FWC 24.25-56C Addendum 2 QA - Answers.pdf
PDF 160 KB Posted
- Attached to
- Telogia Creek WMA Security Fence and Pole Barn
- Solicitation number
- ITB-11555
- Issued by
- Leon County, Florida
About this file
This is Addendum No. 2 from the Florida Fish and Wildlife Conservation Commission (FWC) for Solicitation No. FWC 24/25-56C regarding the Telogia Creek WMA Security Fence and Pole Barn project. The addendum provides answers to eight contractor questions about material specifications and project requirements. All responses to this solicitation must be received no later than 3:30 PM (ET) on Wednesday, February 26, 2025. The project involves installing a security fence using 9-gauge galvanized chain link with 12.5-gauge barb wire and Schedule 40 posts, as well as constructing a pole barn with metal roof purlins and limestone gravel flooring (less than 1 inch diameter).
The contractor will be responsible for obtaining their own NPDES permit and developing/monitoring a Stormwater Pollution Prevention Plan if the disturbed area exceeds 1 acre. The project will be subject to MFMP Transaction Fees. No certified As-Built survey is required at completion, and the contractor is not responsible for any seeding or sodding of the 5-acre site. The wood posts for the barn will not require painting. This addendum provides technical clarifications but does not include specific pricing terms or funding details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 24.25.56C-ITB.FINAL.pdf | ||
| Addendum 1 COE Change.pdf | ||
| FWC 24.25.56C-T&C.FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners Rodney Barreto Chairman Coral Gables
Steven Hudson Vice Chairman Fort Lauderdale
Preston Farrior Tampa
Gary Lester Oxford
Albert Maury Coral Gables
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Office of the Executive Director Roger A. Young Executive Director
Charles “Rett” Boyd Assistant Executive Director
George Warthen Chief Conservation Officer
Jessica Crawford Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T) 800-955-8770 (V)
MyFWC.com
DATE: FEBRUARY 19, 2025
ADDENDUM NO.: 2
BID NO.: FWC 24/25-56C
BID TITLE: TELOGIA CREEK WMA SECURITY FENCE AND POLE BARN
UPDATE: QUESTIONS AND ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 24/25-56C, “TELOGIA CREEK WMA SECURITY
FENCE AND POLE BARN,”.
All responses to the subject solicitation must be received no later than 3:30 PM (ET) on Wednesday, February 26, 2025.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Joshua Stringer, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
Please provide a material specification for the security fence, ie: ga chainlink fabric, ga barbed wire, sch posts, etc.
ANSWER #1
9-gauge Galvanized Chain Link, 12.5-gauge barb wire, Schedule 40 posts.
QUESTION #2
Are roof purlins anticipated to be metal?
ANSWER #2
Yes
QUESTION #3
Are wood posts at the Barn to be painted?
ANSWER #3
No
QUESTION #4
What gravel material is desired for the barn flooring?
FWC SOLICITATION ADDENDUM 3
ANSWER #4
Limestone, less than 1 inch in diameter.
QUESTION #5
Is a certified As-Built survey required at project completion?
ANSWER #5
No
QUESTION #6
Will this project be subject to the MFMP Transaction Fee?
ANSWER #6
Yes
QUESTION #7
Will the site be seeded/sodded prior to commencement of the Pole Barn and Security Fence Construction Project? Or will the Pole Barn and Security Fence Contractor be responsible for seeding/sodding the entire 5 acre site and if so, please specify the areas that will receive sod and the areas that will be seeded.
ANSWER #7
No sod or seeding by contractor.
QUESTION #8
FWC SOLICITATION ADDENDUM 4
Will the Pole Barn and Security Fence Construction project be able to utilize the NPDES permit presumably in place for the current site clearing project (by others)? If not, will a professional engineer provided by FWC be responsible for engineering and monitoring of the Stormwater Protection Plan and the associated costs?
ANSWER #8
No, the Pole Barn and Security Fence Construction project contractor will need to submit and pay for the Notice of Intent (NOI) to use the National Pollutant Discharge Elimination System (NPDES) generic permit for stormwater discharge form large and small construction activities if the new disturbed area including lay down area is greater than 1 acre. The contractor will be responsible for the Stormwater Pollution Prevention Plan development and monitoring.
END ADDENDUM
| Question #1 |
| Answer #1 |
| Question #2 |
| Answer #2 |
| Question #3 |
| Answer #3 |
| Question #4 |
| Answer #4 |
| Question #5 |
| Answer #5 |
| Question #6 |
| Answer #6 |
| Question #7 |
| Answer #7 |
| Question #8 |
| Answer #8 |
File details come from the government source that posted it. Updated .