fully executed award- SPRRA126PA004.pdf

PDF 2 MB Posted

Attached to
SPRRA1-26-Q-0020/NSN: 5998-21-921-0709/NOUN: CIRCUIT CARD ASSEMB
Solicitation number
SPRRA126PA004
Issued by

About this file

This is a Department of Defense Order for Supplies or Services (DD Form 1155) issued by DLA Aviation at Huntsville, Alabama to CMC Electronics Inc. for the procurement of circuit card assemblies.

The contract SPRRA1-26-P-A004 was awarded to CMC Electronics Inc. (CAGE 90073) located in Ville Saint-Laurent, Montreal, Canada on September 30, 2026, as a result of solicitation SPRRA1-26-Q-0020 under FAR 6.302-1(a)(2) for a limited number of responsible sources. The procurement involves 37 circuit card assemblies (National Stock Number 5998-21-909-7229, Manufacturer's Part Number 220-600696-000) at a firm fixed price of $3,448.30 per unit, totaling $127,587.10. Delivery is scheduled in two partial shipments: 20 units by July 15, 2027, and 17 units by September 30, 2027, to DLA Distribution at Tobyhanna, Pennsylvania. The contract includes a DO-A1 DPAS priority rating, NET 30 payment terms, and FOB Origin shipping from the contractor's facility in Saint-Laurent, Quebec, Canada, with transportation costs paid by the Government. Inspection and acceptance occur at origin by DCMA Americas in Ottawa, Ontario. The contract requires compliance with quality standards including ANSI/ISO/ASQ 9001:2015 or AS 9100, MIL-STD-129 markings, ISPM-15 compliant wood packaging materials, and payment processing through the Wide Area WorkFlow (WAWF) system. The contractor is not classified as a small business concern under NAICS codes 334511, 334419, or 336413.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. SHIP TO

ORDER FOR SUPPLIES OR SERVICES PAGE 1 OF

1. CONTRACT/PURCH ORDER/AGREEMENT NO. 2. DELIVERY ORDER/ALL NO. 3. DATE OF ORDER/CALL

(YYYYMMMDD)

4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than 6) CODE 8. DELIVERY FOB

DESTINATION

OTHER

(See Schedule if other)

10. DELIVER TO FOB POINT BY (Date)

(YYYYMMMDD)

12. DISCOUNT TERMS

13. MAIL INVOICES TO THE ADDRESS IN BLOCK

11. X IF BUSINESS IS

SMALL

SMALL DISAD-

VANTAGED

WOMEN-OWNED

CODE 15. PAYMENT WILL BE MADE BY CODE MARK ALL

PACKAGES AND

PAPERS WITH

IDENTIFICATION

NUMBERS IN

BLOCKS 1 AND 2.

16.

TYPE

OF

ORDER

DELIVERY/

CALL

PURCHASE

This delivery order/call is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract.

Reference your furnish the following on terms specified herein.

ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE

If this box is marked, supplier must sign Acceptance and return the following number of copies:

TYPED NAME AND TITLE DATE SIGNED

(YYYYMMMDD)

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

18. ITEM NO. 19. SCHEDULE OF SUPPLIES/SERVICES

20. QUANTITY

ORDERED/

ACCEPTED*

21.

UNIT

22. UNIT PRICE 23. AMOUNT

*If quantity accepted by the Government is same as quantity ordered, indicate by X.

If different, enter actual quantity accepted below quantity ordered and encircle.

24. UNITED STATES OF AMERICA 25. TOTAL

26.

DIFFERENCES

30. INITIALS

27a. QUANTITY IN COLUMN 20 HAS BEEN

INSPECTED RECEIVED

ACCEPTED, AND CONFORMS

TO THE CONTRACT EXCEPT

AS NOTED:

c. DATE

(YYYYMMMDD)

b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

28. SHIP. NO.

PARTIAL

FINAL

31. PAYMENT

COMPLETE

PARTIAL

FINAL

29. D.O. VOUCHER NO.

32. PAID BY 33. AMOUNT VERIFIED CORRECT FOR

34. CHECK NUMBER

35. BILL OF LADING NO.

42. S/R VOUCHER NO.

36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.

a. DATE

(YYYYMMMDD)

b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

37. RECEIVED

AT

38. RECEIVED BY (Print) 39. DATE RECEIVED

(YYYYMMMDD)

40. TOTAL CON-

TAINERS

41. S/R ACCOUNT NUMBER

DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE.

