fy 2013-prism nofa-2012.09.12.pdf
PDF 334 KB Posted
- Attached to
- FY 2013 PRISM Notice of Funding Availability
- Opportunity number
- FM-PZG-13-001
- Issued by
-
Department of Transportation
About this file
FY 2013 PRISM Notice of Funding Availability
View the file
Other files
| File | Type | Posted |
|---|---|---|
| administrative capabilities questionnaire.docx | DOCX document | |
| fy 2013-prism nofa-2012.09.12.pdf | ||
| administrative capabilities questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Transportation
Federal Motor Carrier Safety Administration
Fiscal Year 2013 – Performance and Registration Information Systems Management (PRISM) Grant Program
Notice of Funding Availability
The United States Department of Transportation’s (US DOT) Federal Motor Carrier Safety Administration (FMCSA) announces the Fiscal Year (FY) 2013 Performance and Registration Information Systems Management (PRISM) Grant Program funding opportunity. This document will assist you by providing important information about the PRISM program, including the FY 2013 program priorities and critical information related to preparing and submitting a grant application. All applications must be submitted through Grants.gov by 11:59 P.M. (Eastern Time) by December 3, 2012.
The Catalog of Federal Domestic Assistance (CFDA) number for PRISM is 20.231.
Important Changes and Reminders for FY 2013:
• All Applicants, even Applicants that have received previous funding, should read this entire Notice of Funding Availability (NOFA). This NOFA establishes minimum requirements for FY 2013 submissions, which have changed from previous years.
Please review the entire document before submitting an application.
• All FY 2013 PRISM applications must be submitted in response to this NOFA;
FMCSA does not anticipate a second NOFA for FY 2013 PRISM.
• There are required elements that all Applicants must address in the application. A suggested outline is located in Appendix A – Guidance for Designing Performance-based Projects, which includes a Project Narrative and a Budget Narrative (also see Appendix B – Guidance for Developing an Object Class Budget), and Appendix C – Key Contacts Form Instructions, and Appendix D – FMCSA Financial Assistance Agreement General Provisions and Assurances (subject to revision).
• The FMCSA will not evaluate applications received without the complete set of required forms and attachments; all application section elements and all documents must be submitted (see Section IV).
• Application review information is clarified to include expectations and evaluation criteria (see Section V).
• All Applicants must submit a current FMCSA Administrative Capability Questionnaire.
(An Applicant need only prepare and certify one questionnaire for all FY 2013 applications, but it must be included in each grant application.)
• The Federal share of funds under the PRISM grant program is 100 percent. There are no State matching or cost-sharing requirements.
• Grantees must agree to comply with the FMCSA Financial Assistance Agreement General Provisions and Assurances throughout the grant period of performance in order to execute the grant agreement and before grant funds are awarded (see Section VI).
• The Central Contractor Registration (CCR) system, along with Federal Agency Registration (FedReg), the Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS) have migrated to the new System for Award Management (SAM) at the end of July 2012. For further information please see https://www.sam.gov/sam/ or https://www.bpn.gov/ccr.
• Applicants requesting funds to place equipment or temporary facilities, modify structures, or to alter existing infrastructure are required to assess the ability for the equipment, modifications, or alterations to withstand current and future climatic conditions, including potential changes in climatic conditions. The applicant shall use the best-available peer-reviewed studies and science to determine the potential climatic conditions the equipment, modifications or alterations may experience over the life-cycle of the equipment, modification or alteration funded by the grant. The applicant can rely on existing Federal Highway Administration suggestions or guidelines for placing infrastructure, or on other Federally-issued guidance on assessing potential impacts of climate change.
Section I: Funding Opportunity Description
The FMCSA announces the availability of PRISM funding as authorized based on authorities provided for in the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy For Users (SAFETEA-LU), Pub. L. No.109-59, §§ 4101(c)(3), 4109, 119 Stat. 1144, 1715, 1720-21 (2005), as amended by Moving Ahead for Progress in the 21st Century (MAP-21), Pub. L. No. 112-141, §§ 32602 and 32603(c) (2012). PRISM grants are governed by 49 United States Code (U.S.C.) §§ 49 31106(b) and 31109 (2006), as amended. The PRISM grant program provides financial assistance to State commercial motor vehicle (CMV) registration and enforcement agencies that conduct two interrelated tasks to promote CMV safety. The first is determining the safety fitness of a motor carrier when licensing or registering the carrier or by determining the safety fitness while the license or registration is in effect. The second activity is denying, suspending, or revoking CMV registrations of a motor carrier that has been issued an operations out-of-service order by FMCSA.
According to 49 U.S.C. § 31106(d), FMCSA may carry out the purpose of PRISM by funding “other Federal departments, agencies, and instrumentalities, or by making grants to, and entering into contracts and cooperative agreements with, States, local governments, associations, institutions, corporations, and other persons”. The FMCSA provides PRISM funds to link Federal motor carrier safety information systems with State commercial motor vehicle registration and licensing systems. This connection enables a State to determine if a motor carrier or registrant has been ordered to cease interstate operations by FMCSA when that carrier or registrant applies for or renews vehicle registration, or while the registration is in effect and enables the State to take action on that information. Law enforcement activities https://www.bpn.gov/ccr are funded by PRISM grants as an enhancement to track and improve safety performance of carriers with demonstrated poor safety performance.
Other Agency PRISM priorities described below include vehicle registration programs and law enforcement programs. State registration agencies and/or State law enforcement agencies may apply separately or together. The following is a list of specific requirements for State registration agencies to implement PRISM. Applicants are encouraged to submit proposals that represent strategies to support and enrich their existing PRISM program based on these criteria:
Registration Program Requirements
1. Identify, collect, and maintain the USDOT number and Taxpayer Identification Number (TIN) for the motor carrier responsible for the safe operation of each vehicle being registered.
2. Print and barcode the motor carrier information on the cab card if the motor carrier responsible for the safety of the vehicle is not expected to change during the registration year.
3. Validate all the USDOT numbers before adding any USDOT number to the International Registration Plan registration files.
4. Have the capacity to issue USDOT numbers by online access to the Motor Carrier Management Information System (MCMIS) database using standardized procedures.
5. Incorporate PRISM requirements in temporary authority processes (e.g., trip permits).
6. Have and exercise authority to suspend, revoke, or deny registration if the motor carrier responsible for safety of the vehicle is prohibited from interstate operations.
7. Seek and implement authority to retrieve plates from carriers whose registration has been suspended, revoked, or denied based on PRISM sanctions. In some states this authority must be procured separately from the previous requirement.
8. Check carrier safety status before issuing credentials and deny the registration if the motor carrier is prohibited from interstate operations.
9. Maintain/update the USDOT Number and TIN for the motor carrier responsible for the safe operation of each vehicle registered and require the carrier to provide an updated Motor Carrier Identification Report (MCS-150 form) if not updated within the past year, prior to issuing registration credentials.
10. Update the PRISM Target File nightly with registration information for vehicles assigned to motor carriers in the Motor Carrier Safety Improvement Process (MCSIP).
11. Provide the ability to query registration files by USDOT registrant number and motor carrier responsible for safety in order to obtain registration records details.
12. Provide assistance to FMCSA in finding correct addresses of motor carriers by evaluating registration files.
13. Provide motor carrier law enforcement with a report that lists vehicle and registration data for all vehicles assigned to a specific carrier upon request by the safety investigator/compliance review officer.
14. Ensure PRISM training is provided to all appropriate staff.
15. Ensure PRISM information/training is provided to motor carriers and other interested parties.
16. Ensure all appropriate staff members attend MCMIS training.
Law Enforcement Program Requirements
In addition to registration, the enforcement component of PRISM complements the program.
Applicants must submit performance-based proposals that clearly articulate how enforcement technological efficiencies (i.e., license plate readers, barcode scanners, improvements to existing fixed weigh stations) directly meet the purpose of the PRISM program. Applicants must demonstrate strategies to support, enrich, or evaluate their existing PRISM program based on the criteria below. Applications that fail to demonstrate a clear linkage to the PRISM program will be marked ineligible. Applicants are encouraged to submit performance-based proposals that represent strategies to support, enrich, or evaluate their existing PRISM program based on these criteria:
1. Seek authority to stop and inspect vehicles based on the safety fitness of the motor carrier assigned to the vehicle. This requirement specifically applies to probable cause states.
2. Provide the ability to identify vehicles assigned to carriers in MCSIP and give these vehicles priority for inspection.
3. States must coordinate seizing license plates with FMCSA Division Offices.
4. Implement procedures to determine how to correct unassigned or incorrectly assigned safety events.
5. Ensure PRISM training is provided to all enforcement officers.
6. Improve the quality and completeness of data.
Program Goals – FY 2013 National Priorities
National priorities for the PRISM program include:
Priority funding consideration in FY2013 will be given to applications that address vehicle registration systems changes to accommodate FMCSA’s elimination of the “vehicle registrant-only” USDOT number. On September 15, 2012, FMCSA will eliminate the “vehicle registrant-only” designation. PRISM program funding is available to State agencies to implement this change. In summary, eligible activities related to the removal of the “vehicle registrant-only” USDOT number include (but are not limited to):
• System Modification. The State should modify their registration system to recognize a different designation because USDOT numbers will no longer be used. States can modify their systems several ways that include (but are not limited to): 1) allowing the system to accept an alpha designation (i.e., REGONLY) instead of the USDOT number; 2) leave the field blank; or 3) allow the system to accept a unique, State numeric identifier.
• Administrative Clean Up. The State should modify their registration system to update their system records for pre-existing “vehicle registrant-only” USDOT numbers. After September 15, these numbers will appear as inactive USDOT numbers and should be replaced in the State’s registration system with a corrected notation (i.e., interstate carrier, REGONLY, etc., as applicable).
• Validation and Safety Edits. The State should modify their registration system to conduct validation and safety edit checks to ensure that “vehicle registrant-only” USDOT numbers are no longer populated into the registration system. These safety checks ensure data quality and integrity.
• Renewal applications/MCS–150 information edits. The State should modify their renewal application forms to include the system modifications noted above. The updated information will aid the State in efficiently processing vehicle renewal applications.
• State form/procedures changes. The State should modify instructions, registration forms, checklists, and user manuals so State staff and CMV operators and motor carriers are aware of the elimination of the registrant-only process changes.
Section II: Award Information
Available Funding
i. For FY 2013, FMCSA anticipates awarding a total of $5,000,000 in PRISM funding to States, U.S. Territories and Commonwealths, and the District of Columbia to enhance
State registration systems, administrative processes, and law enforcement encouragement to carriers to improve safety grants.
ii. The Federal share of all funds awarded under the PRISM grant program is 100 percent
(100%). There is no State matching or cost-sharing requirement. However, the State must provide the necessary management and technical resources, facilities, and training to meet all operational, technical, and data processing requirements to implement an effective program.
iii. Applicants may not receive the full amount requested. If an Applicant accepts a grant awarded under this program, it is responsible for all project expenses that exceed the awarded amount. The FMCSA may contact the Applicant directly if the award amount is expected to be less than the amount requested to ensure that the project will remain sustainable with less than the amount requested.
iv. The FMCSA expects to announce awards as soon as administratively practicable subject to availability of funds.
Cost Requirements
Costs charged to FMCSA grants must be in accordance with the applicable cost principles for the Grantee type. All reimbursable items must be necessary, reasonable, allocable, and allowable to accomplish the goals of the program. These standards are described in the applicable cost principles and administrative requirements:
• 49 Code of Federal Regulations (CFR) Part 18; and
• 2 CFR Part 225 (Cost Principles for State, Local, and Indian Tribal Governments, OMB Circular A-87).
The eligibility of specific items of cost is subject to review by FMCSA. For assistance during the pre-application phase, Applicants may contact the FMCSA Grant Program Manager listed in Section VII of this NOFA or their local FMCSA Division Office for guidance on the cost eligibility of activities or items. Acquisition of real property, land, or buildings is NOT an eligible expense under the PRISM grant program.
Expenses eligible for reimbursement under the PRISM program include, but are not limited to:
1. Salaries and wages of the personnel associated with the project and fringe benefits such as contributions to employee benefits (including social security and pension funds);
2. Equipment, indicating whether it will be purchased or leased, related to information technology hardware and software, contractor support, data acquisition, storage, and analysis that are specifically identifiable as PRISM program-related to develop a database to coordinate resources and improve efficiency;
3. Material and supplies;
4. Publication costs and document dissemination;
5. Travel that is directly related to project objectives;
6. Consultant services;
7. Contracts and/or subawards;
8. Items such as computer services, if not included as part of indirect costs; and
9. Indirect expenses related to operating and maintaining facilities, equipment, and grounds that are considered “facilities costs” and salaries of support staff to the extent they are measurable and recurring (e.g., rent and overhead). NOTE: Any application containing indirect costs in its proposed project budget must be accompanied by either the signed current indirect cost rate negotiated agreement approved by the cognizant Federal agency or a copy of the request for such rate. If indirect costs are not included in the project’s proposed budget, no indirect cost rate agreement is required.
Section III: Eligibility Information
Eligible Applicants for PRISM funds are States, the District of Columbia, the Commonwealth of Puerto Rico, the Commonwealth of the Northern Mariana Islands, the Territories of American Samoa, Guam, and the U.S. Virgin Islands.
Individuals and businesses are not eligible to apply for PRISM funding.
Section IV: Application and Submission Information
Application Information
The FMCSA utilizes Grants.gov (www.grants.gov) for accepting PRISM program applications. All FY 2013 PRISM applications must be submitted electronically through this site. To apply, the Applicant first must complete the Grants.gov registration process. To register, go to http://www07.grants.gov/applicants/get_registered.jsp and follow the instructions found on the Grants.gov website by selecting “Get Registered.”
The registration process can take as long as four weeks. Applicants are encouraged to register as soon as possible. The Grants.gov website provides customer support through its toll-free number, (800) 518-GRANT, or through e-mail at support@grants.gov. The customer support center is open from 7:00 A.M. to 9:00 P.M. Eastern Time, Monday through Friday, except Federal holidays, to address Grants.gov technical issues. The FMCSA does not own or maintain Grants.gov and is therefore unable to provide technical assistance; all technical assistance issues should be directed to the above contact information.
All applications must be submitted through Grants.gov by 11:59 P.M. Eastern Time on December 3, 2012. Applications received after this time will be considered only if funds remain available after the review process for timely applications. Due to unforeseen connectivity or technical issues associated with online submission, FMCSA strongly encourages all Applicants to submit their applications well in advance to allow for additional time if needed.
If the designated grant official from an Applicant requires special assistance or accommodation associated with submitting this grant application, methods other than Grants.gov are available. Please contact the Agency personnel listed in Section VII of this notice if assistance is required.
Application Requirements
All PRISM program applications for FY 2013 must include the following Standard Forms as provided in Grants.gov:
1. SF-424 – Application for Federal Assistance This is the standard application form for all requests for Federal assistance. When completing Section F, please ensure that the individual listed as the point of contact is knowledgeable about the project(s) listed in the application and can answer relevant questions.
2. SF-424A – Budget Information for Non-Construction Program This is a standard budget form for requests for Federal assistance. On page 1, the Applicant may request up to four (4) projects. The Applicant should clearly indicate the title of each project in the boxes provided in Column A. If there are more than four (4) projects proposed, please submit just the total for all projects on the SF-424A on Grants.gov and then provide the detailed breakdown of each project using the Excel version of the SF-424A form (located on the Grantee resources page at http://www.fmcsa.dot.gov/about/GRANTS/grantee-resources.aspx) as a supplemental form. Applicants may use as many supplemental forms as needed to provide a breakdown of each project. However, please ensure that when combined they tie to the total submitted through Grants.gov.
On page 1A, please clearly indicate up to four (4) projects listed on page 1 in Rows 1-4 (if applicable) and then fill in the appropriate object class categories in Rows A-K. See Appendix B – Guidance for Developing an Object Class Budget.
Please complete the remaining pages as appropriate. If the Applicant feels that an additional budget worksheet is necessary to further explain estimated costs, please attach a budget document to the Attachments Form (explained in #5 below). Attached budgets should be pre-formatted to print on standard, letter-sized paper (PDF format is preferable). If the Applicant attaches budget worksheets for multiple projects under the same grant application, each project should be clearly distinguished in the document.
3. SF-424B – Assurances for Non-Construction Programs This is a standard assurances form associated with accepting Federal assistance funds. This assurances document indicates that the Applicant organization is in substantial compliance with various programs, regulations, and Federal laws. This document should not be completed without confirmation from the appropriate agency or State official that the Applicant organization is indeed compliant. The FMCSA and other applicable Federal agencies reserve the right to request further information and/or conduct an audit to confirm compliance as indicated on this form, as provided for in the United States Code or the Code of Federal Regulations.
4. SF-LLL – Disclosure of Lobbying Activities This form requests information related to the lobbying activities of the Applicant.
5. Attachment Forms This document is used to submit supplemental attachments to support the grant application.
These attachments must include a copy of the Applicant’s approved indirect cost rate from its cognizant Federal agency or a letter indicating that the Applicant has no cognizant agency (see Supplemental Information below).
Please note, applications received without the complete set of required forms will be not be evaluated until all forms are received. All forms are part of the application package available for download and completion in Grants.gov.
Attachment file names must be limited to the following characters: A-Z, a-z, 0-9, underscore (_), hyphen (-), space, and period. Using any other characters for attachment file names will cause the application to be rejected.
PRISM-specific components or attachments to the application MUST include:
the Applicant’s Project Narrative that includes a problem statement, objectives, goals, strategies and activities, an evaluation or monitoring plan, a description of the Applicant’s organizational capacity, and a budget narrative (see Appendix A – Guidance for Designing Performance-based Projects to see a sample performance-based plan);
line-item budget and a budget narrative that justifies the budget requested by line item;
current approved indirect cost rate letter, if applicable (see Supplemental Information);
FMCSA Administrative Capability Questionnaire; and Key Contacts Form (see Appendix C – Key Contacts Form Instructions).
If the grant is to be used to place equipment or temporary facilities, modify structures, or to alter existing infrastructure, the applicant is required to assess the ability for the equipment, modifications, or alterations to withstand current and future climatic conditions, including potential changes in climatic conditions. The applicant shall use the best-available peer-reviewed studies and science to determine the potential climatic conditions the equipment, modifications or alterations may experience over the life-cycle of the equipment, modification or alteration funded by the grant. The applicant can rely on existing Federal Highway Administration suggestions or guidelines for placing infrastructure, or on other Federally-issued guidance on assessing potential impacts of climate change.
Supplemental Information
The Applicant should attach any supplemental information that it believes will support the proposal. However, the Applicant should limit the information provided to FMCSA to what is needed to evaluate the proposed projects. Descriptions of problems and proposed solutions should not exceed 3 – 4 pages in length unless they involve the most complicated of issues.
The FMCSA advises that:
• If the Applicant is claiming indirect costs, a copy of the Applicant’s signed current approved indirect cost rate from the cognizant Federal agency should be included in the application.
• When preparing an application package, Applicants should not save each application section as an individual document. All information relating to a single project request should be included in one document attached to the application package (PDF preferred).
• Budgets and other information in charts or spreadsheets should be pre-formatted for printing on standard size copy paper.
Section V: Application Review Information
The FMCSA will review all application packages for FY 2013 PRISM funding for eligibility, completeness, and timeliness of submission. The FMCSA will evaluate each of the required proposal elements: Problem Statement, Project Goal(s) and Objective(s), Work Plan, Evaluation or Monitoring Plan, Organizational Capacity, and the Budget Narrative. Reviewers will consider the below criteria and questions when reviewing each application for its impact on highway safety.
In order to be considered for funding, the application must address the following four areas to comply with the PRISM Program uniform policies, procedures, and technical and operational standards. These areas include:
1. Explain how the Applicant ensures that State motor carrier and vehicle data is collected and reported to FMCSA in a uniform, timely, and accurate manner;
2. Explain how the Applicant ensures that the appropriate, necessary measures and procedures are in place to operate a reliable, information system available to FMCSA and other States;
3. Explain how the Applicant has established and implemented a process to cancel the motor vehicle registration and seize the registration plates of a vehicle when an employer is found liable under 49 U.S.C. § 31310(i)(2)(C) for knowingly allowing or requiring an employee to operate such a commercial motor vehicle in violation of an out-of-service order; and
4. Explain how the Applicant already has or is seeking the authority to impose sanctions relating to commercial motor vehicle registration on the basis of a Federal safety fitness determination.
Project Narrative
Problem Statement
This section documents the need for the proposed program and describes the unmet needs the Applicant intends to address. Applicants should describe the problem and provide supporting data whenever possible. Applicants should compare data to a baseline whenever possible. All data must be properly cited and clearly presented to minimize the need for additional validation.
Evaluation Criteria: In reviewing the Problem Statement, FMCSA will consider the extent to which the Applicant has demonstrated knowledge of the problems associated with the PRISM program and clearly identified the barriers to successfully meeting the national priorities listed in this NOFA. The FMCSA may consider any or all of the following criteria in its evaluation:
1. How well does the application support applicable statutory and program requirements?
2. Does the application provide data to support the need or the problem it proposes to mitigate?
3. In considering data provided by the Applicant regarding the current status of the problem identified:
i. How well does the data identify proposed PRISM activities?
ii. How well is the data quantified?
iii. Are the data sources identified and appropriate for the purposes used? To what extent?
iv. Does the application establish baseline measures or benchmarks to describe the problem statement? To what extent?
Project Goal(s) and Objective(s)
This section establishes the outcome-based goals and objectives of the grant activities and directly addresses the problem statement. The application should establish goals and objectives that are performance-based in nature and linked to increased highway safety, rather than simply identifying counts of specific activities. For example, the application may establish a percentage increase in the number of cancelled motor vehicle registrations when an employer knowingly allowed or required an employee to operate a CMV in violation of an out-of-service order. Objectives must be specific, measurable results expected within a particular grant performance period. The FMCSA will consider the reasonableness of these goals in evaluating the application. Further, if FMCSA awards a grant based on these project goals and objectives, it will use these Applicant-established goals to evaluate performance and for consideration in awarding future grants.
This section may explain broad themes for proposed actions and should reflect reasonable choices among alternative paths, but not identify or explain specific activities.
Evaluation Criteria: In reviewing the Project Goals and Objectives, FMCSA will consider the extent to which the Applicant describes sound program goals and objectives that are specific, measurable, and can likely be achieved during the grant period of performance. The FMCSA will also consider the extent to which the Applicant thoroughly explains why it selected the project goals and objectives to address the need(s) established in the Problem Statement. The FMCSA may consider any or all of the following questions in its evaluation:
1. How well does the project goal address FMCSA’s FY 2013 national priorities for
PRISM?
2. How well does the project goal address the Applicant’s problem statement?
3. How well does the application establish project objectives that are measureable using the data sources identified?
4. How well does the application establish project objectives that are reasonable and feasible in their scope?
Work Plan: Proposed Tasks
This section describes the various tasks and program activities the Applicant proposes to carry out using grant funds to accomplish the objectives and mitigate issues identified in the problem statement. The Work Plan must include a description of the site(s) where the work will be performed, the duration of each proposed task or activity, a list of required goods or services, the number of personnel necessary to conduct the activities, and the entire time schedule for the effort. The level of detail will vary according to the project, but should be concise and sufficient to support the project goal and justify the funding requested in the budget. This section is the core of the Applicant’s proposal.
Evaluation Criteria: In reviewing the Work Plan, FMCSA will consider the extent to which the Applicant describes tasks, activities, and timelines to achieve the project goals. The FMCSA may consider any or all of the following questions in its evaluation:
1. How well does the application describe tasks and activities that will help achieve the project objectives and mitigate the problem identified?
2. How well does the application describe the sites where the activities will be conducted?
3. How well does the application describe specific goods, services, and individuals or organizations necessary for the completion of tasks to support the project goal?
4. How well does the application establish detailed and feasible timelines for each proposed task or activity?
5. How well does the application identify implementation challenges and describe how the
Applicant may overcome them? How well does the application describe innovative or creative approaches to implementing the program (if applicable)?
6. How well does the application describe innovative or creative approaches to implementing the program (if applicable)?
Evaluation or Monitoring Plan
In this section, the Applicant explains how it will monitor its program strategies to ensure they are being implemented as designed and achieving the desired results. Applicants should use the program performance goals established earlier in the application and identify milestone measures during the performance period to achieve those goals. Applicants could also identify process evaluation measures that describe how their organization will remain focused on implementing a quality program on time and within budget. Finally, Applicants should provide additional information regarding the outcome evaluation to detail the types of measures that will be used to document the success of the proposed project. Applicants should describe how they plan to measure the effectiveness of each activity and strategy, such as using incremental benchmarks for a multi-phased strategy to determine whether targets/milestones were met. The following factors may be used by the Applicant to evaluate performance:
• baseline data compared to new results;
• effectiveness of strategies and activities;
• monitoring plan and adjustments, as appropriate; and
• data for quarterly reports or annual update.
Evaluation Criteria: In reviewing the Evaluation or Monitoring Plan, FMCSA will consider the extent to which the Applicant thoroughly outlines how it will monitor the effective implementation of the strategies and document the project outcomes. The FMCSA may consider any or all of the following questions in its evaluation:
1. How well does the application describe an Evaluation/Monitoring Plan that assesses the overall performance of the proposed project?
2. How well does the application utilize iterative performance measures that are quantifiable, time-specific, and realistic?
3. How well does the application describe the performance measures that support the project outcome goals?
4. Does the application include data sources that are relevant to completing the evaluation? To what extent?
Organizational Capacity
In this section the Applicant demonstrates that it has the expertise to successfully implement the stated strategies and attain its stated goal(s). Organizational Capacity includes information related to the Applicant’s organizational goals, mission statement, structure, and other information relevant to the proposed project. Providing a description of the scope of current activities as well as key elements of previous and/or other motor carrier or highway safety programs demonstrates the Applicant organization’s ability to successfully implement program requirements and meet program expectations. It is also appropriate to reference any past performance descriptions and/or operating certifications/accreditations in this section.
Evaluation Criteria: In reviewing the Organizational Capacity, FMCSA will consider the extent to which the Applicant thoroughly documents its infrastructure and other organizational information to demonstrate an ability to perform the activities proposed in the application.
This may include past performance during previous projects. The FMCSA may consider any or all of the following questions in its evaluation:
1. How well does the Applicant describe its organization, mission, and infrastructure?
2. How well does the Applicant describe its work on current or past activities for similar projects?
3. How well does the Applicant demonstrate its capability to successfully implement the proposed project?
The FMCSA may also consider the following questions, based on information contained in Agency records; Applicants may include proprietary information to support this section of their application:
4. How well has the Applicant performed in achieving its goals in prior awards from
FMCSA?
5. How effectively has the Applicant utilized proposed funds in previous grants (based on remaining, unexpended balances at the end of similar efforts in previous grants)?
6. What is the actual or estimated amount of funds available for expenditure from previously issued grants for projects similar to those in the application?
Budget Narrative
This section describes the costs necessary to complete the proposed tasks and achieve the project goal. The Budget Narrative should thoroughly and clearly justify or explain each Budget Category (Object Class) and follow all guidelines and limitations as provided in the application package. The budget narrative must be clear, specific, detailed, and mathematically correct; it should correspond to the information and figures on the budget forms. A well-written Budget Narrative allows the Applicant and FMCSA to understand all costs included in the budget and to monitor the expenditure of funds and determine whether the budget items are allowable for reimbursement under Federal cost principles. Where appropriate, costs per unit will be calculated and compared with national averages to determine cost-effectiveness. As appropriate, proposed costs will be compared with historical information to confirm reasonableness. The level of detail should be sufficient to justify the funding requested.
Evaluation Criteria: In reviewing the Budget Narrative, FMCSA will consider the extent to which the Applicant describes costs that are allocable, allowable, reasonable, and necessary.
The FMCSA may consider any or all of the following questions in its evaluation:
1. How well does the application provide clear explanations of the costs associated with each Budget Category (Object Class)?
2. How well does the Budget Narrative support the funds requested on the application Budget forms? To what extent is the cost estimate commensurate with the volume of records to be improved?
3. How accurate are the mathematical computations in the Budget Narrative and in other budget forms?
4. How well does the application demonstrate a cost-effective approach that will provide a demonstrable impact on safety as the result of grant funds?
5. Does the application describe proposed project expenditures that are:
i. Allowable under the cost principles established in this NOFA and all
FMCSA cost eligibility policies;
ii. Allocable specifically to the activities proposed by the application;
iii. Reasonable in amount and quantity for the activities proposed;
iv. Necessary to conduct the activities proposed?
6. If applicable, how accurately is an Indirect Cost Rate (IDCR) applied to the budget?
7. If applicable, how accurately are fringe benefits applied to the budget?
Funding Decisions
This is a discretionary grant program. Funding decisions may depend on the quality and completeness of the information provided. The FMCSA does not have an appeals process for unsuccessful applications for discretionary grant funds.
Section VI: Award Administration Information
Upon receipt and approval of the complete PRISM application package, FMCSA will award funding and enter into grant agreements as soon as administratively practicable. An award recipient may be required to submit a supplemental budget or project narrative based on a partial or modified grant award.
Funding amounts made available for reimbursement may be impacted by limitations placed on the spending authority and appropriations enacted for FMCSA.
Reporting responsibilities include quarterly program performance status using the Performance Progress Report (SF-PPR). The PPR should address any additional questions/factors as deemed appropriate by FMCSA.
Grantees must agree to the FMCSA Financial Assistance Agreement General Provisions and Assurances before grant funds will be awarded (see Appendix D http://www.fmcsa.dot.gov/documents/chief-counsel/2012/2012-FMCSA-Grant- Provisions.pdf). These provisions require, but are not limited to, submission of quarterly financial (Federal Financial Report SF-425) and performance progress reports (PPR).
Additional information on quarterly reports and other required forms and templates is available at http://www.fmcsa.dot.gov/safety-security/safety-initiatives/mcsap/ mcsapforms.htm.
Section VII: Agency Contact
This grant program is managed by:
Office of Safety Programs Office of the Associate Administrator for Enforcement Federal Motor Carrier Safety Administration United States Department of Transportation
Please contact your FMCSA Division Office to obtain further information and guidance concerning PRISM requirements and development, as well as the Federal Motor Carrier Safety Regulations.
http://www.fmcsa.dot.gov/about/contact/offices/displayfieldroster.asp
For general information about PRISM funding and requirements, please contact FMCSA Headquarters:
For questions on:
Administrative process and procedures: Technical and programmatic issues:
Julie Otto Stephen Parker PRISM Grant Administrative Manager PRISM Program Manager Email (preferred): julie.otto@dot.gov Email (preferred): stephen.parker@dot.gov Office: 202-366-0710 Office: 202-366-6407
By Mail: By Mail:
U.S. Department of Transportation U.S. Department of Transportation Federal Motor Carrier Safety Administration Federal Motor Carrier Safety Administration 1200 New Jersey Ave, SE, West Building 1200 New Jersey Ave, SE, West Building Washington, DC 20590 Washington, DC 20590 ATTN: Julie Otto (MC-ESS) ATTN: Stephen Parker (MC-ECE)
Section VIII: Other Information
The FMCSA Grant Programs Website: http://www.fmcsa.dot.gov/safety-security/grants/grants.aspx.
The FMCSA Grantee Resources Website: http://www.fmcsa.dot.gov/about/GRANTS/grantee-resources.aspx.
A - 1
APPENDIX A
GUIDANCE FOR DESIGNING PERFORMANCE-BASED PROJECTS
FMCSA seeks to award funding for performance-based programs. When applying for grant opportunities, Applicants should describe program goals, objectives, and outcomes before describing the specific tasks necessary to achieve them. By focusing on the outcome or impact of a program, the Applicant is better able to explain to FMCSA the need for financial assistance.
When requesting grant funding for multiple projects within a single grant application, Applicants should discuss each project individually. That is, Applicants must provide clear and concise problem statements, proposed solutions, explanations of the resources necessary to achieve the desired outcomes, and expected timelines for each project, keeping all relevant information for individual efforts separated. Applicants should address all of the components of each project, in sequence, before addressing a different project. This approach allows FMCSA to fully evaluate the merits of each project individually.
The following provides general guidance on preparing a typical Project Narrative and Budget Narrative for a discretionary grant. Please note that each FMCSA announcement will provide specific guidance regarding the format of the application, the required elements, and evaluation criteria.
I. Project Narrative
The Project Narrative section of the application is where the Applicant describes what problem or need it intends to address with grant funds, the goals and objectives the project expects to accomplish, proposed tasks and timelines, and how the effectiveness of the project design will be measured. The Project Narrative should be succinct, self-explanatory, and well-organized so that reviewers can understand each component of the proposed project. Project Narrative sections are described below.
a. Problem Statement
This section documents the need for the proposed program and describes the unmet needs to be addressed, with data clearly presented and cited. The following is a sample crash-based Problem Statement:
[COUNTY] in the northwest corridor of I-99 in [STATE], is ranked XX among the XX counties in [STATE] for the number of fatal and injury crashes among large trucks and buses.1 In the most recent five years for which data are documented (YEAR – YEAR), XX people have lost their lives due to crashes caused by [FACTOR].2 The data also suggests that [FACTOR-2] is increasing as the proximate cause of crashes during the heaviest traffic times.
Data Source(s) Fatalities by State. Fatality Analysis Reporting System (FARS), www.fars.nhtsa.dot.gov
2008 Collision Statistics. 2010 Highway Safety Funding Guideline. Page XX.
A - 2
The following is a sample of a non-enforcement-related Problem Statement:
The State of CDLandia currently conducts CDL knowledge and skills testing according to a modified version of the AAMVA 2.0 testing model. This version is no longer compliant with the Federal Motor Carrier Safety Regulations.1
Data Source(s) 1 Commercial Driver’s License Testing and Commercial Learner’s Permit Standards Rule [76 FR 26854, May 9, 2011]
b. Goal(s) and Objective(s)
This section establishes the outcome-based goals and objectives of the grant activities and directly addresses the problem statement.
Effective Goals and Objectives are:
• Specific
• Measureable
• Action-oriented
• Realistic
• Time-phased
The FMCSA will consider the reasonableness of these goals and objectives in evaluating the application. Further, if FMCSA awards a grant based on these project goals and objectives, it will use these Applicant-established goals to evaluate performance for consideration of future grants.
Sample Goal: The State of Borderland requests Federal financial assistance through the FY 2013 BEG program to reduce the number of crashes involving unsafe trucks crossing U.S.
international borders operated by foreign carriers and/or drivers. Grant funds will be used to support activities that provide targeted enforcement activities as the strategy to achieve this goal.
Sample Objectives:
1. To decrease fatalities involving vehicles entering the U.S. from a foreign country by
___%, from ____# during FY 2012 to ____# by September 30, 2013
2. To increase safety inspections of vehicles entering the US from a foreign country by
___%, from ____# during FY 2012 to ____# by September 30, 2013
3. To increase the knowledge of highway safety from a baseline of ____% to ____% among individuals attending one of the five safety enforcement education/publicity campaigns for compliance with CMV safety standards and regulations focusing on drivers of vehicles entering the US from a foreign country conducted during FY 2013
A - 3
c. Work Plan: Proposed Tasks
This section describes the various tasks and program activities the Applicant proposes to carry out using grant funds to accomplish the objectives and mitigate the issues identified in the problem statement. This section should not be based upon specific dates, but based on award date plus duration of time needed to complete each task. Vague timeframes such as “Summer 2013” are not acceptable.
Project Strategy The Applicant describes the strategy it plans to implement to achieve its
Goals and Objectives.
Project Activity The Applicant describes the activities to be performed to implement each Project Strategy, including time frames for each activity.
Note: The Applicant may implement more than one strategy to achieve the stated performance objective. In those instances, the strategy, project activity measure(s), Work Plan and Evaluation / Monitoring sections as well as the Budget Narrative should remain sequenced within the document to allow for easier review.
Sample Work Plan:
Strategy: Conduct Targeted Safety Enforcement Education Activities
Time Frame
Proposed Activity/Milestone Location
Responsible Party
Level of Effort
Award + 90 days
Identify date and locations to begin safety enforcement targeted education campaign (and provide day-to-day support for duration of project)
Applicant agency
Project Assistant (1)
.5 FTE
Award + 90 days
Identify Educator, locations to provide education, and any other needed resources (and provide oversight for duration of project)
Applicant agency
Project Manager (1)
.5 FTE
Award + 120
Design questionnaires for pre/post surveys
Consultant agency
Consultant (1)
100 hours
Award + 200
Conduct safety enforcement education classes and pre/post tests
Truck driving schools, trucker associations
Educators (2)
2 @ 120 hours each
Award + 330
Evaluate results of pre/post tests for safety enforcement education classes, write report
Consultant agency location
Consultant (1)
1 @ 200 hours
A - 4
d. Identification / Resolution of Challenges
This section should discuss any challenges that potentially could arise in the design or implementation of the activities described in the Work Plan. Applicants should be sure to include strategies that could be used to mitigate these challenges. This is a section that often is not included by Applicants; however, it is particularly useful for new grants and/or project designs for which it is unclear how well they will perform.
e. Evaluation / Monitoring Plan
In this section the Applicant should explain how it will monitor its program strategies to ensure they are being implemented as designed and achieving the desired results. The Evaluation Plan is the roadmap that will serve as a guide through each step of the evaluation. Each objective should have at least one strategy and each strategy should have at least one project activity measure. Project activity measures are specific, observable, and measurable characteristics or changes that show the progress a program is making towards achieving a specified goal or objective. Once the project activity measures are identified, the sources of data and how the data will be collected will need to be determined. Some data collection methods are more appropriate for process evaluation (such as a count of the number of times an activity is conducted), while other methods are more appropriate for outcome evaluation (such as measuring change in knowledge using pre- and post-survey results).
Project Activity Measure The Applicant describes how it will quantifiably measure the activities, e.g., number of staff hours, details completed/performed, or other measures of the particular activities.
Evaluation / Monitoring The Applicant describes how it will evaluate and monitor the effectiveness of each respective Project Activity Measure against the Work Plan and Project Strategy. Incremental benchmarks must be described and included for a multi-phased strategy.
A - 5
Sample Monitoring / Evaluation Plan Outline
Objective: To conduct five (5) safety enforcement education/publicity campaigns for compliance with CMV safety standards and regulations focusing on drivers use of handheld cellular devices.
Proposed Strategy:
Project Activity Measure:
Data Source:
Communicating Results
Responsible Party/Agency
Media Campaign project activities are being conducted at the planned level (quantity and quality)
Number, length, type, and time of day media ads are aired
Logs;
Amount of spending
To whom:
Stakeholders, Funder
How: Quarterly Report, Final Report, Website
Project Manager
Outreach/Education project activities are:
a) being conducted…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.