FWC 21.22-75 A#3 Corrected Cost Sheets.pdf
PDF 1 MB Posted
- Attached to
- DERELICT, AT-RISK/PUBLIC NUISANCE & VESSEL TURN IN PROGRAM (VTIP) VESSEL REMOVAL FROM WATERS OF FL
- Solicitation number
- RFP-00800
- Issued by
- Florida
About this file
This document is an addendum to a Request for Proposals (RFP) issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the Derelict, At-Risk/Public Nuisance and Vessel Turn in Program (VTIP) Vessel Removal from Waters of this State, Destruction, and Disposal. Addendum #3 includes corrected cost sheets that all respondents must use in their proposals. The RFP seeks competitive proposals for the removal, destruction, and disposal of derelict, at-risk/public nuisance, and VTIP vessels across multiple regions in Florida. Responses to the RFP must be received by 2:00 PM ET on June 29, 2022. This is a multi-award RFP, and subsequent to awarding the RFP, FWC will initiate a Request for Quotes (RFQ) for each unique project. The contract may be renewed for up to three additional one-year periods.
The corrected cost sheets provided in Addendum #3 include unit pricing for various services related to vessel removal, decontamination, destruction, and disposal. Respondents must provide pricing for all items listed for the region(s) they are responding to, or their response will be deemed non-responsive. The cost sheets also include a provision for a percentage markup (up to 10%) for cost reimbursement items. Evaluation of proposals will consider the total cost of the contract, including the total cost for each possible renewal year.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 21.22-75 A#1 Revised Calendar.pdf | ||
| FWC 21.22-75 RFP - Final.pdf | ||
| FWC 21.22-75 A#2 QA Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman Coral Gables
Michael W. Sole Vice Chairman Sebastian
Steven Hudson Fort Lauderdale
Gary Lester Oxford
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Robert A. Spottswood
Key West
Office of the
Executive Director
Eric Sutton Executive Director
Thomas H. Eason, Ph.D.
Assistant Executive Director
Jennifer Fitzwater
Chief of Staff
850-487-3796
850-921-5786 FAX
Mana gin g fish and wildlife resourc e s for their long-te rm well-b ei n g and the benefi t of peopl e .
620 South Meridian Street
Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800 955-8770 (V)
MyFWC.com
Finance and Budget Office
(850) 488-6551
DATE: JUNE 20, 2022
ADDENDUM NO.: 3
BID NO.: FWC 21/22-75
BID TITLE: DERELICT, AT-RISK/PUBLIC NUISANCE AND VESSEL TURN
IN PROGRAM (VTIP) VESSEL REMOVAL FROM WATERS OF
THIS STATE, DESTRUCTION, AND DISPOSAL
UPDATE: CORRECTED COST SHEETS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s
(FWC) Solicitation No. FWC 21/22-75, “Derelict, At-Risk/Public Nuisance and
Vessel Turn in Program (VTIP) Removal from Waters of this State, Destruction, and Disposal”.
All responses to the subject solicitation must be received no later than 2:00
PM (ET) on Wednesday, June 29, 2022.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in
Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875
Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Ruth Heggen
FWC Procurement Manager
FWC 21/22-75, Addendum #3, Page 1 of 1
BEGIN ADDENDUM #3
Item #1: Corrected Cost Sheets
In order to correct a line in the Barge and/or Crane section, Attachment G, Cost Sheets, is hereby deleted in its entirety and replaced with Attachment G-1, Corrected Cost Sheets, attached hereto and made a part of the solicitation. Respondents must use the Corrected Cost
Sheets in their response. The Corrected Cost Sheets shall be completed in their entirety for the Region for which the Respondent is proposing to provide services, and returned, as part of the RFP response or the response shall be deemed non -responsive. In the event that a
Respondent cannot provide one of the services listed on the Corrected Cost Sheets, “N/A” shall be written in the space for the price. Services noted with an “N/A’ by the Respondent cannot be provided by the Respondent if they receive an award under this RFP.
END ADDENDUM #3
FWC 21/22-75, Attachment G-1. Page 1 of 31
ATTACHMENT G-1
FWC 21/22-75
CORRECTED COST SHEETS
CONTRACTOR SHALL NOT ALTER THE PRICE SHEET IN ANY WAY
Price shall be less any Federal or State sales or use taxes. The Respondent recognizes that the State of Florida, by virtue of its sovereignty, is not required to pay taxes on services , goods and/or equipment purchased incident to such service.
PRICES SHALL BE PROVIDED FOR ALL ITEMS LISTED FOR THE REGION THEY ARE
RESPONDING FOR OR THE RESPONSE WILL BE REJECTED. IN THE EVENT THAT A
RESPONDENT CANNOT PROVIDE ONE OF THE SERVICES LISTED ON THE COST SHEET, “N/A”
SHALL BE WRITTEN IN THE SPACE FOR THE PRICE. SERVICES NOTED WITH AN “N/A’ BY THE
RESPONDENT CANNOT BE PROVIDED BY THE RESPONDENT IF THEY RECEIVE AN AWARD
UNDER THIS RFP.
PURSUANT TO SECTIONS 287.057(1)(a)1 AND 287.057(1)(a)2., F.S., EACH CONTRACTOR SHALL
SUPPLY A PRICE FOR EACH YEAR THAT A CONTRACT MAY BE RENEWED.
Price shall be less any Federal or State sales or use taxes. The Respondent recognizes that the State of
Florida, by virtue of its sovereignty, is not required to pay taxes on services, goods and/or equipment purchased incident to such service.
Price shall include all necessary costs necessary to provide the services listed including, but not limited to, highest estimated rate for employee pay, benefit costs, insurance, travel and incidental expenses, fuel, vehicles, materials, supplies, PPE, disposal methods/equipment, and any other costs necessary for the
Contractor to meet project specifications. Respondent should take into account potential price increases and market fluctuations that could affect the Respondent’s costs over the term of contract.
In the event that the Contractor anticipates the need for a particular piece of equipment that would need to be rented, the rental price can be provided under the Cost for Items Not Listed Above section of the Cost
Sheets below. Equipment owned or rented can used to complete projects and the Cost Sheets should take that into account.
Awards will be made in accordance with the specifications herein. This is a multi-award RFP. Subsequent to awarding the RFP, a Request for Quotes (RFQ) will be initiated for each unique project. Project quotes shall be calculated using the rates provided herein. An award under this Request for Proposals is not a guarantee of work.
Evaluation of proposals shall include consideration of the total cost of the contract, including the total cost for each possible renewal year, as submitted by the Respondent.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
FWC 21/22-75, Attachment G-1. Page 2 of 31
NORTHWEST REGION COST SHEET
Respondent shall check all counties they are committing to do work in. This information will be used in the calculation of the points for the Area of Operational Availability criteria.
WALTON _____ JACKSON ____ SANTA ROSA _____ LEON _____
BAY _____ HOLMES ____ OKALOOSA _____ JEFFERSON _____
GULF _____ WASHINGTON FRANKLIN _____ GADSDEN _____
CALHOUN _____ ESCAMBIA ____ WAKULLA _____ LIBERTY _____
ITEM DESCRIPTION
Uni t Price
COLUMN A COLUMN B COLUMN C COLUMN D
MOBILIZATION/DEMOBILIZATION
(Includes: transport of equipment, personnel, vehicles, land-based staging sites, on-water mob/demob of all vessels associated with a project)
NOTE: Mobilization/Demobilization prices will be a maximum ceiling rate. Based on the specifics of a pro ject, Respondents may propose a lower rate in a
Quote.
