About this file
This document is an addendum for Solicitation No. FWC 24/25-05, "Babcock/Webb Road Materials Project", issued by the Florida Fish and Wildlife Conservation Commission (FWC). The solicitation is seeking competitive bids for the supply/delivery and tailgate spread of DOT Certified bank run shell, as well as the supply/delivery of crushed concrete materials, to be used at the Babcock/Webb Wildlife Management Area. The addendum provides clarification on several questions, including that crushed concrete cannot be substituted for rock, and that the materials must be delivered periodically between the issuance of the Purchase Order/Notice to Proceed and June 1, 2025, with the FWC Project Manager scheduling the specific delivery timelines.
The solicitation requires bidders to be registered in the MyFloridaMarketPlace (MFMP) system and with Sunbiz prior to the bid opening, which is scheduled for 2:00 PM (ET) on Thursday, September 12, 2024. The contract will be awarded to the successful bidder, and any protests must be filed within the time prescribed in Section 120.57(3), Florida Statutes, and Chapter 28-110, Florida Administrative Code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 24.25-05 ITB - Final.pdf | ||
| FWC 24.25-05 ITB - Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners Rodney Barreto Chairman Coral Gables
Steven Hudson Vice Chairman Fort Lauderdale
Preston Farrior Tampa
Gary Lester Oxford
Albert Maury Coral Gables
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Office of the Executive Director Roger A. Young Executive Director
Charles “Rett” Boyd Assistant Executive Director
George Warthen Chief Conservation Officer
Jessica Crawford Chief of Staff
850-487-3796
850-921-5786 FAX
Mana gin g fish and wildlife resourc e s for their long-te rm well-b ei n g and the benefi t of peopl e .
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T) 800-955-8770 (V)
MyFWC.com
DATE: AUGUST 30, 2024
ADDENDUM NO.: 1
BID NO.: FWC 24/25-05
BID TITLE: BABCOCK/WEBB ROAD MATERIALS PROJECT
UPDATE: QUESTIONS & ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 24/25-05, “Babcock/Webb Road Materials Project”.
All responses to the subject solicitation must be received no later than 2:00 PM (ET) on Thursday, September 12, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Ruth Heggen FWC Procurement Manager
FWC 24/25-05 ADDENDUM #1 2
BEGIN ADDENDUM #1
Question #1: Can we substitute crushed concrete for rock?
Answer #1: No.
Question #2: Can all material be delivered in one event, or will it need to be delivered periodically?
Answer #2: No, Oilwell and Powerline Material Site Phases can occur anytime between issuance of the Purchase Order/Notice to Proceed and June 1, 2025. The FWC Project Manager will consult, at least two weeks prior to the desired work performed period, with the Contractor to schedule supply and delivery of crushed concrete. The FWC Project Manager will consult, at least one month prior to the desired work performed period, with the Contractor to schedule supply, deliver, and tailgate spread of bank run shell.
Question #3: Can the work be completed at one time?
Answer #3: No, Oilwell and Powerline Material Site Phases can occur anytime between issuance of the Purchase Order/Notice to Proceed and June 1, 2025. The FWC Project Manager will consult, at least two weeks prior to the desired work performed period, with the Contractor to schedule supply and delivery of crushed concrete. The FWC Project Manager will consult, at least one month prior to the desired work performed period, with the Contractor to schedule supply, deliver, and tailgate spread of bank run shell.
END ADDENDUM #1