FY-24 RPOC PWS (Final Draft).pdf

PDF 2 MB Posted

Attached to
Regional Port Operations (RPOC) Follow on Contract
Solicitation number
N0969723PORTOPS
Issued by

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Regional Port Operations Maintenance and Services

Commander Navy Region Southeast (CNRSE)

C 1.0 OVERVIEW

C 1.1. General: The services to be furnished under this contract include operation of various watercraft and boats, related maintenance services, port operations, and waterfront administration in support of Port Operations, Commander Navy Region Southeast at the following locations: Naval Air Station (NAS) Pensacola, FL; Naval Support Activity (NSA) Panama City, FL; Naval Submarine Base (NSB) Kings Bay, GA; Naval Station (NAVSTA) Mayport, FL; Naval Ordnance Test Unit (NOTU) Port Canaveral, FL;

Naval Air Station (NAS) Jacksonville, FL; and Naval Air Station (NAS) Key West, FL throughout the Southeast Region of the United States. The Contractor shall be responsible for the operation, preventive, predictive, corrective maintenance, depot level maintenance of various watercrafts, boats and equipment, industrial marine repair services and shall provide port operations services as outlined in this Performance Work Statement (PWS). All the Contractor's costs shall be included in its Firm Fixed-Price. No overtime shall be provided under this contract. The Contractor shall plan, schedule, coordinate and ensure effective completion of all services described herein. This includes the following tasks:

C 2.0 REGULATORY COMPLIANCE

C 3.0 GOVERNMENT FURNISHED EQUIPMENT, FACILITIES AND SERVICES

C 4.0 CONTRACTOR FURNISHED EQUIPMENT, FACILITIES AND SERVICES

C 5.0 TRANSITION

C 6.0 GENERAL VESSEL, EQUIPMENT AND PERSONNEL STANDARDS

C 7.0 MAINTENANCE PROGRAM AND ADMINISTRATION

C 8.0 REGIONAL BOAT MAINTENANCE CENTER (RBMC)

C 9.0 ORGANIZATIONAL MAINTENANCE AND REPAIRS OF GOVERNMENT

FURNISHED BOATS, SERVICE CRAFT, WATERFRONT, FACILITY AND OSR

EQUIPMENT

C 10.0 INTERMEDIATE AND DEPOT LEVEL MAINTENANCE AVAILABILITIES AND

DOCKING REGULAR OVERHAULS (DROH) SERVICES

C 11.0 NAS PENSACOLA PORT OPERATIONS – OPERATIONS AND CROSS-

FUNCTIONED SERVICES

C 12.0 CNATRA SUPPORT – CNATRA TRAINING OPERATIONS (NAS PENSACOLA)

C 13.0 COAST GUARD SUPPORT – COAST GUARD SERVICE REQUIREMENTS (NAS

PENSACOLA)

C 14.0 REGIONAL SHIP MOVEMENT SUPPORT SERVICES

C 15.0 SWFLANT SUPPORT – NEAR PORT SECURITY BARRIER (NPSB) AND

WATERFRONT RESTRICTED AREA GATE OPENINGS AND CLOSINGS (NSB

KINGS BAY)

C 16.0 HURRICANE / HEAVY WEATHER / SEVERE WEATHER REQUIREMENTS

C 17.0 TRANSPORTATION SERVICES

C 18.0 REQUIRED LOGS, RECORDS, PLANS, DOCUMENTATION, REPORTS AND

INSPECTIONS

C 19.0 PROPERTY ADMINISTRATION

C 20.0 SUPPLY, LOGISTICS AND CONFIGURATION MANAGEMENT OF

GOVERNMENT OWNED WATERCRAFT AND EQUIPMENT

C 21.0 QUALITY MANAGEMENT SYSTEM AND SAFETY PROGRAM REQUIREMENTS

C 22.0 STAFFING PLAN / POSITION SKILL SET, EXPERIENCE, QUALIFICATION,

TRAINING AND CERTIFICATION REQUIREMENTS

C 23.0 SECURITY

C 24.0 REFERENCED GOVERNMENT PUBLICATIONS

C 25.0 DEFINITIONS AND ACRONYMS

C 26.0 TECHNICAL EXHIBITS

C 27.0 QUALITY ASSURANCE SURVEILLANCE PLAN / PERFORMANCE

REQUIREMENTS SUMMARY (PRS) MATRIX

C 28.0 PHASE OUT SERVICES

C 29.0 DELIVERY INFORMATION

C 2.0 REGULATORY COMPLIANCE

C.2.1. The Contractor warrants that all aspects of performance shall be in full compliance with all applicable laws, regulations, permits and other requirements of the United States including all applicable Federal, local, Department of Defense (DOD) and United States Coast Guard (USCG) regulations.

C.2.2. The Contractor shall not pollute the environment. The Contractor warrants that it will avoid all pollution and is in compliance with all DOD, Navy, Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and local base instructions. The Contractor shall be responsible for all spills that they cause into the environment and shall immediately notify the applicable installation or authority of any spill. The following list is illustrative of the pollution regulations with which the Contractor must comply:

C.2.2.1 Hazardous material management and waste disposal shall be in accordance with all DOD, Navy, and base regulations. The Contractor shall comply with the Federal and Installation’s Governing Standards for Naval Air Station (NAS) Pensacola, FL; Naval Support Activity (NSA) Panama City, FL; Naval Submarine Base (NSB) Kings Bay, GA; Naval Station (NAVSTA) Mayport, FL; Naval Ordnance Test Unit (NOTU) Port Canaveral, FL; Naval Air Station (NAS) Jacksonville, FL; Naval Air Station (NAS) Key West, FL, and any other location in execution of duties outlined in this contract, Clean Water Act, the Oil Pollution Act of 1990, 33 U.S.C. §§2701 et seq., (OPA 90), MARPOL Annex I (which prohibits all discharges of oil in special areas), and all applicable statutes and supporting U.S. Coast Guard regulations. Additionally, for hazardous materials used and/or generated during operation and/or maintenance including shipyard periods, the Contractor shall comply with the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the Clean Air Act, the Clean Water Act, OPA 90, and all other applicable statutes and regulations.