Year 1 Price
Renewal Year 1
Pri ce
Renewal Year 2
Renewal Year 3
1 – 5 Vessels $_______________ $_______________ $_______________ $_______________
6 – 10 vessels $_______________ $_______________ $_______________ $_______________
11 – 15 vessels $_______________ $_______________ $_______________ $_______________
16 or more vessels $_______________ $_______________ $_______________ $_______________
REMOVAL OF SUNKEN VESSEL
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot))
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' – 31 $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Vessels 56' - 79' $_______________ $_______________ $_______________ $_______________
Vessels 80' + $_______________ $_______________ $_______________ $_______________
ON WATER TOWING FOR DESTRUCTION
(Price Per Hour) Renewal Year 1
(Price Per Hour) Renewal Year 2
(Price Per Hour)
Renewal Year 3
(Price Per Hour)
Al l Vessels (Price per hour including fuel)
FWC 21/22-75, Attachment G-1. Page 3 of 31
BARGE AND/OR CRANE
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
LAND BASED TRANSPORT (If applicable) Year 1
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
VESSEL DECONTAMINATION EMERGENCY
ENVIRONMENTAL CLEAN-UP MEASURES TO
INCLUDE REMOVAL AND DISPOSAL OF HAZ-
MAT ITEMS NOT RELATED TO FUEL/BLACK OR
GRAY WATER.
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price Per Gallon
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
ENVIRONMENTAL CLEAN-UP AND DISPOSAL
OF USED PRODUCTS (absorbance socks/mats)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 4 of 31
VESSEL DECONTAMINATION BLACK
WATER/GRAY WATER REMOVAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price per Gallon)
Al l vessels $_______________ $_______________ $_______________ $_______________
VESSEL DECONTAMINATION FUEL REMOVAL
AND DISPOSAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
VESSEL DESTRUCTION AND DISPOSAL (includes containers, landfill fees, minimizing/crushing/destruction)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OFFLOADING FROM BARGE Year 1
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OFFLOADING FROM TRUCK Year 1
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 5 of 31
OTHER FACTORS (aluminum and steel) FOR
VESSEL CUTTING
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
MARINA LIFTING FROM WATER Year 1
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
COSTS OR ITEMS NOT LISTED ABOVE BUT
WHICH CAN BE PROVIDED, PLEASE LIST
BELOW.
Please ensure to note on the individual line below what unit pricing you are using (ex. lump sum, per foot, per gallon, per unit etc. )
Year 1 Price Renewal Year 1
Pri ce
Renewal Year 2
Pri ce
FWC 21/22-75, Attachment G-1. Page 6 of 31
BY SIGNING BELOW, I ATTEST THAT I HAVE READ THE ENTIRE BID AND AGREE TO FURNISH
THE SERVICE AT THE PRICE QUOTED ABOVE. I HEREBY AFFIRM I HAVE NOT BEEN IN ANY
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: _____________________________________________________________________________________
Address: _______________________________________________________________________________________
Signed: ________________________________________________________________________________________
Print Name: ___________________________________________________________________________________
Title: __________________________________________________________________________________________
Fax: ___________________________________________________________________________________________
City/State/Zip: _________________________________________________________________________________
Telephone: _____________________________________________________________________________________
PERCENTAGE MARKUP FOR COST
REIMBURSEMENT ITEMS (MAX OF 10%)
_ ____________ % X $10,000 =
(Number for Cost Evaluation Only)
GRAND TOTAL OF ALL PRICES ABOVE FOR
EACH COLUMNS ABOVE + CALCULATION FOR
EVALUATION OF % MARKUP
GRAND TOTAL FOR NORTHWEST REGION
(ADD TOTALS FOR COLUMN A + COLUMN B + COLUMN C + COLUMN D)
**NOTE: TOTALS ARE FOR PRICE CALCULATIONS/COMPARISONS ONLY**
FWC 21/22-75, Attachment G-1. Page 7 of 31
NORTHCENTRAL REGION COST SHEET
Respondent shall check all counties they are committing to do work in. This information will be used in the calculation of the points for the Area of Operational Availability criteria.
