Fully Executed 70Z04725FPCNI0002.pdf

PDF 1 MB Posted

Attached to
Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement)
Solicitation number
70Z04724RPCNI0007
Issued by

About this file

This is a fully executed Optional Form 347 (Order for Supplies or Services) issued by the US Coast Guard for the Rio Bayamon Housing Hurricane Resiliency Project. The order was awarded to Tutor Perini Corporation on January 15, 2025 for a firm-fixed price of $20,463,394.00.

The contract (70Z04725FPCNI0002) requires Tutor Perini to provide all labor, material, equipment, mobilization/de-mobilization, permitting, construction support, quality control services, and ancillary items for the Design-Build project at USCG Base San Juan, PR. The work must comply with Task Order Announcement 70Z04724RPCNI0007, RFP Guide Specifications #10878151 dated December 14, 2023, related drawings, DB Wage Determination PR20230002, and Amendments 0001-0005. The contract completion date is March 9, 2027. The delivery address is USCG Headquarters in Washington DC. The contract was signed by the contractor's Senior Vice President Paul Lloyd on January 16, 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The Contractor shall provide all labor, material, equipment, mobilization, de-mobilization, permitting, construction support, quality control services, and ancillary items required for the Design-Build project “San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase -1 Re-procurement).” All work shall be in accordance with the Task Order Announcement 70Z04724RPCNI0007, RFP Guide Specifications #10878151 dated December 14, 2023, all related drawings, reference drawings, reference documents, DB Wage Determination PR20230002 dated 01/05/2024, Amendments 0001 through 0005, and Tutor Perini Corporations’ proposal dated September 10, 2024.

The Contract Completion Date is March 9, 2027.

Signature: Tutor Perini Corporation

Name: Mr. Paul Lloyd

Title: Senior Vice President

Signature: ____________________

Date: _______________________

The total amount of award is $20,463,394.00. The obligation for this award is shown in box 17(i).

January 16, 2025

PG1 70Z04725FPCNI0002
Award 70Z04725FPCNI0002 Rio Bayamon v1_TPC signed
Award 70Z04725FPCNI0002 Rio Bayamon
Page 2 Rio Bayamon Award

File details come from the government source that posted it. Updated .