FSH PWS - FY23 Washer Dryer - Draft.pdf

PDF 1 MB Posted

Attached to
FY23 Ft Sam Washer/Dryer Lease and Maintenance Federal contract opportunity
Solicitation number
FA301623R0016
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to FY23 Ft Sam Washer/Dryer Lease and Maintenance, newest first.
File Type Posted
FY23 Ft Sam Washer-Dryer Synopsis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT WASHER AND DRYER LEASE /

MAINTENANCE SERVICES

JOINT BASE SAN ANTONIO FORT SAM HOUSTON AND CAMP BULLIS

19 APR 2023

1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other items or services necessary for Washer/Dryer Maintenance, Repair and Leasing and Clothes Dryer Exhaust Duct Cleaning service as defined in this Performance Work Statement (PWS) at Joint Base San Antonio Fort Sam Houston and Camp Bullis. Contractor shall be responsible for the delivery, installation, cleaning, maintenance, repair, removal, and relocation of contractor furnished washers and dryers. Washer/dryer locations and types are listed on Appendix A. Contractor shall monitor, schedule and clean clothes dryer exhaust ducts as necessary to minimize the amount of lint accumulation and ensure ducts do not pose a safety or fire hazard.

Facility numbers, estimated quantities, and recommended cleaning schedules for dryer ducts are listed on Appendix C Dryer Duct.

2. PERSONNEL

2.1. Contract Manager. The contractor shall provide a Contract Manager or alternate who shall be responsible for the operations, management, compliance of contract requirements and quality control. Contract Manager/alternate shall respond to the Contracting Officer (CO) and / or Contracting Officer’s Representative (COR) two business hours of notification.

2.2. Washer/Dryer Repair Technician / General Maintenance Technician. The contractor shall provide one repair technician and one general maintenance technician qualified to work on the washers/dryers. Technicians shall be available to provide services at JBSA Fort Sam Houston and Camp Bullis five days per week except for federal holidays. Contractor shall be responsible for, but not limited to, responding to service calls, machine repair, preventive maintenance, scheduled inspections, dryer exhaust duct cleaning and monitoring of equipment. The contractor shall maintain a log of all inspections performed, repairs and preventive maintenance accomplished. The log shall be made available to the Contracting Officer Representative (COR) for review and copies provided within two business days of request.

3. EQUIPMENT

3.1. Equipment Quality Standards. All machines shall be new at the start of the first period of performance. Replacement appliances shall not be older than 2023 model of washers and dryers.

Replacement equipment shall be the same size and color.. Washers and dryers shall be heavy duty, commercial or industrial brand/design and have the minimum number of control knobs, switches, settings and cycles. All washers and dryers shall be white in color. Washers and dryers shall operate without the use of coins or tokens and shall not have any coin or token slot attachments. All machines shall be in compliance with DoD Instruction 4170.11, Installation Energy Management, and Energy Policy Act (EPACT) 2005, Public Law 109-58, where applicable.

3.2. Washers. Washers shall be no smaller than 16 lb. capacity as indicated on Appendix 1. The washers shall meet the industry standard dimensions. The existing washers are 27” W x 25 ½” D x 42 ¾” H in size. Contractor shall furnish all parts and accessories and make all connections (hot and cold-water hoses, drain hose etc.), to make equipment operational. The hot and cold-water lines and drain hoses shall be included in the washer and dryer maintenance cost.

DRAFT

Washers’ cords shall be equipped with a UL listed, molded 3 prong 110V or 240v male plug whichever is applicable to the building electrical requirement and each machine’s specifications.

3.3. Large Capacity Washers. Washers listed on Appendix 1 as “large capacity” shall be hard mount machines with no smaller 22 lb. capacity. Contractor shall be responsible for following the manufacturer’s installation instructions. The washers shall be installed in a safe and functioning manner.

3.4. Dryers. Dryers shall be the largest capacity, minimum of 18 lb. for either electric or gas operated as indicated on Appendix 1. The dryers shall meet the industry standard dimensions.

The existing three sizes of dryer dimensions are as follows:

18 lb. dryer – 29” W x 25 ½” D x 41 ¾” H;

30 lb. stackable dryer – 31 1/2” W x 42 1/2 “ D x 75 1/2” H;

18 lb. stackable dryers - 27” W x 28” D x 75 1/4” H.

Dryers shall have a “push to start” button/panel, which operates only when door is closed.

Dryers shall be heavy-duty machines designed specifically for commercial use. All gas dryers shall be equipped with electronic igniter. Contractor shall furnish electrical cords for electric dryers (the electrical cords are not cost reimbursable). Dryer cords shall be equipped with a UL listed, molded 3 or 4 prong 110V or 220V male plug, whichever is applicable to the building utility requirement. Gas dryers are 3 prong 110V. Electric dryers are 4 prong 220V. The contractor shall furnish all flexible gas lines for gas dryers.

Stackable Dryers (18 lb. and 30 lb.). Dryers shall be gas or electric as indicated on Appendix A.

Dryers shall have a “push to start” button/panel, which operates only when door is closed.

Stackable dryers consist of two drums which equal one set/stackable unit. The monthly cost for inoperable machines will be deducted per drum, not per set; see para 4.1 within this PWS.

3.5. Dryer Exhaust Metal Ducting. The contractor shall provide and install rigid metal ducting for all 30 pounds (lb.) single and stacked dryers, from the dryer to the facility permanent exhaust system. Dryer exhaust vents shall be firmly attached to prevent the ducting from coming loose.

