Attachment JA-1.10 Solicitation Number FA5004-15-B-C006

REPAIR CH&PP COAL CAR SHAKER SECTION 01 73 26

EIELSON AFB, ALASKA EXISTING UTILITIES

PROJECT NO.: FTQW 11-1005

Design Alaska, Inc. 01 73 26 - 1

PART 1 GENERAL

1.1 SCOPE: SECTION 01 73 26 – EXISTING UTILITIES

A. This section covers the existing project systems and construction.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

1.2 UTILITIES, MECHANICAL, ELECTRICAL AND COMMUNICATIONS

A. All existing project utilities, plumbing, HVAC, fire protection, electrical and communications systems are defined as critical. These systems shall be maintained in service unless otherwise approved by the Contracting Officer.

1.3 EXISTING UTILITIES INTERRUPTIONS

A. All utility interruptions require prior approval of the Contracting Officer. Schedule with the Contracting Officer all utility interruptions a minimum of seven days prior to the date of the desired interruption.

B. Distribution Shop personnel will operate all heating service and water service valves when interrupting or reestablishing these utilities when requested and scheduled. The Contractor shall not operate main steam, condensate or water isolation valves within the distribution system.

1.4 LOSS OF EXISTING UTILITIES

A. The Contractor is responsible for all damages to facilities on and off the Project site resulting from his interruption of a utility without prior approval of the Contracting Officer. The Contractor shall correct all damages without additional cost to the Government.

B. The Contracting Officer will have Base utility personnel and other Government personnel define the location and routing of all existing utilities within the Project Site, if requested by the Contractor. The Contractor is responsible for maintaining any markers or locators placed by Government utility personnel within the Project Site or that may be affected by his work.

END OF SECTION