6 Yr Main.

9
Security Guard Shack
G-23239641
ABC
10
2021
2027

Annual

9
FMC Crane Forebay 130 Ton
G-23239635
ABC
10
2021
2027

Annual

VC
Visitor Building Lobby
G-23239637
ABC
10
2021
2027

Annual

VC
Visitor Building Machinery Room
G-23239640
ABC
10
2021
2027

Annual

TR
Sand Blast Shop Tailrace
G-2329657
ABC
10
2021
2027

Annual

TR
All Hands Trailer
G-23239647
ABC
10
2021
2027

Annual

9
FMC Crane Forebay 130 Ton crane cab
H- 13367903
ABC
10
2022
2028

Annual

9
FMC Crane Forebay 130 Ton Top Deck
H- 127805056
ABC
10
2022
2028

Annual

JFF
JFF Kitchen
G-23239662
ABC
10
2021
2027

Annual

JFF
Miller Welder
G-091116423
ABC
10
2021
2027

Annual

JFF
Separator Building
G-23239638
ABC
10
2021
2027

Annual

JFF
Munson Boat
G-23239648
ABC
10
2021
2027

Annual

Repair Pit
Elev. 580 D/S wall near the air hose
I00424249
ABC
10
2023
2029
Annual
New
Repair Pit
Elev. 589 D/S wall near the air hose
I00414686
ABC
10
2023
2029
Annual
New
Repair Pit
Elev. 598 D/S wall near the air hose
I00424247
ABC
10
2023
2029
Annual
New
Repair Pit
Elev. 607 D/S wall near the air hose
I00414685
ABC
10
2023
2029
Annual
New
Repair Pit
Elev. 616 D/S wall near the air hose
I00414690
ABC
10
2023
2029
Annual
New
Repair Pit
Elev. 625 D/S wall near the air hose
I00414678
ABC
10
2023
2029
Annual
New
Repair Pit
Elev. 634 D/S wall near the air hose
I00414672
ABC
10
2023
2029
Annual
New
4
Warehouse bay 6
F-51088797
ABC
5
2018
2024

6 Yr Main.

5
Safety Cage
H-28956837
CO2
5
2022
2027
Annual
5
Safety Cage
G-99201268
CO2
5
2021
2026
Annual
5
Safety Cage
H-27699084
ABC
5
2022
2028

Annual

5
Safety Cage
H-27717202
ABC
5
2022
2028

Annual

5
Safety Cage
H-27717201
ABC
5
2022
2028

Annual

5
Safety Cage
H-20192575
ABC
5
2022
2028

Annual

5
Safety Cage
H-27699085
ABC
5
2022
2028

Annual

6
K-Grade Electrical Shop
F-51040223
CO2
5
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
9
COH Crane Trash Rack 20 Ton
51087777
ABC
10
2023
2029

Annual

9
LGO - 1 (Work boat) White Tug Boat
F-99799481
ABC
5
2020
2026

Annual

9
LGO -1 White Tug boat cab
F-99798893
ABC
5
2020
2026

Annual

9
LGO -1 White Tug boat cab
F-51040217
CO2
5
2018
2023
5 Yr hydro
Hydro will be adjusted to 2025
JFF
Boom Truck A94032212
F-51088796
ABC
5
2021
2027