The contractor shall ensure flexible aluminum ducting is used for all other dryers.

3.6. Appliance Identification and Signage. All contractor provided washers and dryers shall be labeled with a machine number (i.e. D100 for Dryer #100, W303 for Washer #303) for easy identification. Identification numbers shall be non-removable and easily viewed. The contractor shall also identify equipment as property of the contractor (where applicable). The contractor shall furnish and apply “Operating Instructions” decals in each laundry room that will be prominently displayed in plain view. The contractor shall furnish and apply any other signage deemed necessary for proper usage and safe operation of equipment.

3.7. Parts/Equipment Installation. The contractor shall furnish and install gas-splitters, shut offs, reducers, nipples and any other equipment and materials as required to ensure machines operate correctly. Machines shall be grounded in accordance with manufacturer’s recommendations and National Electric Code (NEC).

3.8. Replacement Equipment. The contractor shall maintain, at their own storage facility, sufficient stock to replace equipment that cannot be made operational as required in Paragraph 4.1.

4. SERVICES

4.1. Washer/Dryer Service Tickets. The COR will prepare washer/dryer service request tickets for all calls received by base customers.

4.1.1. The contractor shall check-for and pick up service request tickets from the COR, Monday through

Friday, no later than 8:00 A.M daily (excluding federal holidays) at the Service Contracts Office.

4.1.2. The contractor shall complete the service ticket by identifying the response date, a short summary of repair performed or reason the equipment was not made operational. Completed service ticket shall be returned to the COR within two business days of ticket pick up time (excluding weekends and federal holidays).

4.1.3. Equipment shall be repaired and operational within two business days.

4.1.4. If a contractor provided appliance cannot be made operational within the same two business day period, the contractor shall replace the appliance with a fully operational machine no later than three business days after the service ticket pick up.

4.1.5. Contractor shall notify COR of replacement date and time so service ticket may be closed out. If an appliance is not repaired or replaced within three business days (excluding weekends and federal holidays), the Government will not pay for the inoperable machine for that month.

4.2. Duct Cleaning. The contractor shall inspect and clean all dryer exhaust vents quarterly from the dryer itself to the permanent exhaust system. The contractor shall monitor, schedule and clean ducts as needed to ensure ducts do not fill with lint, are clean and lint/dirt free and do not pose a fire/safety hazard.

4.2.1. The contractor shall thoroughly clean all areas of the interior and exterior of dryer exhaust ducts and adjacent areas so that all traces of dirt, mildew, lint, etc., are removed. The contractor shall clean all components to the dryer exhaust duct system to include exhaust caps, grills, louvers, bird/insect screens, rain caps, exhaust fan hoods and the exterior of ducts if exposed. The contractor shall clean the floor area around all dryers, specifically behind the dryers where lint and trash accumulate. Floor shall be cleaned of all dirt, lint, grime, trash, etc.

4.2.2. In facilities where multi dryer ducts are available, the contractor will be allowed to shut off only one system at a time for cleaning. Contractor may disconnect and remove dryers, exhaust louvers, grills and duct access covers as necessary to gain access to the interior of exhaust ducts.

4.2.3. Contractor shall reinstall dryers and ducting immediately after duct cleaning is completed in a facility. Contractor shall not cause damage to dryers, gas lines, electrical connections, and ducting. The contractor shall be responsible for making repairs to damages caused by the contractor at no additional cost to the government. There are several configurations of dryer vents on JBSA Fort Sam Houston. Some are cleanable from the interior of the facility with no special equipment. Some require a ladder for cleaning, and some are only cleanable with a boom lift. See Appendix C for specific locations and requirements.

4.3. Washer/Dryer Maintenance. At a minimum, the contractor shall monitor and inspect all washers and dryers monthly to ensure equipment is operational and performing according to design. Preventive maintenance shall be performed to identify potential problems and to repair them before equipment fails. Washer and dryer connections such as hoses, exhaust vents, gas lines, etc. shall be inspected during the scheduled equipment inspections. Contractor shall inspect all washers and dryers monthly in order to maintain and repair the machines.

4.4. Dryer Filter Cleaning. Contractor shall inspect dryer lint filters and immediately replace torn or unusable filters. Contractor shall ensure dryer exhaust vents are properly secured to dryer and exhaust ducting at all times to prevent fire hazards. Contractor shall identify and replace deteriorated ducting as part of the monthly cleaning schedule. Contractor shall ensure areas surrounding dryers are free from lint, debris etc., after each service.

4.5. Clean-up. Contractor shall be responsible for leaving appliances and work areas clean at the end of each repair/inspection/replacement. Contractor shall dispose of trash, rubbish, parts, etc., at an off-base disposal site.

4.6. Machine Reinstallation. The contractor shall reinstall all washers and dryers removed for work back to their original location (includes back in floor anchoring system where applicable).

Contractor shall test gas line connections after dryers are reinstalled to ensure no gas leaks are present. Contractor shall make repairs to connections as necessary to correct any gas leaks. All washers and dryers shall be returned to operation at completion of work for each facility. The contractor shall routinely check all vent connections to ensure dryers exhaust ducts are connected to dryer flex hoses.

4.7. Machine Relocation. There may be instances when the contractor is responsible for temporarily removing machines from a building for renovations. The government will not provide storage space. Upon completion of renovations, contractor shall relocate machines and ensure they are fully operational. Contractor shall invoice against applicable Remove/Reinstall Washer/Dryer Contract Line Item Number (CLIN) 0X12 and 0X13.

