This document is an Addendum (No. 1) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for Solicitation No. FWC 24/25-92, the Derelict Vessel "Borocho" Reefing Project in Martin County. The addendum provides a series of questions and answers related to the project, addressing preparatory activities, environmental considerations, and project specifics. Key details include restrictions on preparation activities at the vessel's current location, confirmation that only safe transport to a marine facility is permitted, and clarification on removal requirements for generators, machinery, and potential hazardous materials like asbestos and lead-based paint. The bid responses are due by 4:00 PM (ET) on Thursday, July 10, 2025, with specific instructions for submission and protest procedures.

The addendum reveals that Martin County has not approved a specific mooring location for the vessel during remediation, and the contractor must propose and receive approval for a marine facility from the Commission's Contract Manager. No additional structural removal beyond what is specified in the Scope of Work is required by Martin County or other agencies. The document emphasizes that the contractor must notify the Contract Manager if additional asbestos locations are identified and provides clarification on the definition of "loose wire cable" as those not confined to the vessel's interior. The project appears to involve comprehensive vessel preparation for eventual deployment as an artificial reef, with strict guidelines for removal and remediation processes.

View the file

Other files

File Type Posted
FWC 24.25-92 Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Fish and Wildlife Conservation Commission

Commissioners

Rodney Barreto

Chairman

Coral Gables

Steven Hudson

Vice Chairman

Fort Lauderdale

Preston Farrior

Tampa

Gary Lester

Oxford

Albert Maury

Coral Gables

Gary Nicklaus

Jupiter

Sonya Rood

St. Augustine

Office of the

Executive Director

Roger A. Young

Executive Director

Charles “Rett” Boyd

Assistant Executive Director

George Warthen

Chief Conservation Officer

Jessica Crawford

Chief of Staff

850-487-3796

850-921-5786 FAX

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street

Tallahassee, Florida

32399-1600

Voice: 850-488-4676

Hearing/speech-impaired:

800-955-8771 (T)

800-955-8770 (V)

MyFWC.com

DATE: JUNE 30, 2025

ADDENDUM NO.: 1

BID NO.: FWC 24/25-92

BID TITLE: DERELICT VESSEL “BOROCHO” REEFING PROJECT – MARTIN

COUNTY 2025

UPDATE: QUESTIONS AND ANSWERS

The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s

(FWC) Solicitation No. FWC 24/25-92, “Derelict Vessel ‘Borocho’ Reefing

Project – Martin County”.

All responses to the subject solicitation must be received no later than 4:00

PM (ET) on Thursday, July 10, 2025.

A response received after the exact time specified will not be considered.

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in

Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875

Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.

Sincerely, Matt Carroll, FWC Procurement Manager

FWC SOLICITATION ADDENDUM 2

BEGIN ADDENDUM

QUESTION #1A

What prep activities can we complete at its current location?

ANSWER #1A

The only preparation at current location is for the safe transport to the marine facility for remediation.

QUESTION #1B

Have there been previous discussions with the land owner?

ANSWER #1B

The land owner is not involved with this project.

QUESTION #2

Has the paint been tested to confirm it is lead free?

ANSWER #2

No. The paint has not been tested for lead.

QUESTION #3

The only known asbestos is on the main engine exhaust stack?

ANSWER #3

At this time, the only known asbestos is in the main engine exhaust stack. The awarded contractor must notify the Commission’s Contract Manager if additional asbestos locations are identified. Please see Scope of Work Section 6.2.

QUESTION #4A

Are all generators required to be removed?

ANSWER #4A

Yes. Generators are required to be removed.

FWC SOLICITATION ADDENDUM 3

QUESTION #4B

Are all machinery except the main engine required to be removed?

ANSWER #4B

Yes. Machineries, excluding the main engine and transmission, are required to be removed.

QUESTION #5

Can Martin County approve of a location to moor the vessel while it’s being cleaned?

ANSWER #5

Martin County has no location approved to moor the vessel during remediation. Per

Scope of Work Section 5.3, The Contractor must notify and receive approval from the

Commission’s Contract Manager about the facility used for remediation prior to relocating the vessel (Phase 1). The contractor must propose their preferred marine facility to the Commission for approval.

QUESTION #6

Does the county or any other agency require the removal of any of the structure aside from the handrails mentioned in the scope of work (mast, etc.) for wildlife safety?

ANSWER #6

No. There are no additional known requirements from Martin County or agencies other than the Commission or the US Coast Guard that go beyond those listed in the scope of work for this solicitation.

Please see Scope of Work Section 6 for all structures needing removal. For further clarification on Section 6.8, the Commission defines any loose wire cable as those not confined to the interior of the vessel.

END ADDENDUM