FY_2019_TSGP_remediationguide_final_508.pdf

PDF 42 KB Posted

Attached to
Fiscal Year 2019 Transit Security Grant Program (TSGP) Federal grant opportunity
Opportunity number
DHS-19-GPD-075-00-01
Issued by
Department of Homeland Security

About this file

FY_2019_TSGP_remediationguide_final_508

View the file

Other files for this federal grant opportunity

Other files attached to Fiscal Year 2019 Transit Security Grant Program (TSGP), newest first.
File Type Posted
PKG00250067-instructions.pdf PDF
TSGP_IJ_Template_FEMA_Form_089-4_Final.pdf PDF
FY_2019_TSGP_Securityplan_Final_508.pdf PDF
FY_2019_TSGP_Sample_Budget_Detail_Worksheet_508.pdf PDF
FY 2019_TSGP_NOFO_Final_508.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY 2019 Transit Security Grant Program Remediation Guide

Prior Assessments:

• What type of assessment(s) is being used as a basis to identify the vulnerabilities, and when/where were they conducted? Please list the assessment(s), what entity conducted them (owner/operator, DHS, including approved sub-contractors), and when they were conducted.

• Does the asset have a significant vulnerability per the assessment that could be exploited by a terrorist causing significant loss of life and/or system disruption?

• Did the assessment recommend specific mitigation options to address vulnerabilities? What types of options were presented (e.g., operational, physical security, electronic security, etc.)?

Remediation Plan:

• Does the remediation plan adequately describe how vulnerabilities were identified?

• Does the remediation plan adequately address all the vulnerabilities as described in the assessment?

• Does the remediation plan call for further resources to be utilized, other than the best estimate developed for the final design component, and are those resources present?

• Is proper documentation for EHP review available? If not completed, is the expected completion date known?

• Are there any other environmental obstacles at the local or state level?

• Does the remediation plan include detailed costs for the mitigation options identified in the assessment?

• Does the remediation plan include detailed timelines for the mitigation options identified in the assessment?

Timelines/Costs:

• Do the timelines, milestones, and cost estimates appear reasonable given the 36-month period of performance?

• Is the budget for the project consistent and are all variances in cost-drivers taken into consideration?

• Based on prior research/experience, does the remediation plan appear to be efficient?

• Based on prior research/experience, are there other more cost effective mitigation options available?

Prior Assessments:
Remediation Plan:
Timelines/Costs:

Accessibility Report

Filename:

FY 2017_TSGP_remediationguide_final.pdf

Report created by:

Organization:

[Enter personal and organization information through the Preferences > Identity dialog.]

Summary

The checker found no problems in this document.

Needs manual check: 2

Passed manually: 0

Failed manually: 0

Skipped: 0

Passed: 30

Failed: 0

Detailed Report

Document

Rule Name Status Description

Accessibility permission flag Passed Accessibility permission flag must be set

Image-only PDF Passed Document is not image-only PDF

Tagged PDF Passed Document is tagged PDF

Logical Reading Order Needs manual check Document structure provides a logical reading order

Primary language Passed Text language is specified

Title Passed Document title is showing in title bar

Bookmarks Passed Bookmarks are present in large documents

Color contrast Needs manual check Document has appropriate color contrast

Page Content

Rule Name Status Description

Tagged content Passed All page content is tagged

Tagged annotations Passed All annotations are tagged

Tab order Passed Tab order is consistent with structure order

Character encoding Passed Reliable character encoding is provided

Tagged multimedia Passed All multimedia objects are tagged

Screen flicker Passed Page will not cause screen flicker

Scripts Passed No inaccessible scripts

Timed responses Passed Page does not require timed responses

Navigation links Passed Navigation links are not repetitive

Forms

Rule Name Status Description

Tagged form fields Passed All form fields are tagged

Field descriptions Passed All form fields have description

Alternate Text

Rule Name Status Description

Figures alternate text Passed Figures require alternate text

Nested alternate text Passed Alternate text that will never be read

Associated with content Passed Alternate text must be associated with some content

Hides annotation Passed Alternate text should not hide annotation

Other elements alternate text Passed Other elements that require alternate text

Tables

Rule Name Status Description

Rows Passed TR must be a child of Table, THead, TBody, or TFoot

TH and TD Passed TH and TD must be children of TR

Headers Passed Tables should have headers

Regularity Passed Tables must contain the same number of columns in each row and rows in each column

Summary Passed Tables must have a summary

Lists

Rule Name Status Description

List items Passed LI must be a child of L

Lbl and LBody Passed Lbl and LBody must be children of LI

Headings

Rule Name Status Description

Appropriate nesting Passed Appropriate nesting

Back to Top

File details come from the government source that posted it.