This document is a Forest Service Supplemental Specifications document for construction contracts, specifically focused on traffic control and signage installation for the Helena Lewis & Clark National Forest. The specifications provide detailed technical requirements for permanent traffic control devices, including sign panels, posts, materials, and fabrication standards. Key specifications include requirements for sign panel types (plywood, steel, aluminum, plastic), crashworthy design, material certifications, and installation guidelines following the Manual on Uniform Traffic Control Devices (MUTCD) and USDA Forest Service standards.
The related federal contract opportunity (Solicitation #1240LU25Q0062) involves GAOA Forest Wide Entry Sign Replacements with a construction magnitude between $25,000 and $100,000. The project requires installing new entry signs across the Helena Lewis & Clark National Forest, with specific technical specifications outlined in the document including precise requirements for sign panel materials, protective overlay films, edge treatments, and installation methodologies. Contractors must adhere to detailed fabrication standards, obtain CO (Contracting Officer) approval for sign layout proofs, and ensure all materials and installations meet federal agency specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DrawingsWithMaps.pdf | ||
| ExperienceQuestionnaire.pdf | ||
| Sf1442_1240LU25Q0062.pdf | ||
| RFQ_1240LU25Q0062.pdf | ||
| MT20250066_Wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
| Preface | 2 |
| 101 - Terms¸ Format¸ and Definitions | 3 |
| 101.01 Meaning of Terms. | 3 |
| 101.03 Abbreviations. | 3 |
| 101.04 Definitions. | 4 |
| 102 - Bid¸ Award¸ and Execution of Contract | 8 |
| Delete Section 102. | 8 |
| 103 - Scope of Work | 9 |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. | 9 |
| 104 - Control of Work | 10 |
| Delete Subsections 104.01, 104.02, 104.04. | 10 |
| 104.06 Use of Roads by Contractor. | 10 |
| 105 - Control of Material | 11 |
| 105.05 Use of Material Found in the Work. | 11 |
| 106 - Acceptance of Work | 12 |
| 106.01 Conformity with Contract Requirements. | 12 |
| 106.02 Visual Inspection. | 14 |
| 107 - Legal Relations and Responsibility to the Public | 15 |
| Delete Subsection 107.05. | 15 |
| 108 - Prosecution and Progress | 16 |
| Delete Section 108. | 16 |
| 109 - Measurement and Payment | 17 |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. | 17 |
| 109.01 Measurement of Work. | 17 |
| 109.02 Measurement Terms and Definitions. | 18 |
| 155 - Schedules for Construction Contracts | 19 |
| Delete Section 155. | 19 |
| 633 - Permanent Traffic Control | 20 |
| 633.02 Material. | 20 |
| 633.03 General. | 20 |
| 633.05 (a) Fabrication. | 20 |
Preface Preface_wo_01_12_2022
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 - Terms¸ Format¸ and Definitions 101.01_National_1_12_2022 Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_1_12_2022 Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FSAR — Forest Service Acquisition Regulations MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
| MP | — | milepost | location | ||
| ppm | — | parts per million | volume | ||
| STA | station | location |
101.04_National_1_12_2022 Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid¸ Award¸ and Execution of Contract 102.00_National_1_12_2022
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_1_12_2022 Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_1_12_2022 Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_1_12_2022 Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.05_National_1_12_2022
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.
106 - Acceptance of Work 106.01_National_1_12_2022 Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
Sampling method;
Number of samples;
Sample transport;
Test procedures;
Testing laboratories;
Reporting;
Estimated time and costs; and Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
1. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_1_12_2022
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_1_12_2022 Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress 108.00_National_1_12_2022 Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_1_12_2022 Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01_National_1_12_2022 Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1 Decimal Accuracy of Quantities for Final Payment
| Pay Item |
| Level of Precision |
| Linear Foot |
| 1 |
| Exception--Timber, Steel, and concrete Piles |
| 0.1 |
| Station |
| 0.1 |
| Mile |
| 0.01 |
| Square Foot |
| 0.1 |
| Square Yard |
| 0.1 |
| Each |
| 1 |
| Acre |
| 0.01 |
| Gallon |
| 1 |
| M-Gals. |
| 0.1 |
| Cubic Yard | |
| 1 |
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
| Exception--Concrete; Masonry |
| 0.01 |
| Pound |
| 1 |
| Ton |
| 0.1 |
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials 0.01
| Hour |
| 0.1 |
| MFBM |
| 0.01 |
| Station Yard |
| 1 |
| Cubic Yard Mile |
| 1 |
| Ton Mile |
| 1 |
109.02_National_1_12_2022 Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
155 - Schedules for Construction Contracts 155.00_National_1_12_2022 Delete Section 155 in its entirety.
Delete Section 155.
633 - Permanent Traffic Control 633.00_National_1_12_2022 Delete the first sentence of Subsection 633.02 and replace with the following:
Description
633.01 This work consists of installing and removing and resetting permanent traffic control devices.
Sign Panels are designated as plywood, steel, aluminum, plastic, fiberglass reinforced plastic, or extruded aluminum.
Sign posts are designated as wood, aluminum, galvanized steel, or corrosion resistant steel.
633.02 Material. Conform to the MUTCD and the following Section and Subsections subsections:
Aluminum Panels……………………………………………………………718.00(c) Delineator & Object Marker Retroreflectors………………….718.08(b) Epoxy Markings………………………………………………………………718.11 Epoxy Resin Adhesives……………………………………………………718.17 Glass Beads…………………………………………………………………….718.14 Hardware……………………………………………………………………….718.06 Legends and Boarders……………………………………………………718.07 Minor Concrete………………………………………………………………601 Object Marker & Delineator Posts………………………………….718.05 Paint……………………………………………………………………………….719 Panels…………………………………………………………………………….718.03 Pavement Markers………………………………………………………….718.15 Preformed pavement marking tape……………………………….718.13 Plastic Panels………………………………………………………………….718.06(d) Plywood Panels………………………………………………………………718.03(a) Retroreflective Sheeting…………………………………………………718.01 Signposts…………………………………………………………………………718.04 Solventborne traffic paint……………………………………………….718.09 Steel Panels…………………………………………………………………….718.03(b) Temporary Pavement Markings………………………………………718.16 Thermoplastic Markings………………………………………………….718.12 Waterborne Traffic Paint…………………………………………………718.10
Furnish Certification to the CO that all materials comply with the specific requirements.
Ensure that all concrete meets the requirements specified in Section 602, or as SHOWEN ON THE DRAWINGS.
Furnish reinforcing steel as SHOWEN ON THE DRAWINGS that meets the requirements specified in Subsection 709.01
Make the following changes to Subsection 633.03:
633.03 General.
Delete the first paragraph of Subsection 633.03 and replace with the following:
Furnish and install permanent traffic control devices according to the MUTCD, USDA Forest Service EM-7100-15 and permanent traffic control plans. Provide traffic control devices that are crashworthy.
Add the following sentence to Subsection 633.03:
Sign panel layout proofs shall be approved by the CO prior to ordering.
Add the following to Subsection 633.05(a):
633.05 (a) Fabrication.
(3) Protective Overlay Film. When specified, cover the entire face of a sign with a clear high-performance, solvent-resistant, ultraviolet-stabilized, pressure-sensitive adhesive, protective overlay film. Use 3M Scotchlite Premium Protective Overlay Film Series 1160 or approved equivalent.
(4) Edge Film. When specified, edge film shall be 3 inches wide vinyl film that is pressure-sensitive, premium quality, clear, and ultraviolet-resistant.