This document is a Request for Proposals (RFP) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for annual statewide deer harvest surveys. The intent of the RFP is to obtain competitive responses for annual post-season telephone/internet surveys of hunters to estimate deer harvest, deer harvest per hunter effort, and hunter satisfaction. FWC is seeking an experienced contractor to conduct these surveys for five consecutive years, with a possible renewal for up to five additional years. Key objectives of the surveys include estimating the number of deer hunters, days hunted, deer harvested by sex, harvest per hunter day, hunter satisfaction, and harvest reporting compliance at the statewide, management zone, and deer management unit levels.
The RFP outlines detailed technical specifications and power analysis requirements for the survey design and sample collection. Respondents must provide a summary of experience, project organization, detailed project plan, implementation schedule, and cost for completing the surveys. Responses are due by March 17, 2023 at 2:00 PM ET. The RFP also includes standard state terms and conditions, as well as specific requirements for federal funding if applicable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 22.23-75 A#1 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION
1875 ORANGE AVENUE E
TALLAHASSEE, FL 32311-6160
(850) 488-6551
REQUEST FOR PROPOSALS
FWC 22/23-75
ANNUAL STATEWIDE DEER HARVEST SURVEYS
RESPONDENT ACKNOWLEDGEMENT FORM
Purpose: The intent of this RFP is to obtain competitive responses for annual post-season telephone/internet surveys of hunters to estimate deer harvest, deer harvest per hunter effort and hunter satisfaction, per the specifications contained herein. Only responsive and responsible Respondents will be considered for award of this RFP.
Responsive: To be responsive, a response must constitute a definite, firm, unqualified and unconditional offer to meet all the material terms of this RFP. Material terms are those that could affect the price, quantity, quality, or delivery.
Also included as material terms are those which are clearly identified in this RFP and which, for reasons of policy, must be complied with at risk of response rejection for non-responsiveness.
Non-Responsive: Any submission that does not comply with this RFP in any way, does not contain all the properly signed forms, supplements or deviates from the RFP requirements or has an incomplete Cost Sheet may be considered nonresponsive at the discretion of Procurement Manager.
Responsible Companies: The Commission shall only consider responsible companies. Responsible companies are those that have, in the sole judgment of the Commission, the financial ability, experience, resources, skills, capability, reliability and business integrity necessary to perform the requirements of the contract. The Commission may also consider references and quality to determine the responsibility of the Respondent. The Commission reserves the right to use any information, whether supplied through the Respondent’s submission or otherwise obtained, in determining responsibility.
Rejection of Reponses: The Commission reserves the right to reject any and all responses and to waive any minor irregularity in the submissions received in response to this RFP. The Commission reserves the right to consider all information, whether submitted or otherwise, to determine responsiveness and responsibility and to reject responses accordingly.
Name of Business: ______________________________________________________________________________________________
Contact Person Name: ___________________________________________________________________________________________
Business Address: _______________________________________________________________________________________________
City: __________________________ State: ____________________________ Zip code: ____________________________________
Phone: __________________________ Fax: _____________________________ Email: ____________________________________
Federal Employer Identification Number: ___________________
I certify that this RFP response is submitted without prior understanding, agreement, or connection with any corporation, fir m, or person submitting a response for the same professional services and is in all respects fair and without collusion or fraud. I agree to abide by all conditions of this RFP and certify that I am authorized to sign this acknowledgement for the Respondent.
Authorized Signature ____________________________________________________________________________________________
Authorized Signature Name and Title: _____________________________________________________________________________
Date: _______________________________________
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 2 of 52
CALENDAR OF EVENTS
FWC 22/23-75
SCHEDULE DUE DATE METHOD
RFP Advertised February 24, 2023 Posted on the Vendor Information Portal (VIP)
Deadline for Questions
Must be received PRIOR to:
March 2, 2023
@ 5:00 PM ET
See Deadline for Questions Clause
Anticipated date for Responses to Written Questions
March 7, 2023 Posted on the Vendor Information Portal (VIP)
SEALED RESPONSE DUE
(REMEMBER: RFP number should be clearly marked on envelope)
Must be received
PRIOR to:
March 17, 2023
@ 2:00 PM ET
Mailing Address:
Florida Fish & Wildlife Conservation Commission
Attn: Purchasing
1875 Orange Ave E
Tallahassee, Florida 32311-6160
Submissions are due BEFORE the date and time of the public opening.
Public Response Opening March 17, 2023
@ 2:00 PM ET
Public Opening Location:
1875 Orange Ave E
Tallahassee, FL 32311-6160
-Teleconference- Conference call phone number: 1.888.585.9008
Conference room number: 218-721-199
Evaluation Period
From March 21, 2023 to March 31, 2023
Florida Fish & Wildlife Conservation
Commission
Anticipated Date of Intended
Award April 10, 2023 Posted on the Vendor Information Portal (VIP) https://vendor.myfloridamarketplace.com/
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 3 of 52
GENERAL CONDITIONS
FWC 22/23-75
The Florida Fish and Wildlife Conservation Commission’s (FWC or Commission) mission is to manage fish and wildlife resources for their long-term well-being and the benefit of people. The Commission administers six (6) major programs including habitat and species conservation, freshwater fisheries management, law enforcement, marine fisheries management, hunting and game management and fish and wildlife research.
A Respondent submitting a response shall be registered in the MyFloridaMarketPlace (MFMP) system and, where required, the Sunbiz system prior to the RFP opening. Business entities which must be on file with
Sunbiz include the following foreign and domestic entities: Corporations for and not for profit, Limited Liability Companies (LLC), Limited Partnerships (LP) including Limited Liability Limited Partnerships
(LLLP), and organizations doing business under a fictitious name (DBA). A Respondent may not be considered for an award if not registered in the MFMP and Sunbiz system. The Respondent’s registration address and federal employer identification (FEID) number should match the Respondent’s address and
FEID number listed on the Respondent Acknowledgment form (page 1).
Certified Minority-owned, Woman-owned and Service-Disabled Veteran Business Enterprises, as certified by the State of Florida Office of Supplier Diversity, are encouraged by the Commission to participate in the bidding process.
Response from Respondent shall include all necessary equipment to complete the job. The Respondent is required to supply all specified documentation when submitting a response for this project.
Please note:
• The terms “Contract,” “Agreement” and “Purchase Order” are used interchangeably in the document.
• The terms “Commodities” and “Goods” are used interchangeably in the document.
TERMS AND CONDITIONS
PUR 1000 and PUR1001 are hereby incorporated by reference. PUR1000 and PUR1001 can be found at the
Department of Management Services website at the following link:
https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purc hasing_pur_forms
The following terms and conditions take precedence over the PUR1001 and PUR1000 forms where applicable. The Commission objects to and shall not consider any additional terms or conditions submitted by a Respondent or Contractor, including any appearing in documents attached as part of a Respondent’s response. In signing and submitting its response, a Respondent agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect. Failure to comply with terms and conditions, including those specifying information that must be submitted with a response, shall be grounds for rejecting a response.
The terms and conditions of Attachment A, Purchase Order Terms and Conditions, are hereby incorporated into this solicitation. Any contract resulting from this solicitation will include the terms and conditions of this solicitation and the terms and conditions contained in Attachment A.
https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms https://www.dms.myflorida.com/business_operations/state_purchasing/state_agency_resources/state_purchasing_pur_forms
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 4 of 52
PROCUREMENT MANAGER
Ruth Heggen ruth.heggen@myfwc.com
TERM
The contract will be effective from issuance of the Purchase Order through June 30, 2027.
If circumstances constituting Force Majeure have occurred, or if anything occurs beyond the Contractor’s control, the Contractor may request in writing an extension of Completion Date. The Project Manager and
Contract Manager will review the extension request and if they determine it is justified, will forward to the
Bid Request Inbox (bidrequest@myfwc.com) for procurement review and approval/disapproval.
RENEWAL
The Commission has the option to renew this Contract for one five-year period after the initial Contract period upon the same terms and conditions contained herein. Pursuant to Sections 287.057(1)(a)2., and
287.057(1)(a)3., Florida Statutes, each Contractor shall supply a price for each year that a contract may be renewed. Evaluation of responses shall include consideration of the total cost of the contract, including the total cost for each renewal year, as submitted by the Contractor.
Exercise of the renewal option is at the Commission’s sole discretion and shall be conditioned, at a minimum, on the Contractor’s satisfactory performance of this Contract and is subject to the availability of funds. The Contractor, if it desires to exercise this renewal option, will provide written notice to the
Commission no later than thirty (30) days prior to the Contract expiration date. The renewal term shall require written approval from the Commission’s Procurement Manager.
SUBCONTRACTS
Subcontracting IS NOT permitted pursuant to the Terms and Conditions of the Purchase Order.
DIVERSITY
The Commission is committed to supporting Florida’s diverse business industry and population through ensuring participation by minority, women, and veteran-owned business enterprises in the economic life of the state. The State of Florida Mentor Protégé Program connects minority, women, and veteran-owned business enterprises with private corporations for business development mentoring. We strongly encourage contractors doing business with the State of Florida to consider this initiative. For more information on the
Mentor Protégé Program, please contact the Office of Supplier Diversity at (850) 487-0915 or osdinfo@dms.myflorida.com.
FWC encourages diversity in its procurement program and requests that all subcontracting opportunities afforded by this solicitation enthusiastically embrace diversity. The award of subcontracts should reflect the vast array of citizens in the State of Florida. Bidders can visit the Office of Supplier Diversity website for information on certified business enterprises that may be considered for subcontracting opportunities.
VERBAL INSTRUCTION PROCEDURE
Respondents may not consider any verbal instructions as binding upon the Commission. No negotiations, discussions, or actions shall be initiated or executed by the Respondent as a result of any discussion with any Commission employee. Only those communications from the Commission that are in writing may be considered as a duly authorized expression on behalf of the Commission.
mailto:bidrequest@myfwc.com?subject=Extension%20Request https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program mailto:osdinfo@dms.myflorida.com https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd/mentor_protege_program
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 5 of 52
DEADLINE FOR QUESTIONS
Any questions from Respondents that require an official FWC answer concerning this project shall be submitted in writing to the Procurement Manager identified below. Questions must be received no later than the date and time specified in the Calendar of Events (Page 2). Questions may be sent via email with the solicitation number in the subject line. It is the responsibility of the Respondent to confirm receipt of questions if needed.
If questions are received, an addendum will be issued and shall be posted on the Vendor Information Portal.
LIMITATION ON RESPONDENT CONTACT DURING SOLICITATION PERIOD
Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, (note the 72-hour posting period excludes Saturdays, Sundays, and state holidays) any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the Procurement Manager or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.
RESPONDENT SPECIFICATION INQUIRIES
If the specifications of this Request for Proposal (RFP) could restrict potential Respondent competition, the
Respondent has 72 hours within which to request to the Commission that the specification(s) be changed.
The Procurement Manager must receive the written request within 72 hours after the posting date of the
RFP.
Requested changes to the Commission’s specifications shall include the Respondent’s concerns regarding restricting competition, provide detailed justification, and provide recommended changes to the specification(s). A Respondent’s failure to request changes by the prescribed date and time shall be considered to constitute the Respondent’s acceptance of the Commission’s specifications.
The Commission shall determine what change(s) to the RFP is acceptable to the Commission. If accepted, the Commission shall issue an addendum reflecting the change(s) to the RFP, which shall be posted to the
Vendor Information Portal.
It is up to the Respondent to ensure that everything is included as required by the Commission’s Purchasing Office. It is not the Commission’s responsibility to mail or fax any forms to a potential Contractor. Response packet information may also be requested from the Commission’s Purchasing Section by calling (850) 488- 6551. Please have solicitation number and Respondent information available when requesting any information.
ADDENDUMS
If the Commission finds it necessary to supplement, modify or interpret any portion of the specifications or documents or answer any Respondent questions during the solicitation period, an addendum shall be posted on the Vendor Information Portal website. Each Respondent is responsible for monitoring the Vendor Information Portal for new or changing information relative to this procurement. The Commission bears no responsibility for any delays, or resulting impacts, associated with a Respondent’s failure to obtain the information made available through the Vendor Information Portal.
https://vendor.myfloridamarketplace.com/ https://vendor.myfloridamarketplace.com/
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 6 of 52
ECONOMY OF PRESENTATION
Each response shall be prepared simply and economically, providing a straightforward, concise delineation of Respondent’s capabilities to satisfy the requirements of this RFP. Elaborate binding, colored displays, and promotional materials are not required. However, examples of services provided may be included as attachments to the response. Emphasis in each response must be on completeness and clarity of content.
To expedite the evaluation of responses, it is essential that Respondents follow the format and instructions contained herein. All costs associated with preparing a response to this RFP is the sole responsibility of the
Respondent.
RESPONDENT ACKNOWLEDGMENT
For this response to be considered responsive, the Respondent Acknowledgement Form (page 1) must be completed in its entirety, signed by the Respondent and returned as part of the response. Otherwise the response will be deemed non-responsive. By affixing your signature to the Respondent Acknowledgement
Form, the Respondent hereby states that the Respondent has read all response specifications and conditions and agrees to all terms, conditions, provisions, specifications, and is currently licensed to do business within the State of Florida, if required by State or Federal Law, for the services or commodities the Respondent will provide the Commission under these response specifications.
MANDATORY RESPONSIVENESS REQUIREMENTS FOR RESPONSE SUBMISSION
Response submission should be organized as follows:
TAB A. Respondent Acknowledgment Form (Mandatory)
The Respondent shall complete and submit the Respondent Acknowledgment Form (page 1) in its entirety and return the form as part of the RFP response or the response shall be deemed non-responsive.
TAB B. References (Mandatory) — Attachment B
The Respondent shall complete and submit the References form enclosed herein, to provide a minimum of three (3) references for similar projects completed. Current contact names, phone numbers and email addresses shall be given. This information shall be provided on the Reference Form, enclosed herein, and submitted with the response. The References form shall be completed in its entirety and returned as part of the RFP response or the response shall be deemed non-responsive.
TAB C. Executive Summary/Proposed Methodology (Mandatory)
The Respondent shall present a high-level summary of the methodology proposed, including the reasoning behind the proposed methodology. The Executive Summary shall be submitted as part of the RFP response or the response shall be deemed non-responsive.
TAB D. Respondent Background and Experience (Mandatory)
The Respondent shall present a summary of experience, including the experience with similar projects
(i.e., annual surveys, post-season surveys, telephone/internet surveys). Specific experience to be addressed in this section includes:
1. a brief history of the Respondent company; and,
2. experience preparing and completing annual surveys for similar state and/or research organizations.
TAB E. Project Organization (Mandatory)
The Respondent shall present qualifications and experience of proposed personnel as well as the proposed Project Team structure. Specific topics to be discussed include:
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 7 of 52
1. qualifications, experience, and education of proposed personnel, including the intended
Project Manager;
2. structure of the proposed project team during survey development (protocols and questionnaires), implementation and management of the survey, data input, and analysis and reporting.
TAB F. Project Plan (Mandatory)
This section shall present the Respondent’s plan for the completing the tasks identified in the scope of
Work, including:
1. methodologies to be used for the survey development (protocols and questionnaires), quality assurance and implementation;
2. testing of the survey and methodologies for modifications after initial development;
3. implementation and management of the survey;
4. data input into database; and,
5. analysis and reporting.
TAB G. Implementation Schedule (Mandatory)
The Respondent shall present their proposed implementation schedule, based on the date of purchase order issuance. The schedule shall address activities required to accomplish the development and implementation of the survey that meets the requirements identified in the Scope of Work and shall depict a schedule for all steps providing adequate FWC review time, revision time, if needed, and additional subsequent review time.
The Implementation Schedule from the selected respondent shall be included in the purchase order resulting from this solicitation. A sample format is provided:
ID Milestones Start Finish Duration
1 Contract Award Day 1
2 Survey Development
3 Survey Testing
4 Survey Performance
5 Data Input
6 Data Analysis
7. Reporting
TAB H. Cost Sheet (Mandatory) — Attachment C
The Respondent shall provide a price for completion of the survey for each year of the initial term of the project as well as the potential renewal periods.
The Cost Sheet shall be completed in its entirety and returned as part of the RFP response or the response shall be deemed non-responsive.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 8 of 52
TAB I. Addendum (if applicable)
CONFIDENTIALITY/PUBLIC RECORDS LAW
Respondents are cautioned that Florida law generously defines what constitutes a public record and grants broad rights of public access to those records (e.g., section 119.07, F.S.). If a Respondent considers any portion of the documents, data or records submitted in their Response to this solicitation to be confidential, proprietary, trade secret or otherwise not subject to disclosure pursuant to Chapter 119, F.S., the Florida
Constitution or other authority, the Respondent must mark the document as “Confidential.” The Respondent shall also provide the Commission with a separate PDF redacted copy of its Response and briefly describe in writing the grounds and specific legal citations for claiming exemption from public records law. This redacted copy shall contain the Commission’s solicitation name, number and the
Respondent’s name on the cover and shall be clearly titled “Redacted Copy.” The Redacted Copy should only redact those portions of material that the Respondent claims is confidential, proprietary, trade secret or otherwise not subject to public disclosure pursuant to Chapter 119, F.S., the Florida Constitution or other authority. If after the notice of intended decision or thirty (30) days after response opening, whichever is earlier, the Commission receives a public record request related to the solicitation, the Commission will provide the Redacted Copy to the requestor. If the Respondent fails to properly indicate any material enclosed in their Response is confidential, the Commission is authorized to produce documents, data or records in their entirety as submitted to the Commission in answer to a public records request. The
Commission will endeavor to provide notice to the Respondent of all public records requests received related to documents provided by the Respondent that were marked pursuant to this paragraph. In no event shall the Respondent hold the Commission or any of its employees or agents liable for disclosing, or otherwise failing to protect the confidentiality of information submitted in response to this solicitation.
MAILING INSTRUCTIONS
The Contractor shall submit one (1) original and one (1) separate electronic copies (on a flash drive) of their response in a SEALED ENVELOPE addressed to:
Florida Fish and Wildlife Conservation Commission Attn: Purchasing
1875 Orange Avenue East
Tallahassee, Florida 32301
The envelope shall be plainly marked on the outside with: SOLICITATION NUMBER, DATE AND TIME
OF THE RESPONSE OPENING.
THE COMMISSION IS NOT RESPONSIBLE FOR THE OPENING OF ANY ENVELOPES THAT ARE NOT PROPERLY
MARKED.
PLEASE NOTE : The Commission’s official business hours of operation are 8:00 AM–5:00 PM ET, exclusive of Saturdays, Sundays and state holidays. Selecting delivery services, such as next day first delivery, may result in attempted delivery prior to opening or closing, and the Commission will not be available to accept those deliveries. THE COMMISSION IS NOT RESPONSIBLE FOR LATE SUBMISSIONS DUE TO COMPLICATIONS
RELATED TO SELECTED DELIVERY SERVICES .
SOLICIATION PUBLIC OPENING
The public opening of this RFP will be conducted at the date, time and method specified in the Calendar of
Events (Page 2) . RESPONSES RECEIVED AFTER THE SPECIFIED DATE AND TIME WILL BE
REJECTED.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 9 of 52
Any person with a qualified disability shall not be denied equal access and effective communication regarding any response documents or the attendance at any related meeting or response opening. If accommodations are needed because of a disability, please contact the Purchasing Section at (850) 488-6551 at least three (3) workdays prior to the opening.
SELECTION AND EVALUATION OF RESPONSES
An evaluation committee consisting of three (3) Commission representatives with collective knowledge and experience related to the solicitation’s program area will independently evaluate and score each
Respondent’s response. The Evaluation Criteria Scoring Sheet (Attachment D) will be used by the evaluation committee to assign scores to all evaluated responses designated as responsive.
Scores will be averaged for all evaluation committee members and ranked by the highest to lowest average score. Respondents must score at least 50 points per work type to be considered for award.
GENERAL EVALUATION CRITERIA
General evaluation criteria include the following:
1. The Commission reserves the right to accept or reject any or all responses received and reserves the right to make an award without further discussion of the responses submitted. Therefore, responses should be initially submitted as outlined in the Mandatory Responsiveness Requirements for
Response Submission and Economy of Presentation sections.
2. Non-responsive responses shall include, but are not limited to, those that:
a. are irregular or are not in conformance with the requirements and instructions contained herein;
b. fail to utilize or complete prescribed forms; or
c. have improper or undated signatures.
3. The Commission may waive minor irregularities in the responses received that are merely a matter of form and not substance, and the corrections of which are not prejudicial to other respondents.
A NON-RESPONSIVE RESPONSE WILL NOT BE CONSIDERED.
EVALUATION SCORING FACTORS
Scoring criteria include:
The following is a summary of evaluation factors with point value assigned to each. These, along with the general requirements, will be used in the evaluation of Respondent responses.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 10 of 52
EVALUATION FACTOR MAXIMUM POINTS AVAILABLE
Executive Summary/Proposed Methodology 10
Respondent Background and Experience 10
Project Organization 25
Project Plan 30
Implementation Schedule 15
Cost 10
TOTAL: 100
Points will be awarded on the basis of the following evaluation factors:
1. Executive Summary/Proposed Methodology (10 points)
High‐level synopsis of the response will be evaluated based on clarity and ability for methodology to meet FWC needs.
2. Respondent Background and Experience (10 points)
Background and Experience will be evaluated based on experience with developing and implementing survey as presented in the response.
3. Project Organization (25 points)
Project Organization will be evaluated based on the Respondent’s proposed organization structure’s ability to successfully complete this project.
4. Project Plan (30 points)
Project Plan will be evaluated based upon the Respondent’s proposed plan for developing and implementing a survey that meets FWC’s needs.
5. Implementation Schedule (15 points) Implementation Schedule will be evaluated based on timeline provided and the thoroughness of the approach to the survey.
6. Cost (10 points)
The evaluation of each Respondent’s cost proposal will be conducted based on the cost formula below.
The Respondent submitting the lowest cost will receive the maximum points for the cost element of the evaluation. The other respondent's scores will be based on a relative percentage of the dollar amount higher than the lowest cost or price submitted by the lowest priced Respondent.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 11 of 52
Formula for Cost Factor:
𝐴 ÷ 𝑁× (𝐵) = 𝐶
A = Lowest total proposed cost (including renewals)
N = Proposed cost for Respondent under review
B = Number of maximum points awarded for lowest response
C = Score awarded to next lowest cost
NOTE: Each evaluator independently chooses the score based on their own judgment. Failure of the
Respondent to provide any of the information required in their RFP response should result in a score of zero (0) for that element of the evaluation.
POSTING OF RESPONSE TABULATION
Response Tabulation, with recommended award, will be posted electronically as Agency Decisions on the Department of Management Services Vendor Information Portal as a Public Notice. The Agency Decision may be viewed on the Vendor Information Portal, and will remain posted for a period of 72 hours. Failure to file a protest within the time prescribed in Section 120.57(3)(b), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
Awarded Respondents are instructed not to proceed until a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice is given to the Contractor by the Commission.
A company or person who proceeds prior to receiving a Purchase Order, Formal Written Contract, Lease, Notice to Proceed, or some other form of written notice from the Commission does so without a contract and at their own risk.
Sealed responses, proposals, or replies received by an agency pursuant to a competitive solicitation are exempt from Section 119.07(1) and Section 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision or until thirty (30) days after opening the responses, proposals, or final replies, whichever is earlier.
CONTRACT
The successful Respondent’s response and the Purchase Order shall form the contract between the parties.
In the event there is any disagreement between the documents, the parties shall refer first to the Request for Proposal then to Contractor’s response. The Commission reserves the right to revise the Purchase Order as necessary to meet the requirements of this RFP.
SCOPE CHANGES AFTER CONTRACT EXECUTION
The Commission shall provide written notice to the successful Contractor thirty (30) days in advance of any
Commission required changes to the technical specifications and/or scope of service that affect the successful Contractor’s ability to provide the service as specified herein. Any changes that are other than purely administrative changes will require a change order.
FWC CONTRACT MANAGER
The FWC employee identified as the Contract Manager shall perform the following on behalf of the FWC:
review, verify, and approve receipt of services/deliverables from the Contractor;
• Submit requests for change orders/amendments/renewals, if applicable;
http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&Search_String=&URL=0100-0199/0119/Sections/0119.07.html
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 12 of 52
• Review, verify, and approve invoices from the Contractor; and, if applicable, complete the
Certificate of Contract Completion form; and
• Maintain an official record of all correspondence between the Commission and the Contractor and forward the original correspondence to the Procurement Manager for the official file (e.g., renewal letters, vendor name change letter).
DELIVERABLES
The following services or service tasks are identified as deliverables for the purposes of the subsequent
Contract:
a. Performance of all services set forth in the Scope of Work.
b. Submission of all invoicing, supporting documentation, Corrective Action Plans and reports.
LIQUIDATED DAMAGES
If the Contractor fails to complete the work or the conditions of the Purchase Order and/or Change Orders by the completion date, the Commission shall have the right to deduct liquidated damages from any amount due and payable to the Contractor. Liquidated damages shall be assessed in the amount of $50.00 per calendar day of delay. Exceptions to this provision may be made if a delay is attributable to circumstances that are clearly beyond the control of the Contractor. The burden of proof of unavoidable delay shall rest with the Contractor and shall be supplied in a written form and submitted to the Contract Manager.
PERMITTING
Permitting for this project, if needed, is the responsibility of the Contractor. A copy of all permits shall be posted at the work site location at all times during the project. The Contractor is responsible for complying with all permit conditions and the Contractor shall pay any penalties arising from the Contractor’s permit violations.
AUTHORIZED COMPENSATION
It is understood and agreed that all compensation under this RFP is specifically limited to the Contractor’s response price accepted by the Commission, and to the specific procedure for payment established in this
RFP and the Purchase Order executed pursuant to it. The Commission is not liable for any costs, fees, expenses or any other compensation whatsoever incurred or charged by the Contractor, other than the response price paid for the work specifically described in the Scope of Work, which work is actually accomplished and invoiced by the Contractor subsequent to the Commission’s notice to proceed (or other notice to begin work). Thus, the Commission is not liable for any costs incurred or charged by the Contractor in anticipation of responding to, or performing work described in, this RFP, including but not limited to equipment or personnel procured by the Contractor in anticipation of such work. The Commission is not responsible to the Contractor for any loss or damages resulting from circumstances unforeseen at the time of publication of this RFP including, but not limited to, those resulting from a “force majeure”.
ADDITIONAL LEGAL REQUIREMENT
All corporations seeking to do business with the State shall, at the time of submitting a response, be on file with the Department of State in accordance with provisions of Chapter 607, Florida Statutes; similarly, partnerships seeking to do business with the State shall, at the time of submitting such response, have complied with the applicable provisions of Chapter 620, Florida Statutes. For further information on required filing and forms, please go to the following sites: http://sunbiz.org or http://dos.myflorida.com.
http://www.sunbiz.org/ http://dos.myflorida.com/
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 13 of 52
USE OF CONTRACT BY OTHER STATE AGENCIES AND ELIGIBLE USERS
As provided in Chapter 60A-1.045, F.A.C., and Section 287.042(16) F.S., other State of Florida agencies may purchase from the resulting contract of this RFP, provided that the Department of Management
Services has determined the contract’s use is cost effective and in the best interest of the State, and with the Contractor’s consent.
Other State of Florida governmental entities and eligible users may also request of the Contractor to be able to use this contract. If the Contractor agrees to other entities to utilize this RFP contract, such agencies shall coordinate their use of this contract with the Florida Fish and Wildlife Conservation Commission in order to reduce scheduling conflicts.
CONDITIONS AND SPECIFICATIONS
The Respondent is required to examine carefully the conditions and specifications of this RFP and to be thoroughly informed regarding any and all requirements of the conditions and specifications.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 14 of 52
SCOPE OF WORK
FWC 22/23-75
ANNUAL STATEWIDE DEER HARVEST SURVEYS
PURPOSE
In an effort to achieve several objectives in Florida’s Strategic Deer Management Plan, the Florida Fish and Wildlife Conservation Commission (FWC) is seeking an experienced contractor (Contractor) to conduct an annual deer hunter harvest survey for five consecutive years (base year 2023) pending funding and possible renewal for up to five additional years. The survey must produce accurate estimates of the following harvest parameters: days hunted, deer harvested (by sex), harvest per hunter day, hunter satisfaction, and harvest reporting compliance in each of the 4 Deer Management Zones (Fig. 1) and 12
Deer Management Units (DMUs; Fig. 1) as described below. The Contractor will provide a summary report along with the raw data in an organized database. Surveys will also monitor 5 trends in harvest and hunter satisfaction parameters. Methods are flexible as long as the desired power (described below) is achieved.
BACKGROUND/SCOPE OF WORK
Wildlife agencies throughout North America obtain estimates of annual hunter harvest of game species in order to monitor population trends and adjust regulations according to management objectives. For the past ten years, FWC has conducted post-season telephone/internet surveys of hunters to estimate deer harvest, deer harvest per hunter effort, and hunter satisfaction. Continuation of these annual hunter surveys is imperative to the long-term monitoring and management of deer populations as well as informing potential regulation changes.
OBJECTIVES OF SURVEY
1. Estimate, with the above-mentioned power to detect changes, the following parameters:
a. Number of deer hunters statewide and by management zone (Fig. 1), deer management unit
(DMU; Fig. 2), county, and season type (archery, muzzleloading gun, and general gun).
b. Number of days hunted statewide and by management zone, DMU, county, and season type.
c. Number of males (bucks) and females (does) harvested statewide and by management zone, DMU, county, and season type.
d. Number of deer harvested per hunter day statewide and by management zone, DMU, county, and season type.
2. Estimate parameters from objectives 1a-1d for public and private land separately:
a. Estimate number of points for harvested bucks statewide and by management zone, DMU, county, season type, and land type (public or private).
3. Estimate the number of does and antlerless males harvested with antlerless deer permits, during general gun antlerless deer days, or during the archery/crossbow season.
4. Estimate hunter satisfaction at the DMU level by:
a. Season type
b. Land type
5. Estimate compliance with harvest reporting.
6. Monitor trends in estimates obtained from objectives 1-6 in surveys prior to and subsequent to the
2022-23 base year survey.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 15 of 52
SURVEY DESIGN AND SAMPLE COLLECTION
Methods of conducting the survey are flexible, but the sample must be unbiased (i.e., an accurate representation of all deer hunters in each DMU).
POWER ANALYSIS
In May 2022, FWC research staff performed a power analysis of the results from the 2020-21 and 2021-22 statewide harvest survey to determine the number of completed surveys needed to achieve 90% power in a one-way Analysis of Variance (ANOVA) to detect a 25% change between consecutive years for each harvest parameter (following a log transformation) at the statewide and DMU levels. The specifications (i.e., number of completed surveys statewide and per DMU) listed below for the service requested are based on the results of this power analysis, and attainment of said specifications is critical to the success of the survey and its utility for FWC’s Deer Management Program.
Key Findings of Power Analysis
The number of respondents needed for a given DMU from hunters who hunted in the DMU to achieve 90% power in a one-way ANOVA to detect a 25% change over consecutive years for each of the following harvest parameters: harvest and harvest per hunter day.
DMU Harvest Harvest per Hunter Day Zone A 65 65
B1 65 65
C1 60 60
C2 65 65
C3 85 85
C4 70 70
C5 85 85
C6 85 85
D1 95 95
D2 115 115
Statewide 80 310
PROJECT TIMETABLE
Base year survey to begin in April 2023 with the final report sent to FWC by June 15, 2023. Each year after base year, the annual survey shall begin following completion of the deer hunting season and the final report must be submitted to FWC by June 15 th of each year.
SERVICES TO BE PROVIDED BY CONTRACTOR
Contractor will be expected to provide the following:
1. Full cooperation and high degree of communication with FWC Deer Management Program staff during planning, coordination, and implementation of the survey. Cooperation and communication with FWC Deer Management Program includes, but is not limited to:
a. FWC approval of all survey protocols;
b. FWC approval of survey questionnaire; and,
c. FWC approval of final report thoroughness, analyses, and summaries
2. Implementation and management of the entire survey including, but not limited to, conducting phone interviews or internet surveys, data entry, database management, and data analysis.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 16 of 52
3. Obtaining adequate responses of hunters in each DMU to obtain desired power. For example, one methodology may sample by making the assumption that hunters generally hunt in the DMU in which they live. Proposals of other effective methodologies are welcome and encouraged.
4. A test or “dry run” of the survey to ensure efficacy of the methodology chosen.
5. Thorough report consisting of a summary of key findings, clear and concise explanation of methods and analyses, evaluation of method used (e.g., based on response rates and results, make suggestions for subsequent surveys), and detailed findings and descriptive and inferential statistics presented in a clear and intuitive manner.
6. Raw data input into an organized database, and copies (digital or hardcopy) of all telephone logs or internet surveys upon request.
INFORMATION PROVIDED TO CONTRACTOR BY FWC
FWC will provide the Contractor with a list of licensed Florida deer hunters with the mailing address, email address, and phone number that was provided by the hunter. Reports from previous year’s surveys and a copy of the above summarized power analysis are available upon request.
INVOICING
Invoices each year shall be submitted within ten (10) business days of FWC issuing approval of the final report.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 17 of 52
Figure 1. The four deer management zones (A-D). Management zones were designated as such based on similar landscape characteristics and deer breeding chronology.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 18 of 52
Figure 2. Each of the four deer management zones (A-D) are subdivided to create twelve Deer Management
Units (DMUs). DMUs were designated as such based on similar landscape characteristics, deer breeding chronology and hunter preferences.
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 19 of 52
ATTACHMENT A
FWC 22/23-75
FLORIDA FISH & WILDLIFE CONSERVATION COMMISSION
PURCHASE ORDER TERMS & CONDITIONS
Last Updated: November 1, 2022
Section 1. PURCHASE ORDER.
A. Composition and Priority.
The Contractor agrees to provide commodities or contractual services to the Commission within the manner and at the location specified in the Purchase Order, and any attachments to the Purchase Order. These Purchase Order Terms and Conditions, whether generic or specific, shall take precedence over any inconsistent or conflicting provision in the State of Florida, General Contract Conditions, PUR 1000. Additionally, the terms of the Purchase Order supersede the terms of any and all prior agreements with respect to this purchase.
B. Initial Term.
Unless otherwise specified, the Purchase Order begins on the date of issuance. Contractual services or commodities to be provided by the Contractor shall be completed by the date specified on the
Purchase Order end date.
Section 2. PERFORMANCE.
A. Performance Standards.
The Contractor agrees to perform all tasks and provide deliverables as set forth in the Statement of
Work and attachments to the Purchase Order. The Commission shall be entitled at all times, upon request, to be advised as to the status of work being done by the Contractor and of the details thereof.
Coordination shall be maintained by the Contractor with representatives of the Commission, or of other agencies involved in the project on behalf of the Commission.
B. Performance Deficiency.
If the Commission determines that the performance of the Contractor is unsatisfactory, the
Commission may notify the Contractor of the deficiency to be corrected, which correction shall be made within a time frame specified by the Commission. The Contractor shall provide the Commission with a corrective action plan describing how the Contractor will address all issues of Purchase Order non‐performance, unacceptable performance, and failure to meet the minimum performance levels, deliverable deficiencies, or Purchase Order non‐compliance. If the corrective action plan is unacceptable to the Commission, the Contractor will be assessed a non ‐performance retainage equivalent to ten (10) percent of the total invoice amount or as specified in the contractual documents.
The retainage will be applied to the invoice for the then‐current billing period. The retainage will be withheld until the Contractor resolves the deficiency. If the deficiency is subsequently resolved, the
Contractor may invoice the Commission for the retained amount during the next billing period. If the
Contractor is unable to resolve the deficiency, the funds retained will be forfeited.
C. Contractor Responsibilities.
The Contractor agrees that all Contractor employees, subcontractors, or agents performing work under the Purchase Order shall be properly trained technicians who meet or exceed any specified training qualifications. Upon request, the Contractor shall furnish a copy of technical certification or other proof of qualification. All employees, subcontractors, or agents performing work under the
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 20 of 52
Purchase Order must comply with all security and administrative requirements of the Commission.
The Commission may conduct, and the Contractor shall cooperate in, a security background check or otherwise assess any employee, subcontractor, or agent furnished by the Contractor. The Commission may refuse access to, or require replacement of, any personnel for cause, including, but not limited to, technical or training qualifications, quality of work, change in security status, or non-compliance with the Commission’s security or other requirements. Such refusal shall not relieve the Contractor of its obligation to perform all work in compliance with the Purchase Order. The Commission may reject and bar from any facility for cause any of the Contractor’s employees, subcontractors, or agents.
D. Assignment.
The Contractor shall not sell, assign or transfer any of its rights, duties or obligations under the
Purchase Order without the prior written consent of the Commission. In the event of any assignment, the Contractor remains secondarily liable for performance of the Purchase Order, unless the
Commission expressly waives such secondary liability. The Commission may assign the Purchase
Order with prior written notice to the Contractor.
E. Damages to State Property.
Any damages to state property (e.g., structures, roads, culverts, fences, trees, or other natural resources) caused by the Contractor while working on this project shall be the responsibility of the
Contractor to remedy, as determined by the Commission. The Contractor shall be responsible for the conduct of all Contractor personnel at all times while on the job site.
Should any historical or cultural artifacts be uncovered, the Contractor shall immediately halt work and notify the Commission’s Contract Manager. Please note: The State Archaeologist has the power to halt work if he or she has reason to believe artifacts are being disturbed.
F. Subcontractor Minority Status Report.
Contractor shall provide a Subcontractor Minority Status Report to the Commission’s Contract
Manager, summarizing the participation of certified and non-certified woman-, veteran- and/or minority-owned business enterprise subcontractors/material suppliers for this Contract. The report shall be completed in its entirety and submitted with each invoice. The Contractor shall indicate “N/A” if the project does not utilize subcontractors. The Office of Supplier Diversity can assist in furnishing names of qualified woman-, veteran- and/or minority-owned business enterprises. Contact the
Commission’s Minority Coordinator at (850) 488-6551 with any questions.
G. Independent Contractor.
The Contractor shall perform as an independent contractor and not as an agent, representative, or employee of the Commission. The Contractor covenants that it presently has no interest and shall not acquire any interest that would conflict in any manner or degree with the performance of services required. Each party hereto covenants that there is no conflict of interest or any other prohibited relationship between the Contractor and the Commission. The Contractor agrees to include this provision in all its subcontracts under the Purchase Order.
H. Commission Rights to Undertake or Award Supplemental Contracts.
The Contractor agrees that the Commission may undertake or award supplemental contracts for work related to the Purchase Order. The Contractor and its subcontractors shall cooperate with such other contractors and the Commission in all such cases.
https://www.dms.myflorida.com/agency_administration/office_of_supplier_diversity_osd
Request for Proposal – Revised 11.4.2022 FWC 22/23-75, Page 21 of 52
Section 3. PAYMENT AND FEES.
A. Payment.
The Contractor will be paid upon submission of properly certified invoice(s) to the Commission after delivery and acceptance of commodities or contractual services is confirmed in writing by the
Commission.
B. Invoicing.
Invoices may be submitted electronically to the Commission’s designated Contract Manager, as identified in this Purchase Order. The Contractor acknowledges that the Commission’s Contract
Manager shall reject invoices lacking documentation necessary to justify invoiced expenses.
C. Invoices, Continued.
All invoices shall be processed in accordance with Section. 215.422, Florida Statutes (F.S.), and Rule 69I-24, Florida Administrative Code (F.A.C.), upon receipt of a proper invoice and approval and inspection of goods or services. The Commission shall record the date of receipt of an invoice on the date on which a proper invoice is first received at the place designated by the Commission. Approval and inspection of goods or services shall take no longer than five (5) working days unless the bid specifications, purchase order, or contract specifies otherwise.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .