FWC 25.26-59 Addendum #1 QAs FINAL.pdf

PDF 177 KB Posted

Attached to
Roadcapping on Fisheating Creek WMA
Solicitation number
ITB-14751
Issued by
Leon County, Florida

About this file

This is Addendum No. 1 to a solicitation issued by the Florida Fish and Wildlife Conservation Commission (FWC) for road capping services on Fisheating Creek Wildlife Management Area. The addendum provides clarifications and answers to bidder questions regarding the project scope. The project involves capping approximately 1.1 miles of road, including Banana Grove Road (1 mile) and an adjoining parking loop (0.1 mile), using DOT-certified shell rock or lime rock material at a minimum 4-inch depth. Bidders are required to supply all materials, labor, equipment, and services necessary for the complete road capping and must submit sealed bids by 2:00 PM ET on January 29, 2026. Mandatory site visits were required prior to bid submission, with the original question deadline of January 15, 2026. Project completion is required by May 30, 2026, with liquidated damages of $150.00 per calendar day assessed for delays beyond the specified completion date. The contract term is one year from issuance of the Purchase Order.

Key clarifications provided in the addendum include that no performance bond is required; DOT Bank Run Shell material is not acceptable for this project; bidders must determine the appropriate amount of fill material needed to meet specifications; material and equipment may be staged onsite at a designated fill storage site with the contractor bearing sole responsibility for security; parking spaces in the loop area require both fill material and grading with a 4% crown slope as specified; and vegetation cleared from the roadside may be piled and retained onsite per the Scope of Work rather than hauled away. The total budget for this project is $80,000, and the project is not federally funded. Subcontracting is not permitted, and bidders must be registered in MyFloridaMarketPlace (MFMP) and the SunBiz system prior to bid opening. The award will be made to the responsive, responsible bidder submitting the lowest bid price.

View the file

Other files

File Type Posted
FWC 25.26-59 FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Fish and Wildlife Conservation Commission

Commissioners

Rodney Barreto

Chairman

Coral Gables

Steven Hudson

Vice Chairman

Fort Lauderdale

Preston Farrior

Tampa

Joshua Kellam

Palm Beach Gardens

Gary Lester

Oxford

Albert Maury

Coral Gables

Sonya Rood

St. Augustine

Office of the

Executive Director

Roger A. Young

Executive Director

Charles “Rett” Boyd

Assistant Executive Director

George Warthen

Chief Conservation Officer

Jessica Crawford

Chief of Staff

850-487-3796

850-921-5786 FAX

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street

Tallahassee, Florida

32399-1600

Voice: 850-488-4676

Hearing/speech-impaired:

800-955-8771 (T)

800-955-8770 (V)

MyFWC.com

DATE: JANUARY 22, 2026

ADDENDUM NO.: 1

BID NO.: FWC 25/26-59

BID TITLE: ROAD CAPPING ON FISHEATING CREEK WMA

UPDATE: QUESTIONS AND ANSWERS

The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s

(FWC) Solicitation No. FWC 25/26- 59 ROAD CAPPING ON FISHEATING CREEK

WILD MANAGEMENT AREA.

All responses to the subject solicitation must be received no later than 2:00

PM (ET) on Thursday, January 29, 2026.

A response received after the exact time specified will not be considered.

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in

Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875

Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.

Sincerely, Martin Ehlen

FWC Procurement Manager

FWC SOLICITATION ADDENDUM 2

Addendum No. 1 Questions & Answers

FWC 25/26-59

QUESTIONS #1A and #1B The parking spaces in the loop area:

[Question 1A] Do we need to put material down for the parking spaces?

[Answer 1A] Yes

[Question 1B] Do we need to grade the parking spaces?

[Answer 1B] Yes

Fill material and grading will be necessary to smooth the transition from the road into the parking spots to avoid pooling and allow water to flow into the grass.

QUESTION #2 Does this job require a Bond?

ANSWER #2 No.

QUESTION #3 Can we use DOT Bank Run Shell?

ANSWER #3 No.

QUESTION #4 Can we use (B02) DOT Bank Run Shell?

ANSWER #4 No.

QUESTION #5 4% slope will require a lot of material. Do you have estimated amount of Tons you need for this project?

ANSWER #5 No, Bidders shall determine the appropriate amount of fill needed to meet the specifications of this project.

QUESTION #6 Can we stage material & equipment onsite

ANSWER #6 Yes, see Figure 1 for fill storage site. Equipment may be stored on site. Security of the equipment shall be the sole responsibility of the Contractor, including theft and/or damages.

FWC SOLICITATION ADDENDUM 3

QUESTION #7 The road is really flat seems like a crown of 4-6% is quite a bit thick that the material will need to be. (This statement is not phrased as a question. See Answer #7 directly below.)

ANSWER #7 This question is unclear. The road shall be completed as specified in the Scope of

Work.

QUESTION #8 Can we make it 2% crown?

ANSWER #8 No.

QUESTION #9 Is there somewhere onsite that we can put the Vegetation from the side of roadway etc.?

ANSWER #9 Yes, see Scope of Work, paragraph 2.1.

QUESTION #10 Do we need to haul away the vegetation after job is competed?

ANSWER #10 No.

QUESTION #11 Do we need to haul away the vegetation offsite or can it be piled and stayed onsite somewhere?

ANSWER #11 No, see Scope of Work, paragraph 2.1.

QUESTION #12 Is this a federal funds job?

ANSWER #12 No.

QUESTION #13 What is the Dollar amount for this budget?

ANSWER #13 $80,000.

END ADDENDUM

File details come from the government source that posted it. Updated .