This is an Invitation to Bid (ITB) document issued by the Florida Fish and Wildlife Conservation Commission (FWC) for mechanical harvesting and removal of nuisance aquatic plants within Lake Tohopekaliga in Osceola County, Florida. The project requires the removal of non-mobile nuisance and noxious aquatic and wetland vegetation and associated organic detrital material from approximately 15 acres on the southern area of Big Grassy Island, with material to be deposited on two in-lake disposal islands located less than 0.5 miles from the harvesting work area. Primary plant species targeted for removal include spatterdock, mud mats with mature water primrose, burhead sedge, knotweed, and hydrilla. The non-mandatory pre-bid conference and site visit is scheduled for September 15, 2026, at 10:00 AM ET at the Kissimmee Field Office (1601 Scotty's Road, Kissimmee, FL 34744). A mandatory bidder site visit is required prior to bid submission. The deadline for written questions is September 22, 2026, at 5:00 PM ET, with responses posted on the Vendor Information Portal on September 25, 2026. Sealed bids must be received by October 2, 2026, at 2:30 PM ET, with public bid opening at the same date and time, offered both in-person and via teleconference. The anticipated award date is October 6, 2026. The contractor must begin work within seven days of receiving the Notice to Proceed and complete all work by December 10, 2026. The contract term is one year from issuance of the purchase order.
The estimated total project budget is $200,000. Bids should include pricing for aquatic plant removal and disposal on a per-acre basis for the 15-acre site, equipment mobilization costs, and equipment demobilization costs, with mobilization and demobilization each not to exceed five percent of the total bid price. The Commission will award the contract to the responsive, responsible bidder submitting the lowest total price. Bidders must be registered in MyFloridaMarketPlace (MFMP) and Sunbiz prior to bid opening and must provide a minimum of three verifiable references for similar projects. The contractor is required to supply all necessary equipment, including barge-mounted excavators with rake attachments or buckets allowing water decantation, and floating aquatic harvesters for cleanup operations. Turbidity control devices must be deployed and maintained within a 150-meter mixing zone, with contractor responsibility for monitoring turbidity levels to ensure compliance with State Water Quality Standards. The contractor is responsible for all permitting compliance, equipment maintenance, first aid and spill kits, and safety equipment. Liquidated damages of $100 per calendar day apply for failure to complete work by the specified completion date, except in cases of Force Majeure. Payment will be made in two installments: following mobilization and 25 percent completion, and final payment upon project completion including demobilization. Subcontracting is permitted with prior written approval, and contractors must submit a Subcontractor Minority Status Report with each invoice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 1.pdf | ||
| Addendum No. 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION
1875 ORANGE AVE E
TALLAHASSEE, FL 32311-6160
(850) 488-6551
Lake Tohopekaliga Aquatic Plant Removal
FWC 26/27-08
INVITATION TO BID
ITB BIDDER ACKNOWLEDGEMENT FORM
Purpose: The intent of this bid is to obtain competitive pricing for the mechanical harvest and removal of nuisance aquatic plants within Lake Tohopekaliga (Osceola County), Florida, per the specifications contained herein. Only responsive and responsible Contractors will be considered for award of this Invitation to Bid (ITB).
Responsive: To be responsive, a bid must constitute a definite, firm, unqualified and unconditional offer to meet all of the material terms of this ITB. Material terms are those that could affect the price, quantity, quality, or delivery. Also included as material terms are those which are clearly identified in this ITB and which, for reasons of policy, must be complied with at risk of bid rejection for non-responsiveness.
Non-Responsive: Any submission that does not comply with this ITB in any way, does not contain all the properly signed forms, supplements or deviates from the Bid requirements or has an incomplete Price Sheet may be considered nonresponsive at the discretion of the Procurement Manager.
Responsible Vendors: The Commission shall only consider responsible vendors. Responsible vendors are those that have, in the sole judgment of the Commission, the financial ability, experience, resources, skills, capability, reliability and business integrity necessary to perform the requirements of the contract. The Commission may also consider references and quality to determine the responsibility of the bid. The Commission reserves the right to use any information, whether supplied through the Bidder’s submission or otherwise obtained, in determining responsibility.
Sealed Bid: In response to an Invitation to Bid (ITB), a sealed bid is the final submission of a bid from a vendor prior to the bid deadline, after which no further submissions will be considered.
Rejection of Bids: The Commission reserves the right to reject any and all bids and to waive any minor irregularity in the submissions received in response to this ITB. The Commission reserves the right to consider all information, whether submitted or otherwise, to determine responsiveness and responsibility and to reject bids accordingly.
Name of Business: _________________________________________________________________________________________________________
Contact Person Name: _____________________________________________________________________________________________________
Business Address: _________________________________________________________________________________________________________
City: ______________________________ State: _______________________________ Zip code: _______________________________________
Phone: _____________________________ Fax: __________________________________ Email: _______________________________________
Federal Employer Identification Number: _________________________
The undersigned attest to the following:
“We understand all of the terms, conditions and the specifications contained herein and agree to abide by all of the terms, conditions and the specifications in their entirety. We have examined the site in reference to the specifications contained within this ITB and have familiarized ourselves with the entire site and have examined carefully the extent of the work that is needed.”
Authorized Signature (Manual): ______________________________________________________________________________________________
Authorized Signature Name (Typed) and Title: __________________________________________________________________________________
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 3 of 72
CALENDAR OF EVENTS
FWC 26/27-08
SCHEDULE DUE DATE METHOD
Bid Advertised September 8, 2026 Posted on the Vendor Information Portal (VIP)
NON-MANDATORY Pre-Bid Conference
September 15, 2026
@ 10:00 AM ET
See Pre-Bid Conference Clause
Deadline for Questions
Must be received PRIOR to:
September 22, 2026
@ 5:00 PM ET
See Solicitation Questions Clause
Anticipated date for Responses to Written Questions
September 25, 2026 Posted on the Vendor Information Portal
SEALED BIDS DUE
(REMEMBER: The bid number should be clearly marked on envelope)
Must be received PRIOR to:
October 2, 2026
@ 2:30 PM ET
Mailing Address:
Florida Fish & Wildlife Conservation Commission Attn: Purchasing 1875 Orange Ave E Tallahassee, Florida 32311-6160
Submissions are due BEFORE the date and time of the public opening.
Public Bid Opening October 2, 2026
@ 2:30 PM ET
Public Opening Options for Attendance:
-In Person- 1875 Orange Ave E Tallahassee, FL 32311-6160
-Teleconference- Conference call phone number: 1.850.270.2928
Conference room number: 753-105-67#
Anticipated Date of Intended Award October 6, 2026 Posted on the Vendor Information Portal https://vendor.myfloridamarketplace.com/
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 4 of 72
GENERAL CONDITIONS
FWC 26/27-08
The Florida Fish and Wildlife Conservation Commission’s (FWC or Commission) mission is to manage fish and wildlife resources for their long-term well-being and the benefit of people. The Commission administers six (6) major programs including habitat and species conservation, freshwater fisheries management, law enforcement, marine fisheries management, hunting and game management and fish and wildlife research.
A Bidder submitting a bid shall be registered in the MyFloridaMarketPlace (MFMP) system and where required, the Sunbiz system prior to the bid opening. Business entities which must be on file with Sunbiz include the following foreign and domestic entities: Corporations for and not for profit, Limited Liability Companies (LLC), Limited Partnerships (LP) including Limited Liability Limited Partnerships (LLLP), and organizations doing business under a fictitious name (DBA). A Bidder may not be considered for an award, if not registered in the MFMP and Sunbiz system. The Bidder’s registration address and federal employer identification (FEID) number should match the Bidder’s address and FEID number listed on the Bidder Acknowledgment form (Page 2).
Certified Minority-owned, Woman-owned and Service-Disabled Veteran Business Enterprises, as certified by the State of Florida Office of Supplier Development, are encouraged by the Commission to participate in the bidding process.
Bids from Bidders shall include all necessary equipment to complete the job. The bidder is required to supply all specified documentation when submitting a bid for this project.
Please note:
• The terms “Contract,” “Agreement” and “Purchase Order” are used interchangeably in the document.
• The terms “Commodities” and “Goods” are used interchangeably in the document.
TERMS AND CONDITIONS
PUR 1000 and PUR1001 are hereby incorporated by reference. PUR1000 and PUR1001 can be found at the Department of Management Services website at the following link:
https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur _forms
The following terms and conditions take precedence over the PUR1001 and PUR1000 forms where applicable. The Commission objects to and shall not consider any additional terms or conditions submitted by a Bidder or Contractor, including any appearing in documents attached as part of a Bidder’s response. In signing and submitting its bid, a Bidder agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Failure to comply with terms and conditions, including those specifying information that must be submitted with a bid, shall be grounds for rejecting a bid.
The terms and conditions of Attachment A, Purchase Order Terms and Conditions, are hereby incorporated into this solicitation. Any contract resulting from this solicitation will include the terms and conditions of this solicitation and the terms and conditions contained in Attachment A.
PROCUREMENT MANAGER
Xavier Wilson xavier.wilson@myfwc.com https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 5 of 72
ESTIMATED BUDGET
The Commission has an estimated budget for this project of $200,000.
TERM
The contract will be effective one year upon issuance of Purchase Order.
If circumstances constituting Force Majeure have occurred, or if anything occurs beyond the Contractor’s control, the Contractor shall submit an extension request in writing. The Project Manager and Contract Manager will review the extension request and if they determine it is justified, will forward to the Bid Request Inbox (bidrequest@myfwc.com) for procurement review and approval/disapproval.
SUBCONTRACTS
Subcontracting IS permitted pursuant to the Terms and Conditions of the Purchase Order. The Subcontractor Minority Status Report (Attachment C) shall be submitted with each invoice for payment. The List of Subcontractors (Attachment H) shall be included with bid submission.
DIVERSITY
The Commission is committed to supporting Florida’s diverse business industry and population through ensuring participation by minority, women, and veteran-owned business enterprises in the economic life of the state. The State of Florida Mentor Protégé Program connects minority, women, and veteran-owned business enterprises with private corporations for business development mentoring. We strongly encourage contractors doing business with the State of Florida to consider this initiative. For more information on the Mentor Protégé Program, please contact the Office of Supplier Development at (850) 487-0915 or osdinfo@dms.myflorida.com.
FWC encourages diversity in its procurement program and requests that all subcontracting opportunities afforded by this solicitation enthusiastically embrace diversity. The award of subcontracts should reflect the vast array of citizens in the State of Florida. Bidders can visit the Office of Supplier Development website for information on certified business enterprises that may be considered for subcontracting opportunities. However, pursuant to Section 287.05701 F.S., the Commission may not request documentation of or consider a vendor’s social, political, or ideological interests when determining if the vendor is a responsible vendor, nor give preference to a vendor based on the vendor’s social, political, or ideological interests.