Annual

JFF
Shop North wall
F-51086282
ABC
5
2018
2024

6 Yr Main.

JFF
Pressure Washer
F-51088801
ABC
5
2018
2024

6 Yr Main.

3
Clark Forklift BC 33828
F-54713983
ABC
2.5
2018
2024

6 Yr Main.

4
Pressure Washer
F-54716029
ABC
2.5
2018
2024

6 Yr Main.

4
Mobile 90 Ton Crane truck Cab
F-54713989
ABC
2.5
2018
2024

6 Yr Main.

4
Mobile 90 Ton Crane Operator Cab
F-54719458
ABC
2.5
2018
2024

6 Yr Main.

4
FMC Crane Tailrace 50 Ton
F-54715513
ABC
2.5
2018
2024

6 Yr Main.

4
Broderson Lift 33849
F-54713991
ABC
2.5
2018
2024

6 Yr Main.

4
CAT electric fork lift (Warehouse)
F-54713982
ABC
2.5
2018
2024

6 Yr Main.

4
GEHL Forklift 33848
F-54715515
ABC
2.5
2018
2024

6 Yr Main.

4
JLG 33826
F-54713986
ABC
2.5
2018
2024

6 Yr Main.

4
Toyota Forklift 33828
F-54715508
ABC
2.5
2018
2024

6 Yr Main.

4
F750 g71-0044R
F-54719457
ABC
2.5
2018
2024

6 Yr Main.

4
Pickup Electricians G63-2379V
F-54715514
ABC
2.5
2018
2024

6 Yr Main.

4
F350 Ext Cab G63 2376V
F-54719464
ABC
2.5
2018
2024

6 Yr Main.

4
Dodge 3500 Lic. G 0901Y
F-54717362
ABC
2.5
2018
2024

6 Yr Main.

9
Admin Vehicle G610656x
F-54719462
ABC
2.5
2018
2024

6 Yr Main.

9
Security Guard Truck G61-264OU
F-54719465
ABC
2.5
2018
2024

6 Yr Main.

9
LGO - 1 (Work boat) Mech. Work boat
F-54717364
ABC
2.5
2018
2024

6 Yr Main.

F-54713985
ABC
2.5
2018
2024

6 Yr Main.

TR
Smoke Pit
F-54715518
ABC
2.5
2018
2024

6 Yr Main.

9th
Smoke Pit
F-54717363
ABC
2.5
2018
2024

6 Yr Main.

JFF
Ford f550 4x4
F-54716026
ABC
2.5
2018
2024

6 Yr Main.

JFF
ford f350 4x4
F-54713984
ABC
2.5
2018
2024

6 Yr Main.

JFF
Genie Lift
F-54719454
ABC
2.5
2018
2024

6 Yr Main.

JFF
Back hoe
F-54715516
ABC
2.5
2018
2024

6 Yr Main.

CONTRACTOR TO QUOTE FOR BASE YEAR

FIRE EXTINGUISHER CLASS SCHEDULE 2025
SERVICE COUNT
UNIT COST
TOTAL COST
50 lbs CO2 Annual
4
50 lbs CO2 Hydro
0
30 lbs D Annual
5
30 lbs D Six Year
0
20 lbs ABC Annual
87
20 lbs ABC Six Year
0
6 liter K Annual
4
6 liter K Hydro
0
15 lbs CO2 Annual
4
15 lbs CO2 Hydro
39
10 lbs ABC Annual
29
10 lbs ABC Six Year
2
10 lbs CO2 Annual
0
10 lbs CO2 Hydro
2
5 lbs CO2 Annual
2
5 lbs CO2 Hydro
2
5 lbs ABC Annual
8
5 lbs ABC Six Year
3
2.5 lbs ABC Annual
0
2.5 lbs ABC Six Year
24
Total of Fire Extinguishers
219

CONTRACTOR TO QUOTE FOR OPTION YEAR 1

FIRE EXTINGUISHER CLASS SCHEDULE 2026
SERVICE COUNT
UNIT COST
TOTAL COST
50 lbs CO2 Annual
4
50 lbs CO2 Hydro
0
30 lbs D Annual
5
30 lbs D Six Year
0
20 lbs ABC Annual
87
20 lbs ABC Six Year
0
6 liter K Annual
4
6 liter K Hydro
0
15 lbs CO2 Annual
43
15 lbs CO2 Hydro
0
10 lbs ABC Annual
30
10 lbs ABC Six Year
0
10 lbs CO2 Annual
2
10 lbs CO2 Hydro
0
5 lbs CO2 Annual
3
5 lbs CO2 Hydro
1
5 lbs ABC Annual
10
5 lbs ABC Six Year
2
2.5 lbs ABC Annual
24
2.5 lbs ABC Six Year
0
Total of Fire Extinguishers
219

CONTRACTOR TO QUOTE FOR OPTION YEAR 2

FIRE EXTINGUISHER CLASS SCHEDULE 2027
SERVICE COUNT
UNIT COST
TOTAL COST
50 lbs CO2 Annual
0
50 lbs CO2 Hydro
4
30 lbs D Annual
0
30 lbs D Six Year
5
20 lbs ABC Annual
4
20 lbs ABC Six Year
83
6 liter K Annual
0
6 liter K Hydro
4
15 lbs CO2 Annual
39
15 lbs CO2 Hydro
4
10 lbs ABC Annual
13
10 lbs ABC Six Year
17
10 lbs CO2 Annual
2
10 lbs CO2 Hydro
0
5 lbs CO2 Annual
3
5 lbs CO2 Hydro
1
5 lbs ABC Annual
11
5 lbs ABC Six Year
1
2.5 lbs ABC Annual
24
2.5 lbs ABC Six Year
0
Total of Fire Extinguishers
219

CONTRACTOR TO QUOTE FOR OPTION YEAR 3

FIRE EXTINGUISHER CLASS SCHEDULE 2028
SERVICE COUNT
UNIT COST
TOTAL COST
50 lbs CO2 Annual
4
50 lbs CO2 Hydro
0
30 lbs D Annual
5
30 lbs D Six Year
0
20 lbs ABC Annual
87
20 lbs ABC Six Year
0
6 liter K Annual
4
6 liter K Hydro
0
15 lbs CO2 Annual
43
15 lbs CO2 Hydro
0
10 lbs ABC Annual
26
10 lbs ABC Six Year
4
10 lbs CO2 Annual
2
10 lbs CO2 Hydro
0
5 lbs CO2 Annual
2
5 lbs CO2 Hydro
4
5 lbs ABC Annual
7
5 lbs ABC Six Year
5
2.5 lbs ABC Annual
24
2.5 lbs ABC Six Year
0
Total of Fire Extinguishers
219

CONTRACTOR TO QUOTE FOR OPTION YEAR 4

FIRE EXTINGUISHER CLASS SCHEDULE 2029
SERVICE COUNT
UNIT COST
TOTAL COST
50 lbs CO2 Annual
4
50 lbs CO2 Hydro
0
30 lbs D Annual
5
30 lbs D Six Year
0
20 lbs ABC Annual
87
20 lbs ABC Six Year
0
6 liter K Annual
4
6 liter K Hydro
0
15 lbs CO2 Annual
43
15 lbs CO2 Hydro
0
10 lbs ABC Annual
23
10 lbs ABC Six Year
7
10 lbs CO2 Annual
2
10 lbs CO2 Hydro
0
5 lbs CO2 Annual
6
5 lbs CO2 Hydro
0
5 lbs ABC Annual
12
5 lbs ABC Six Year
0
2.5 lbs ABC Annual
24
2.5 lbs ABC Six Year
0
Total of Fire Extinguishers
219

3.0 SECURITY, SAFETY & ENVIRONMENTAL

3.1 Access and General Protection. All Contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

3.2 Contractors Requiring Access to a DoD Facility. All Contractor and associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable facility and area commander facility access, and local security policies and procedures (provided by a government representative, as NCIC and TSDB are available).

3.3 Escorting. All Contractor and associated subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted area.

3.4 Pre-screen Candidates Using E-Verify Program. The Contractor must pre-screen candidates using the E verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the candidate has two valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 5 business days after the initial contract award.

3.5 Authorized Personnel. Only persons directly involved with accomplishment of the Contractor’s operations on this contract shall be allowed on the Project. In accordance with the requirements above and Little Goose Project access requirements, a complete submittal package for a contractor employee will be provided per section 1.6.2.

3.6 Contractor Vehicles. All usual Contractor vehicles shall have permanent or temporary identification on both sides, of a size sufficient to provide visual identification from at least 20 feet from the vehicle. If a temporary unmarked vehicle must be used, the Contractor shall provide year, make, model, color, and license plate for the vehicle to the COR prior to arrival of the vehicle to the Project. All vehicles are subject to search.

3.7 Antiterrorism/Operations Security (AT Level 1/OPSEC) Security Requirements.

All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access shall complete AT Level I awareness training before contract start date or the effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer (if a COR is not assigned) within five calendar days after completion of training by all employees and subcontractor personnel.

3.8 Suspicious Activity Reporting Training (e.g., iWATCH, CorpsWatch, or See Something, Say Something).

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative, or law enforcement entity. This training shall be completed prior to the commencement of the contract award with the results reported to the COR NLT 5 calendar days after the completion of the training. Watch all videos and email COR when viewing is complete.

1. https://youtu.be/GLJ4Gbv8kkY
2. https://youtu.be/v5ybLc18dQE

4.0 SAFETY REQUIREMENTS

4.1 Safety Standards. The Contractor shall comply with all applicable Occupational Safety and Health Act (OSHA) Standards, as well as the Corps of Engineers’ Safety and Health Requirements Manual EM 385-1-1 that are in effect at the time of contract award. This section calls out only a few specific requirements. Prospective offerors are encouraged to review the EM 385-1-1 at: https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_385-1-1.pdf to gain an understanding of the full requirement prior to developing their offer. Contractor personnel and equipment shall be subject to safety inspections by Government personnel while on federal property.

4.2 Training & PPE. The Contractor shall ensure that all personnel are trained to the level of expertise required for proper performance of the task, general first aid procedures, and use of safety equipment. Personal protective equipment (PPE) shall be provided by the Contractor and must be appropriate to the task.

4.2.1 Safe Clearance / Hazardous Energy Control / Lockout-Tagout. All Contractor work performed onsite shall meet the requirements of Walla Walla District "Safety and Occupational Health Office; Safe Clearance Program for the Control of Hazardous Energy,” NWWP 385-1-20. In accordance with Chapter 10 of NWWP 385-1-20, the Contractor may perform work under its own Lockout/Tagout procedures for work that can be completed in one work shift. To obtain authorization to do so, the Contractor must provide a copy of its own Lockout/Tagout procedures to the Government for review and acceptance, as well as provide annual NWW Hazardous Energy Control Program training to each authorized employee (see 1.11.4 below).

4.2.2 If the Contractor’s Lockout/Tagout procedures are not submitted or accepted, or if the equipment must be left under a clearance longer than one shift, the Contractor shall be required to operate under the Walla Walla District Safe Clearance Program requirements.

4.2.3 Required Annual HECP Training. Contractor and subcontractor employees operating under the Contractor’s Lockout/Tagout procedures or under the Walla Walla District Safe Clearance Program, as described above, shall take the HECP procedure training described below. Any non-working personnel, vendors and visitors that will be entering an area under Safe Clearance shall take Awareness level training. Training and written tests for the modules below shall be completed online prior to commencing onsite work. Time estimates for training follow:

a. Awareness Level Training: Approximately 1 hour

b. Affected Persons: Approximately 2 hours in addition to Awareness Level training.

c. Authorized Individuals: Approximately 3 hours in addition to Awareness Level training and Affected Personnel Training.

Contractor is responsible for cost of training. Training is an annual requirement and will expire one year from completion date. Training is available through the Vivid Learning Systems and is available online at http://Hecp.vividlms.com. Cost for the training is displayed on the home page. Submit the training completion certification(s) to the COR a minimum of five days prior to the individual's arrival at site.

4.2.4 Protection of Government Property. The Contractor shall protect all existing Government structures, utilities, equipment, and work of any kind against damage or interruption of service, which may result from its operations. Persons engaged under this contract may be working in areas containing control systems vital to the operation of the project. The Contractor shall protect against accidental and/or intentional operation of any control systems.

4.2.5 Incident/Accident Reporting. An accident constitutes an incident or act involving the Contractor, which may or may not have caused obvious damage to persons or property. This includes injuries to Contractor employees, members of the public, or damage to Government or personal property. The Contractor shall notify the COR by telephone within 30 minutes of any incident or accident, followed by a written report. The report shall include, but not be limited to, location, nature of the injury or accident, name(s) of injured party(ies), conditions/circumstances surrounding the occurrence, cause of the occurrence, parties notified, and actions taken. The report shall be accompanied by sketches, graphs, drawings, and photographs, as needed, and forwarded to the COR within one working day following the occurrence of an accident or injury.

5.0 ENVIRONMENTAL REQUIREMENTS

5.1 Conservation. The Contractor must ensure employees practice utility conservation. The Contractor is.

responsible for operating under conditions that prevent the waste of utilities, to include turning off lights when not necessary for work and turning off water faucets and valves when not in use.

5.2 Environmental and Hazardous Materials. The Contractor must establish systems and controls to minimize.

use of hazardous materials and generation of hazardous wastes, maximize recycling of materials and comply with local, state, and federal guidelines for hazardous material and waste storage and disposal. Where applicable, the Contractor shall use environmentally safe products during completion of their project.

TECHNICAL EXHIBIT 1

DELIVERABLES SCHEDULE

DELIVERABLE
FREQ/DUE DATE
COPIES
SUBMIT TO
Pre-work submittals
Prior to per-work meeting
1 each
COR
2.1.1 MATERIALS AND SERVICES; Section 2.1.2 SPECIFIC TASKS
Upon completion of testing
1 each
COR
Quality Control Report
Each day worked/no later than 3 days after work has been performed
1 each
COR
The Contractor shall provide personnel, materials, supplies, consumables, equipment, and other items and services necessary for maintaining fire extinguishers at Little Goose Lock and Dam.
End of Period of Performance
219 Fire Extinguishers
COR/Safety Officer

DELIVERY:

Little Goose Dam 1001 Little Goose Dam Rd.

Dayton WA. 99328

File details come from the government source that posted it. Updated .