MADISON _____ LEVY ____ COLUMBIA _____ BAKER _____
NASSAU _____ TAYLOR ____ CITRUS _____ HAMILTON _____
BRADFORD _____ LAFAYETTE ____ GILCHRIST _____ UNION _____
CLAY _____ DIXIE ____ SUWANNEE _____ ALACHUA _____
DUVAL _____
MOBILIZATION/DEMOBILIZATION
(Includes: transport of equipment, personnel, vehicles, land-based staging sites, on-water mob/demob of all vessels associated with a project)
NOTE: Mobilization/Demobilization prices will be a maximum ceiling rate. Based on the specifics of a
1 – 5 Vessels $_______________ $_______________ $_______________ $_______________
6 – 10 vessels $_______________ $_______________ $_______________ $_______________
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot))
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' – 31 $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
(Price Per Hour) Renewal Year 1
(Price Per Hour) Renewal Year 2
(Price Per Hour)
Renewal Year 3
(Price Per Hour)
FWC 21/22-75, Attachment G-1. Page 8 of 31
(Price Per Foot)
Renewal Year 1
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price per Foot)
INCLUDE REMOVAL AND DISPOSAL OF HAZ-
MAT ITEMS NOT RELATED TO FUEL/BLACK OR
GRAY WATER.
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price Per Gallon
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OF USED PRODUCTS (absorbance socks/mats)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 9 of 31
WATER/GRAY WATER REMOVAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3 minimizing/crushing/destruction)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 10 of 31
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
BELOW.
Please ensure to note on the individual line below what unit pricing you are using (ex. lump sum, per foot, per gallon, per unit etc. )
Year 1 Price Renewal Year 1
Pri ce
Renewal Year 2
Pri ce
FWC 21/22-75, Attachment G-1. Page 11 of 31
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: _____________________________________________________________________________________
Address: _______________________________________________________________________________________
Signed: ________________________________________________________________________________________
Print Name: ___________________________________________________________________________________
Title: __________________________________________________________________________________________
Fax: ___________________________________________________________________________________________
City/State/Zip: _________________________________________________________________________________
_ ____________ % X $10,000 =
GRAND TOTAL FOR NORTHCENTRAL REGION
FWC 21/22-75, Attachment G-1. Page 12 of 31
NORTHEAST REGION COST SHEET
Respondent shall check all counties they are committing to do work in. This information will be used in the calculation of the points for the Area of Operational Availability criteria.
ST. JOHNS _____ VOLUSIA ____ OSCEOLA _____ PUTNAM _____
BREVARD _____ ORANGE ____ MARION _____ LAKE _____
SEMINOLE _____ FLAGLER ____ INDIAN RIVER _____ SUMTER _____
MOBILIZATION/DEMOBILIZATION
(Includes: transport of equipment, personnel, vehicles, land-based staging sites, on-water mob/demob of all vessels associated with a project)
NOTE: Mobilization/Demobilization prices will be a maximum ceiling rate. Based on the specifics of a
1 – 5 Vessels $_______________ $_______________ $_______________ $_______________
6 – 10 vessels $_______________ $_______________ $_______________ $_______________
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot))
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' – 31 $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
(Price Per Hour) Renewal Year 1
(Price Per Hour) Renewal Year 2
(Price Per Hour)
Renewal Year 3
(Price Per Hour)
FWC 21/22-75, Attachment G-1. Page 13 of 31
(Price Per Foot)
Renewal Year 1
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price per Foot)
INCLUDE REMOVAL AND DISPOSAL OF HAZ-
MAT ITEMS NOT RELATED TO FUEL/BLACK OR
GRAY WATER.
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price Per Gallon
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OF USED PRODUCTS (absorbance socks/mats)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 14 of 31
WATER/GRAY WATER REMOVAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3 minimizing/crushing/destruction)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 15 of 31
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
BELOW.
Please ensure to note on the individual line below what unit pricing you are using (ex. lump sum, per foot, per gallon, per unit etc. )
Year 1 Price Renewal Year 1
Pri ce
Renewal Year 2
Pri ce
FWC 21/22-75, Attachment G-1. Page 16 of 31
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: _____________________________________________________________________________________
Address: _______________________________________________________________________________________
Signed: ________________________________________________________________________________________
Print Name: ___________________________________________________________________________________
Title: __________________________________________________________________________________________
Fax: ___________________________________________________________________________________________
City/State/Zip: _________________________________________________________________________________
_ ____________ % X $10,000 =
GRAND TOTAL FOR NORTHEAST REGION
FWC 21/22-75, Attachment G-1. Page 17 of 31
SOUTHWEST REGION COST SHEET
Respondent shall check all counties they are committing to do work in. This information will be used in the calculation of the points for the Area of Operational Availability criteria.
HERNANDO _____ POLK _____ LEE _____ PASCO _____
MANATEE _____ HARDEE _____ PINELLAS _____ SARASOTA _____
DE SOTO _____ HILLSBOROUGH _____ CHARLOTTE _____ HIGHLANDS _____
MOBILIZATION/DEMOBILIZATION
(Includes: transport of equipment, personnel, vehicles, land-based staging sites, on-water mob/demob of all vessels associated with a project)
NOTE: Mobilization/Demobilization prices will be a maximum ceiling rate. Based on the specifics of a
1 – 5 Vessels $_______________ $_______________ $_______________ $_______________
6 – 10 vessels $_______________ $_______________ $_______________ $_______________
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot))
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' – 31 $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
(Price Per Hour) Renewal Year 1
(Price Per Hour) Renewal Year 2
(Price Per Hour)
Renewal Year 3
(Price Per Hour)
FWC 21/22-75, Attachment G-1. Page 18 of 31
(Price Per Foot)
Renewal Year 1
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price per Foot)
INCLUDE REMOVAL AND DISPOSAL OF HAZ-
MAT ITEMS NOT RELATED TO FUEL/BLACK OR
GRAY WATER.
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price Per Gallon
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OF USED PRODUCTS (absorbance socks/mats)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 19 of 31
WATER/GRAY WATER REMOVAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3 minimizing/crushing/destruction)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 20 of 31
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
BELOW.
Please ensure to note on the individual line below what unit pricing you are using (ex. lump sum, per foot, per gallon, per unit etc. )
Year 1 Price Renewal Year 1
Pri ce
Renewal Year 2
Pri ce
FWC 21/22-75, Attachment G-1. Page 21 of 31
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: _____________________________________________________________________________________
Address: _______________________________________________________________________________________
Signed: ________________________________________________________________________________________
Print Name: ___________________________________________________________________________________
Title: __________________________________________________________________________________________
Fax: ___________________________________________________________________________________________
City/State/Zip: _________________________________________________________________________________
_ ____________ % X $10,000 =
GRAND TOTAL FOR SOUTHWEST REGION
FWC 21/22-75, Attachment G-1. Page 22 of 31
SOUTH A REGION COST SHEET
Respondent shall check all counties they are committing to do work in. This information will be used in the calculation of the points for the Area of Operational Availability criteria.
BROWARD _____ SAINT LUCIE ____ GLADES _____ MARTIN _____
HENDRY _____ PALM BEACH ____ OKEECHOBEE _____
MOBILIZATION/DEMOBILIZATION
(Includes: transport of equipment, personnel, vehicles, land-based staging sites, on-water mob/demob of all vessels associated with a project)
NOTE: Mobilization/Demobilization prices will be a maximum ceiling rate. Based on the specifics of a
1 – 5 Vessels $_______________ $_______________ $_______________ $_______________
6 – 10 vessels $_______________ $_______________ $_______________ $_______________
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot))
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' – 31 $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
(Price Per Hour) Renewal Year 1
(Price Per Hour) Renewal Year 2
(Price Per Hour)
Renewal Year 3
(Price Per Hour)
FWC 21/22-75, Attachment G-1. Page 23 of 31
(Price Per Foot)
Renewal Year 1
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price per Foot)
INCLUDE REMOVAL AND DISPOSAL OF HAZ-
MAT ITEMS NOT RELATED TO FUEL/BLACK OR
GRAY WATER.
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price Per Gallon
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OF USED PRODUCTS (absorbance socks/mats)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 24 of 31
WATER/GRAY WATER REMOVAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3 minimizing/crushing/destruction)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 25 of 31
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
BELOW.
Please ensure to note on the individual line below what unit pricing you are using (ex. lump sum, per foot, per gallon, per unit etc. )
Year 1 Price Renewal Year 1
Pri ce
Renewal Year 2
Pri ce
FWC 21/22-75, Attachment G-1. Page 26 of 31
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: _____________________________________________________________________________________
Address: _______________________________________________________________________________________
Signed: ________________________________________________________________________________________
Print Name: ___________________________________________________________________________________
Title: __________________________________________________________________________________________
Fax: ___________________________________________________________________________________________
City/State/Zip: _________________________________________________________________________________
_ ____________ % X $10,000 =
GRAND TOTAL FOR SOUTH A REGION
FWC 21/22-75, Attachment G-1. Page 27 of 31
SOUTH B REGION COST SHEET
Respondent shall check all counties they are committing to do work in. This information will be used in the calculation of the points for the Area of Operational Availability criteria.
COLLIER _____ MIAMI-DADE _____ MONROE _____
MOBILIZATION/DEMOBILIZATION
(Includes: transport of equipment, personnel, vehicles, land-based staging sites, on-water mob/demob of all vessels associated with a project)
NOTE: Mobilization/Demobilization prices will be a maximum ceiling rate. Based on the specifics of a
1 – 5 Vessels $_______________ $_______________ $_______________ $_______________
6 – 10 vessels $_______________ $_______________ $_______________ $_______________
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot))
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' – 31 $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
(Price Per Hour) Renewal Year 1
(Price Per Hour) Renewal Year 2
(Price Per Hour)
Renewal Year 3
(Price Per Hour)
FWC 21/22-75, Attachment G-1. Page 28 of 31
Year 1
(Price Per Foot)
Renewal Year 1
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price per Foot)
INCLUDE REMOVAL AND DISPOSAL OF HAZ-
MAT ITEMS NOT RELATED TO FUEL/BLACK OR
GRAY WATER.
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
(Price Per Gallon
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
OF USED PRODUCTS (absorbance socks/mats)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 29 of 31
WATER/GRAY WATER REMOVAL
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3
Year 1
(Price Per Gallon)
Renewal Year 1
(Price Per Gallon)
Renewal Year 2
(Price Per Gallon)
Renewal Year 3 minimizing/crushing/destruction)
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $________________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
FWC 21/22-75, Attachment G-1. Page 30 of 31
Year 1
(Price Per Foot)
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
Renewal Year 1
(Price Per Foot)
Renewal Year 2
(Price Per Foot)
Renewal Year 3
(Price Per Foot)
Vessels less than 25' $_______________ $_______________ $_______________ $_______________
Vessels 26' - 31' $_______________ $_______________ $_______________ $_______________
Vessels 32' - 40' $_______________ $_______________ $_______________ $_______________
Vessels 41' - 55' $_______________ $_______________ $_______________ $_______________
BELOW.
Please ensure to note on the individual line below what unit pricing you are using (ex. lump sum, per foot, per gallon, per unit etc. )
Year 1 Price Renewal Year 1
Pri ce
Renewal Year 2
Pri ce
FWC 21/22-75, Attachment G-1. Page 31 of 31
AGREEMENT OR COLLUSION AMONG BIDDERS IN RESTRAINT OF FREEDOM OF COMPETITION.
Contractor: _____________________________________________________________________________________
Address: _______________________________________________________________________________________
Signed: ________________________________________________________________________________________
Print Name: ___________________________________________________________________________________
Title: __________________________________________________________________________________________
Fax: ___________________________________________________________________________________________
City/State/Zip: _________________________________________________________________________________
_ ____________ % X $10,000 =
GRAND TOTAL FOR SOUTH B REGION
File details come from the government source that posted it. Updated .