C.2.2.2 Contractor-operated vessels shall handle spill prevention in accordance with DOD, Navy, local instructions, Installation Spill Prevention and Response Plan and OPNAVINST 5090 series guidance.

C.2.2.3 All coatings shall follow the National Emission Standards for Hazardous Air Pollutants (NESHAP) under the Clean Air Act.

C 3.0 GOVERNMENT FURNISHED EQUIPMENT, FACILITIES AND SERVICES

C.3.1. The Contractor shall take custody of and maintain the Government-furnished watercrafts and equipment listed in Technical Exhibits 01, 02, 03 and 04. At vessel and equipment turnover, the Government warrants that the boats are in good material condition, safe to perform all missions and that equipment is in proper working condition. The Government will replace vessels at the end of their service life with vessels in-kind. For the purposes of this contract, the terms vessel, boat and watercraft are synonymous.

C.3.2. Facilities. The Contractor shall have use of Government-owned facilities (as identified in the PWS) in support of this contract. The Contractor shall be responsible for providing all cleaning, supplies and janitorial services for the assigned spaces (not covered under the base janitorial contract) at Naval Air Station (NAS) Pensacola, FL; Naval Support Activity (NSA) Panama City, FL; Naval Submarine Base (NSB) Kings Bay, GA; Naval Station (NAVSTA) Mayport, FL; Naval Ordnance Test Unit (NOTU) Port Canaveral, FL; Naval Air Station (NAS) Jacksonville, FL; Naval Air Station (NAS) Key West, FL. The Contractor shall keep all assigned facilities in an orderly and sanitary condition. This shall include policing of the grounds, parking lots, slips, and piers provided for use, including pickup and removal of trash and debris. The Contractor shall also support the Zone Inspection Program at each installation. (The installation Technical Point of Contact (TPOC) or COR will provide schedules and instructions). On a monthly basis, the Contractor shall inspect the fire extinguishers in the assigned areas and identify any deficiencies to the COR. The Contractor is required to conserve energy and water to the maximum extent practical in accordance with the Base Energy Conservation Regulation. The Contractor shall observe the Base Energy Conservation Regulation and shall post this instruction for employees to read. The Contractor shall not modify or renovate any of the buildings without the approval of the Contracting Officer Representative (COR). The Contractor shall be financially responsible for any damage to assigned spaces caused by personnel in his/her employ or by subcontractors hired by the Contractor.

COR: Robin Fellows, Program Manager (Marine Operations) Voice Phone: 808-372-9855.

E-mail: robin.l.fellows4.civ@us.navy.mil

C.3.3. The Government will provide the following facilities and services: For those items requiring disposal, the Contractor shall deliver the items to the location identified by the Government.

C.3.3.1. Naval Air Station Jacksonville

(1) Temporary maintenance area for light maintenance and troubleshooting of vessels.

(2) Electricity.

(3) Potable water.

(4) There is no office space at this installation. Contractor employees shall commute to perform maintenance requirements at NAS, Jacksonville.

(5) There is no HAZMAT disposal or drums for HAZMAT generated during maintenance and repair operations.

C.3.3.2. Naval Air Station Key West

(1) Building 284 (Truman Annex) – One (1) Office space.

(2) Building 284 (Truman Annex) – Non-exclusive use of service bays 1, 2 and 3 for boat maintenance and equipment storage.

(3) Truman Annex Mole Pier.

(4) Truman Annex Mole Pier boat ramp.

(5) Electricity.

(6) Restroom facilities.

(7) Fuel Oil - DFM (F76), JP5 and MOGAS for Government-owned vessel/craft operations.

(8) Potable water.

(9) HAZMAT disposal and drums for HAZMAT generated during maintenance and repair operations.

(10) Oily waste disposal.

(11) Garbage disposal.

C.3.3.3. Naval Submarine Base Kings Bay

(1) Building 5040 – Non-exclusive use of service bays 1, 2 and 3 for boat maintenance and equipment storage.

(2) Building 5040 – Two (2) office spaces.

(3) Building 5041 – Shared use HAZMAT locker for stowage of main/bulk stock and Authorized User List (AUL) managed items.

(4) Building 5041 – HAZMAT Disposal and drums for HAZMAT generated during maintenance and repair operations.

(5) Building 5040 – Flammable lockers for daily maintenance requirements.

(6) Facility 5926 – “T” pier.

(7) Facility 5929 – Refueling Pier.

(8) Facility 5936 – Site VI pier

(9) Facility 5927 – Small boat floating pier.

(10) Facility 5807 – Port Ops boat ramp.

(11) Facility 5873 – MSF boat ramp.

(12) Facility 5041 – Lounge and vending area.

(13) Facility Site VI laydown area – May not be available for the duration of the contract.

(14) Electricity.

(15) Restroom facilities.

(16) Fuel Oil - DFM (F76) and MOGAS for Government-owned vessel/craft operations.

(17) Potable water.

(18) Oily waste disposal.

(19) Garbage disposal.