4.8. Appliance Inventory. The contractor shall provide the COR with a complete and accurate inventory list of all machines installed within ten business days of contract start. The inventory list shall contain, as a minimum, appliance type, size, serial number, assigned machine ID#, year of manufacture and building number where each machine is located. An updated and accurate inventory list shall be submitted to the COR within the first five business days of the first month of each quarter (October, January, April and July), or upon request of the CO or COR.

5. SCHEDULES

5.1. Washer/Dryer Maintenance Schedule. The contractor shall submit a monthly maintenance schedule to the COR for all appliances at least five business days before the start of each month.

Maintenance schedule shall include the date and approximate time each machine shall be serviced. Changes to the maintenance schedule shall be immediately identified to the COR.

5.2. Dryer Exhaust Cleaning Schedule. The contractor shall establish and submit a monthly dryer duct cleaning schedule for all work to the COR at least five business days before the start of each month. The schedule shall include the Monthly Dryer Duct Cleaning -Appendix 3. Maintenance schedule shall include the date and approximate time each machine shall be serviced. Changes to the cleaning schedule shall be immediately identified to the COR.

6. ADDITIONAL REQUIREMENTS

6.1. Phase-Out and Phase-In. The phase-out of old washers and dryers shall be performed during the last month of the current contract. The incumbent will be notified, and both shall work together to maintain washer and dryer capacity in each facility during each day of the phase-in and phase-out period. The new contractor shall submit a phase-in schedule five days after contract award. The government will provide a copy of the phase-in schedule to the incumbent contractor. The new contractor shall coordinate installation of new machines with the incumbent contractor removing the old machines. The incumbent contractor shall remove old washers and dryers in accordance with the phase-in schedule. The incumbent contractor will not be allowed to store any washers and dryers on base. The new contractor shall submit a daily list of all washer and dryers placed that day to the COR. No facility shall be left without washer and dryers during the transition period.

6.2. Additions and Deletions of Washers/Dryers/Services. The government will provide the contractor with a written contract modification for any washer/dryer/duct cleaning additions or deletions. When possible, the government will provide a minimum of seven calendar days advance notice for machine additions/deletions. In certain circumstances, it may be necessary for the contractor to store the ordered machines until building/facility is ready for equipment installation. Additions/Deletions shall be based on the current year’s unit price for the same type of machine.

6.3. Temporary Support Requirements. In the event of mass deployments, natural disasters, temporary facility occupation and other events of a similar nature, the contractor shall provide washers and dryers as requested by the government for a temporary period, with operational machines of the same type and age as other contractor furnished machines. The contractor shall provide machines in any building on the installations even if not listed in the Appendix of this PWS. Equipment/service may be required for several days, weeks or months. Pricing shall be in accordance with the submitted/established pricing for the type of equipment requested.

6.4. Washer and Dryer Usage. The contractor is advised that washers and dryers will receive very high usage, above normal wear and tear, due to the training missions on JBSA Lackland. The contractor can also expect to continually replace control knobs, lint screens, timers, screws, agitators, transmissions, etc., due to high usage, overloading etc.

6.5. Equipment Abuse. The contractor shall notify the COR in writing, immediately after discovering abuse to the equipment. The COR will go to the site with the contractor and verify if the equipment has been abused. Abused equipment is not subject to the time requirements of paragraph 1.2.1. The contractor shall submit in writing all equipment abuse items to the COR no later than three business days of discovering the abuse, to include the cost of the replacement parts. The contractor shall provide the cost of parts to the COR when the need for additional parts/equipment has been identified. Any cost exceeding $2000 (total) per machine requires approval by the Contracting Officer (CO). COR shall provide the contractor written approval (email is sufficient) prior to repair of equipment for costs at and under $2000. For costs exceeding $2000, the CO shall provide contractor written approval (email is sufficient) prior to repair of equipment.

7. SERVICE SUMMARY. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Service Summary (SS) provides information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. A Valid Defect is when a service does not meet the requirements of the PWS, which may be found during a government inspection or reported on a valid customer complaint form or a combination of the two for each category. Multiple defects may be found during one inspection or reported on one valid complaint.

These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4(a), Contract Terms and Conditions – Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional errors on each work shall be allowed in an effort to identify normal phase-in problems.

PERFORMANCE OBJECTIVE PWS PAR MONTHLY PERFORMANCE

THRESHOLD

SS-1

The contractor shall maintain a log of all inspections performed, repairs and preventive maintenance accomplished.

The log shall be made available to the Contracting Officer Representative (COR) for review and copies provided within two business days of request.

2.2 No more than 1 defect

SS-2

Washers and dryers are operating as designed

3.1 No more than 5 defects

SS-3

Replacement of unserviceable equipment within allotted time frame

4.1.4 No more than 1 defect

SS-4

Service tickets are picked up and completed within 2/3 business days IAW PWS Provides monthly maintenance and cleaning schedule; inventory listing current; inventory reports IAW PWS

4.1.1, 4.8, 5.1,

5.2 No more than 1 defect

SS-5

Preventive maintenance is performed in accordance with schedule.

4.3 No more than 3 defects

SS-6

The contractor shall monitor, schedule and clean ducts as needed to ensure ducts do not fill with lint, are clean and lint/dirt free and do not pose a fire/safety hazard

5.2 No more than 1 defect

SS-7

Quality Control inspection procedures are followed and documented in accordance with Contractor’s Quality Control Program (QCP)

7.1 No more than 1 defect

7.1. Quality Control. The contractor shall develop and maintain a Quality Control Program to ensure services are performed in accordance with the PWS. The contractor shall develop and implement procedures to track, identify, prevent, remedy and ensure non-recurrence of defective service. The contractor is responsible for the quality control program to include updates to ensure compliance with the PWS.

7.2. Quality Control Plan (QCP). A written QCP shall be submitted as part of the contractor’s proposal package. Any changes after initial QCP submission shall be provided to the CO prior to implementation.

7.3. Quality Assurance. The government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The CO or COR shall inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine if performance meets the standards contained in this PWS.

Any unsatisfactory inspection (defect) result shall be recorded on a Surveillance Checklist. The Contractor shall start re-performing the service at no additional cost to the government within two hours after notification by the CO or COR. The services shall be completed within 24 hours of the notification unless the COR has been notified and agreed to additional time for completion.

The Contractor shall return the signed/dated Surveillance Checklist within three business days of receipt annotating what actions were taken to correct the discrepancy and what action will be taken to ensure no repeat discrepancies.

When a performance threshold has not been met, the COR will initiate a Contract Discrepancy Report (CDR) and submit to the CO. The CO will issue the CDR to the Contractor. The Contractor shall respond to the CDR in accordance with instructions provided and return it to the CO within ten calendar days of receipt. A Progress Meeting will be scheduled at minimum with the Contractor, CO, and COR.

Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall result in a letter of concern from the CO. All remedies shall be in accordance with the FAR 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services, and Inspection/Acceptance.

Corrected deficiencies shall still count against the contractor but will allow for full monthly payment. If re-performance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. Disputes between the COR and the contractor on the validity of a performance assessment shall be referred to the CO.

8. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

8.1. Facilities. The government will not provide a building, room or trailer space on the installation for contractor use during the performance of the contract.

8.2. Utilities. The government will provide water, electricity and gas as needed in performance of work. The contractor shall provide all tools, equipment, and other items as necessary to perform tasks in accordance with the PWS.

8.3. Equipment. No Government Furnished Equipment will be provided during the performance of the contract.

9. GENERAL INFORMATION.

SORENSEN, HEATHER A CIV USAF AETC 502 CONS/JBKAA

The clause is now titled: 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services, and Inspection/Acceptance.

Hours of Operation. All work shall be performed during the normal duty day, 7:30 am to 4:30 P.

M., Monday thru Friday, except for federal holidays. Federal holidays include:

New Year’s Day – 1 January Birthday of Martin Luther King Jr. – 3rd Monday in January Washington’s Birthday – 3rd Monday in February Memorial Day – Last Monday in May Juneteenth – 19th of June Independence Day – 4th of July Labor Day – 1st Monday in September Columbus Day – 2nd Monday in October Veteran’s Day – 11 November Thanksgiving Day – 4th Thursday in November Christmas Day – 25th of December

Arrangements may be made in the case of building modifications or washer/dryer installation to allow for weekend work at no additional cost to the government.

General Liability. The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

Property Damage Liability. Property damage liability insurance shall be required.

Automobile Liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract.

Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims. Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commander. Services under this contract have been determined not to be essential for performance during crisis.

Performance of Services During Crisis Declared by the National Command Authority or Overseas Combatant Commander. Services under this contract have been determined not to be essential for performance during crisis.

Criminal Background Checks: Contractor shall ensure a criminal background check has been performed on all employees working on the installation. Only minimum level National Crime Information Center (NCIC) background checks are required for the performance of this contract. This requirement is mandatory as called for in AFI10-245-O_AETCSUP-O ANTITERRORISM (AT) PROGRAM IMPLEMENTATION. These checks shall be accomplished prior to the first day of performance. Background checks shall be accomplished at no additional cost to the government.

Security Requirements for Unclassified Services

Base Entry and Vehicle Control Requirements: Contractor shall comply with AFFARS Clause 5352.242-9000, “Contractor access to Air Force Installations” which is hereby incorporated by reference if not otherwise included. Contractor personnel shall comply with all on-base traffic laws.

List of Employees: The contractor shall provide the COR a current list of employees within five calendar days after receiving award or Notice of Award. The list shall include employee’s name, driver’s license number, and state of issue and date of birth. Updated lists shall be provided when an employee’s status or information changes.

Reporting Requirements: The contractor shall comply with AFI 71-101, Volume I, Criminal Investigations. Contractor shall report to the 802 Security Forces any information or circumstances which may pose a threat to DOD or contractor personnel, resources, or DOD information.

Physical Security: The contractor shall comply with Force Protection Condition FPCON procedures, Random Antiterrorism Measures (RAMS) and local search/identification requirements.

Information in regard to the afore-mentioned items, may be provided on an as needed basis to the contractor.

Personnel: Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, bearing the company name or logo. The coloring or design of the items selected should be such that it identifies personnel easily and quickly for safety and personnel protection.

Restricted Personnel. The government is authorized to restrict the employment under the contract of any contractor employee or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.

Vehicles. All contractor furnished vehicles shall display the contractor’s company logo and vehicle number. Company logo shall be a magnetic sign or painted/stenciled on both sides of the vehicle and shall be easily visible/legible to base personnel.

10. Appendices.

Appendix A - Estimated Quantities and Locations Appendix B - Laundry Equipment Type Quantities Appendix C - Dryer Duct Cleaning Frequencies/Pictures of Typical Dyer Vents

APPENDIX A

WASHER AND DRYER QUANTITIES AND LOCATIONS

BLDG NO. BLDG TYPE FLOOR WASHER DRYER REMARKS

FT SAM

HOUSTON

257 Dorm 1 3 4 4 gas dryers 257 Dorm 2 3 4 4 gas dryers 257 Dorm 3 3 4 4 gas dryers 272 Dorm 1 19 30 15 stackable gas dryers 590 Dorm 1 10 12 6 stackable electric dryer units 590 Dorm 2 2 4 2 stackable electric dryer units 590 Dorm 3 2 4 2 stackable electric dryer units 591 Dorm 1 10 12 6 stackable electric dryer units 591 Dorm 2 2 4 2 stackable electric dryer units 591 Dorm 3 2 4 2 stackable electric dryer units

904 Dorm 1 6 8 6 Stackable electric gas combo & 1 stackable gas dryer unit.

904 Dorm 2 6 8 6 Stackable units washer/gas dryer combo & 1 stackable gas dryer unit.

904 Dorm 3 6 8 6 Stackable gas dryer combo & 1 stackable gas dryer unit.

905 Laundry Tower 1 6 8 6 Stackable electric dryer combo & 1 stackable electric dryer unit.

905 Laundry Tower 2 6 8 6 Stackable electric dryer combo & 1 stackable electric dryer unit.

905 Laundry Tower 3 6 8 6 Stackable electric dryer combo & 1 stackable electric dryer unit.

907 Laundry Tower 1 6 8 6 Stackable electric dryer combo & 1 stackable electric dryer unit.

907 Laundry Tower 2 6 8 6 Stackable electric dryer combo & 1 stackable electric dryer unit.

907 Laundry Tower 3 6 8 6 Stackable electric dryer combo & 1 stackable electric dryer unit.

915 Laundry Tower 1 6 8 electric dryer combo & 1 stackable electric dryer unit.

915 Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

915 Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

916 Laundry Tower 1 6 8 electric dryer combo & 1 stackable electric dryer unit.

916 Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

916 Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

920 Laundry Tower 1 6 1 electric dryer combo & 1 stackable electric dryer unit.

920 Laundry Tower 2 6 1 electric dryer combo & 1 stackable electric dryer unit.

920 Laundry Tower 3 6 1 electric dryer combo & 1 stackable electric dryer unit.

929 Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

929 Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

930 Laundry Tower 1 6 8 electric dryer combo & 1 stackable electric dryer unit.

930 Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

930 Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

1002 Dorm 1 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 2 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 3 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 4 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 5 10 14 2 single gas dryers, 6 stackable gas dryers.

1153 Dorm 1 2 2 2 single electric dryers 1350 Dorm A – A 8 8 8 top load washers / 8 single electric dryers 1350 Dorm A - B 8 8 8 top load washers / 8 single electric dryers 1350 Dorm B - A 0 0 Converted to storage room 1350 Dorm B – B 0 0 Converted to storage room 1350 Dorm C – A 0 0 Converted to storage room 1350 Dorm C – B 0 0 Converted to storage room 1350 Dorm D – A 0 0 Converted to storage room 1350 Dorm D - B 0 0 Converted to storage room 1350 Dorm E – A 0 0 Converted to storage room 1350 Dorm E - B 0 0 Converted to storage room 1469 Dorm 1 30 48 24 Stackable electric dryers units 1469 Dorm 2 30 48 24 Stackable electric dryers units 1469 Dorm 3 30 48 24 Stackable electric dryers units 1469 Dorm 4 30 48 24 Stackable electric dryers units 1475 Dorm 1 30 48 24 Stackable electric dryers units 1475 Dorm 2 30 48 24 Stackable electric dryers units 1475 Dorm 3 30 48 24 Stackable electric dryers units 1475 Dorm 4 30 48 24 Stackable electric dryers units 1479 Dorm 1 30 48 24 Stackable electric dryers units 1479 Dorm 2 30 48 24 Stackable electric dryers units 1479 Dorm 3 30 48 24 Stackable electric dryers units 1479 Dorm 4 30 48 24 Stackable electric dryers units 2791 Dorm Stand Alone 1 33 32 16 stackable gas dryer units

2791 Dorm 1 8 12

8 stackable washer units, electric dryer combo, and 2 stackable electric dryer units

2791 Dorm 2 8 12

8 stackable washer units, electric dryer combo, and 2 stackable electric dryer units

2791 Dorm 3 8 12 8 electric dryer combo, and 2 stackable electric dryer units

3312 Dorm 1 38 52 26 Stackable electric dryers units 3312 Dorm 2 38 52 26 Stackable electric dryers units 3312 Dorm 3 38 52 26 Stackable electric dryers units 3312 Dorm 4 38 52 26 Stackable electric dryers units 3314 Dorm 1 38 52 26 Stackable electric dryers units 3314 Dorm 2 38 52 26 Stackable electric dryers units 3314 Dorm 3 38 52 26 Stackable electric dryers units 3314 Dorm 4 38 52 26 Stackable electric dryers units 3631 Dorm 1 28 44 22 stackable gas dryer units

Dorm Laundry

Rooms 1 3 5 5 single gas dryers

Dorm Laundry

Rooms 2 3 5 5 single gas dryers

Dorm Laundry

Rooms 3 3 4 4 single gas dryers

Dorm Laundry

Rooms 4 3 5 5 single gas dryers

Dorm Laundry

Rooms 5 0 0 Removed all Machines from Bldg. on 5th Floor Laundry room (P00009)

3820 Patient Rooms 1 18 18 18 single gas dryers 3820 Patient Rooms 2 18 18 18 single gas dryers 3820 Patient Rooms 3 18 18 18 single gas dryers 3820 Patient Rooms 4 18 18 18 single gas dryers

4021 UEPH Dorm 1 8 6 8 Top Load Washer, 6 stackable gas dyers

4021 UEPH Dorm 2 8 6 8 Top Load Washer, 6 stackable gas dyers

4021 UEPH Dorm 3 8 6 8 Top Load Washer, 6 stackable gas dryers

Camp Bullis 5050 (SFS) Security Forces 1 1 1 1 electric dryer

5050 (S) Supply 1 1 1 1 electric dryer 5131 (M) Hutment Latrine 1 2 2 2 electric dryers 5131 (F) Hutment Latrine 1 2 2 2 electric dryers

5152 Hutment Latrine 1 4 4 4 electric dryers 5204 Hutment Latrine 1 2 2 2 electric dryers 5205 Hutment Latrine 1 2 2 2 electric dryers 5206 Hutment Latrine 1 2 2 2 electric dryers 5207 Hutment Latrine 1 2 2 2 electric dryers 5296 Hutment Latrine 1 2 2 2 electric dryers 5298 Hutment Latrine 1 2 2 2 electric dryers 5299 Hutment Latrine 1 2 2 2 electric dryers 5380 Hutment Latrine 1 2 2 2 electric dryers 5382 Hutment Latrine 1 2 2 2 electric dryers 5384 Hutment Latrine 1 2 2 2 electric dryers 5390 Hutment Latrine 1 2 2 2 electric dryers

5391 Hutment Latrine 1 2 2 2 electric dryers 5392 Hutment Latrine 1 2 2 2 electric dryers

(Side 1) Fixed Facility 1 1 1 1 electric dryer

(Side 2) Fixed Facility 1 1 1 1 electric dryer 6155 32d Med Bde 1 9 18 9 Stackable electric dryers

Connex Stand Alone 1 7 7 7 electric dryers

Connex Stand Alone 2 7 7 7 electric dryers

Connex Stand Alone 3 7 7 7 electric dryers

APPENDIX B

LAUNDRY EQUIPMENT TYPE AND

QUANTITIES

***NOTE: All Stackable and Combo units are considered both one washer and one dryer***

Laundry Equipment

TOTAL CLIN

Washers, Top Load 924 0301 Washers, Front Load 91 0302 Single Electric Dryers 96 0303 Single Gas Dryers 113 0304 Stackable Electric Dryers Units 552 0305 Stackable Gas Dryers Units 86 0306 Washer/G Dryer Combo Units 18 0307 Washer/E Dryer Combo Units 150 0308 Large Capacity Washer 3 0310

TOTAL COMBINED MACHINES 2033

APPENDIX C

DRYER DUCT CLEANING SCHEDULE

Facilities with Quarterly Requirements

BLDG

NO. BLDG TYPE FLOOR WASHER DRYER REMARKS

FT SAM HOUSTON

257 Dorm 1 3 4 4 gas dryers 257 Dorm 2 3 4 4 gas dryers 257 Dorm 3 3 4 4 gas dryers 272 Dorm 1 19 30 15 stackable gas dryers 590 Dorm 1 10 12 6 stackable electric dryer units 590 Dorm 2 2 4 2 stackable electric dryer units 590 Dorm 3 2 4 2 stackable electric dryer units 591 Dorm 1 10 12 6 stackable electric dryer units 591 Dorm 2 2 4 2 stackable electric dryer units 591 Dorm 3 2 4 2 stackable electric dryer units 904 Dorm 1 6 8 6 Stackable electric gas combo & 1 stackable gas dryer

904 Dorm 2 6 8 6 Stackable units washer/gas dryer combo & 1 stackable 904 Dorm 3 6 8 6 Stackable gas dryer combo & 1 stackable gas dryer unit.

905 Laundry

1 6 8 6 Stackable electric dryer combo & 1 stackable electric

2 6 8 6 Stackable electric dryer combo & 1 stackable electric

3 6 8 6 Stackable electric dryer combo & 1 stackable electric 907 Laundry

1 6 8 6 Stackable electric dryer combo & 1 stackable electric

2 6 8 6 Stackable electric dryer combo & 1 stackable electric

3 6 8 6 Stackable electric dryer combo & 1 stackable electric

915 Laundry

1 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 1 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 1 6 1 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 2 6 1 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 3 6 1 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 1 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 1 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 2 6 8 electric dryer combo & 1 stackable electric dryer unit.

Laundry Tower 3 6 8 electric dryer combo & 1 stackable electric dryer unit.

1002 Dorm 1 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 2 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 3 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 4 10 14 2 single gas dryers, 6 stackable gas dryers.

1002 Dorm 5 10 14 2 single gas dryers, 6 stackable gas dryers.

1153 Dorm 1 2 2 2 single electric dryers

2791 Dorm

St d

1 33 32 16 stackable gas dryer units

2791 Dorm 1 8 12 8 stackable washer units, electric dryer combo, and 2 stackable electric dryer units

2791 Dorm 2 8 12 8 stackable washer units, electric dryer combo, and 2 stackable electric dryer units

2791 Dorm 3 8 12 8 electric dryer combo, and 2 stackable electric dryer units

3312 Dorm 1 38 52 26 Stackable electric dryers units 3312 Dorm 2 38 52 26 Stackable electric dryers units 3312 Dorm 3 38 52 26 Stackable electric dryers units 3312 Dorm 4 38 52 26 Stackable electric dryers units 3314 Dorm 1 38 52 26 Stackable electric dryers units 3314 Dorm 2 38 52 26 Stackable electric dryers units 3314 Dorm 3 38 52 26 Stackable electric dryers units 3314 Dorm 4 38 52 26 Stackable electric dryers units 3631 Dorm 1 28 44 22 stackable gas dryer units 3820 Dorm