NON-MANDATORY PRE-BID CONFERENCE/SITE VISIT MEETING
A non-mandatory Pre-bid Conference Site Visit Meeting will be held at Kissimmee Field Office (1601 Scotty's Rd, Kissimmee, FL 34744) on the date and time specified in the Calendar of Events (Page 3). The purpose of the Pre-bid Conference Site Visit Meeting is to discuss the contents of this ITB and to accept verbal questions from Bidders concerning the project. The Commission will make a reasonable effort to answer verbal questions asked at the Pre-bid Conference Site Visit, however, Bidders should clearly understand that verbal discussions held at the Pre-bid Conference Site Visit shall not be binding on the Commission, and the Commission will only issue an official written response to verbal questions subsequently submitted in writing in accordance with the Deadline for Questions clause below.
1601 Scotty's Rd, Kissimmee, FL 34744
MANDATORY BIDDER SITE VISIT
It is mandatory that prospective bidders inspect the project sites prior to submitting a bid. This will enable bidders to familiarize themselves with the scope of work. Bidders shall visit the sites on their own. The Site Visit Mandatory mailto:bidrequest@myfwc.com?subject=Extension%20Request https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program mailto:osdinfo@dms.myflorida.com https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 6 of 72
Attestation-Individual Bidder Attendance form (Attachment D) must be completed by the Contractor and submitted with the bid package. FWC will only issue an official written response to verbal questions subsequently submitted in writing in accordance with the Deadline for Questions clause below.
1601 Scotty's Rd, Kissimmee, FL 34744
VERBAL INSTRUCTION PROCEDURE
Bidders may not consider any verbal instructions as binding upon the Commission. No negotiations, discussions, or actions shall be initiated or executed by the Bidder as a result of any discussion with any Commission employee. Only those communications from the Commission that are in writing, may be considered as a duly authorized expression on behalf of the Commission.
SOLICITATION QUESTIONS
Any questions from Bidders that require an official FWC answer concerning this project shall be submitted in writing to the Procurement Manager. This includes specification inquiries, such as questions or requests for additional or altered terms and conditions. Questions to the Procurement Manager shall not constitute formal protest of the specifications or of the solicitation. Questions must be received no later than the date and time specified in the Calendar of Events (Page 3). Questions may be sent via email with the solicitation number in the subject line. It is the responsibility of the bidder to confirm receipt of questions if needed.
If questions are received, an addendum will be issued and shall be posted on the Vendor Information Portal (https://vendor.myfloridamarketplace.com).
LIMITATION ON BIDDER CONTACT DURING SOLICITATION PERIOD
Bidders to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the Commission posting the notice of intended award, (i.e., the 72-hour posting period excludes Saturdays, Sundays, and state holidays) any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the Procurement Manager or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.
BIDDER SPECIFICATION CHALLENGE
Any protest concerning the specifications of this solicitation shall be made in accordance with PUR1001, paragraph 20, “Protests”. A notice of protest of the solicitation documents shall be made within seventy-two hours after the posting of the solicitation. Failure to file a protest within the time prescribed in Section 120.57(3)(b), F.S., shall constitute a waiver of proceedings under Chapter 120, F.S.
ADDENDUMS
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents or answer any Bidder questions during the ITB period an addendum shall be posted on the Vendor Information Portal internet site. Each Bidder is responsible for monitoring the Vendor Information Portal website (https://vendor.myfloridamarketplace.com) for new or changing information relative to this procurement. The Commission bears no responsibility for any delays, or resulting impacts, associated with a Bidder’s failure to obtain the information made available through the Vendor Information Portal.
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 7 of 72
BIDDER ACKNOWLEDGMENT
In order for this bid to be valid, the bid must be completed in its entirety, signed by the Bidder and returned, as part of the bid or the bid will be rejected. By affixing your signature to the ITB Bidder Acknowledgement Form (page 2), the Bidder hereby states that the Bidder has read all bid specifications and conditions and agrees to all terms, conditions, provisions, specifications, and is currently licensed to do business within the State of Florida, if required by State or Federal Law, for the services or commodities the Bidder will provide the Commission under these bid specifications.
MANDATORY RESPONSIVE REQUIREMENTS
The Commission will not review Bids from Bidders who do not meet the mandatory responsive requirements listed in Attachment B, Mandatory Responsive Requirements. Note: The Commission will perform an initial responsiveness check.
Bids found to be non-responsive will not be considered for award. The Commission reserves the right to act upon information discovered during and after the initial responsiveness check impacting the responsibility or responsiveness of the Bid or Bidders.
REFERENCES
Each prospective Bidder shall provide a minimum of three (3) references for similar projects completed. Current contact names and phone numbers shall be included with the bid package. See the attached references form for reference requirements.
EQUAL BIDS
In the event that there is no multiple award contemplated in the ITB, and the Commission receives equal bids eligible for award, the Commission will comply with the following, as applicable: sections 287.057(12), 287.082, 287.087,287.092, 295.187(4)(a), and 295.187(4)(b), F.S. In order to clarify the Bidders’ status with regard to the applicable statutory preference requirements, the Commission may request information from Bidders with equal bids. A Bidder will not be permitted to amend or supplement its Bid in response to such request for clarification. If the tie has not been broken by application of the aforementioned statutes, the Commission will proceed with a random selection to decide the award.
SUPPORTING/SUPPLEMENTAL INFORMATION
The Commission requires that bidders submit all required technical, specification, and other supporting information with their bid, so that a detailed analysis and determination can be made, by the Contract Manager that the product/service offered meets this ITB’s specifications and that other requirements of this ITB have been met. However, provided a bid meets the requirements for a definite, firm, unqualified, and unconditional offer, the Commission reserves the right to request supplemental information from the bidder after the bids have been opened to ensure that the products/services offered completely meet this ITB’s requirements. The requirement for such supplemental information will be at the reasonable discretion of the Commission and may include the requirement that a bidder will provide a sample product(s) so that the Commission can make a first-hand examination and determination.
A bidder's failure to provide this supplemental information or the product sample(s), within the time set by the Commission, will cause the Commission to consider the Contractor non-responsive and reject the Contractor’s bid.
CONFIDENTIALITY/PUBLIC RECORDS LAW
Bidders are cautioned that Florida law generously defines what constitutes a public record and grants broad rights of public access to those records; see, for example, section 119.07, F.S. If a Bidder believes that its response contains information that is confidential or exempt from disclosure under Florida Law, the Bidder shall clearly segregate and mark that information (for example, stamp each page "Confidential" and place it in an envelope marked "Confidential") and briefly describe in writing the grounds and specific legal citations for claiming exemption from the public records law. If after the notice of intended decision or thirty (30) days after bid opening, whichever is earlier, the Commission receives a
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 8 of 72 public record request related to the solicitation, the Commission will provide copies of public records that are not exempt to the requester. The Commission will endeavor to provide notice to the Bidder of all public records requests received related to documents provided by the Bidder that were marked pursuant to this paragraph. In no event shall the Bidder hold the Commission or any of its employees or agents liable for disclosing, or otherwise failing to protect the confidentiality of, information submitted in response to this solicitation.
MAILING INSTRUCTIONS
All bids shall be submitted printed on 8x11 white paper in a SEALED ENVELOPE addressed to:
Florida Fish and Wildlife Conservation Commission Attn: Purchasing 1875 Orange Ave E Tallahassee, Florida 32311-6160.
The envelope shall be plainly marked on the outside with: BID NUMBER, DATE AND TIME OF THE BID OPENING.
THE COMMISSION IS NOT RESPONSIBLE FOR THE OPENING OF ANY ENVELOPES THAT ARE NOT PROPERLY MARKED .
PLEASE NOTE: The Commission’s official business hours of operation are 8:00 AM–5:00 PM ET, exclusive of Saturdays, Sundays and state holidays. Selecting delivery services, such as next day first delivery, may result in attempted delivery prior to opening or closing, and the Commission will not be available to accept those deliveries. THE COMMISSION IS NOT
RESPONSIBLE FOR LATE SUBMISSIONS DUE TO COMPLICATIONS RELATED TO SELECTED DELIVERY SERVICES . DIGITAL SUBMISSIONS SHALL
BE DEEMED NON-RESPONSIVE AND SHALL NOT BE ACCEPTED; ANY CONFLICT BETWEEN A PAPER SUBMISSION AND A DIGITAL COPY OF
THAT SUBMISSION WILL BE IGNORED AND THE AGENCY WILL RELY ON THE PAPER SUBMISSION ONLY.
SOLICITATION PUBLIC OPENING
The public opening of this bid will be conducted at the date, time and method specified on the Calendar of Events (Page 3).
BIDS RECEIVED AFTER THE SPECIFIED DATE AND TIME WILL BE REJECTED.
Any person with a qualified disability shall not be denied equal access and effective communication regarding any bid/proposal documents or the attendance at any related meeting or bid/proposal opening. If accommodations are needed because of a disability, please contact the Purchasing Section at (850) 488-6551 at least three (3) workdays prior to the opening.
AWARDED BID/INSPECTION
The Commission will award the bid to the responsive, responsible bidder who submits the lowest bid price. If deemed necessary, an interview with the bidder by the Contract Manager may be required and scheduled before the bid is awarded.
The Commission reserves the right to inspect the prospective Contractor’s materials and background record prior to making an award of the Contract. If the Contract Manager determines the lowest bidder does not have sufficient experience, equipment, etc., to meet the specifications of this ITB, the Commission reserves the right to reject the bidder and evaluate the next lowest bidder.
POSTING OF BID TABS
Bid Tabulations with Contractors identified as awarded bidders will be posted electronically as Agency Decisions on the Department of Management Services Vendor Information Portal as a Public Notice. The Agency Decision may be viewed
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 9 of 72 at https://vendor.myfloridamarketplace.com, and will remain posted for a period of 72 hours. Failure to file a protest within the time prescribed in Section 120.57(3)(b), F.S., shall constitute a waiver of proceedings under Chapter 120, F.S.
Awarded Bidders are instructed not to proceed until a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice is given to the Contractor by the Commission. A company or person who proceeds prior to receiving a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice from the Commission does so without a contract and at their own risk.
Sealed bids, proposals, or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.07(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision or until thirty (30) days after opening the bids, proposals, or final replies, whichever is earlier.
SCOPE CHANGES AFTER CONTRACT EXECUTION
The Commission shall provide written notice to the successful bidder thirty (30) days in advance of any Commission required changes to the technical specifications and/or scope of service that affect the successful bidder’s ability to provide the service as specified herein. Any changes that are other than purely administrative changes will require a change order.
FWC CONTRACT MANAGER
The FWC employee identified as the Contract Manager shall perform the following on behalf of the FWC:
• review, verify, and approve receipt of services/deliverables from the Contractor;
• submit requests for change orders/amendments/renewals, if applicable;
• review, verify, and approve invoices from the Contractor; and, if applicable, complete the Certificate of Contract Completion form; and
• maintain an official record of all correspondence between the Commission and the Contractor and forward the original correspondence to the Procurement Manager for the official file.
DELIVERABLES
The following services or service tasks are identified as deliverables for the purposes of the subsequent Contract:
a. Performance of all services set forth in the Scope of Work.
b. Submission of all invoicing, supporting documentation, Corrective Action Plans and reports.
NOTICE TO PROCEED
The awarded Bidder shall not initiate work under this contract until the required Insurance documentation has been received by the Commission. The Contractor may begin work once it has received an official written Notice to Proceed (Attachment E) from the Contract Manager.
CERTIFICATE OF CONTRACT COMPLETION
The Contract Manager shall conduct a final inspection of the work to determine if completion has occurred. Upon satisfactory completion of the work, the Contractor shall send the Contract Manager a notarized Certificate of Contract Completion (Attachment F) and the contract shall be deemed completed upon the issuance date of such Certificate.
http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0119/Sections/0119.07.html
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 10 of 72
LIQUIDATED DAMAGES
If the Contractor fails to complete the work or the conditions of the Purchase Order and/or Change Orders by the completion date, the Commission shall have the right to deduct liquidated damages from any amount due and payable to the Contractor. Liquidated damages shall be assessed in the amount of $100 per calendar day of delay. Exceptions to this provision may be made if a delay is attributable to circumstances that are clearly beyond the control of the Contractor.
The burden of proof of unavoidable delay shall rest with the Contractor and shall be supplied in a written form and submitted to the Contract Manager.
PERMITTING
Permitting for this project, if needed, is the responsibility of the Commission. A copy of all permits shall be posted at the work site location at all times during the project. The Contractor is responsible for complying with all permit conditions and the Contractor shall pay any penalties arising from the Contractor’s permit violations.
MATERIAL AND EQUIPMENT ON COMMISSION PROPERTY
If the Commission allows the Contractor to have project materials or equipment delivered to and/or stored upon the Commission-managed or owned property before, during, or after the term of the project, the Contractor will be fully and solely responsible for all expenses and liability incurred as a result of the delivery or storage. Should the Commission, in its sole discretion, determine that any project materials or equipment stored on its property must be moved in response to an emergency, the Contractor shall hold harmless, indemnify, defend, and may be responsible for costs of any reasonably necessary actions taken by the Commission.
AUTHORIZED COMPENSATION
It is understood and agreed that all compensation under this ITB is specifically limited to the Contractor’s bid price accepted by the Commission, and to the specific procedure for payment established in this ITB and the Purchase Order executed pursuant to it. The Commission is not liable for any costs, fees, expenses or any other compensation whatsoever incurred or charged by the Contractor, other than the bid price paid for the work specifically described in the Scope of Work, which work is actually accomplished and invoiced by the Contractor subsequent to the Commission’s notice to proceed (or other notice to begin work). Thus, the Commission is not liable for any costs incurred or charged by the Contractor in anticipation of responding to, or performing work described in, this ITB including, but not limited to, equipment or personnel procured by the Contractor in anticipation of such work. The Commission is not responsible to the Contractor for any loss or damages resulting from circumstances unforeseen at the time of publication of this ITB including, but not limited to, those resulting from a “force majeure”.
ADDITIONAL LEGAL REQUIREMENT
All corporations seeking to do business with the State shall, at the time of submitting a bid, be on file with the Department of State in accordance with provisions of Chapter 607, F.S.; similarly, partnerships seeking to do business with the State shall, at the time of submitting such bid, have complied with the applicable provisions of Chapter 620, F.S. For further information on required filing and forms, please go to the following sites: http://sunbiz.org or http://dos.myflorida.com.
USE OF CONTRACT BY OTHER STATE AGENCIES AND ELIGIBLE USERS
As provided in Chapter 60A-1.045, Florida Administrative Code (F.A.C.), and Section 287.042(16), F.S., other State of Florida agencies may purchase from the resulting contract of this ITB, provided that the Department of Management Services has determined the contract’s use is cost effective and in the best interest of the State, and with the Contractor’s consent.
http://www.sunbiz.org/ http://dos.myflorida.com/
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 11 of 72
Other State of Florida governmental entities and eligible users may also request of the Contractor to be able to use this contract. If the Contractor agrees to other entities to utilize this ITB contract, such agencies shall coordinate their use of this contract with the Florida Fish and Wildlife Conservation Commission in order to reduce scheduling conflicts.
CONDITIONS AND SPECIFICATIONS
The bidder is required to examine carefully the conditions and specifications of this bid and to be thoroughly informed regarding any and all requirements of the conditions and specifications.
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 12 of 72
SCOPE OF WORK
FWC 26/27-08
LAKE TOHOPEKALIGA AQUATIC PLANT REMOVAL
PURPOSE
The Florida Fish and Wildlife Conservation Commission (FWC or Commission) has identified the need to remove non-mobile nuisance and noxious aquatic and wetland vegetation and associated organic detrital material for the purpose of enhancing valuable fish and wildlife habitat of Lake Tohopekaliga (Non-mobile aquatic vegetation and associated organic sediments is defined as “those plants and sediments that are unlikely to move from its location prior to Contractor removal and are feasible to be bid on a ‘per-project’ or ‘per-acre’ basis”. This definition does not preclude mobility of the material after removal work has begun for which the Contractor is responsible [see Section 6, "Deployment and Maintenance of Appropriate Turbidity Control Devices", below]).
PROJECT LOCATION
Lake Tohopekaliga is an 18,810-acre lake located in Osceola County, Florida in Kissimmee at Geographic Location: Latitude N and Longitude W (Figure 1).
FWC BOAT RAMP
1601 Scotty's Road Kissimmee, Florida 34744 GPS waypoint: 28.26249˚ N, -81.38372˚ W
Directions to the boat ramp from Kissimmee, Florida: Take Neptune Road to King's Highway. Head south on King's Highway to Pine Island Road. Turn right and head west on Pine Island Road to Scotty's Road. Turn right and continue until road ends. FWC Boat ramp will be on right at end of Scotty's Road, north of Richardson's Fish Camp.
PROJECT/WORK SCHEDULE
The Contractor will be issued a Notice to Proceed (NTP) for this project and must begin work within seven (7) days of issuance of the NTP. The Contractor shall mobilize equipment, conduct aquatic plant harvesting, deposit aquatic plant material onto identified in-lake upland disposal islands, contour disposal islands, clean up staging/access areas in the harvesting site (Figure 2; yellow polygons), and demobilize all equipment to the staging area at the FWC ramp located at 1601 Scotty’s Rd., Kissimmee, FL. All work must be completed by close of business December 10, 2026. Extensions beyond these dates shall only be allowed at the sole discretion of the Commission Project Manager in case of Force Majeure.
The awarded contractor agrees to abide by the Project Manager’s decision as to which disposal island(s) can be utilized if the Project Manager determines that the contractor’s efficiency/productivity is not at a level to accomplish project goals within the allotted project timeframe.
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 13 of 72
1. GENERAL SPECIFICATIONS
1.1. All bids submitted will include bids for all specified work units. (See “PRICE SHEET”).
1.2. The total budget for this project is $200,000.00.
2. PROJECT SPECIFICATIONS
2.1. The project consists of one work area located on southern area of Big Grassy Island, Lake Tohopekaliga.
There are two in-lake disposal islands located less than 0.50 miles from the harvesting work area. The work sites and disposal sites will be delineated by a digital polygon (Figure 2). Google Earth™ (.kmz or .kml) digital polygon files depicting the work sites will be provided to the prospective vendors.
2.2. Table of waypoints depicting the corners of the harvesting polygon and include the waypoints for in-lake disposal islands:
Waypoint 1 28°13'25.31"N 81°22'51.17"W
Waypoint 2 28°13'21.99"N 81°22'44.12"W
Waypoint 3 28°13'30.20"N 81°22'44.67"W
Waypoint 4 28°13'36.66"N 81°22'47.03"W
Waypoint 5 28°13'43.68"N 81°22'46.99"W
Waypoint 6 28°13'43.19"N 81°22'52.31"W
Waypoint 7 28°13'34.84"N 81°22'51.48"W
In-lake Disposal Island 1 28°13'50.33"N 81°22'41.91"W
In-lake Disposal Island 2 28°13'29.37"N 81°22'18.02"W
3. AQUATIC PLANT REMOVAL AND SPOIL TRANSPORT
3.1.1. The primary aquatic plant species to be removed on the harvesting site include: spatterdock (Nuphar advena), mud mats with mature water primrose Ludwigia spp., burhead sedge (Cyperus blepharoleptos), and knotweed (Polygonum densiflorum), and hydrilla (Hydrilla verticullata);
however, all plant material WITHIN the boundaries of the work site shall also be removed, unless specifically identified by the Commission Project Manager for avoidance from removal (see next paragraph), in order to accomplish project goals. Removal of plants defined, for the purpose of this project, as removal of all floating, emergent, and submerged portions of all plants and associated, root matter, organic and detrital material within the designated awarded work area to mineralized soil.
3.1.2. Beneficial plant species present within the work sites should be avoided to the extent possible, including emergent and submersed plants such as bulrush (Scirpus spp), spikerush (Eleocharis spp), eelgrass (Vallisneria neotropicalis), Illinois pondweed (Potamogeton illinoensis), etc. When traversing from work site to the disposal island the Contractor must avoid passing through areas that have beneficial plant species.
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 14 of 72
3.1.3. The work area is delineated in Figure 2. Google Earth™ (.kmz or .kml) files will be provided to contractors.
3.1.4. Total acreage of the work areas, as of June 2026, is calculated to be 15 acres, within which all plants and associated organic detrital material shall be removed and placed on designated permitted in-lake upland disposal islands. All targeted area acreages and associated material volume calculations should be independently verified by the Contractor before submitting a bid on the project.
3.1.5. The Commission Project Manager will determine the sequence in which all work sites will begin, and harvesting will be conducted.
3.1.6. The Commission Project Manager will be present frequently to direct equipment operators, answer questions and concerns and make decisions pertaining to the project.
3.1.7. If water levels fall below 52 ft. NGVD, regardless of equipment used for removal, the Commission
Project Manager will evaluate the project areas to determine if any work can continue. In the event that the project must be suspended due to falling water levels or other factors out of the Contractor’s control (Force Majeure), the Contractor shall request, in writing, an extension of the Completion Date as outlined in the General Conditions under the “TERM” clause. If the Commission Project
Manager deems it necessary to issue an extension beyond the stated deadlines in the WORK
SCHEDULE, the Commission Project Manager will have to obtain permission from the FWC Snail Kite coordinator, the U.S. Fish & Wildlife Service and the FWC Waterfowl Management Program
Coordinator, before any extension is approved.
4. MOBILIZATION AND DEPLOYMENT OF EQUIPMENT
4.1.1. Barge-mounted excavators with a rake attachment or bucket that allows excess water to be decanted are required to remove the bulk of the aquatic plant material from the work site. Floating aquatic harvesters are recommended to perform clean-up of plant and organic material that is floating or that has been dropped to the bottom during the removal process. However, at the
Contractor’s discretion, the Contractor shall provide and maintain any floating-type mechanical-removal equipment capable of removing aquatic plants and associated organic sediments up to three
(3) feet thick as identified above for the duration of the project. When formulating the total quote price, the Contractor shall consider using as many pieces of mechanical-removal equipment as necessary to harvest material and dispose of material in a consolidated manner upon the in-lake disposal sites to complete the project in the time frame as specified by the WORK SCHEDULE and the Commission Contract Manager and/or Commission Project Manager.
4.1.2. “Cookie-cutters” or other aquatic plant-shredding equipment shall not be used. Tracked (e.g., excavators, bulldozers) or wheeled (e.g., off-road dump trucks) equipment shall not be used in direct contact with the lake bottom, unless the equipment is specifically designed for amphibious use
(manufacturer design specifications of the proposed equipment must be approved in writing by the Commission Contract Manager and/or Commission Project Manager prior to use). If non-amphibious equipment is proposed for use on the lake bottom, matting material must be used to prevent rutting of the lake bottom and preserve any subterranean archeological or geological conditions that may exist.
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 15 of 72
5. IN-LAKE DISPOSAL
5.1. The Contractor shall be responsible for transporting aquatic plant spoil material directly from the worksite via transport barges, aquatic harvester, or other floating conveyance vessel to the nearest in-lake disposal island (Figure 2) as directed by the Commission Project Manager. All material removed from the work site shall be placed on a designated disposal island. Temporary staging or disposal of harvested material at non-permitted disposal sites is not allowed. The locations of the spoil deposition sites have been identified by the Commission Project Manager and will not exceed a distance greater than one (1) mile from aquatic plant-harvesting area.
5.2. The in-lake disposal islands will require preparation to receive the new material, including the use of heavy equipment to rearrange existing spoil and make room for new material. A long-reach trackhoe and skid steer are recommended to use for island preparation and disposal operations. The heavy equipment will have to be transported via floating barges. Island preparation and transport of heavy equipment shall be factored into each contractor’s “Aquatic Plant Removal & Disposal” quote price.
5.3. If aquatic plants or other material are restricting access to any disposal island, the Contractor shall, as needed to provide access, be required to remove the material restricting access around or to the island.
Any material removed shall be placed well up onto the disposal island and compacted as directed by the
Project Manager to prevent turbidity and material falling into the adjacent waters. This cost shall be factored into each contractor’s “Aquatic Plant Removal & Disposal” quote price.
6. DEPLOYMENT AND MAINTENANCE OF APPROPRIATE TURBIDITY CONTROL DEVICES
6.1. Turbidity levels shall be controlled within the 150-meter (492-feet) mixing zone allowed for each work site. Floating debris (aquatic vegetation, organic material, and/or trash) shall be contained within the areas of aquatic vegetation removal and disposal as designated by the PVC poles delineating each work site. If turbidity levels exceed 24 Nephlometric Turbidity Units (NTU) above natural background conditions outside the mixing zone allowed for the project site or if floating debris is observed outside the designated work area, the contractor, at his or her expense, shall be responsible for providing, deploying, and maintaining turbidity control devices in a manner that shall effectively isolate the project site from the surrounding area for the duration of the project. In consultation with the Commission
Project Manager, the Contractor shall choose the type of turbidity control device used, provided that it effectively contains floating debris and prevents the degradation of water quality in surrounding waters as defined by Rule 62-302.500/530, F.A.C. (State Water Quality Standards) and is approved by the Commission Project Manager. The Contractor, at his or her expense, shall also provide the means and personnel to open and close the barrier(s) to allow the mechanical-removal equipment to ingress/egress the work site while transporting material to the off-loading site(s).
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 16 of 72
6.2. The Contractor shall be responsible for monitoring turbidity levels to ensure compliance with State Water
Quality Standards:
6.2.1. Monitoring shall take place during hours of equipment operation;
6.2.2. Monitoring sites shall include, but may not be limited to, the outside boundary of the mixing zone and a site within the lake that is outside the influence of the aquatic plant removal activities;
6.2.3. Turbidity shall be monitored at least once each workday for at least three workdays per work-week;
6.2.4. In addition to turbidity readings, the contractor shall record, for each monitoring site, sample date, sample time, and sample location (in Latitude / Longitude).
6.2.5. A copy of the monitoring reports shall be provided to the Commission Project Manager upon request.
7. DEMOBILIZATION
7.1. Before demobilizing from each disposal island, the harvested material will be consolidated above the high-water level on each island (55 ft. NGVD) and shall be smoothed out along the pre-existing contour of each island to avoid leaving any uneven mounds of material. Disposal shall not exceed the original footprint of each island as directed by the Commission Project Manager. The Commission Project
Manager shall photographically document the spoil island’s general shape prior to start of work by the
Contractor and use a GPS unit to collect data to document the islands’ global positions and footprint area.
8. INSPECTION AND COMPLIANCE
8.1. The Commission reserves the right to inspect the lowest bidding Contractor’s procedures, equipment, materials, and background record prior to making a determination of award status. At its sole discretion, the Commission has the right to order the immediate replacement of any individual(s) working on behalf of the Contractor as long as the basis for the replacement is not discriminatory or for any other reason contrary to law. The Commission may take this action if the Commission determines that it is in its best interest to do so but will not be required to provide a reason for requesting the replacement of any individual(s). The Commission may also elect to terminate this Contract, for this reason, without any liability whatsoever to the Contractor, including but not limited to liability for unfinished work product.
The Commission reserves the right to require the Contractor to replace any operating personnel or equipment used in the performance of this contract if the personnel or equipment are violating, or have violated, any state or federal laws; or are unsafe; causing damage; or for any valid reason. In this event, the Contractor shall immediately, upon written or verbal (to be later reduced to writing) communication from the Commission, provide replacements satisfactory to the Commission at no additional cost.
8.2. The Contractor shall supply assurance (with a written agreement from the rental and/or sales company) to the Commission Contract Manager and/or Commission Project Manager that all necessary equipment
(as determined by the Commission Contract Manager and/or Commission Project Manager) will be available as required. The Commission Contract Manager and/or Commission Project Manager reserves the right to require that the Contractor demonstrates that the Contractor’s equipment meets the specifications and functional capabilities required for the project. The Commission Contract Manager
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 17 of 72 and/or Commission Project Manager decision as to whether the proposed Contractor’s equipment specifications required to complete the project shall be final and not subject to legal challenge by the proposed Contractor. Inspection of materials and equipment shall be at such time as may be mutually agreed to by Commission Contract Manager and/or Commission Project Manager and each proposing
Contractor. Such inspection shall not relieve the Contractor of any obligations or responsibilities, nor shall it transfer any liability to the Commission. If the Commission Contract Manager and/or Commission
Project Manager determines the lowest bidding Contractor does not have sufficient equipment, labor and/or positive references, the bid for the lowest quoting Contractor can and shall be voided. The same process shall then be used to evaluate the next lowest bidding Contractor.
9. WORK COMPLETION DOCUMENTATION
9.1. Following the substantial completion of each work area, the Contractor shall schedule an inspection with the Commission Project Manager to determine if the requirements for each work area have been satisfied. Work area inspection shall take place no sooner than 48 hours following the mutual determination between the Contractor and the Commission Project Manager of work area substantial completion. The “final completion” objective within each work area is “open water”. If targeted aquatic vegetation or organic sediment material is observed floating within the work area upon inspection, the contractor must remove that excess material and transport it to the nearest approved disposal site. Upon removal of that material, the Commission Project Manager will inspect the work area as soon as feasible to determine work area final completion. Any aquatic vegetation or organic sediment material found floating within the work area following work area approval by the Commission Project Manager is not required to be removed by the Contractor.
9.2. All activities conducted during this project are subject to photographic and video documentation, as long as no direct interference with equipment operation occurs. Failure by the Contractor to allow documentation or attempts by the Contractor to prevent documentation of any work activities may result in termination.
10. WORK EXPERIENCE
10.1. The Contractor shall have successfully completed at least three (3) projects of equivalent size and scope and shall provide the required references using the Reference Form. The completed Reference Form shall be submitted with the bid.
10.2. Issuance of one or more permit non-compliance actions by the Florida Department of Environmental
Protection (DEP) or United States Army Corps of Engineers (USACE) shall cause the Contractor to be ineligible to participate on any quote, bid, or associated project (contractor or sub-contractor) for one calendar year from date of non-compliance issuance by DEP or USACE.
Ch. 287 Invitation to Bid – Revised 07.01.2026 FWC 26/27-08, Page 18 of 72
11. RESPONSIBILITIES OF THE CONTRACTOR
11.1. Unless otherwise established in the Purchase Order, the Contractor shall complete all work as set forth in the SOW in full compliance with the terms of this ITB. The responsibilities of the Contractor include, but are not limited to:
11.2. The Contractor, upon issuance of a Purchase Order, shall initiate operations at the specified project location by the commencement date specified in the Notice to Proceed (NTP), Attachment E. The NTP shall be issued within ten (10) calendar days following issuance of the Purchase Order and shall establish the Contractor’s authorized commencement date within that ten (10) calendar-day period, unless otherwise agreed upon by the Commission. If the Contractor fails to start work by the date specified in the NTP, the Commission shall have the option to terminate the Purchase Order and assign the work to another contractor. The Contractor shall notify the Commission Project Manager via electronic mail at least seven (7) days prior to entering the work site. Prior to initiating work, the Contractor shall provide the Commission Project Manager with an estimated work schedule that includes the number of personnel and pieces of equipment anticipated each day, with applicable dates, for discussion.