C.3.3.4. Naval Station Mayport

(1) Building 2078 – One (1) office space.

(2) Building 2078 – Non-exclusive use of service bays 1 and 2.

(3) Building 2078 - Shared use HAZMAT locker for stowage of main/bulk stock and Authorized User List (AUL) managed items.

(4) Building 2078 – HAZMAT disposal and drums for HAZMAT generated during maintenance and repair operations.

(5) Small boat slips (Floating docks).

(6) Boat basin boat ramp.

(7) Electricity.

(8) Restroom facilities.

(9) Fuel Oil – DFM (F76), JP5 and MOGAS for Government-owned vessel/craft operations.

(10) Potable Water.

(11) Oily waste disposal.

(12) Garbage disposal.

C.3.3.5. Naval Ordinance Testing Unit Cape Canaveral (NOTU)

(1) Building 01066 – One (1) office space.

(2) Facility 90540 – Poseidon wharf.

(3) Facility 79100 – Trident wharf.

(4) Building 90516 (Butler) – Non-exclusive use storage of parts and maintenance equipment.

(5) Trident boat ramp.

(6) Trident North floating docks.

(7) Building 90525 - Shared use HAZMAT locker for stowage of main/bulk stock and Authorized User List (AUL) managed items.

(8) Building 01759 – Pressure washing containment area.

(9) Electricity.

(10) Restroom facilities.

(11) Fuel Oil – DFM (F76), JP5 and MOGAS for Government-owned vessel/craft operations.

(12) Potable water.

(13) Garbage disposal.

C.3.3.6. Naval Support Activity Panama City

(1) Building 597 – One (1) office space.

(2) Building 670 – Non-exclusive use of one (1) exterior and two (2) interior service bays.

(3) Building 326 – Port Ops stowage and maintenance area.

(4) Building 670 – HAZMAT disposal and drums for HAZMAT generated during maintenance and repair operations.

(5) Building 670 - Shared use HAZMAT locker for stowage of main/bulk stock and Authorized User List (AUL) managed items.

(6) Marina boat ramp.

(7) Facility 302 – General purpose small boat berth.

(8) Wharf 146.

(9) Electricity.

(10) Restroom facilities.

(11) Fuel Oil – DFM (F76), JP5 and MOGAS for Government-owned vessel/craft operations.

(12) Potable water.

(13) Oily Waste disposal.

(14) Garbage disposal.

C.3.3.7. Naval Air Station Pensacola

(1) Building 38 – Lower-level supplies storeroom, engine workshop, electric/electronic workshop, battery storage/charger room and welding/machine workshop; 2nd deck office spaces, dispatch and classroom.

(2) Building 73 – (Storage space) The Contractor shall not be responsible for janitorial services in this building.

(3) Building 74 – (Entire building) The Contractor shall be responsible for janitorial services in this building.

(4) Building 3851 – (Storage space) Shore power cables and hoses.

(5) Building 3854 – Storage space) Pier support equipment.

(6) Buildings 3855 / 3856 Pier shacks.

(7) Pier 302 – Alpha.

(8) Pier 303a – Bravo.

(9) Pier 303 – Charlie.

(10) Adjacent parking lots.

(11) Boat basin.

(12) Wet slips.

(13) Associated waterfront areas.

(14) Electricity.

(15) Restroom facilities.

(16) Fuel Oil - DFM (F76), JP5 and MOGAS for Government-owned vessel/craft operations.

(17) Potable water.

(18) HAZMAT Disposal for HAZMAT generated during maintenance and repair operations.

(19) Garbage disposal.

(20) Pier space to moor vessels utilized in support of this contract.

(21) Oily waste disposal.

C.3.4. The Government reserves the right to substitute, add, subtract or change the sponsors, number of and/or types of vessels and equipment supporting the same and/or similar Government missions. The required changes will be added to the contract through a negotiated modification in accordance with FAR 52.212- 4(c), Changes.

C.3.5. The Government will provide special tools and test equipment, Technical Exhibit 01, currently utilized to perform maintenance and testing on the equipment furnished by this contract as Government Furnished Equipment. The Contractor may be required to purchase special tools not currently in inventory but necessary to perform the required maintenance on Government-furnished Equipment under this contract. If purchase of these tools is directed by the Government and if the Contractor is required to incur costs under this Section by the Government, the Government shall thereafter reimburse the Contractor in accordance with Section C 20.8. Such tools, the costs of which have been reimbursed by the Government, shall become Government property. The Contractor is financially responsible for replacement or repair of damage or loss of Government tools and support/test equipment provided in support of this contract. The Contractor is financially responsible for the maintenance of equipment, special tools and test equipment provided as Government Furnished Equipment and utilized by the Contractor in the performance of this contract. A joint inventory shall be conducted at the beginning and end of the contract period to verify condition and quantities of tools provided by the Government/returned to the Government.

C.3.6. Government Directed Special Requirements: The Government may direct the Contractor to provide Oil Spill Response equipment resources and maintenance throughout the Southeast Region in the event of a national significance oil spill. Other Government directed requests include but is not limited to boat operations to support dignitary visits, training operations, channel surveys, fleet liaison support services, or any other event requiring the use of boats and crews. The Contracting Officer will notify the Contractor of such requiring the use of boats and crews. The Contracting Officer via the COR will notify the Contractor at least 15 calendar days prior to the event for non-emergencies. The Contractor shall provide the services in the most cost-effective manner possible. Prior to any additional costs incurred as a result of Government directed special requirements the Contractor shall be responsible for obtaining Government authorization before it will be considered a reimbursable item. The Government is not obligated to reimburse the Contractor for any costs incurred that was not approved by the COR and or Contracting Officer.

Reimbursement will be IAW Section C 20.8.

C.3.7. Tools, equipment, materials, supplies and inventory provided and procured by the Government in the performance of this PWS are “exclusively” for use to support the contract efforts. The Contractor is not authorized to utilize the tools, equipment, materials, supplies or inventory for any other purposes.

C.3.8. In addition to the Contracting Officer’s Representative (COR) and Assistant Contracting Officer’s Representative (ACOR) each installation will be assigned a Technical Point of Contact (TPOC).

C 4.0 CONTRACTOR FURNISHED EQUIPMENT, FACILITIES AND SERVICES

C.4.1. General Requirements: The Contractor shall be responsible for operating, navigating, maintaining, repairing and maintenance availabilities of various watercrafts, boats, service crafts, oil spill response and waterfront equipment as well as performing port services administration, functions and operations as outlined in this contract. The Contractor shall provide an offsite Regional Maintenance Facility in accordance with Section C 8.0 and shall be responsible for launch recovery and towing of small boats with Department of Transportation (DOT) approved trailers in support of maintenance and repairs as outlined in this contract.

C.4.2. Office Equipment: The Contractor shall provide all Automated Data Processing (ADP) for unclassified information necessary for their personnel to support this contract. This can include, but is not limited to computers, hardware, printers, scanners, copiers, LAN systems, commercial software, etc. The Contractor shall always maintain an open connection to an Internet Service Provider (ISP) to provide continuous email connectivity and effective and efficient use of the web based Commercial Maintenance Program. The maintenance program will require a minimum of 10mb/2mb and 15 GB throughput. The Contractor shall not be provided a Navy-unique email address or access to Navy IT systems.

C.4.3. Communication Equipment: The Contractor shall be responsible for landline telephone services at the RBMC (local and long distance).

C.4.4. Office Supplies: The Contractor shall provide all their own office supplies necessary to support the contract.

C.4.5. Cell phones: The Contractor shall provide cell phones to all key personnel. The Contractor shall provide to the Government a directory that contains location, name, assigned position and phone number within 7 days of contract award. Key Personnel requirements are in Section C 22.0.

C.4.6. Tools, Support Equipment and Annual Subscriptions: The Contractor shall be responsible for providing annual subscriptions required to use diagnostic/special tools used by their maintenance personnel, basic hand tools, power tools, common support equipment, and any other tools and support equipment not provided by the Government to perform the preventative, predictive and corrective tasks delineated in this performance work statement or maintenance program along with necessary tool boxes and containers used for their storage and safekeeping.

C.4.7. Safety and Support Equipment: The Contractor shall be responsible for providing all personnel safety related items i.e., life jackets, vests, personal floatation devices, hearing protection, safety glasses, hard hats, face shields etc. for their personnel which are commensurate with the operation or evolution being conducted.

C.4.8. Management and Authority:

C.4.8.1. Program Management Support. The Contractor shall designate an individual as the Program Manager (PM) who shall be permanently located at the Regional Boat Maintenance Center (RBMC) for this contract. The PM shall provide oversight, guidance and leadership to all Contractor personnel assigned in the performance of this contract. The PM shall be the Contractor’s point of contact with the Contracting Officer (KO) and the Contracting Officers Representative (COR) and shall have the authority to commit the Contractor in all matters related to this contract.

C.4.8.2. Site Management Support. The Contractor shall designate individuals as the Site Manager who will be permanently located at the following installations: NSB Kings Bay, NAS Pensacola, NAS Key West, NOTU Cape Canaveral, NS Panama City, NAS Jacksonville and NS Mayport. Due to no Government provided facilities at NAS Jacksonville, the Site Manager for NS Mayport will provide Site Management Support to NAS Jacksonville. With the Program Managers concurrence, the individuals shall have the authority to commit the Contractor in all matters related to the assigned installations in this contract.

C.4.8.3. Boat Operator Authority. A boat operator (“Operator”) is defined as a person who is responsible for the operation of any vessel being used in support of this contract. The Operator is responsible for the navigation and care of the vessel as well as the safety of personnel embarked. The Operator shall execute his duties in accordance with U.S. Coast Guard rules and regulations as well as other federal, state and local laws. The Operator has the sole authority for safeguarding embarked personnel and the vessel assigned to his/her custody. The Operator has the authority to abort operations when there is a clear and present danger to safety of embarked personnel and/or his/her assigned watercraft.

C.4.8.4. Maintenance Program Support. The Contractor shall designate an individual as the Maintenance Supervisor. This support shall be provided as a collateral duty at NAVSTA Mayport and NSB Kings Bay due to the volume of historical preventative and corrective maintenance actions. The Maintenance Supervisor shall perform administrative functions such as scheduling, documenting preventative and corrective maintenance for their assigned site.

C.4.9. Emergency Contact: Key personnel must be available to be contacted by the COR or Contracting Officer 24 hours a day, 7 days a week to respond to emergency situations.

C.4.10. Readiness: The Contractor shall ensure that the craft and crew are maintained in such that they are ready to support operational and training requirements in accordance with contract requirements. If the Contractor fails to provide a ready craft, due to mechanical problems, lack of sufficient, properly trained personnel, or any other cause clearly within the responsibility of the Contractor, the Government has the right to reschedule the missed operation / training requirement at the Government’s discretion giving an eight (8) hour advanced notice to the Contractor. The Contractor shall submit a boat/equipment non-availability notice to the COR verbally, in writing, or via e-mail no later than one (1) hour after any boat and/or equipment failure or damage occurs. Verbal notifications shall be followed-up with written or email notification to the COR within four (4) hours after any boat and/or equipment failure or damage occurs.

The Contractor shall provide an estimated time of repair and estimated cost of repair within twelve (12) hours of providing a non-availability notice.

C.4.11. Working hours: Port Operations normal working hours are Monday through Friday, 0600-1800.

Normal hours of operation for each service are identified in the sections that describe the service. Federal Holidays will be considered non-normal working hours except for those services that are required every day of the year.

C.4.12. Flex Time: The start of normal hours of operation can change daily, as required by the Government.

Unless otherwise specified, the earliest the workday can start is 0500 and the latest is 0900. The Government will make every effort to provide two (2) calendar days’ notice prior to changing the flextime schedule. Each service and/or vessel defined herein may have a unique flextime schedule.

C.4.13. Force Protection supplies/services: The requirements for force protection of ships and facilities are rapidly changing. If additional supplies and services within the general scope of the contract are required by the Contracting Officer, the required supplies and or services will be added to the contract through a negotiated modification.

C 5.0 TRANSITION

C.5.1. To ensure services are provided on a “turn-key” basis with the Contractor providing all necessary management expertise, personnel, facilities, supplies, tools, equipment and vehicles unless otherwise specified in this contract as Government furnished equipment (GFE) on 1 October 2023, the contract shall include a three (3) months Transition Period from 1 July 2023 through 30 September 2023. The periods of performance are as follows:

C.5.2. Anticipated Contract Award: 1 July 2023

C.5.3. To ensure the continuity of services are maintained at the required level of proficiency, the Contractor shall provide a transition period from 1 July 2023 through 30 September 2023 with the incumbent service provider. The incumbent service provider’s contract includes FAR Clause 52.237-3, Continuity of Services.

The incoming Contractor shall work with the incumbent service provider to prepare to assume full responsibility for all areas of operations and maintenance. Although the Contractor and the incumbent service provider will work together during the transition period, the incumbent service provider will retain full responsibility during this transition period. The Contractor assumes responsibility for 100% of contract performance on 1 October 2023. All transition activities shall be completed prior to the end of the transition period.

C.5.4. The Contractor shall develop a Transition Plan detailing the transition process, including but not limited to hiring, manning at each installation / facility, Subcontractor arrangements, training and qualifications, obtaining vehicles, weight handling equipment, turnover of GFE, etc. The Contractor’s Transition Plan shall include a plan of action and milestones that identifies all phases of contract implementation and the timeline for completion from the date of contract award until the end of the transition period. The transition schedule will be mutually agreed to by the Contracting Officer, Contracting Officer Representative (COR) and the Contractor to make best use of the capabilities and skills of the Contractor’s personnel. Failure of the Contractor and Contracting Officer or COR to reach a mutually agreeable Transition Plan shall not relieve the Contractor of its obligation to meet the performance schedule to the reasonable satisfaction of the Contracting Officer.

C.5.5. The Contractor shall be allowed to work and be integrated with existing Government and incumbent service provider personnel to complete all training and indoctrination of his/her personnel. The Contractor personnel will be provided familiarization training for the entire operation, as well as specific requirements for deck and engineering personnel. The COR and Program Manager will be responsible for coordinating the crew familiarization and training efforts. Upon the COR’s determination that training and familiarization has been successfully completed, the watercraft and equipment shall be turned over to the Contractor and the Contractor personnel will be approved to independently operate all assigned watercraft and equipment. GFE (Other than craft) shall be transferred to the Contractor upon completion of a turnover inventory performed by the Government during the transition period.

C.5.6. The Contractor shall establish an off-site Regional Boat Maintenance Center (RBMC) within a 50-mile radius of the front gates of NSB Kings Bay, NAVSTA Mayport and NAS Jacksonville for the maintenance and repair of region equipment assigned to the contract IAW Section C 8.0. If the Contractor facility is utilized to perform other work outside of this contract, facility costs shall be equitably split among facility users. If the incumbent service provider’s RBMC facility will not be utilized to perform the services required of this contract, the Contractor shall be responsible for the Supply/Logistics process (i.e., transportation, labor, materials, etc.) to move all Government furnished equipment, property and materials to the Contractor’s RBMC. All costs for the move shall be reimbursable IAW Section 20.8. All Government furnished equipment, property and materials shall be transported from the incumbent service provider’s RBMC no later than 14 September 2023. The Contractor’s RBMC shall be fully operational on 01 October 2023.

Transition Period 1 July 2023 – 30 September 2023

Base Period 1 October 2023 – 30 September 2024

Option I 1 October 2024 – 30 September 2025

Option II 1 October 2025 – 30 September 2026

Option III 1 October 2026 – 30 September 2027

Option IV 1 October 2027 – 30 September 2028

C.5.7. The Contractor’s Transition Plan shall ensure there will be absolutely no interruption of services due to its failure to adequately staff the contract with fully qualified personnel to perform all of the requirements of the PWS. All personnel that the Contractor provides to the Government to perform Port Operations Support Services shall meet all of the skills and knowledge, qualification and experience requirements specified in Section C 22.0. Personnel requirements for all key personnel shall be completed at award.

Personnel qualifications for all non-key personnel shall be completed by 01 October 2023. The Contractor’s Transition Plan shall include its Training Plan for all personnel.

C.5.8. The Government and Contractor shall jointly inspect each vessel before turnover to the Contractor. The inspection results for each vessel will be individually uploaded into the commercial maintenance program so as to become a record of material condition. All inspections may be videotaped for future reference

C.5.9. During the final week of the contract period of performance, the Contractor shall provide a complete, written updated Technical Exhibits 01, 02, 03 and 04 of all Government-furnished equipment and materials provided under this contract. If the incumbent service provider is awarded the new contract, the final inventory shall be conducted with the COR or ACOR. If the incumbent service provider is not awarded the new contract, the incumbent service provider shall conduct a joint inventory with the incoming Contractor and the COR or ACOR.

C.5.10. The Contractor shall submit a final proposed transition plan to be incorporated in the contract to the Contracting Officer for review and approval no later than 15 calendar days after contract award. Following approval, the contract award shall be modified to incorporate the Contractor’s final approved transition plan. The Contracting Officer and the COR shall evaluate the Contractor’s transition plan weekly until the end of the transition period. Failure of the Contractor to satisfy its transition plan shall be cause for termination of the contract.

C 6.0 GENERAL VESSEL, EQUIPMENT AND PERSONNEL STANDARDS

C.6.1. The Contractor shall operate Government furnished equipment, watercraft and boats in accordance with all applicable laws, regulations, permits, IAW the original equipment manufacturer’s technical manuals and specifications, all applicable Federal, local, Environmental Protection Agency (EPA), Occupational Safety and Health (OSHA) Department of Defense (DOD) and United States Coast Guard (USCG) regulations.

C.6.2. Watercraft Standards of Appearance: All watercraft shall be maintained in a neat sanitary condition with all loose gear, equipment and tools stowed in a safe, secure, and orderly fashion. All labels, placards and stencils shall be kept clearly legible.

C.6.3. Hull and weather decks: The exterior hull, weather decks and superstructure, including ladders, booms, winches, capstans, and all other deck fittings, shall be maintained in a clean, rust/corrosion free condition.

Waterline and draft marks shall be repainted with sufficient frequency to ensure a high standard of appearance and vessel smartness. The national ensign, jack, pennants, and signal flags shall be clean and un-tattered. All craft shall be washed down with freshwater on a weekly basis to include bilges, exterior stowage compartments, associated vessel equipment and trailers. The Contractor shall also perform a freshwater wash down of all solely assigned Contractor operated craft after each use.

C.6.4. Mooring lines shall be maintained in a clean and serviceable condition. Rigging and ground tackle shall be maintained in accordance with manufacturer’s recommendation. All rigging and ground tackle shall be regularly inspected and maintained to be clean and rust/corrosion free condition.

C.6.5. Engineering spaces: Engineering spaces shall be maintained in a neat, clean, oil-free condition with bilges dry or at the minimum practical level, and oil-free. Attention shall be given to small leaks, insulation and lagging, painting and preservation, equipment stowage, and similar housekeeping items. Machinery shall be maintained to original equipment manufacturer’s specifications and professional marine engineering standards of material condition and readiness required for mission performance. Packing glands, guards, and other similar items shall be routinely maintained. Constant attention shall be given to maintenance and repair actions that impact safety. Surface coatings shall be maintained in accordance with applicable vessel technical manuals and Naval Ships Technical Manual (NSTM) 631. Status boards posted instructions and diagrams shall be neatly and accurately maintained.

C.6.6. Interior spaces: All interior spaces shall be maintained in a clean, corrosion/rust-free and properly painted condition. Decks and ladders shall be maintained free of tripping and slip hazards. Craft’s furniture shall be maintained in good repair.

C.6.7. The Contractor shall maintain all assigned boats, craft, vessels, waterfront and oil spill response equipment that includes brows, brow stands, shore power cables, hoses, boom reels, vacuum trucks, OSR conex boxes, and boom in good condition. This includes preservation, cleaning, maintenance and repair.

Shore power cables and cradles shall be protected from damage and stored out of exposure to the elements.

C.6.8. Launching and recovering of vessels: The Contractor shall launch and recover vessels in direct support of Contractor assigned maintenance, repairs and contracted operational requirements, Fleet Liaison services and when directed by the COR. Military personnel will perform launching and recovering of vessels not in direct support of contracted operations and maintenance testing, before during or after working hours, weekends and holidays, unless directed by the COR.

C.6.9. Vessel inspections: The Contractor shall utilize the Board of Inspection and Survey (INSURV) check sheets to prepare for all Government and Contractor inspections of vessels. The check sheets shall be completed at a minimum of one week prior to the inspection and provided to the Contracting Officer’s Representative. The Contractor shall upload the check sheets into the maintenance program as supporting documents.

C.6.10. Uniforms. All Contractor employees shall wear a Contractor-furnished uniform. Contractor must provide uniforms suitable to the environmental conditions. The uniforms must be professional in appearance and be kept neat and clean. The uniforms must have company identification on front and back and the company’s name will be visible on the front of outer clothing, hats will have the company name or logo on the front. Non-company provided hats are not authorized. The uniform design must be submitted to the COR for approval prior to use. The wearing of military uniform like clothing on the installations in the performance of duties is not authorized.

C.6.11. Contractor personnel shall maintain a clean, groomed and professional appearance.

C.6.12. Contractor personnel shall be able to clearly communicate in English.

C.6.13. Identification Badges. All Contractor employees shall have their Government provided identification badges in their possession at all times.

C.6.14. Medical Requirements. The Contractor shall provide trained, qualified, medically and psychologically fit personnel consistent with the craft mission and projected area of operation.

C.6.15. Contractor personnel shall be assigned cross-functional duties to the maximum extent possible.

C.6.16. Smoking. Smoking is permitted only in the designated areas.

C.6.17. Training. All training/certifications required must be kept current through the entire contract period.

C 7.0 MAINTENANCE PROGRAM AND ADMINISTRATION

C.7.1. The Contractor shall present to the Government a commercial maintenance program they intend to implement at each installation for all equipment referenced in the PWS and Technical Exhibits. The Government reserves the right to determine which maintenance program is technically acceptable and will be used. The Contractor shall include all costs for the commercial maintenance program in their Firm Fixed-Price. The maintenance records, schedules, manuals, drawings, pictures, supporting documents, etc.

in the program will belong to and be turned over to the Government at the end of the contract period. The commercial maintenance program shall include the following implementation services: First year subscription; Facility maintenance services; Inventory and Purchasing module; Barcode inventory module;

and On-Site training. The commercial maintenance program shall include annual subscription services for the contract option periods. The Contractor shall be responsible for internet connection that will support maintenance program as described in Section C 4.0. The Contractor shall have dedicated personnel to support maintenance scheduling, data entry to include common verbiage, accuracy of entries, implementation of updated manuals, drawings, BOATALTS, completion of inventories and quality assurance checks.

C.7.2. Maintenance Program: The Contractor shall incorporate all boats, waterfront equipment, OSR equipment and GFE assigned to them in this PWS that requires maintenance into the commercial maintenance program and establish maintenance procedures as required. The Contractor shall verify procedures, maintenance checks and documentation that support the maintenance prior to implementation. The maintenance program must be able to accurately depict the status of each vessel and equipment, provide historical operational, maintenance and repair data, total maintenance costs per boat or equipment, inventory and costs of parts used, labor hours estimated per maintenance check, actual labor hours used, part failure analysis, engine hours recording, scheduling of maintenance checks, number of checks completed on a weekly, monthly and annual basis. The Contractor shall upload all pertinent reference and supporting documentation that pertains to each vessel or piece of equipment, for easy reference to technical manuals, standard operating procedures, drawings, logs, pictures, purchase orders, etc. The program will have the capability to assign vessels to a future maintenance availability or scheduled overhaul, this will allow building the work package for future events and inputting all maintenance and repairs to that availability.

C.7.3. Maintenance Program Fleets I and II: The program will consist of two fleets. Fleet one (Contractor Fleet) will encompass all boats, service craft, waterfront equipment, OSR equipment and support equipment that the Contractor is responsible for. Fleet two (Military Fleet) will encompass all service craft, waterfront equipment, OSR equipment and support equipment that the Military is responsible for with access to both maintenance fleets available to all sites as determined by the COR. The maintenance fleets will be kept separated unless otherwise directed by the COR. Fleet one maintenance program administration will be provided by Maintenance Supervisors at each installation with administrative oversight provided by the Maintenance Program Administrator via the Contractor’s Maintenance Manager and or Maintenance Systems Administrator. The Contractor shall establish communication with the maintenance program provider within the first week of award to schedule training and maintenance data input. All training requirements shall be completed by the end of the transition period. The Contractor shall work with the COR and establish maintenance coverage of all contracted equipment at each installation. For any maintenance program, the Government will require a startup effort, which will incorporate all the boat information, maintenance checks and inventory input. The Contractor shall also incorporate waterfront equipment, OSR equipment and support equipment in the maintenance program that the Contractor is responsible for. The Contractor shall have the ability to add waterfront, OSR equipment and support equipment to both fleets. All maintenance and repair material requirements for the Military fleet will be on a reimbursable basis in accordance with Section C 20.8. The Contractor shall be responsible for adding the required metrics into Fleet one and a Government representative and or the Military will be responsible for adding the required program metrics into Fleet two IAW Technical Exhibit 11 with the Maintenance Systems Administrators oversight. Access to the program will be determined by the COR.

C.7.4. Maintenance Program Administration: The Contractor shall have personnel dedicated to maintenance program entries at each site where maintenance and operations occur. The Contractor shall maintain the commercial maintenance program for tracking cradle to grave history of preventative, predictive and corrective maintenance. The Contractor shall initiate, implement and manage the maintenance program based on Government directed maintenance practices, OEM recommendations and industry best practices, with an emphasis on planning/scheduling and preventative/predictive/corrective maintenance. The Contractor shall ensure Contractor maintenance technicians are adequately trained and equipped so the maintenance and repairs can be accomplished in a safe, timely, and cost-effective manner. The requirements for maintenance program administration also include the following:

C.7.4.1. Perform Quality Assurance Surveillance: Track, analyze and improve key maintenance parameters. Verify entries in the commercial maintenance program are accurate IAW Technical Exhibit 11 and as set forth by the Contractor’s Maintenance Manager and COR. (i.e., Operations, services, costs, notes, supporting documents, manuals, parts, maintenance procedures, repair procedures, vessel refurbishments, job hours (Estimated and actual), equipment data (S/N’s, Model information, parameters, type), purchase orders and receipts. Make recommendations to the Contracting Officer’s Representative for improving maintenance/repair operations and solving maintenance related problems.

C.7.4.2. Oversee, draft, edit and review responsibilities for maintenance procedures and routines for vessels, OSR, waterfront support equipment and development/incorporation of maintenance requirements, routines, and schedules for new assets. Development of and document existing and or new maintenance procedures.

C.7.4.3. Monitor inventory high and low limit alerts. Recognize long lead time parts and adjust limits accordingly for sustained operations.

C.7.4.4. Develop user ID’s and required level of access as directed by the COR.

C.7.4.5. Maintenance Program Business Rules: The Contractor shall update and disseminate to their personnel and follow the Government provided business rules pertaining to the commercial maintenance program data entries IAW Technical Exhibit 11.

C.7.4.6. Review operation of equipment and systems constantly to minimize unplanned downtime and anticipate and solve problems in a timely manner.

C.7.4.7. The Contractor shall ensure the commercial maintenance program data is current and accurate.

The Contractor shall update the commercial maintenance program data and inspect for accuracy of data input on a daily basis. The Contractor shall ensure the database identifies all equipment and inventory by make/model/serial number, communications and navigation equipment, ancillary mission equipment, engines, engine hours, part numbers, to include any other equipment or components that may be designated by the COR. The Contractor shall close vessel repair orders in the commercial maintenance program prior to the vessel moving from one location to another. This database will allow the Contractor to provide a complete audit trail for all property items from order to receipt to final disposition.

C.7.4.8. The Contractor shall develop and utilize an equipment tag-out program. Equipment tag-out shall be done on all equipment when it involves safety of personnel or risk of equipment damage. The tag-outs record sheets shall be uploaded into the commercial maintenance program as an attachment / supporting document to the maintenance action involved.

C.7.4.9. The Contractor shall include operational services provided data into the commercial maintenance program IAW the maintenance program business rules (Technical Exhibit 11). This includes but is not limited to line handlers, training operations, gate opening and closings, OSR response, prevention booming, NPSB movements, inspections, etc.

C.7.5. The Contractor is responsible for manning and administrative requirements to ensure the commercial maintenance program is fully operational on 01 October 2023 to meet the requirement of Section C 7.0.

C.7.6. Navy personnel and as arranged with the Contractor may assist with Fleet one maintenance checks for their professional growth. The Contractor shall sign the maintenance or repair as complete and is ultimately responsible for oversight, data entry and completion of the maintenance actions.

C.7.7. The Contractor shall not upload proprietary company logos or name into the commercial maintenance program.

C 8.0 REGIONAL BOAT MAINTENANCE CENTER (RBMC)

C.8.1. The Contractor shall establish an off-site Regional Boat Maintenance Center (RBMC) within a 50-mile radius of the front gates of NSB Kings Bay, NAVSTA Mayport and NAS Jacksonville for the maintenance and repair of region equipment assigned to the contract, staging of non-essential boats, OSR and waterfront equipment. The RBMC shall not be in a FEMA designated flood zone, or an area impacted by a category 3 hurricane storm surge.

C.8.2. RBMC normal hours of operations are 5 days per week, 12 hours per day, Monday through Friday 0600- 1800.

C.8.3. The RBMC will be the hub for logistics, maintenance and repair of watercraft, service craft. OSR and waterfront equipment. All requirements outlined in the contract shall be managed with oversight from the

RBMC. The Contractor and the COR will determine the most effective and efficient number of assets to rotate to the RBMC and the installations based on repairs and mission requirements.

C.8.4. The Contractor shall be responsible for all services required to operate the RBMC such as water, electricity, phones, internet, lawn maintenance, trash, sewage, hazardous materials stowage, hazardous waste disposal, etc. on a non-reimbursable basis.

C.8.5. If the Contractors proposed RBMC is to be utilized for other company business and or Government contracts provide a detailed plan to the COR of how services, inventory GFE and materials are kept separate and secure from use in other business. At no time shall services, tools, materials, inventory, GFE procured or issued to this contract be utilized for any other purpose than this PWS.

C.8.6. The RBMC shall have a 24/7 monitored security system service that provides entry point alarms and video surveillance of property and building entry points.

C.8.7. The RBMC shall have at a minimum 10,000 sq. ft. under roof including multiple maintenance bays with access doors large enough to support preventative, predictive and corrective maintenance to all trailerable boats listed in this contract and to support the disassembly and reassembly of boats for refurbishment.

Maintenance bays at a minimum must be able to accommodate a boat on trailer length of 50 feet with access doors closed.

C.8.8. The RBMC outside laydown area requires a minimum of 2 acres. This area must be capable of supporting blast, prime and paint evolutions for boat, OSR and waterfront equipment overhauls. The laydown area will also be used to stage up to twelve (12) boats/trailers, up to four (4) equipment trailers and various brows, platforms, fenders and equipment in support of Fleet Liaison services.

C.8.9. The central inventory of consumables and Government purchased bulk inventory repair parts will require approximately 4,000 sq. ft. of climate-controlled storage. The Contractor shall maintain an on-hand inventory of frequently used and long lead time preventative and predictive maintenance parts at all locations. All excess inventory and infrequently used parts will be stocked at the RBMC. Spaces dedicated to inventory storage shall have controlled access.

C.8.10. The Government's RPOC COR will be provided an exclusive use office space with internet (hard wire and Wi-Fi) phone access and dedicated parking stall at the RBMC to provide full support to the Contractor, oversee the maintenance program, perform maintenance spot-checks, coordinate boat movements and execute the QASP.

C 9.0 ORGANIZATIONAL MAINTENANCE AND REPAIRS OF GOVERNMENT FURNISHED

BOATS, SERVICE CRAFT WATERFRONT, FACILITY AND OSR EQUIPMENT

C.9.1. General. The watercraft and their ancillary systems, waterfront and facility equipment listed in this PWS and Technical Exhibits 01, 02, 03 and 04 shall be maintained by the Contractor in accordance with original equipment manufacturer’s specifications, the Joint Fleet Maintenance Manual (JFMM) Volumes IV, V, VI, applicable NSTM’s and best engineering practices.

C.9.2. Normal hours of operation for maintenance and repair services are five (5) days per week, 12 hours per day, Monday through Friday 0600-1800.

C.9.3. The Contractor shall perform a visual…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .