FY_2019_IBSGP_IJ_Template_508.pdf
PDF 116 KB Posted
- Opportunity number
- DHS-19-GPD-057-00-01
- Issued by
-
Department of Homeland Security
About this file
FY_2019_IBSGP_IJ_Template_508
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PKG00250064-instructions.pdf | ||
| FY_2019_IBSGP_VASP_Certification_508.pdf | ||
| FY_2019_IBSGP_Sample_Budget_508.pdf | ||
| FY_2019_IBSGP_NOFO_FINAL_508.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 2019 IBSGP Investment Justification Template
Investment Heading
State Bus System Name Urban Area(s) Served Investment Name Investment Phase Requested Amount $
I. Background Note: This section only needs to be completed once per application, regardless of the number of investments proposed. The information in this section provides background/context for the investment(s) requested, but does not represent the evaluation criteria used by DHS for rating individual investment proposals. It will also be used to confirm eligibility.
I.A. Identify the bus system and that system’s point(s) of contact (POC) and Chief Executive Officer (CEO), as well as the POC and CEO for additional bus systems/partners.
Response Instructions Identify the following:
• Company USDOT Number;
• POC’s name and title;
• POC’s full mailing address;
• POC’s telephone number;
• POC’s fax number;
• POC’s email address;
• CEO’s name;
• CEO’s full mailing address;
• CEO’s telephone number;
• CEO’s email address;
• POC and CEO information (as above) for additional bus systems/partners; and
• Include the corresponding information for the single authorizing official for the applicant organization—i.e., the individual authorized to sign a grant award.
I.B. Describe the extent of applicant’s operations in UASI jurisdictions. (Note – this response will help DHS determine applicant’s eligibility to participate in the FY 2018 IBSGP.)
Response Instructions Provide:
• A list of UASI jurisdictions serviced;
• For charter services only, the number of trips annually to each UASI jurisdiction (must be a minimum of 50 trips); and
• A source, such as a web site or brochure, which would allow DHS to verify service provided.
I.C. Describe applicant’s system infrastructure and scope of operations for fixed-route services and/or charter services.
Response Instructions Describe the size of applicant’s fleet, including a source (such as a website or brochure) which would allow DHS to verify fleet size.
For fixed-route services, address each of the following factors:
• System Infrastructure;
• Area of Operations;
• Number of Eligible Buses;
• Number of Passengers (Annually);
• Number of Miles Driven (Annually);
• Number of Employees (Specify categories, such as drivers, administration, management, and mechanics);
• Description of Terminals/Bus Lots:
o Number of Terminals/Bus Lots (Owned/Leased and Operated);
o Location (street address and city) of each Terminal/Bus Lot (within which UASI jurisdiction it is located);
• Passenger Traffic for Each Terminal;
• Other tenants at Each Terminal (other bus companies); and
• Any other important system features.
For charter services, address each of the following factors:
• Company Infrastructure;
• Area of Operations;
• Number of Eligible Buses;
• Number of Passengers (Annually);
• Number of Employees (Specify categories, such as drivers, administration, management, and mechanics);
• Description of Bus Lots:
o Number of Bus Lots (Owned/Leased and Operated);
o Location of each Bus Lot (within which UASI jurisdiction it is located);
and
• Any other important features of the charter service.
II. Strategic and Program Priorities
II.A. Provide an abstract for this investment.
Response Instructions Provide a statement summarizing this investment, addressing the following questions:
• What bus security risk will the project address?
• How will the investment address a transportation security need?
• How will the investment enhance overall system security?
II.B. Describe how the investment will address one or more of the Intercity Bus Security Fundamentals.
Response Instructions • Describe how, and the extent to which, the proposed investment addresses one or more of the following:
o Operating and capital costs associated with over-the-road bus security awareness, preparedness, and response training, including training for front-line employees for potential security threats and conditions as well as training developed by institutions of higher education and by non-profit employee labor organizations, for over-the-road bus employees o Live or simulated exercises for the purpose of assessing and improving the capabilities of entities to prevent, prepare for, mitigate, respond to, and recover from acts of terrorism o Public awareness campaigns for enhanced over-the-road bus security o Establishing and improving an emergency communications system linking drivers and over-the-road buses to the recipient’s operations center or linking the operations center to law enforcement and emergency personnel.
o Implementing and operating passenger screening programs for weapons and explosives o Protecting or isolating the driver of an over-the-road bus o Chemical, biological, radiological, or explosive detection, including canine patrols for such detection o Acquiring, upgrading, installing, or operating equipment, software, or accessorial services for collection, storage, or exchange of passenger and driver information through ticketing systems or other means and for information links with government agencies, for security purposes o Modifying over-the-road buses to increase their security o Installing cameras and video surveillance equipment on over-the-road buses and at terminals, garages, and over-the-road bus facilities o Constructing and modifying terminals, garages, and facilities, including terminals and other over-the-road bus facilities owned by state or local governments, to increase their security
Note: If this investment is for a facility security enhancement, applicants must identify the exact location of the facility. In rural areas, include information sufficient for DHS/FEMA to locate the facility with mapping software, such as GPS coordinates, nearby landmarks, nearest cross-streets, etc.
• Regardless which priority above is addressed through the investment, ensure that the response includes a justification for the approach to accomplishing stated goals and objectives. Provide an explanation that considers answering such questions as:
o Has a security assessment been conducted? If so, identify who conducted the assessment, when it was completed, and summarize the results;
o How does the proposed approach achieve the best possible balance of enhanced security and cost effectiveness available to applicant’s organization?
o Other unique, organization-specific factors leading to this project investment?
III. Impact
III.A. Describe how the implementation of this investment will decrease or mitigate risk. Describe how the project offers the highest risk reduction potential at the least cost. Include output and outcome metrics.
Response Instructions • Discuss how this investment will reduce risk (e.g., reduce vulnerabilities or mitigate the consequences of an event) in a cost effective manner by addressing the needs and priorities identified in earlier analysis and review;
• Identify the nature of the risk and how the risk and need are related to show how addressing the need through this investment will also mitigate risk (e.g., reduce vulnerabilities or mitigate the consequences of an event); and
• Outline the expected, high-level impacts this investment is expected to attain or achieve if implemented, and potential negative impacts if the investment is not implemented...
• What measurable outcomes will indicate this investment is successful?
• What National Preparedness Goals does this address?
IV. Funding & Implementation Plan
IV.A. Investment Funding Plan.
Response Instructions • Complete the chart below to identify the amount of funding that is being requested for this investment only;
• Funds should be requested by allowable cost categories (as identified in the FY 2018 IBSGP NOFO);
• Applicants must make funding requests that are reasonable and justified by direct linkages to activities outlined in this particular investment; and,
• Applicants must indicate whether additional funding (non-FY 2018
IBSGP) will be leveraged for this investment.
Note: Investments will be evaluated on the expected impact on security relative to the amount of the investment (i.e., cost effectiveness). An itemized Budget Detail Worksheet and Budget Narrative also must be completed for this investment. See Sample in this document for a sample format.
Federal IBSGP Request
Total Match* (Cash or In-Kind)
Grand Total
Facility Security Enhancements Enhanced Ticket Identification and Passenger Screening Vehicle and Driver Security Enhancements Emergency Communications Public Awareness Campaigns Training Exercises M&A (excluding any grant writer fee) Grant Writer Fee (up to $1,500) Total
IV.B. Discuss funding resources beyond this fiscal year’s funding that have been identified and will be leveraged to support the implementation of this investment.
Response Instructions • Discuss other funding sources (e.g., non-IBSGP grant programs, public or private agreements, future fiscal year grants) that will contribute to the implementation of this investment; and
• If no other funding resources have been identified or if none are necessary, provide rationale as to why the requested FY 2018 IBSGP funding is sufficient for the implementation of this investment.
IV.D. Provide a high-level timeline, milestones and dates, for the implementation of this investment. Up to 10 milestones may be provided.
Response Instructions Applicants should supply a timeline indicating the proposed milestones within the project keeping in mind the performance period on the grant is up to 36 months. The sample table below may aid the applicant.
• Only include major milestones that are critical to the success of the investment;
• While up to 10 milestones may be provided, applicants should only list as many milestones as necessary to sufficiently describe the project;
• Milestones are for this discrete investment – those that are covered by the requested FY 2017 IBSGP funds and will be completed over the 36-month grant period;
• Milestones should be kept to high-level, major tasks that will need to occur;
• Identify the planned start date associated with the identified milestone.
The start date should reflect the date at which the earliest action will be taken to start achieving the milestone;
• Identify the planned completion date when all actions related to the milestone will be completed and overall milestone outcome is met; and
• List any relevant information that will be critical to the successful completion of the milestone (such as those examples listed in the question text above).
• Examples of possible milestones:
o Define kill switch implementation plan o Complete installation o Complete successful test of kill switches
Sample Milestones
Sample Project Milestones Anticipated Dates Grant is awarded Award Date Recipient works on EHP and Financial clearance Award Date + 3 months Recipient receives confirmation that special conditions are released
Release of Funds Date
Recipient works with vendors to obtain GPS Unit contract
Release Date + 1 month
Vendor equips GPS units onto buses Release Date + 6 months Recipient trains staff on new GPS units Release Date + 7 months GPS Project is complete Release Date + 9 months Recipient submits final closeout documents to
DHS/FEMA GPD
Release Date + 12 months
FY 2017 IBSGP Investment Justification Template
Accessibility Report
Filename:
FY 2017 IBSGP.IJ.Template_508.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 2
Passed manually: 0
Failed manually: 0
Skipped: 0
Passed: 30
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Needs manual check Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Needs manual check Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Passed Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Passed Appropriate nesting
Back to Top
File details come from the government source that posted it.