CONTRACTING/ORDERING OFFICER

9. CONTRACTOR CODE FACILITY

NAME

AND

ADDRESS

BY:

d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

f. TELEPHONE NUMBER g. E-MAIL ADDRESS

Section A - Solicitation/Contract Form

CIRCUIT CARD ASSEMBLYInstrument Name:

North American Industry Classification System (NAICS) : 334511

A-1. This contract SPRRA1-26-P-A004 is awarded to CMC Electronique Inc. Cage 90073, as a result of solicitation SPRRA1-26-Q-0020 IAW 10 U.S.C. 2301 (c)(1) FAR 6.302-1(a)(2) "A limited number of responsible sources, and no other supplies or services will satisfy agency requirements, full and open competition need not be accounted for."

*** END OF NARRATIVE 1 ***

SPRRA126PA004

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0010 CIRCUIT CARD ASSEMB

National Stock Number:

5998219210709

Manufacturer's Part Number: 220- 600696-000

Manufacturer's CAGE: 90073

CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W58H0Z3300BE51

Product Service Code: 5998

North American Industry Classification System (NAICS):

334511

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A1

Weapon System Code: HBE

Bill to Party: W58H0Z

Pricing Arrangement: Firm Fixed Price

ACRN: AA

PR Number: W58H0Z0098069998 PR Line Item Number: 0010

37 Each USD 3,448.30

Firm Price

USD

127,587.10 Funded Amount

USD

127,587.10

Additional Descriptive Data:

CIRCUIT CARD ASSEMBLY

Section C - Description/Specifications/Statement of Work

Requirements Noun: Circuit Card Assembly NSN: 5998-21-909-7229 Mfr. PN: 220-600696-000

Section D - Packaging and Marking

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: MILITARY LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND SIZE (INCHES)

WT [1.0] LB

LN [6.3] IN

WD [5.3] IN

DP [3.0] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15 COMPLIANT

MIL-STD-2073-1 Codes, APPENDIX J

JI/A/MP [GX] JII/CD [1] JIII/PM [00] JIV/WM [K3] JV/CD [LT]

JVI/CT [A] JVII/UC [NS] JVII/IC [00] JIX/A/PK [F] JX/SM [39] JVIIIA/OPI [M]

SUPPLEMENTAL INFORMATION:

NS - FASTPACK (XC1) 8115-00-787-2142

*** END OF NARRATIVE 1 ***

Section E - Inspection and Acceptance

The Government's Quality Assurance Representative (QAR) will inspect supplies described by manufacturer's name/code and part number at origin location(s):

The QAR may require that objective evidence be furnished establishing the name and address of the plant that manufactures the supplies to ensure that a domestic product is being supplied. Objective evidence of performance must be present for all quality assurance requirements specified in the contract. The QAR may require additional examinations and tests to determine:

Completeness of item

Material is new and unused

Absence of rust

Contamination, or deterioration

Correct identification/item marking

Correct packaging

Absence of any damage

Compliance with preparation for delivery

If the supplier is not the manufacturer of the supplies, objective evidence must be furnished to establish that the supplies were produced by the approved manufacturer.

For supplies designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number. Any deviation shall be cause for rejection of the item. The Procuring Activity may add additional inspection requirements based on the evaluation of the surplus offer. Such additional requirements will be identified before the award.

*** END OF NARRATIVE 1 ***

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed- Price.

1996-08

52.246-16 Responsibility for Supplies. 1984-04

FAR Clauses Incorporated by Full Text

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.246-11 Higher-Level Contract Quality Requirement.

2014-12

Higher-Level Contract Quality Requirement (Dec 2014)

The Contractor shall comply with the higher-level quality standard(s) listed below.(a)

ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS

UNDER 7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY

The Contractor shall include applicable requirements of the higher-level quality standard(s) (b) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

Any subcontract for critical and complex items (see 46.203(b) and (c)); or(1)

When the technical requirements of a subcontract require-(2)

Control of such things as design, work operations, in-process control, testing, and inspection; (i) or

Attention to such factors as organization, planning, work instructions, documentation control, (ii) and advanced metrology.

