FY 2025 BUILD Application Checklist.pdf

PDF 142 KB Posted

Attached to
FY 2025 National Infrastructure Investments
Opportunity number
DTOS59-25-RA-RAISE
Issued by

About this file

This is an application checklist for the FY 2025 BUILD grant program, detailing 11 required submission components with their corresponding NOFO sections and page limits. The checklist specifies mandatory documents including the SF-424 form, Project Information Form (Excel format), Project Description (5-page limit), Project Location File (in specified GIS formats), Project Budget (5-page limit), Funding Commitment Documentation, Merit Criteria Narrative (15-page limit), Project Readiness (5-page limit), and Benefit-Cost Analysis materials.

The checklist is associated with the FY 2025 National Infrastructure Investments grant opportunity (DTOS59-25-RA-RAISE) administered by the Department of Transportation, which provides $1.5 billion in funding through the Infrastructure Investment and Jobs Act. Projects must be between $5 million and $25 million ($1 million minimum for rural areas), with funds available for obligation through September 30, 2029, and must be expended by September 30, 2034. The program requires balanced distribution between rural (≤200,000 population) and urban (>200,000 population) areas, with no more than 15% of funds awarded to a single state.

BUILD 2025 Application Checklist

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILD 2025 Application Checklist

Information File Name NOFO Section Page Limit

1 ☐

SF-424

(Found in Grants.gov application package) SF-424 D.1 N/A

2 ☐

Project Information Form (Found in Grants.gov application package) (Excel)

FY 2025 BUILD Project Information Form D.2 N/A

3 ☐

Project Description Project Description D.3 5 pages

4 ☐

Project Location File (.zip with .shp, .shx, .dbf, and .prj; or KML/KMZ) Project Location File D.4 N/A

5 ☐

Project Budget Project Budget D.5 5 pages

6 ☐

Funding Commitment Documentation Funding Commitments D.5 N/A

7 ☐

Merit Criteria Merit Criteria Narrative D.6 15 pages

8 ☐

Project Readiness Project Readiness D.7 5 pages

9 ☐

Benefit-Cost Analysis Narrative* BCA Narrative D.8 N/A

10 ☐

Benefit-Cost Analysis Calculations* (unlocked Excel file) BCA Calculation D.8 N/A

11 ☐

Letters of Support (optional) Letters of Support D.7 N/A

File details come from the government source that posted it. Updated .