Attach_JA1.2_Section_01_12_00.pdf

PDF 18 KB Posted

Attached to
Replace Coal Car Shaker at Central Heat and Power Plant, Eielson AFB
Solicitation number
FTQW11-1005
Issued by

About this file

Attach JA1.2 Section 01 12 00

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment JA-1.2 Solicitation Number FA5004-15-B-C006

REPAIR CH&PP COAL CAR SHAKER SECTION 01 12 00

EIELSON AFB, ALASKA ALTERATION PROJECT PROCEDURES

PROJECT NO.: FTQW 11-1005

Design Alaska, Inc. 01 12 00 - 1

PART 1 GENERAL

1.1 REQUIREMENTS INCLUDED

A. This section covers the existing project systems and construction.

B. Procedural requirements.

C. Rehabilitation and renovation of existing spaces and materials.

1.2 RELATED REQUIREMENTS

Section 01 73 29 - Cutting and Patching.PART 2 PRODUCTS

1.3 PRODUCTS FOR PATCHING AND EXTENDING WORK

A. New Materials: As specified in individual Specification Sections.

B. Match existing products and work for patching and extending Work.

Determine type and quality of existing products by inspection and any necessary testing. Determine quality of workmanship by use of existing as a standard. Patching, extending, or matching shall be performed as necessary to make Work complete and consistent with existing products, materials and workmanship.PART 3 EXECUTION

1.4 GENERAL

A. Remove existing work, materials and items as indicated on the Drawings, as required by job site conditions, as scheduled, and as specified herein, to accomplish new Work and alteration in the existing building.

B. Remove work carefully and only to the extent required for the final Work. Minimize damage to adjacent materials.

C. When portions of existing conditions are shown, it is not meant to indicate that all existing conditions are shown.

D. Patch existing surfaces which are made defective in appearance or function by the execution of Work.

E. Take reasonable and adequate precautions to protect the Government’s property from damage during demolition Work, removal of debris, and damage by the elements. Repair any damage to Government property due to the aforesaid work or replace in a manner satisfactory to the Contracting Officer.

REPAIR CH&PP COAL CAR SHAKER SECTION 01 12 00

EIELSON AFB, ALASKA ALTERATION PROJECT PROCEDURES

PROJECT NO.: FTQW 11-1005

Design Alaska, Inc. 01 12 00 - 2

F. Provide and maintain suitable barricades, shelters, lights, and danger signals during the progress of the Work. Provide barricades meeting the requirements of the applicable building codes.

Assume the responsibility of barriers to completion of Contract and remove at completion of Contract.

1.5 INSPECTION

A. Verify that demolition is complete, and areas are ready for installation of new Work.

B. Beginning of restoration Work means acceptance of existing conditions.

1.6 PREPARATION

A. Plan all work in advance, informing Contracting Officer of procedure and schedule.

B. Verify existing conditions affecting Work including existing sizes and materials indicated prior to beginning Work or ordering materials that are affected by existing conditions. Notify Contracting Officer of conflicts in writing.

C. Where openings are to be cut in existing structures cut such openings with care. Where materials, equipment, frames, etc., are to be removed, remove such items with care to minimize damage to adjacent materials.

D. Cut, move, or remove items as necessary for access to alterations and renovations Work; replace and restore at completion.

E. Cut pockets, openings, chases, depressions, etc., to install or allow for installation of materials or equipment.

F. Remove from site unsuitable material not marked for salvage, such as rotted wood, rusted metals, and deteriorated masonry and concrete; replace materials as specified for finished Work.

G. Remove from site, including concealed spaces, debris and abandoned items resulting from demolition operations from the site promptly. No accumulation of debris is permitted.

H. Prepare surfaces and remove surface finishes to provide for proper installation of new Work and new finishes.

I. Close openings in exterior surfaces to protect existing work and salvage items from weather and extremes of temperature and humidity. Insulate ductwork and piping to prevent condensation in exposed areas.

J. Locate penetrations to avoid structural members.

REPAIR CH&PP COAL CAR SHAKER SECTION 01 12 00

EIELSON AFB, ALASKA ALTERATION PROJECT PROCEDURES

PROJECT NO.: FTQW 11-1005

Design Alaska, Inc. 01 12 00 - 3

1.7 SELECTIVE DEMOLITION

A. Cut, move, or remove items as necessary for access to alterations and renovations Work; replace and restore at completion.

B. Cut pockets, openings, chases, depressions, etc., to install or allow for installation of materials and equipment.

C. Remove unsuitable material, such as rotted wood, rusted metals, and deteriorated masonry and concrete; replace materials as specified for finished Work.

D. Remove surface finishes and prepare surfaces to provide for proper installation of new Work and new finishes.

E. Close openings in exterior surfaces to protect existing work and salvage items from weather and extremes of temperature and humidity. Insulate ductwork and piping to prevent condensation in exposed areas.

1.8 DISPOSAL OF DEBRIS

A. Promptly remove from the site, including from concealed spaces, debris resulting from construction and demolition operations and abandoned items. No accumulation of debris will be permitted.

B. Legally and safely dispose of debris resulting from construction and demolition operations.

1.9 ALTERATION AND RENOVATION

A. Coordinate Work of alterations and renovations of existing spaces and materials to expedite completion and to accommodate Government occupancy.

B. Patch Work in a manner to minimize damage and restore products and finishes to original condition.

C. Install products as specified in individual Specifications Sections.

D. Refinish visible existing surfaces to remain in renovated rooms and spaces with a neat transition to adjacent new finishes.

E. In addition to specified replacement of equipment, restore existing mechanical and electrical systems to full operational condition.

F. Fit Work at penetrations of surfaces as specified in Cutting and Patching Specification.

REPAIR CH&PP COAL CAR SHAKER SECTION 01 12 00

EIELSON AFB, ALASKA ALTERATION PROJECT PROCEDURES

PROJECT NO.: FTQW 11-1005

Design Alaska, Inc. 01 12 00 - 4

1.10 TRANSITIONS

A. Where new Work abuts or aligns with existing, make a smooth and even transition. Patched Work shall match existing adjacent work in texture and appearance.

B. Where a change of plane of 1/4 inch or more occurs, submit recommendation for providing a smooth transition for Contracting Officer review.

C. When finished surfaces are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and make recommendations to Contracting Officer.

1.11 INSTALLATION

A. Coordinate Work of alterations and renovations to expedite completion and to accommodate Government occupancy.

B. Remove, cut, and patch Work in a manner to minimize damage and to provide means of restoring products and finishes to original condition.

C. In addition to specified replacement of equipment, restore existing mechanical and electrical systems to full operational condition.

D. Install products as specified in individual Specification Sections.

1.12 REPAIR OF DAMAGED SURFACES

A. Patch or replace portions of existing surfaces which are disturbed, damaged, or otherwise made defective in appearance or function by the execution of Work under this Contract. Restore to original condition.

B. Repair substrate prior to patching finish.

1.13 FINISHES

A. Finish surfaces as specified in individual Sections.

B. Finish patches to produce uniform finish and texture over entire area. When finish cannot be matched, refinish entire surface to nearest intersections.

1.14 CLEANING

A. In addition to cleaning specified in Section 01 50 00, clean Government occupied areas of Work daily.

REPAIR CH&PP COAL CAR SHAKER SECTION 01 12 00

EIELSON AFB, ALASKA ALTERATION PROJECT PROCEDURES

PROJECT NO.: FTQW 11-1005

Design Alaska, Inc. 01 12 00 - 5

B. After the demolition Work in any area is completed, clean the area before new construction is started.

END OF SECTION