1 3 5 5 single gas dryers

2 3 5 5 single gas dryers

3 3 4 4 single gas dryers

4 3 5 5 single gas dryers

5 0 0 Removed all Machines from Bldg. on 5th Floor 3820 Patient

1 18 18 18 single gas dryers

1350 Dorm A Wing A 8 8 8 top load washers / 8 single electric dryers 1350 Dorm A Wing B 8 8 8 top load washers / 8 single electric dryers 1350 Dorm B Wing A 0 0 Converted to storage room 1350 Dorm B Wing B 0 0 Converted to storage room 1350 Dorm C Wing A 0 0 Under Construction 1350 Dorm C Wing B 0 0 Under Construction 1350 Dorm D Wing A 0 0 Converted to storage room 1350 Dorm D Wing B 0 0 Converted to storage room 1350 Dorm E Wing A 0 0 Converted to storage room 1350 Dorm E Wing B 0 0 Converted to storage room 1469 Dorm 1 30 48 24 Stackable electric dryers units 1469 Dorm 2 30 48 24 Stackable electric dryers units 1469 Dorm 3 30 48 24 Stackable electric dryers units 1469 Dorm 4 30 48 24 Stackable electric dryers units 1475 Dorm 1 30 48 24 Stackable electric dryers units 1475 Dorm 2 30 48 24 Stackable electric dryers units 1475 Dorm 3 30 48 24 Stackable electric dryers units 1475 Dorm 4 30 48 24 Stackable electric dryers units 1479 Dorm 1 30 48 24 Stackable electric dryers units 1479 Dorm 2 30 48 24 Stackable electric dryers units 1479 Dorm 3 30 48 24 Stackable electric dryers units 1479 Dorm 4 30 48 24 Stackable electric dryers units

3820 Patient

2 18 18 18 single gas dryers

Patient Rooms 3 18 18 18 single gas dryers

Patient Rooms 4 18 18 18 single gas dryers

CAMP BULLIS

Facilities with annual requirements

Security

1 1 1 1 electric dryer 5050 (S) Supply 1 1 1 1 electric dryer

Hutment

1 2 2 2 electric dryers 5131 (F) Hutment

5152 Hutment

1 4 4 4 electric dryers 5204 Hutment

5205 Hutment

5206 Hutment

5207 Hutment

5296 Hutment

5298 Hutment

5299 Hutment

5380 Hutment

5382 Hutment

5384 Hutment

5390 Hutment

5391 Hutment

5392 Hutment

(Side 1)

Fixed Facility 1 1 1 1 electric dryer

(Side 2)

Fixed Facility 1 1 1 1 electric dryer

32d Med

Bde 1 9 18 9 Stackable electric dryers

Connex Stand Alone 1 7 7 7 electric dryers

Connex

Stand Alone 2 7 7 7 electric dryers

Connex

Stand Alone 3 7 7 7 electric dryers

Description of Requirements:

Multiple Story Facilities:

There are multiple story facilities that require specialized equipment.

There are 5 barracks that are 4 stories. 3312, 3314, 1469, 1475, 1479. Each barracks has 8 laundry rooms. The total number of laundry rooms is 40. The interior manifolds connect to the dryers with flex duct. The manifolds are permanently fixed to the interior of the facility with screws and caulking. It is not practical to remove the interior portion of the manifold for cleaning access. These 5 buildings will need to serviced from the outside. The exterior of the manifolds are equipped with removable grates that allow access for cleaning. The grates sit in channels and lift up and out to remove. The first floors may be cleaned with a 16-foot extension ladder. The 2nd, 3rd, and 4th floors will require a lift. The terrain is grass, dirt, and uneven. This service requires an all-terrain boom type lift with a minimum of 45-foot reach capacity. These manifolds are specific to these 5 facilities. Other multiple story facilities do not have a similar manifold system and are cleanable from the interior.

Single Story Facilities:

Single Story Facilities are serviceable from the interior and exterior.

Typical Dyer Vents Systems:

Typical Manifold Dryer Vents:

The picture shown is B1469. All the other buildings mentioned are the same manifolds that are going to have to use a boom lift to clean the vents from the outside.

The exterior of the manifolds are equipped with removable grates that allow access for cleaning.

The grates sit in channels and lift up and out to remove. The first floors may be cleaned with a 16-foot extension ladder. The 2nd, 3rd, and 4th floors will require a lift. The terrain is grass, dirt, and uneven. This service requires an all-terrain boom type lift with a minimum of 45-foot reach capacity. These manifolds are specific to these 5 facilities.

BLDGS: 1469, 1475, 1479, 3312 and 3314

1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other items or services necessary for Washer/Dryer Maintenance, Repair and Leasing and Clothes Dryer Exhaust Duct Cleaning servi...
2. PERSONNEL
2.1. Contract Manager. The contractor shall provide a Contract Manager or alternate who shall be responsible for the operations, management, compliance of contract requirements and quality control. Contract Manager/alternate shall respond to the Con...
2.2. Washer/Dryer Repair Technician / General Maintenance Technician. The contractor shall provide one repair technician and one general maintenance technician qualified to work on the washers/dryers. Technicians shall be available to provide services...
3. EQUIPMENT
3.1. Equipment Quality Standards. All machines shall be new at the start of the first period of performance. Replacement appliances shall not be older than 2023 model of washers and dryers. Replacement equipment shall be the same size and color.. W...
3.3. Large Capacity Washers. Washers listed on Appendix 1 as “large capacity” shall be hard mount machines with no smaller 22 lb. capacity. Contractor shall be responsible for following the manufacturer’s installation instructions. The washers shall ...
3.4. Dryers. D ryers shall be the largest capacity, minimum of 18 lb. for either electric or gas operated as indicated on Appendix 1. The dryers shall meet the industry standard dimensions. The existing three sizes of dryer dimensions are as follows:
18 lb. dryer – 29” W x 25 ½” D x 41 ¾” H;
30 lb. stackable dryer – 31 1/2” W x 42 1/2 “ D x 75 1/2” H;
18 lb. stackable dryers - 27” W x 28” D x 75 1/4” H.
Dryers shall have a “push to start” button/panel, which operates only when door is closed. Dryers shall be heavy-duty machines designed specifically for commercial use. All gas dryers shall be equipped with electronic igniter. Contractor shall furnis...
Stackable Dryers (18 lb. and 30 lb.). Dryers shall be gas or electric as indicated on Appendix A. Dryers shall have a “push to start” button/panel, which operates only when door is closed. Stackable dryers consist of two drums which equal one set/st...
3.5. Dryer Exhaust Metal Ducting. The contractor shall provide and install rigid metal ducting for all 30 pounds (lb.) single and stacked dryers, from the dryer to the facility permanent exhaust system. Dryer exhaust vents shall be firmly attached to...
3.6. Appliance Identification and Signage. All contractor provided washers and dryers shall be labeled with a machine number (i.e. D100 for Dryer #100, W303 for Washer #303) for easy identification. Identification numbers shall be non-removable and ...
3.7. Parts/Equipment Installation. The contractor shall furnish and install gas-splitters, shut offs, reducers, nipples and any other equipment and materials as required to ensure machines operate correctly. Machines shall be grounded in accordance ...
4.2. Duct Cleaning. The contractor shall inspect and clean all dryer exhaust vents quarterly from the dryer itself to the permanent exhaust system. The contractor shall monitor, schedule and clean ducts as needed to ensure ducts do not fill with lin...
4.2.1. The contractor shall thoroughly clean all areas of the interior and exterior of dryer exhaust ducts and adjacent areas so that all traces of dirt, mildew, lint, etc., are removed. The contractor shall clean all components to the dryer exhaust d...
4.2.2. In facilities where multi dryer ducts are available, the contractor will be allowed to shut off only one system at a time for cleaning. Contractor may disconnect and remove dryers, exhaust louvers, grills and duct access covers as necessary to ...
4.2.3. Contractor shall reinstall dryers and ducting immediately after duct cleaning is completed in a facility. Contractor shall not cause damage to dryers, gas lines, electrical connections, and ducting. The contractor shall be responsible for mak...
4.3. Washer/Dryer Maintenance. At a minimum, the contractor shall monitor and inspect all washers and dryers monthly to ensure equipment is operational and performing according to design. Preventive maintenance shall be performed to identify potenti...
4.4. Dryer Filter Cleaning. Contractor shall inspect dryer lint filters and immediately replace torn or unusable filters. Contractor shall ensure dryer exhaust vents are properly secured to dryer and exhaust ducting at all times to prevent fire haza...
4.5. Clean-up. Contractor shall be responsible for leaving appliances and work areas clean at the end of each repair/inspection/replacement. Contractor shall dispose of trash, rubbish, parts, etc., at an off-base disposal site.
4.6. Machine Reinstallation. The contractor shall reinstall all washers and dryers removed for work back to their original location (includes back in floor anchoring system where applicable). Contractor shall test gas line connections after dryers a...
4.7. Machine Relocation. There may be instances when the contractor is responsible for temporarily removing machines from a building for renovations. The government will not provide storage space. Upon completion of renovations, contractor shall re...
4.8. Appliance Inventory. The contractor shall provide the COR with a complete and accurate inventory list of all machines installed within ten business days of contract start. The inventory list shall contain, as a minimum, appliance type, size, s...
5.1. Washer/Dryer Maintenance Schedule. The contractor shall submit a monthly maintenance schedule to the COR for all appliances at least five business days before the start of each month. Maintenance schedule shall include the date and approximate ...
5.2. Dryer Exhaust Cleaning Schedule. The contractor shall establish and submit a monthly dryer duct cleaning schedule for all work to the COR at least five business days before the start of each month. The schedule shall include the Monthly Dryer Du...
6.1. Phase-Out and Phase-In. The phase-out of old washers and dryers shall be performed during the last month of the current contract. The incumbent will be notified, and both shall work together to maintain washer and dryer capacity in each facility...
6.2. Additions and Deletions of Washers/Dryers/Services. The government will provide the contractor with a written contract modification for any washer/dryer/duct cleaning additions or deletions. When possible, the government will provide a minimum ...
6.3. Temporary Support Requirements. In the event of mass deployments, natural disasters, temporary facility occupation and other events of a similar nature, the contractor shall provide washers and dryers as requested by the government for a tempora...
6.4. Washer and Dryer Usage. The contractor is advised that washers and dryers will receive very high usage, above normal wear and tear, due to the training missions on JBSA Lackland. The contractor can also expect to continually replace control kno...
6.5. Equipment Abuse. The contractor shall notify the COR in writing, immediately after discovering abuse to the equipment. The COR will go to the site with the contractor and verify if the equipment has been abused. Abused equipment is not subje...

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .