FY_2019_TSGP_remediationguide_final_508.pdf
PDF 42 KB Posted
- Attached to
- Fiscal Year 2019 Transit Security Grant Program (TSGP) Federal grant opportunity
- Opportunity number
- DHS-19-GPD-075-00-01
- Issued by
- Department of Homeland Security
About this file
FY_2019_TSGP_remediationguide_final_508
View the file
Other files for this federal grant opportunity
| File | Type | Posted |
|---|---|---|
| PKG00250067-instructions.pdf | ||
| TSGP_IJ_Template_FEMA_Form_089-4_Final.pdf | ||
| FY_2019_TSGP_Securityplan_Final_508.pdf | ||
| FY_2019_TSGP_Sample_Budget_Detail_Worksheet_508.pdf | ||
| FY 2019_TSGP_NOFO_Final_508.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 2019 Transit Security Grant Program Remediation Guide
Prior Assessments:
• What type of assessment(s) is being used as a basis to identify the vulnerabilities, and when/where were they conducted? Please list the assessment(s), what entity conducted them (owner/operator, DHS, including approved sub-contractors), and when they were conducted.
• Does the asset have a significant vulnerability per the assessment that could be exploited by a terrorist causing significant loss of life and/or system disruption?
• Did the assessment recommend specific mitigation options to address vulnerabilities? What types of options were presented (e.g., operational, physical security, electronic security, etc.)?
Remediation Plan:
• Does the remediation plan adequately describe how vulnerabilities were identified?
• Does the remediation plan adequately address all the vulnerabilities as described in the assessment?
• Does the remediation plan call for further resources to be utilized, other than the best estimate developed for the final design component, and are those resources present?
• Is proper documentation for EHP review available? If not completed, is the expected completion date known?
• Are there any other environmental obstacles at the local or state level?
• Does the remediation plan include detailed costs for the mitigation options identified in the assessment?
• Does the remediation plan include detailed timelines for the mitigation options identified in the assessment?
Timelines/Costs:
• Do the timelines, milestones, and cost estimates appear reasonable given the 36-month period of performance?
• Is the budget for the project consistent and are all variances in cost-drivers taken into consideration?
• Based on prior research/experience, does the remediation plan appear to be efficient?
• Based on prior research/experience, are there other more cost effective mitigation options available?
| Prior Assessments: |
| Remediation Plan: |
| Timelines/Costs: |
Accessibility Report
Filename:
FY 2017_TSGP_remediationguide_final.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 2
Passed manually: 0
Failed manually: 0
Skipped: 0
Passed: 30
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Needs manual check Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Needs manual check Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Passed Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Passed Appropriate nesting
Back to Top
File details come from the government source that posted it.