(End of clause)

OCONUS AWARDEE WITH INSPECTION AND ACCEPTANCE AT ORIGIN: If the awardee is outside the continental United States (OCONUS) and Inspection and Acceptance are at Origin, normal DCMA transportation procedures should be followed, or DLAD Procurement Note C21 Shipping Instruction Request (SIR) should apply.

Overall Contract Inspection/Acceptance Locations

0010 Inspection and Acceptance Location

Both Source Instructions: Inspection: Origin Acceptance: Origin

DoDAAC: SCN01A CountryCode: CAN

DCMA AMERICAS

275 BANK ST SUITE 200, OTTAWA ONTARIO CANADA K2P 2L6

OTTAWA, ON K2P 2L6

CANADA

Section F - Deliveries or Performance

CLIN 0010: First delivery of 20 each shall commence 90 days after contract award and the remaining quantity of 17 each shall be delivered 365 days after contract award to:

SR W1A8 DLA DIST-TOBYANNA

GIBBS AND FIFTH STREETS

WAREHOUSE 6 BAY 4

TOBYHANNA, PA, 18466-5059

*** END OF NARRATIVE 1 ***

FOB Origin (Saint-Laurent, QC, Canada)

0010 Partial Delivery Schedule Delivery On Or Before Delivery Date 15 Jul 2027 20 Each DoDAAC: W25G1W Partial Delivery Schedule Delivery On Or Before Delivery Date 30 Sep 2027 17 Each DoDAAC: W25G1W

37 EachQuantity

Address and POC Ship To DoDAAC: W25G1W CountryCode: USA

W1A8 DLA DIST-TOBYANNA

GIBBS AND FIFTH STREETS, WAREHOUSE 6 BAY 4 TOBYHANNA, PA 18466-5059

UNITED STATES

Special Handling/Notes FoB Details

Party to Pay Transportation Cost: Government

Point Type: Origin (Shipping Point)

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.242-15 Stop-Work Order. 1989-08

52.242-17 Government Delay of Work. 1984-04

52.247-29 F.o.b. Origin. 2006-02

52.247-30 F.o.b. Origin, Contractor's Facility. 2006-02

52.247-32 F.o.b. Origin, Freight Prepaid. 2006-02

52.247-52 Clearance and Documentation Requirements-Shipments to DoD Air or Water Terminal Transshipment Points. (Deviation 2026-O0038)

2026-02

Section G - Contract Administration Data

THE TAC CODE IS AXGE

*** END OF NARRATIVE 1 ***

ACRN LOA Total Amount

AA ^^^097^^^X^4930^001^^260^R^SM2B1100000^^

^^^AC9C^^023204^AC9C^000000^^^6100.26KS^

AC9CV2^SM2B11.0000^

USD 127,587.10

Line Item R/MIPR - PR Line Item# CIN Amount

CLIN 0010 W58H0Z0098069998 - 0010 USD 127,587.10

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. (DEVIATION 2026-O0002)

1991-12 Deviation 2026- O0002

2026-08

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

DFARS Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment 2023-01

Instructions. (Tailored)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process Electronic invoicing.

vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF WAWF training.

Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web WAWF methods of document submission.

entry, Electronic Data Interchange, or File Transfer Protocol.

(f) The Contractor shall use the following information when WAWF payment instructions.

submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following Document type.

document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Document routing.

Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC

HQ0337

Issue By DoDAAC

SPRRA1

Admin DoDAAC

SCN01A

Inspect By DoDAAC

SCN01A

Ship To Code W25G1W

Ship From Code 90073

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) The Contractor shall ensure a payment request includes Payment request.

documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the Receiving report.

requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Elijah Braly, elijah.j.braly.mil@mail.mil, 613-996-1460

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Section H - Special Contract Requirements

H-1. CALIBRATION REQUIREMENTS

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

H-2. IDENTIFICATION MARKING REQUIREMENTS

Item shall be marked per MIL-STD-130.

H-3. BAR CODE MARKING REQUIREMENTS

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology - Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

H-4. ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE

RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION

INSTRUCTIONS

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class I ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using DD Form 1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Defense Contract Management Agency (DCMA) Contract Management Office (CMO) will validate data entries in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.

e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.

f. Classification of RFVs.

(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;

interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.

k. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

l. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

m. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The preferred method of submittal is digitally as a single file in Adobe Acrobat Portable Document Format (PDF). Unless otherwise specified, alternate methods of submittal shall be proposed to and authorized by the PCO prior to submittal. If the hardcopy method is requested and approved, the Contractor shall submit two

(2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution.

4. Distribution.

a. Electronic Distribution. The preferred method of distribution for unclassified is through the email or DOD safe site (https://safe.apps.mil) addressed to the PCO. Classified material shall be distributed via SIPERNET or by classified email as determined by the PCO. Microsoft Word is required for use with the transmittal letter (E-mail).

Required forms will be attached to the E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website (http://www.esd.whs.mil/DD/) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format (PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer.

Drawings may be scanned and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.

5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

H-5. REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT

(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.

If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.

(b) The contractor hereby verifies previous contractual submission of technical data:

Contract No.:

Contractor:

Explanation of Data Rights:

(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s).

Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.

(d) All proposed part number changes shall be submitted pursuant to the requirements of the requirement entitled, " ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE PREPARATION

AND SUBMISSION INSTRUCTIONS"

H-6. SOURCES ELIGIBLE FOR AWARD CONSIDERATION

(a) Competition under this solicitation is restricted to the following sources:

(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment.

(2) Sources that have been approved prior to award -- other than approved sources listed in Section B.

(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.

(b) Only offers submitted by the above sources will be considered for award under this solicitation.

(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained. Whether or not such delay will occur will be solely at the discretion of the Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.

(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source Approval Request (SAR) package, for review and approval, to the Systems Readiness Directorate (SRD), Aviation and Missile Center, DEVCOM. Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). SAR instructions can be found at https://www/avmc.army.mil/Directorates/SRD /SAR/. Questions concerning SAR submissions can be directed to the SRD SAR Team at usarmy.redstone.

devcom-avmc.mbx.amr-m-sar@army.mil.

(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests. In that event, the requestor will be so advised. AMCOM reserves the right to approve a contractor for award prior to completion of physical testing of the offered item. In such cases, the contractor shall perform any outstanding tests and provide all required documentation at no cost to the Government prior to entering upon full production. Lack of successful performance within the specified timeframe shall be grounds for a no cost termination.

(f) When a SAR is received, it will be processed for evaluation. If the evaluation and approval (including preparation or update of the requisite technical data package (TDP)) occurs before award, the requestor will be considered for award if a proposal was submitted per (d) above. If the evaluation/TDP preparation has not been completed prior to award, AMCOM will continue the process until complete. If the requestor's SAR becomes approved, the requestor will be eligible for consideration on all future solicitations for the item.

(g) All approval or disapproval notices shall be officially provided to the contractor by the appropriate technical official.

(h) Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.

H-7. WOOD PACKING MATERIALS REQUIREMENTS

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade."

DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood process verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

H-8. POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES

Preservation, packaging, packing, and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):

CMC Elecronique, Inc.

600 BOUL DR.-FREDERIK-PHILIPS, SAINT-LAURENT, QC H4M 2S9 CAN

H-9. PRODUCT QUALITY DEFICIENCY REPORTS (PQDRS)

Product Quality Deficiency Reports (PQDRs): The Army utilizes the Product Quality Deficiency Report (PQDR) Program as required by the Defense Logistics Manual (DLM) 4000.25, Volume 2, June 24,2025 Change 21 and AR 702-7-1 to identify, report, and resolve potential deficiencies found by the end user in products from the DoD supply chain. When requested by the Government, the Contractor shall assist the AvMC Systems Readiness Directorate (SRD) or the cognizant Contract Administration Office in evaluating PQDRs and exhibits for defects reported on items manufactured under this contract to determine the root cause for deficiencies. A final report should be given no later than 75 days after receipt of PQDR exhibit. Corrective action and Preventative Action to preclude recurrence of discrepancies shall be an integral part of the Contractor's Quality Program. The contractor shall not bill the Government as a direct charge for cooperation with the Government in the resolution of any PQDRs.

H-10. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS

Defense Priorities and Allocations System (DPAS) Rated Awards (JUNE 2025) A DPAS rated order indicates the priority the contractor must give to the performance of the award. There are two priority ratings: "DX" and "DO". All "DX" rated orders have equal priority with each other and take preference over "DO" rated orders and unrated orders. All "DO" rated orders have equal priority with each other and take preference over unrated orders. (see 15 CFR 700.11 and DoDM 4400.1- M).

*** END OF NARRATIVE 1 ***

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

2017-01

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026-O0038)

2026-02

52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)

2026-02

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)

2026-02

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.

(Deviation 2026-O0038)

2026-02

52.211-5 Material Requirements.

(Deviation 2026-O0038)

2026-02

52.211-15 Defense Priority and Allocation Requirements.

2008-04

52.213-4 Terms and Conditions-Simplified 2026-02

Acquisitions (Noncommercial).

(Deviation 2026-O0038)

52.215-19 Notification of Ownership Changes. (Deviation 2026- O0038)

2026-02

52.222-3 Convict Labor. (Deviation 2026- O0038)

2026-02

52.222-19 Child Labor-Cooperation with Authorities and Remedies.

(Deviation 2026-O0038)

2026-03

52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)

2026-02

52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)

2026-02

52.222-90 Addressing DEI Discrimination by Federal Contractors.

(Deviation 2026-O0040, Revision 1)

2026-04

52.223-23 Sustainable Products. (Deviation 2026-O0038)

2026-02

52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act.

(Deviation 2026-O0038)

2026-02

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.232-1 Payments. 1984-04

52.232-8 Discounts for Prompt Payment. 2002-02

52.232-11 Extras. 1984-04

52.232-25 Prompt Payment. 2017-01

52.232-33 Payment by Electronic Funds Transfer-System for Award Management.

2018-10

52.232-39 Unenforceability of Unauthorized Obligations.

2013-06

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2023-03

52.233-1 Disputes. (Deviation 2026- O0038)

2026-02

52.233-1 Disputes. (Deviation 2026- O0038) (Alternate I)

2026-02 Alternate I 2026-02

52.233-3 Protest after Award. (Deviation 2026-O0038)

2026-02

52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)

2026-02

52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)

2026-02

52.240-93 Basic Safeguarding of Covered Contractor Information Systems.

(Deviation 2026-O0038)

2026-02

52.243-1 Changes-Fixed-Price. (Deviation 2026-O0038)

2026-02

52.244-6 Subcontracts for Commercial 2026-04

Products and Commercial Services. (Deviation 2026-O0038)

52.246-23 Limitation of Liability. 1997-02

52.246-26 Reporting Nonconforming Items. 2024-08

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form).

1984-04

DFARS Clauses Incorporated by Reference

Date

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7003 Control of Government Personnel Work Product.

1992-04

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2026- O0025)

2024-05 Deviation 2026- O0025

2026-06

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support.

2023-01

252.204-7018 Prohibition on the Acquisition of 2023-01

Covered Defense Telecommunications Equipment or Services.

252.204-7020 NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.223-7008 Prohibition of Hexavalent Chromium.

2023-01

252.225-7013 Duty-Free Entry. 2025-08

252.225-7048 Export-Controlled Items. 2013-06

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.227-7013 Rights in Technical Data-Other Than Commercial Products and Commercial Services.

2025-08

252.227-7016 Rights in Bid or Proposal Information.

2025-01

252.227-7030 Technical Data-Withholding of Payment.

2000-03

252.227-7037 Validation of Asserted Restrictions on Technical Data.

2025-01

252.232-7010 Levies on Contract Payments. 2006-12

252.243-7001 Pricing of Contract Modifications. 1991-12

252.244-7001 Contractor Purchasing System 2025-01 Alternate I 2025-01

Administration. (Alternate I)

252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System.

2023-01

252.246-7008 Sources of Electronic Parts. 2023-01

252.247-7023 Transportation of Supplies by Sea.

2024-10

252.247-7028 Application for U.S. Government Shipping Documentation/ Instructions.

2012-06

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.204-19 Incorporation by Reference of Representations and Certifications.

2014-12

Incorporation by Reference of Representations and Certifications (Dec 2014)

The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

52.219-28 Postaward Small Business Program Rerepresentation.

2026-02 Alternate I 2026-02

(Deviation 2026-O0038) (Alternate I) (Tailored)

Alternate I . As prescribed in , substitute (Feb 2026) (Deviation 2026-O0038) 19.101(a)(2)(iii)(B) the following paragraph (g)(1) for paragraph (g)(1) of the basic clause:

(g)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.

NAICS Code Small business concern (yes/no)

334511 NO

334419 NO

336413 NO

52.219-28 Postaward Small Business Program Rerepresentation.

(Deviation 2026-O0038)

2026-02

Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options.

However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.

(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it is, is not a small business concern under NAICS 334511 Code assigned to contract number.SPRRA1-26-P-A004

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph .] The Contractor represents that it is, is not, a small disadvantaged (g)(1) of this clause business concern as defined in .13 CFR 124.1001

(3) . The Women-owned small business (WOSB) joint venture eligible under the WOSB Program Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __.]

(4) . The Economically disadvantaged women-owned small business (EDWOSB) joint venture Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __ .]

(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the . The Contractor represents that it is, is not an SDVOSB joint venture eligible SDVOSB Program under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The ____ Contractor shall enter the name and unique entity identifier of each party to the joint venture:

(6) [ HUBZone joint venture eligible under the HUBZone Program. Complete only if the offeror is ] The offeror represents, as part of its offer, that It is, is not a HUBZone small business concern.

a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).

[ The Contractor shall enter the name and unique entity identifier of each party to the joint ____ venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign and date and insert ____ authorized signer's name and title.]

(End of clause)

52.247-1 Commercial Bill of Lading Notations.

2006-02

Commercial Bill of Lading Notations (Feb 2006)

When the Contracting Officer authorizes supplies to be shipped on a commercial bill of lading and the Contractor will be reimbursed these transportation costs as direct allowable costs, the Contractor shall ensure before shipment is made that the commercial shipping documents are annotated with either of the following notations, as appropriate:

If the Government is shown as the consignor or the consignee, the annotation shall be:(a)

Transportation is for the and the actual total transportation charges paid to the carrierthe Army

(s) by the consignor or consignee are assignable to, and shall be reimbursed by, the Government.

If the Government is not shown as the consignor or the consignee, the annotation shall be:(b)

Transportation is for the [name the specific agency] and the actual total transportation ____ charges paid to the carrier(s) by the consignor or consignee shall be reimbursed by the Government, pursuant to cost-reimbursement contract No. . This may be confirmed by ____ contacting [Name and address of the contract administration office listed in the ____________ contract].

(End of clause)

52.252-2 Clauses Incorporated by Reference.

1998-02

Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov

(End of clause)

52.252-6 Authorized Deviations in Clauses. 2020-11

Authorized Deviations in Clauses (Nov 2020)

The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

The use in this solicitation or contract of any (48 CFR (b) Authorized Deviations in Clauses ) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" Chapter 1 after the name of the regulation.

Solicitation/Contract Form
Supplies or Services & Prices or Costs
Description/Specifications/Statement of Work
Packaging and Marking
Inspection and Acceptance
Deliveries or Performance
Contract Administration Data
Special Contract Requirements
Contract Clauses
26diff1:
26diff2:
27AisInspected: Off
27AisReceived: Off
27AisAccepted: Off
27Anoted:
27CrepresentativeSignDate:
27DrepresentativeNameTitle:
27ErepresentativeAddress:
27FrepresentativeTelephone:
27FrepresentativeEmail:
28shipNumber:
29DOvoucherNumber:
30initials1:
30initials2:
32paidBy:
33amountVerified:
34checkNumber:
35billOfLading:
36AofficerSignDate:
36BofficerTitle:
37receivedAt:
38receivedBy:
39receivedDate:
40totalContainers:
41SRAccountNumber:
42SRVoucherNumber:
16repContractReference:
16contractorOrgName: CMC ELECTRONICS INC.
16contractorNameTitle:
16contractorSignatureDate:
16transmissionAcknowledgement: Yes
16numberCopies: 1
17seeSectionG: SEE SECTION G - CONTRACT ADMINISTRATION DATA
18itemNo2:
18itemNo3:
24koNameTitle: KIERA J. CROSS
25totalamt: USD 127,587.10
16deliveryOrder: Off
16deliveryPurchase: Yes
28shipPartial: Off
28shipFinal: Off
31paymentComplete: Off

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .