This is an Invitation to Bid (ITB) #24/25-45 issued by the Town of Manchester, Connecticut, for furnishing detectable warning tiles. The solicitation seeks to procure 96 units of 24"x36", 150 units of 24"x48", and 150 units of 24"x60" prefabricated, cast-in-place detectable warning surface panels from either ADA Solutions or Armor-Tile, with no substitutions allowed. The bid was released on January 6, 2025, with a question submission deadline of January 16, 2025, and a response deadline of January 22, 2025, at 11:00 am. Bids will be opened virtually via Zoom, and the Town reserves the right to purchase additional quantities at the bid price for one year following the award.
The detectable warning tiles must be compliant with American with Disabilities Accessibility Guidelines (ADAAG) and AASHTO M333 Standard Specification, in "Colonial Red" or "Brick Red" color. Delivery is to be made to 263 Olcott Street in Manchester, CT, with a minimum 24-hour notice required. The panels are to be guaranteed against manufacturer's defects, breakage, and deformation for a minimum of five years from the purchase date. Bidders must provide comprehensive vendor information, including company details, contact information, and authorization to sign contracts. The pricing table requires unit costs for each tile size, with the total bid value to be calculated based on the specified quantities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
24/25-45
FURNISH DETECTABLE WARNING TILES
Town of Manchester
Lincoln Center
Manchester, CT 06040
RELEASE DATE: January 6, 2025
DEADLINE FOR QUESTIONS: January 16, 2025
RESPONSE DEADLINE: January 22, 2025, 11:00 am
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/townofmanchester https://secure.procurenow.com/portal/%7bproject.government.code%7d
Town of Manchester
INVITATION TO BID
24/25-45
FURNISH DETECTABLE WARNING TILES
I. Introduction II. Instructions to Bidders
III. Insurance and Indemnification Requirements IV. Standard Instructions for Supplies, Materials & Equipment V. Project Details
VI. Vendor Submissions VII. Pricing Table
Invitation To Bid #24/25-45 Title: FURNISH DETECTABLE WARNING TILES
1. Introduction
1.1. Summary
Furnish 24"x36", 24"x48" and 24"x60" prefabricated, cast in place, detectable warning tiles to the Town of Manchester.
1.2. Contact Information
Cora Narracci
Purchasing Agent
494 Main Street
Purchasing Division
Manchester, CT 06040
Email: cnarracci@manchesterct.gov
Phone: (860) 647-3033
Department:
Engineering
Department Head:
Jeff LaMalva
Town Engineer
1.3. Timeline
Release Project Date January 6, 2025
Question Submission Deadline January 16, 2025, 4:00pm mailto:cnarracci@manchesterct.gov tel:(860)647-3033
Bid Opening Date and Time January 22, 2025, 11:00am
Join Zoom Meeting https://us06web.zoom.us/j/86328732752?pwd=KS
JSwEN4JscRKuAAPA3cFMqJg4Q9AX.1
Meeting ID: 863 2873 2752
Passcode: M1RuBV
One tap mobile
+16465588656,,86328732752#,,,,*810763# US
(New York)
+16469313860,,86328732752#,,,,*810763# US
Dial by your location
• +1 646 558 8656 US (New York)
• +1 646 931 3860 US
• +1 301 715 8592 US (Washington DC)
• +1 305 224 1968 US
• +1 309 205 3325 US
• +1 312 626 6799 US (Chicago)
• +1 346 248 7799 US (Houston)
• +1 360 209 5623 US
• +1 386 347 5053 US
• +1 507 473 4847 US
• +1 564 217 2000 US
• +1 669 444 9171 US
• +1 689 278 1000 US
• +1 719 359 4580 US
• +1 720 707 2699 US (Denver)
• +1 253 205 0468 US
• +1 253 215 8782 US (Tacoma)
Meeting ID: 863 2873 2752
Passcode: 810763
Find your local number:
https://us06web.zoom.us/u/kcHa0SVcwv https://us06web.zoom.us/j/86328732752?pwd=KSJSwEN4JscRKuAAPA3cFMqJg4Q9AX.1 https://us06web.zoom.us/j/86328732752?pwd=KSJSwEN4JscRKuAAPA3cFMqJg4Q9AX.1 https://us06web.zoom.us/u/kcHa0SVcwv
2. Instructions to Bidders
2.1. INSTRUCTIONS TO BIDDERS
In accordance with the provisions of the Town Charter, sealed proposals will be received not later than the date and time set forth above, for furnishing the commodities and/or services listed herein.
Proposals must be executed in accordance with and subject to instructions and specifications contained herein.
The Town of Manchester is an equal opportunity employer and requires an affirmative action policy for all of its Contractors and Vendors as a condition of doing business with the Town, as per Federal Order
11246. By submitting the Proposal for this bid, all vendors and contractors agree to this condition of doing business with the Town, and should the Town choose to audit their compliance, the vendor agrees to cooperate fully.
2.2. ELECTRONIC BIDDING INFORMATION
Important Instructions for Electronic Submittal
Specifications and bid forms must be obtained online at Town of Manchester Procurement Portal
(opengov.com). The exclusive means by which all prospective bidders may obtain bid packages, direct inquiries, request and receive addenda and supplemental information, and submit bids and proposals, shall be through the Town of Manchester’s OpenGov portal.
Bids may be received up to the deadline date and time listed in the solicitation documents, via the
Town’s e-Procurement Portal. The Town e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The
Town of Manchester strongly recommends completing your response well ahead of the deadline.
Addenda Notification and Acknowledgement
Addenda Notification: Bidders are required to register for an account via the Town’s e-Procurement
Portal hosted by OpenGov. Once the bidder has completed registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at Town of Manchester Procurement Portal
(opengov.com).
Submitting Questions and Receiving Responses
Bidders shall submit all inquiries regarding this bid via the Town’s e-Procurement Portal. Please note any deadline for submitting inquiries. All answers to inquiries will be posted on the Town’s e-Procurement
Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries.
When applicable, state bids will be considered for this service.
The Purchasing Authority reserves the right to waive any informality or reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the https://procurement.opengov.com/portal/townofmanchester https://procurement.opengov.com/portal/townofmanchester https://procurement.opengov.com/portal/townofmanchester
Manchester Charter, Code of Ordinances, and Purchasing Guidelines. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions.
An Equal Opportunity/Affirmative Action Employer
2.3. RULES AND REGULATIONS FOR COMPETITIVE BIDDING
These rules and regulations have been adopted by the Board of Directors of the Town of Manchester pursuant to Section 5-22 of the Town Charter. They are standard for all competitive bidding proposals issued by the Town of Manchester, Connecticut for contracts of all types where labor, materials, and necessary equipment to complete work is to be furnished to the Town, where the Town is to purchase supplies, materials, and equipment, where the Town is to sell surplus materials and equipment, or where the Town is to sell real estate. These rules and regulations shall be binding upon all prospective bidders and the Town of Manchester.
2.4. GENERAL RULES
1. The Purchasing Authority may delete or modify any of the instructions to bidders for a particular proposal, indicating such change in the appropriate section of the proposal documents. The Purchasing
Authority may insert special instructions in any special contracts which are subject to competitive bidding.
2. The proposal is signed by the bidder with full knowledge of, and agreement with, the general specifications, conditions, and requirements of this bid. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the Manchester Charter, Code of Ordinances, and
Purchasing Guidelines. By bidding on the proposed purchase or service, the bidder agrees to such terms, provisions, and conditions.
3. The Town has transitioned to electronic bidding. Vendors should submit solicitation responses electronically via the Town of Manchester Procurement Portal. Vendors will be asked to register and should do so prior to submitting bid documents.
4.This bid and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the bidder to download this information. THE TOWN OF MANCHESTER WILL NOT
MAIL A SEPARATE HARD COPY OF ADDENDUM TO BIDDERS. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.
5. Bid prices may not be withdrawn by bidder for 90 days after bid opening.
6. Proposals received later than the time and date specified will not be considered. Amendments to, or withdrawals of bids received later than the time and date set for bid opening will not be considered.
7. All bids shall be opened via a virtual meeting link posted and read aloud. All bids shall be tabulated and copies of said tabulation shall be posted on the website
8. All deliveries of commodities or services hereunder shall comply in every respect with all applicable laws of the Federal Government and/or the State of Connecticut.
9. Purchases made by the Town of Manchester are exempt from payment of Federal Excise Taxes and the Connecticut Sales Tax and such taxes must not be included in bid prices. Federal Excise Tax exemption certificates, if requested, will be furnished.
10. The Bidder, where applicable, shall insert/include the price per stated unit and extend a total price for each item. In the event there is a discrepancy between the unit price and the extension, the unit price will govern. The total cost shall be the sum of the extended prices.
11. Bidders shall, where applicable, submit terms for payment in spaces provided in the proposal form, showing the amount of cash discount which shall apply to bid prices when paid within the stated number of days in the proposal.
12. All inquiries shall be submitted within the time limitations specified in the bid documents and shall be requested via the online portal Q&A. All information given by the Town other than through the
OpenGov portal shall be informal and shall not be binding upon the Town nor shall it furnish a basis for legal action by any bidder or prospective bidder against the Town.
12A. The Town reserves the right to reject any and all bids, to waive technical defects and to make such awards including accepting a bid, although not the low bid, as it deems in its sole discretion to be in the best interest of the Town. The Town reserves the right to reject any bid if the bidder, any officer of the bidder, or any other company owned in whole or in part by any officer(s) of the bidder, is delinquent in the payment of any taxes or fees owed to the Town. The Town reserves the right to require a disclosure statement from the bidder listing the name(s) of all officers of the company.
12B. In the event the Town determines that a contractor is delinquent in any payment due the Town, then the Town may offset the delinquent amount due to the Town against the sums owed the contractor.
13. The Town of Manchester may make such investigation as deemed necessary to determine the ability of the bidder to discharge a contract. The bidder shall furnish the Town with all such information and data as may be required for that purpose. The Town reserves the right to reject any bid if the bidder fails to satisfactorily convince the Town that he is properly qualified by experience and facilities to carry out the obligations of the contract and to satisfactorily complete the work called for herein, or if the bid is conditional in nature.
14. Except where otherwise provided, a contract between the Town and a successful bidder shall consist of the Invitation to Bid, Specifications, Plans, Bid including Proposal form and these Rules and
Regulations. Acceptance by the Town may be by purchase order for the portion of the work awarded to a contractor.
15. All Invitations to Bid shall be publicly advertised in a newspaper having a general circulation within the Town of Manchester, Connecticut.
16. Bids shall be made available on the Town of Manchester Purchasing Web Site via the Bidding site.
17. Alternate bids shall not be accepted unless otherwise specified in the bid documents.
18. Any act or acts of misrepresentation or collusion shall be a basis for disqualification of any bid or bids submitted by such persons guilty of said misrepresentation of collusion. In the event that the Town enters into a contract with any bidder who is guilty of misrepresentation or collusion and such conduct is discovered after the execution of said contract, the Town may cancel said contract without incurring liability, penalty, or damages.
19. In the event that any bidder wishes to protest the potential award of a bid, the bidder must make it’s protest in writing identify the protesting party and the bid number, title and shall include a factual summary of the basis of the protest including any documents that shall be considered and request a conference with respect thereto. Said protest must be received in the Town of Manchester Purchasing
Office, within FIVE (5) business days after the award decision.
20. A conference with respect to said protest shall be scheduled by the Purchasing Authority and shall be attended by the Purchasing Authority or their designee and such other persons as the Purchasing
Department and the Town Manager shall require attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The Town shall make a decision in writing within three (3) business days after said conference and notify protesting bidder.
21. In the event that any protesting bidder wishes to take legal action against the Town, they must first fully comply with all of these Rules and Regulations, including those which have been changed by the
Purchasing Authority pursuant to paragraph 1 herein.
22. Except for special instructions inserted in special contracts by the Purchasing Authority pursuant to paragraph 1 herein, in the event of any conflicts between these Rules and Regulations and the terms and conditions of any document these Rules and Regulations shall prevail.
23. The contractor shall not transfer, sublet, or assign the contract by Power of Attorney or otherwise to any person, firm, or corporation, or in any way vary the terms of the contract without written permission from the Town. The Town has the right to terminate with a thirty (30) day written notice to the contractor. The Town reserves the right to terminate the contract at any time during the contract period. Such termination shall be effective immediately after giving written notice to the contractor that the Town is terminating the contract.
24. All Awards shall be made by the Purchasing Authority.
2.5. Bid Opening Information
Bid responses will be received by 11:00 am on Wednesday, January 22, 2025
Bid openings will be held virtually through Zoom.
ZOOM meeting instructions are as identified in the Introduction Section above.
The virtual bid opening will be exactly the same as a regular bid opening – Purchasing staff will open the bids and read the results out loud. Results are not final until reviewed, tabulations compiled and then posted/distributed to participants. In addition, the requesting department will recommend an award after a complete review of the submissions.
3. Insurance and Indemnification Requirements
3.1. GENERAL CONDITIONS:
Within ten (10) business days of the award or notice, or prior to the start of work, whichever comes first, the contractor will provide, pay for, and maintain in full force and effect the insurance outlined here for coverage’s at not less than the prescribed minimum limits of liability. Such coverage is to remain in force during the life of the contract and for such additional time as may be required, and will cover the contractor/ independent insured’s activities, those of any and all subcontractors, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees.
A.
Certificates of Insurance: The contractor will give the owner a certificate of insurance completed by a duly authorized representative of their insurer certifying that at least the minimum coverage’s required here are in effect and specifying that the liability coverage’s are written on an occurrence (or claims-made where applicable) form and that the coverage’s will not be canceled, non-renewed, or materially changed by endorsement or through issuance of other policy(ies) of insurance without sixty (60) days advance written notice to the Purchasing Division. Failure of the owner to demand such certificate or other evidence of full compliance with these insurance requirements or failure of the owner to identify a deficiency from evidence provided will not be construed as a waiver of the contractor’s obligation to maintain such insurance. Any failure to comply with reporting requirements and provisions of the policies shall not affect coverage provided to Town, its officers, officials, agents, or employees.
B.
Insurer Qualification: All insurance will be provided through companies authorized to do business in the
State of Connecticut and considered acceptable by the owner. Insurance Companies shall maintain a minimum A.M. Best rating of A-/VIII.
C.
Additional Insured: The policy or policies providing insurance as required, with the exception of professional liability and workers’ compensation, will defend and include the owner, directors, officers, representatives, agents and employees, and where applicable owner’s architects or engineers, as additional insureds on a primary and noncontributory basis for work performed under or incidental to this contract.
D.
Retroactive Date and Extended Reporting Period: Coverage, whether written on a claims made or occurrence basis, shall be maintained without interruption from the date of commencement of the
Work until date of final payment and then extended for an additional three (3) years from date of final payment.
If any insurance required here is to be issued or renewed on a Claims Made form as opposed to an
Occurrence form, the retroactive Date for coverage will be no later than the commencement date of the project. The Claims Made form will have an Extended Reporting Period of three years from the date of project completion. All Claims made policies cancelled or non-renewed and not replaced by a subsequent claims made policy will have an Extended Reporting period of three years from the date of cancellation or non-renewal.
E.
Subcontractors’ Insurance: The contractor will require each subcontractor hired by and/or employed by contractor to purchase and maintain insurance of the types specified below. When requested by the owner, the contractor will furnish copies of certificates of insurance evidencing coverage for each subcontractor.
F.
Waiver of Subrogation: The contractor/subcontractor will purchase required insurance policies that shall be endorsed with a waiver of subrogation and all rights of recovery in favor of the Town, its officers, officials, agents and employees. The contractor will require of subcontractors, by appropriate written agreements, similar waivers each in favor of all parties enumerated in this section.
G.
Indemnification/Defense/Hold Harmless: To the extent provided by law, the contractor shall indemnify, defend, and hold harmless the owner, officers, officials, agents and employees, and if applicable, the engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorney’s fees of counsel selected by the owner, arising out of or resulting from the performance of the work and /or the supplying of materials, provided that any such claim, damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom, and (b) is caused in whole or in part by any negligent act or omission of the contractor/ insured, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not they are caused in part by a party indemnified hereunder.
3.2. INSURANCE LIMITS AND COVERAGE:
A.
To the extent applicable, the amounts and types of insurance will conform to the minimum terms, conditions, and coverages of Insurance Services Office (ISO) policies, forms, and endorsements.
B.
If the contractor has self-insured retention’s or deductibles under any of the following minimum required coverage’s, the contractor must identify on the certificate of insurance the nature and amount of such self-insured retention’s or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be the contractor/ independent insured’s sole responsibility.
C.
Workers’ Compensation Insurance: With respect to all operations the Contractor performs and all those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry
Workers’ Compensation insurance as required by the laws of the State of Connecticut.
Employer’s Liability insurance shall be provided in amounts not less than:
• $500,000 per accident for bodily injury by accident,
• $500,000 policy limit by disease; and
• $500,000 per employee for bodily injury by disease.
D.
Commercial General Liability Insurance: With respect to the operations the Contractor performs and also those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Commercial General Liability insurance, including Contractual Liability, Products and Completed Operations, Broad Form Property Damage and Independent Contractors in an amount not less than $1,000,000 combined single limit, per occurrence, and $2,000,000 aggregate. Owner shall be included as additional insured. Per project aggregate to apply.
Notes:
•If underground work is to be undertaken, each policy shall have coverage for and exclusions removed for “Explosion, Collapse and Underground” (“XCU”) hazards.
•Should blasting be required, all necessary permits for the use of explosives shall be obtained by the contractor or insured from the Fire Marshall.
E.
Automobile Liability Insurance: The Contractor shall obtain automobile liability insurance with a minimum limit of $1,000,0000 combined single accident, covering the operation of all motor vehicles, including those hired or borrowed, that are used in connection with the Project for all damages arising out of bodily injury to or death of all persons and/or injury to or destruction of property. This policy shall not be subject to an annual aggregate limitation.
F. Umbrella/Excess Coverage: contractor shall purchase and maintain umbrella/excess liability insurance with a limit of not less than $1,000,000 per occurrence/aggregate, covering all lines of insurance required by this contract. This coverage is required to sit above the underlying General Liability, Automobile Liability and Employer Liability part of the Workers Compensation policies. Depending on the scope and size of risk of the work to be performed, higher limits of coverage may be required.
G.
Owner’s and Contractor’s Protective Liability Insurance for and in the Name of the Town and/or State:
With respect to the Contractor’s operations and also those of its subcontractors, the Contractor shall carry, for and on behalf of the Town and/or State for each accident or occurrence resulting in damages from bodily injury to or death of persons and/or injury to or destruction of property, with a minimum of
$1,000,000 per occurrence.
Other Insurance Coverage That May Be Required:
• Professional Liability: Not less than $1,000,000 per claim and aggregate to be maintained for the duration of the agreement and three years following its termination. This insurance requirement applies when a contractor has a professional designation or license and/or is providing professional services.
The minimum limit for architects and engineers is $1,000,000 per claim and in the aggregate and may be increased depending upon the nature of the services to be provided to Owner.
• Cyber Risk Insurance: Not less than $1,000,000 per cyber incident to be maintained for the duration of the agreement and three years following its termination. This insurance requirement applies when a third party will be using, storing, or accessing private, confidential or protected information.
• Environmental Liability: Not less than $1,000,000 per claim and in the aggregate. This insurance requirement applies when a contractor will be performing environmental clean-up work
(decontamination/remediation), will be working with hazardous substance or waste, or may have similar such exposures while performing work under the proposed agreement. Higher limits of environmental liability coverage may be required depending upon the scope of work.
** Exceptions to the above requirements are subject to the sole discretion of the Town of Manchester
Version 4.2.2024
4. Standard Instructions for Supplies, Materials & Equipment
These instructions are standard for all proposals issued by the Town of Manchester, Connecticut, for the purchase of all supplies, materials, and equipment. The Town of Manchester may delete, supersede, or modify any of these standard instructions for a proposal by indicating such change in the section headed
“Special Instructions to Bidders.”
1. Unless otherwise stated, deliveries must consist of new merchandise.
2. Prices quoted shall be net delivered prices to the Town.
3. The Town may withhold acceptance of, or reject any merchandise which found, upon examination, not to meet the specifications’ requirements. When rejected, it shall be removed by the Contractor
(vendor) within ten (10) days after notification of rejection.
4. When the schedule indicates that an item to be purchased is to be specified, or equal, the bidder may offer an article which is certified to be equal in quality, performance, and in other essential characteristics to the bid standard. Bidder must furnish any information, such as specifications, test results, etc., which will help in determining whether an item is equal or superior to the Town’s bid standard. If a bidder fails to name a substitute, the specified item must be furnished.
5. Bidders agree to comply with all of the latest Federal and State safety standards and regulations and certify that all items furnished in this bid will conform to and comply with said standards and regulations. Bidder further agrees to indemnify and hold harmless the Town for all damages assessed against the Town as a result of the bidder’s failure to comply with said Standards and/or Regulations.
6. The Town reserves the right to make an award by item, total or by group, as may be in the best interest of the Town. If a Bidder desires to bid on an “all or nothing” basis, he shall so indicate on the bid schedule and the Town reserves the right to make an award as may be in the best interest of the Town.
7. The Bidder shall pay all royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the Town of Manchester harmless from loss on account thereof except that the Town of Manchester shall be responsible for all such loss when a particular manufacturer, product, or process is specified by the Town of Manchester.
5. Project Details
5.1. Scope of Work
The detectable warning surface panels shall be a prefabricated cast-in-place detectable warning surface panel with an in-line truncated dome pattern as manufactured by:
ADA Solutions, a Division of SureWerx USA Inc.
323 Andover Street, Suite 3
Wilmington, MA 01887
Phone: 800-372-0519
Fax: 978-262-9125
Web: adatile.com or
Armor-Tile
Engineered Plastics Inc.
300 International Drive Suite 100
Williamsville, NY 14221
Web: armor-tile.com
No substitutions will be accepted.
Panels shall be compliant with American with Disabilities Accessibility Guidelines (ADAAG) and AASHTO
M333 Standard Specification for Detectable Warning Surfaces.
24"x36" panels shall be Model ADA-C-2436 (Armor-Tile) or Model 2436IDPAV2 (ADA Solutions)
24"x48" panels shall be Model ADA-C-2448 (Armor-Tile) or Model 2448IDPAV2 (ADA Solutions)
24"x60" panels shall be Model ADA-C-2460 (Armor-Tile) or Model 2460IDPAV2 (ADA Solutions)
Color shall be "Colonial Red" (No. 20109) (Armor-Tile) or "Brick Red" (No. 20109) (ADA Solutions)
5.2. Right to Purchase Additional Quantities
The Town reserves to right to purchase additional quantities at the bid price for a period of one year.
5.3. Delivery
Bid shall include delivery and offloading to 263 Olcott Street, Manchester CT. Vendor shall provide a minimum 24 hours notice of delivery to Scott Sobinski at (860) 614-5464.
5.4. Warranty
Panels shall be guaranteed from manufacturer's defects, breakage and deformation for a minimum period of five (5) years from the date of purchase.
6. Vendor Submissions
6.1. Bid Requirements*
Did you read through the entire solicitation and confirm that you met all of the bid requirements therein?
☐ Yes
☐ No
*Response required
6.2. Addenda *
This bid and any addenda will be issued on the Town of Manchester website bidding portal. It shall be the responsibility of the bidder to download this information. THE TOWN OF MANCHESTER WILL NOT
MAIL A SEPARATE HARD COPY OF ADDENDUM TO BIDDERS. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.
☐ Please confirm
*Response required
6.3. Document Uploads
Please upload any required information in this section.
6.4. Vendor Information *
Please provide your Company Name
Your Company Address
Your Company's FEIN Number
Your Company's System Award Management Number (SAM)
Your Company's State Contractor License Number (if applicable)
Main Contact Name and Title
Telephone Number
Email Address
*Response required
6.5. Please provide the full name and email address of the person who is authorized to sign contracts on behalf of the company in the event that your company is the successful bidder.*
*Response required
6.6. Please provide your delivery time after receipt of order.* *Response required
7. Pricing Table
BID PROPOSAL
Furnish Detectable Warning Tiles
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 FURNISH 24" X 36" DETECTABLE
WARNING TILE
96 EA
2 FURNISH 24" X 48" DETECTABLE
WARNING TILE
150 EA
3 FURNISH 24" X 60" DETECTABLE
WARNING TILE
150 EA
TOTAL