About this file
Freeport Bridge Deck Repair Project - Special Provisions Summary
This Special Provisions document is issued by the County of Sacramento Community Services Agency Department of Transportation for the Freeport Bridge Deck Repair Project (Contract No. 4702), a bridge rehabilitation project over the Sacramento River. The project scope encompasses furnishing all labor, materials, and equipment necessary to perform bridge painting, repair of broken welds and bolts in the superstructure, repair of loose joint armor, retrofitting of the pin/roller system, traffic control, and related work as specified in the contract plans and specifications. Key work items include weld repairs at interior beam and end panel locations, joint armor repairs at Pier 5 and Abutment 6, pin/roller system replacement at the bascule span locking mechanisms, and bolt repairs to lateral braces. The contract specifies a thirty (30) working day completion period with the first working day occurring on or before November 2nd, 2026, and the bridge must be fully operable by 6 pm on November 30th, 2026. Bids opened on August 25, 2026, with the project documents incorporating the County of Sacramento 2024 Standard Construction Specifications dated November 1, 2024, and the State of California Department of Transportation Standard Specifications dated 2025. The three apparent low bidders are required to submit a statement of experience and business standing along with welding qualifications conforming to AWS D1.1 and AWS D1.5 standards.
The contract includes significant insurance requirements, with general liability limits of Four Million Dollars per occurrence and Four Million Dollars aggregate, automobile liability combined single limit of Two Million Dollars, and contractor's pollution liability insurance with limits of Four Million Dollars per occurrence and aggregate if hazardous materials are encountered. Liquidated damages for delay are assessed at Three Thousand Six Hundred Dollars ($3,600.00) per calendar day for failure to complete work within the prescribed working days. The contractor must obtain encroachment permits from both Yolo County and the California Department of Transportation (Caltrans) prior to commencing any work within their respective rights-of-way, with no additional compensation allowed for these requirements. Work is restricted to allowable hours of 6 am to 6 pm, with the Freeport Bridge remaining closed to marine traffic during the Coast Guard-approved work window from November 1st through November 30th, 2026. The contractor must maintain one lane in each direction on Freeport Boulevard and South River Road at all times unless prior engineer approval is granted. Environmental controls require preparation of a Water Pollution Control Plan, Lead Compliance Plan, and adherence to strict asbestos notification procedures with the Sacramento Air Quality Management District at least 15 days before demolition or rehabilitation activities commence. Payment for mobilization is structured on a graduated basis based on percentage of contract completion, with full mobilization payment capped at ten percent of the original contract amount.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY OF SACRAMENTO
COMMUNITY SERVICES AGENCY
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISIONS
FOR:
FREEPORT BRIDGE
DECK REPAIR PROJECT
FREEPORT BRIDGE OVER SACRAMENTO RIVER
CONTRACT NO. 4702
NOTE: THE COUNTY OF SACRAMENTO 2024 STANDARD CONSTRUCTION SPECIFICATIONS, DATED
NOVEMBER 1, 2024 AND THE STATE OF CALIFORNIA DEPARTMENT ON TRANSPORTATION STANDARD SPECIFICATIONS DATED 2025 ARE HEREBY MADE PART OF THESE SPECIFICATIONS. A COPY OF THE
SACRAMENTO STANDARD CONSTRUCTION SPECIFICATIONS MAY BE DOWNLOADED FROM THE
COUNTY WEBSITE AT HTTPS://SACCOUNTYSPECS.SACCOUNTY.GOV
Bids Open: August 25, 2026
DAVE DEFANTI, CONTRACT NO. 4702
Deputy County Executive DATE: JULY 28, 2026
RON E. VICARI, Director Department of Transportation https://saccountyspecs.saccounty.gov/
COUNTY OF SACRAMENTO
COMMUNITY SERVICES AGENCY
DEPARTMENT OF TRANSPORTATION
FREEPORT BRIDGE
DECK REPAIR PROJECT
FREEPORT BRIDGE OVER SACRAMENTO RIVER
COUNTY CONTRACT NO. 4702
SPECIAL PROVISIONS
GENERAL
TO BE SUPPLEMENTED WITH 2024 SACRAMENTO COUNTY STANDARD
CONSTRUCTION SPECIFICATIONS DATED NOVEMBER 1, 2024 AND THE STATE OF
CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
DATED 2025.
THE SPECIAL PROVISIONS CONTAINED HEREIN HAVE BEEN PREPARED BY OR
UNDER THE DIRECTION OF THE FOLLOWING REGISTERED PEOPLE:
STRUCTURES:
Jared Wilson 93532 6/30/28
SIGNED: ______________________
Jared Wilson, PE Registered Civil Engineer
CONTRACT NO. 4702 FREEPORT BRIDGE DECK REPAIR PROJECT
i
TABLE OF CONTENTS
SECTION 1 – TERMS AND DEFINITIONS .......................................................................................................................... - 1 -
1-1 GENERAL ............................................................................................................................................................... - 1 - 1-1.01 STATE STANDARD PLANS LIST .......................................................................................................................... - 1 -
1-4 SUPPLEMENTAL PROJECT INFORMATION ............................................................................................................. - 2 - SECTION 2 - BID REQUIREMENTS AND CONDITIONS ...................................................................................................... - 3 -
2-6 COMPETENCY OF BIDDERS ................................................................................................................................... - 3 - 2-8 SUBCONTRACTORS ............................................................................................................................................... - 3 -
SECTION 3 - AWARD AND EXECUTION OF CONTRACT .................................................................................................... - 4 - 3-9 INSURANCE ........................................................................................................................................................... - 4 -
3-9.01 GENERAL LIABILITY ........................................................................................................................................... - 4 - 3-9.02 AUTOMOBILE LIABILITY.................................................................................................................................... - 4 - 3-9.03 WORKERS COMPENSATION ............................................................................................................................. - 4 - 3-9.08 CONTRACTOR’S POLLUTION LIABILITY INSURANCE ......................................................................................... - 4 -
SECTION 4 – SCOPE OF WORK ........................................................................................................................................ - 5 - 4-11 LANDS AND RIGHTS-OF-WAY ................................................................................................................................ - 5 - 4-13 DESCRIPTION OF WORK ........................................................................................................................................ - 5 -
SECTION 5 - CONTROL OF WORK AND MATERIALS ........................................................................................................ - 6 - 5-5 COOPERATION WITH OTHER ENTITIES ................................................................................................................. - 6 - 5-6 CONTRACTORS DISMISSAL OF UNSATISFACTORY EMPLOYEES ............................................................................ - 6 - 5-14 SUBSTITUTIONS ..................................................................................................................................................... - 6 - 5-16 MATERIALS SAMPLING AND TESTING ................................................................................................................... - 6 -
5-16.01 CONTROL OF MATERIALS ............................................................................................................................... - 7 - SECTION 6 – LEGAL RELATIONS AND RESPONSIBILITIES ................................................................................................. - 8 -
6-10 PERMITS, AND LICENSES, AND CERTIFICATIONS ................................................................................................... - 8 - 6-10.08 ENCROACHMENT PERMITS ............................................................................................................................ - 8 -
SECTION 7 – PROSECUTION OF THE WORK .................................................................................................................... - 9 - 7-1 BEGINNING OF WORK ........................................................................................................................................... - 9 -
7-1.01 ORDER OF WORK ............................................................................................................................................. - 9 - 7-8.01 ALLOWABLE TIMES AND HOURS OF WORK ................................................................................................... - 10 -
7-12 DELAYS ................................................................................................................................................................ - 11 - 7-15 TIME OF COMPLETION ........................................................................................................................................ - 11 -
SECTION 8 – MEASUREMENT AND PAYMENT .............................................................................................................. - 12 - 8-1.03 PAYMENT FOR MOBILIZATION ....................................................................................................................... - 12 - 8-1.03.B MOBILIZATION A PAY ITEM ........................................................................................................................ - 12 -
8-10 LIQUIDATED DAMAGES FOR DELAY .................................................................................................................... - 12 - SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE .......................................................................................... - 13 -
10-2 AIR POLLUTION CONTROL ................................................................................................................................... - 13 - 10-4 EROSION SEDIMENT AND WATER POLLUTION CONTROL................................................................................... - 14 -
10-4.06 WATER POLLUTION CONTROL PROGRAM (WPCP) ...................................................................................... - 14 - 10-4.09 PAYMENT ..................................................................................................................................................... - 14 -ii
10-4.10 BMP SCHEDULE OF VALUES ......................................................................................................................... - 15 - 10-6 JOB SITE MANAGEMENT ........................................................................................................................... - 18 -
10-7 CONTAMINATED OR HAZARDOUS MATERIALS ................................................................................................... - 18 - 10-7.01 LEAD PAINT ABATEMENT REQUIREMENTS .................................................................................................. - 18 -
SECTION 11 – PRECONSTRUCTION PHOTOGRAPHS AND RECORD DRAWINGS ............................................................. - 19 - 11-2 PRECONSTRUCTION PHOTOGRAPHS .................................................................................................................. - 19 -
SECTION 12 - SAFETY, PUBLIC CONVENIENCE, AND TRAFFIC CONTROL ........................................................................ - 20 - 12-1 SAFETY................................................................................................................................................................. - 20 -
12-1.09.E LEAD COMPLIANCE PLAN .......................................................................................................................... - 20 - 12-3 PUBLIC SAFETY AND TRAFFIC CONTROL .............................................................................................................. - 20 -
12-3.04 FURNISHING, INSTALLING, AND MAINTAINING TEMPORARY TRAFFIC CONTROLS ..................................... - 21 - 12-3.07 CONSTRUCTION SIGNS ................................................................................................................................. - 21 - 12-3.14 PORTABLE CHANGEABLE MESSAGE SIGNS .................................................................................................. - 22 - 12-3.16 TEMPORARY PAVEMENT DELINEATION ....................................................................................................... - 23 -
SECTION 13 – EXISTING FACILITIES ............................................................................................................................... - 24 - 13-4 EXISTING STRUCTURES ........................................................................................................................................ - 24 -
13-4.1 GENERAL ........................................................................................................................................................ - 24 - 13-4.2 BRIDGE REMOVAL .......................................................................................................................................... - 24 - 13-4.3 STRUCTURE REHABILITATION ........................................................................................................................ - 25 -
SECTION 33 – STEEL STRUCTURES ................................................................................................................................ - 32 - 33-1 GENERAL ............................................................................................................................................................. - 32 - 33-3 STRUCTURAL STEEL COATINGS............................................................................................................................ - 32 -
APPENDIX .................................................................................................................................................................... - 34 - STATEMENT OF EXPERIENCE AND BUSINESS STANDING ....................................................................................................... A SCHEDULE OF VALUES ........................................................................................................................................................... B AS-BUILT PLANS .................................................................................................................................................................... C PROJECT INFORMATION RECORD ......................................................................................................................................... D
- 1 -
SECTION 1 – TERMS AND DEFINITIONS
The 2024 County of Sacramento, Community Services Agency Standard Construction Specifications, dated November 1, 2024 and these Special Provisions shall control all work to be done under this contract. In case of conflict between these Special Provisions and the Standard Construction Specifications, these Special Provisions shall take precedence over and be used in lieu of the conflicting portions.
Unless otherwise specified, the California Department of Transportation (State) Specifications, Revised Standard Specifications, and State Standard Plans, DATED 2024, shall be the version used when referenced in these Special Provisions.
The Standard Construction Specifications, which are incorporated by reference in the Contract Documents, may be downloaded from the County website at https://saccountyspecs.saccounty.gov
1-1 GENERAL
1-1.01 STATE STANDARD PLANS LIST
The State Standard Plan sheets applicable to this Contract include those listed below. When applicable, revised standard plans (RSPs) listed below are available at the following website:
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Title Plan Number
Abbreviations, Lines, Symbols and Legend Abbreviations (Sheet 1 of 3) A3A Abbreviations (Sheet 2 of 3) A3B Abbreviations (Sheet 3 of 3) A3C Legend - Lines and Symbols (Sheet 1 of 5) A10A Legend - Lines and Symbols (Sheet 2 of 5) A10B Legend - Lines and Symbols (Sheet 3 of 5) A10C Legend - Lines and Symbols (Sheet 4 of 5) A10D Legend - Lines and Symbols (Sheet 5 of 5) A10E
Temporary Crash Cushions, Railing and Traffic Screen Temporary Railing (Type K) T3A Temporary Railing (Type K) T3B Temporary Barrier System (Cross Bolt) T3C Temporary Barrier System (Cross Bolt) T3D Temporary Barrier System (Cross Bolt) T3E Temporary Barrier System (Cal F-23) RSP T3F Temporary Barrier System (Cal F-23) RSP T3F2 Temporary Barrier System (Staking or Anchoring) RSP T3G Temporary Barrier System (Staking or Anchoring) RSP T3G2
Temporary Traffic Control Systems Traffic Control System Tables For Lane and Ramp Closures T9 https://saccountyspecs.saccounty.gov/ https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
- 2 -
Temporary Water Pollution Control Temporary Water Pollution Control Details(Temporary Silt Fence) T51 Temporary Water Pollution Control Details(Temporary Straw Bale Barrier) T52 Temporary Water Pollution Control Details(Temporary Cover) T53 Temporary Water Pollution Control Details(Temporary Erosion Control Blanket) T54 Temporary Water Pollution Control Details(Temporary Erosion Control Blanket) T55 Temporary Water Pollution Control Details(Temporary Fiber Roll) T56 Temporary Water Pollution Control Details(Temporary Check Dam) T57 Temporary Water Pollution Control Details(Temporary Construction Entrance) T58 Temporary Water Pollution Control Details(Temporary Concrete Washout Facility) T59 Temporary Water Pollution Control Details(Temporary Reinforced Silt Fence) T60 Temporary Water Pollution Control Details(Temporary Drainage Inlet Protection) T61 Temporary Water Pollution Control Details(Temporary Drainage Inlet Protection) T62 Temporary Water Pollution Control Details(Temporary Drainage Inlet Protection) T63 Temporary Water Pollution Control Details(Temporary Drainage Inlet Protection) T64 Temporary Water Pollution Control Details(Temporary High-Visibility Fence) T65 Temporary Water Pollution Control Details(Temporary Large Sediment Barrier) T66 Temporary Water Pollution Control Details(Temporary Construction Roadway) T67
Roadside Signs Roadside Signs - Typical Installation Details No. 1 RS1 Roadside Signs - Wood Post - Typical Installation Details No. 2 RS2 Roadside Signs - Typical Installation Details No. 4 RS4
1-4 SUPPLEMENTAL PROJECT INFORMATION
The Agency makes the following supplemental project information available:
Supplemental Project Information Means Description
Included in the Information Handout 1. As-Built Plans
2. Bridge Inspection Report
3. Site Visit Photos 08-15-2025
- 3 -
SECTION 2 - BID REQUIREMENTS AND CONDITIONS
2-6 COMPETENCY OF BIDDERS
A statement of experience and business standing, together with that of all Subcontractors designated in the Bid, shall be required of the three apparent low bidders in conformance with Section 2-6 of the Standard Construction Specifications and shall be submitted on an Agency provided form included in the Appendices of these Special Provisions.
Bidders shall also submit welding qualifications conforming to AWS D1.1 and AWS D1.5.
2-8 SUBCONTRACTORS
The following is added to the end of Section 2-8, “Subcontractors,” of the Standard Construction Specifications:
Before subcontracted work starts, the Contractor shall submit a Subcontracting Request form (CEM- 1201).
- 4 -
SECTION 3 - AWARD AND EXECUTION OF CONTRACT
3-9 INSURANCE
Contractor’s attention is directed to Section 3-9, “Insurance”, of the Standard Construction Specifications.
3-9.01 GENERAL LIABILITY
Subparagraph of the first paragraph of section 3-9.01, “General Liability” of the Standard Construction Specifications is amended to read as follows:
Each Occurrence Four Million Dollars ($4,000,000) Products and Completed Operations Aggregate Four Million Dollars ($4,000,000) Personal and Advertising Injury Four Million Dollars ($4,000,000) General Aggregate Four Million Dollars ($4,000,000) Fire Damage One Hundred Thousand Dollars ($100,000)
3-9.02 AUTOMOBILE LIABILITY
Subparagraph of the third paragraph of Section 3-9.02, “Automobile Liability” of the Standard Construction Specifications is amended to read as follows:
Bodily Injury and Property Damage Combined Single Limit Two Million Dollars ($2,000,000)
3-9.03 WORKERS COMPENSATION
Subparagraph of the first paragraph of Section 3-9.03, “Workers Compensation,” of the Standard Construction Specifications is amended to read as follows:
1. Contractor must comply with applicable sections of Title 8; CCR; Chapter 4-Division of
Industrial Safety.
3-9.08 CONTRACTOR’S POLLUTION LIABILITY INSURANCE
Section 3-9.08 “Contractor's Pollution Liability Insurance” of the Standard Construction Specifications is amended to read as follows:
In the event that hazardous materials are identified prior to construction, or are encountered as an unforeseen condition during construction, the Contractor, or its environmental Subcontractor, shall procure, maintain, and keep in force at all times during the term of the Contract, at the Contractor’s sole expense, Contractor’s Pollution Liability insurance with limits not less than:
Each Occurrence or Claim Four Million Dollars ($4,000,000) General Aggregate Four Million Dollars ($4,000,000)
- 5 -
SECTION 4 – SCOPE OF WORK
4-11 LANDS AND RIGHTS-OF-WAY
The Contractor’s attention is directed to Section 4-11, “Lands and Rights-of-Way,” of the Standard Construction Specifications and these Special Provisions.
The County rights-of-way shall be used only for purposes that are necessary to perform the required work.
The Contractor shall not occupy the rights-of-way, or allow others to occupy the rights-of-way, for purposes, which are not necessary to perform the required work. Determination of “necessary to perform work” will be made by the Engineer if necessary.
Use of the Contractor's work areas shall be at the Contractor's own risk, and the County shall not be held liable for any damage to or loss of materials or equipment located within such areas. Utilities, including but not limited to water or electricity, will not be provided and shall be the sole responsibility of the Contractor.
Residence trailers will not be allowed within the County rights-of-way.
Personal vehicles of your employees and construction vehicles must not block driveways and access to adjacent properties.
No vehicles, construction equipment, mobile home/office, supplies, materials or facilities shall be driven, parked, stockpiled or located within the driplines of oak trees.
The Contractor shall remove all equipment, materials, and rubbish from the work areas, which the Contractor occupies; and shall leave the areas in a presentable condition.
Full compensation for complying with the requirements of this section shall be considered incidental to the project and no additional compensation will be allowed therefor.
4-13 DESCRIPTION OF WORK
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for:
Project work includes bridge painting, bridge repair work (including but not limited to repairing broken welds and bolts in the superstructure, repairing loose joint armor, and retrofitting the pin/roller system), traffic control, and doing all other work specified on the plans and in the specifications.
Other items or details not mentioned above that are required by these Special Provisions shall be performed, placed, constructed, or installed in accordance with the Standard Construction Specifications and these Special Provisions. The construction, materials, and workmanship for items of work on the plans, but not specifically mentioned in these Special Provisions are referred to the Standard Construction Specifications for conformance.
- 6 -
SECTION 5 - CONTROL OF WORK AND MATERIALS
5-5 COOPERATION WITH OTHER ENTITIES
The Contractor’s attention is directed to Section 5-5, “Cooperation with Other Entities,” of the Standard Construction Specifications and Section titled “Existing Utilities,” of these Special Provisions.
Contractor shall fully cooperate and coordinate with all entities/utilities, including, but not limited to:
• Telephone: AT&T
• Drainage: Sacramento County Water Resources
• Electric: Sacramento Municipal Utilities District (SMUD)
• Fire: Courtland Fire District
• Gas: Pacific Gas & Electric (PG&E)
• Roads: Sacramento County and Yolo County
The points of contact for the utility companies are listed on the title sheet of the Contract Plans.
5-6 CONTRACTORS DISMISSAL OF UNSATISFACTORY EMPLOYEES
The following is to be added to Section 5-6:
The Contractor shall be polite to citizens encountered during the course of work. Loud music, foul language, and cursing are not permitted.
5-14 SUBSTITUTIONS
Should the Contractor seek approval of a product other than the brand or brands named in these specifications, it shall furnish written evidence that such product conforms in all respects to the specified requirements, and that it has been used successfully elsewhere under similar conditions. Where the specified requirements involve conformance to recognized codes or standards, the Contractor shall furnish evidence of such conformance in the form of test or inspection reports, prepared by a recognized agency, and baring an authorized signature.
Manufacturer’s standard data and catalog cut sheets will not be considered sufficient in themselves, and the Engineer will not be responsible for seeking further data from the manufacturer, or for otherwise researching the project. Failure to provide complete data will be cause for rejection of the proposal.
5-16 MATERIALS SAMPLING AND TESTING
When a reference is made in the specifications to the “Laboratory” or “Transportation Laboratory,” the reference shall mean the Sacramento County Materials Test Lab or other laboratories authorized by the Engineer to test materials and work involved in the contract. This laboratory is located at 9665 Agriculture Lane, Sacramento, CA 95827, telephone (916) 875-5330.
The County uses a Quality Assurance Program (QAP) that uses samples and tests to ensure a material is produced to comply with the Contract. The County may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP sampling and testing.
- 7 -
5-16.01 CONTROL OF MATERIALS
The Contractor’s attention is directed to Section 5-13, “Quality of Materials and Workmanship,” Section 5-16, “Materials Sampling and Testing,” and Section 5-17, “Approval of Materials,” of the Standard Construction Specifications.
All materials required to complete the Work under this Contract shall be produced or furnished, delivered, and installed by the Contractor unless otherwise specified in these Project Special Provisions. The Contractor shall be responsible for controlling the quality of materials entering the work and for the quality of the work performed. The Contractor shall perform and provide, at his sole expense, any necessary quality control testing to ensure the quality of materials and the quality of the Work performed. Any Work using non-compliant or unsatisfactory materials or any Work showing unsatisfactory workmanship shall be removed and replaced at the sole cost of the Contractor.
Certificates of Compliance, conforming to the provisions, “Certificates of Compliance,” of the State Specifications shall be furnished for all manufactured products unless otherwise waived by the Engineer.
- 8 -
SECTION 6 – LEGAL RELATIONS AND RESPONSIBILITIES
6-10 PERMITS, AND LICENSES, AND CERTIFICATIONS
No permits have been obtained for this project. The following activities are prohibited unless you obtain Engineer's authorization and the proper permits:
1. Diverting flow
2. Placing gravel
3. Cutting access down into the stream or grading: however, a minimum amount of vegetation may be removed adjacent to the southeast abutment to provide access for small boats.
If vegetation is removed you are responsible for the temporary BMPs. Payment for the temporary BMP's is included in the payment for the various bid items.
6-10.08 ENCROACHMENT PERMITS
The Contractor shall be required to obtain an Encroachment Permit from Yolo County for work within the Yolo County rights of way and the permit must be obtained prior to any work including the placement of any signs or traffic control within Yolo County that may be required in order to perform the Work.
Contractor shall provide a copy of the permit to the Engineer.
The Contractor shall also be required to obtain an Encroachment Permit from the State of California Department of Transportation (Caltrans) for the placement of detour signage within the State rights of way and the permit must be obtained prior to the placement of any signs or traffic control on Highway 160 that may be required in order to perform the Work. Contractor shall provide a copy of the permit to the Engineer.
No placement of detour signage within the State rights of way or work within Yolo County will be allowed until the Agency has received a copy of the Contractor’s encroachment permits.
Full compensation for work involved in obtaining and complying with the requirements of the encroachment permits shall be considered included in the contract prices paid for the various items of work involved and no additional time or compensation will be allowed therefor.
- 9 -
SECTION 7 – PROSECUTION OF THE WORK
7-1 BEGINNING OF WORK
No work is allowed within the riverbed. See section 14-1.01 of the State Specifications for additional restrictions.
Where dimensions of new construction required by this contract are dependent on the dimensions of the existing bridge, you must verify the controlling field dimensions and are responsible for adjusting the dimensions of the work to fit the existing conditions. Be advised that existing dimensions and other conditions at each location with similar details may vary.
Before submitting structural steel shop drawings or performing steel fabrication, verify the adequacy of clearances required for welding, drilling, bolting, removing existing damaged members, and installing the new construction. You are responsible for requesting adjustments in dimensions of the work to accommodate clearances necessary for construction when steel shop drawings are submitted. All requested adjustments in dimensions are subject to the Engineer’s authorization and must be shown on required shop drawing submittals. Only changes for which you already have authorization for in writing by the Engineer are allowed. The Engineer, at their option, may withhold approval of your requested changes. No payment shall be made for requested changes in details which are authorized or provided by the Engineer. The time period required by the County to revise details authorized by the Engineer will be considered for extensions of contract time under the Standard Specifications. No payment will be made to you for delays due to time taken to revise details under these special provisions. You may be granted a contract time extension equal to the number of working days in excess of that time allowed for review of shop drawings which are taken by the County to revise details.
7-1.01 ORDER OF WORK
When required by these Special Provisions or Plans, the Contractor shall follow the sequence of operations as set forth therein.
Liquidated damages, as set forth elsewhere in these special provisions, shall be assessed if the working days are exceeded. No work may take place prior to receipt of the executed Contract and review of the prescribed bonds and insurance.
Contractor's attention is directed to Section 12, “Safety, Public Convenience, and Traffic Control,” of the Standard Construction Specifications and these Special Provisions. Any Special Signs (S1) that are required for detour or maintaining traffic shall be placed a minimum of 10 days in advance of the project start.
The first order of work shall be the following:
• Prepare and submit a Water Pollution Control Plan as required in Section 10.
• Prepare and submit a Lead Compliance Plan
• Prepare and submit Baseline Schedule
• Prepare and submit Traffic Control Plans
• Provide SSPC QC certifications
- 10 -
• Ordering materials and equipment that is not furnished by the County. The Engineer shall be furnished a written statement from the vendor that the order for structural steel has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.
At the end of each work day, all debris, branches, roots, removed fence, rubbish, and other debris in the work area shall be collected and placed in a suitable disposal bin or pile. Materials to be used later in construction shall be neatly stockpiled. All parts of the work shall be left in a neat and presentable condition at the end of the work shift.
Full compensation for Order of Work, as specified herein, shall be considered as included in the prices paid for the various items of work involved and no additional compensation will be allowed therefor.
7-8.01 ALLOWABLE TIMES AND HOURS OF WORK
No lane or road closures will be permitted outside of the allowable hours of work. All traffic lanes shall be open, each day, by the end of shift.
Freeport Bridge Road shall be closed to all vehicular traffic during the allowable work hours of 6am to 6pm. Contractor shall maintain a minimum of one lane in each direction on Freeport Boulevard, and S River Road at all times unless prior approval has been granted by the Engineer.
Freeport Bridge is a dual-leaf bascule type bridge and will remain closed to marine traffic during construction, with the Coast Guard approved window being from 6 am on November 1st to 6 pm on November 30th. The bridge must be fully operable by 6 pm on November 30th. Contractor shall adhere to all Coast Guard requirements including but not limited to the following:
a. The work shall be performed such that waterway traffic and navigational clearances are not affected and the navigable depths are not impaired.
b. All flame-producing, spark-producing, welding, or other hazardous operations shall be halted while vessels are passing through the bridge.
c. Nothing may interfere with proper display of required bridge navigational lighting, or other navigational signals and bridge markings.
d. A good quality marine radio shall be present at the jobsite and properly employed to facilitate reliable communications between the contractor and approaching waterway traffic. The marine radio installed on the bridge is considered adequate for this purpose.
e. Nothing may fall from the bridge or be deposited into the water. If anything is accidentally dropped into the water, immediate action shall be taken to remove it, and the waterway shall be cleared to the satisfaction of the U.S. Army Corps of Engineers.
f. The Federal Water Pollution Control Act prohibits the discharge of oil, including oil-based paints, into the navigable waters of the United States. In the event of discharge, the responsible party shall immediately take action to halt the discharge and notify the National Response Center, U.S. Coast Guard, by calling (800) 424-8802. Failure to report such discharge may result in substantial fines, imprisonment, or both. The responsible party will be responsible for clean-up costs, if any.
- 11 -
g. No temporary obstructions in the waterway, i.e. bridge scaffolding, use of barges, etc., will occur during the work window.
h. The drawbridge must return to its regular operating schedule immediately at the end of the designated time-period.
Contractor shall complete, sign and return the Project Information Record (See Appendix), so Coast Guard may contact you if any issues arise, emergency or otherwise, during the project.
7-12 DELAYS
Contractor’s attention is directed to Section 7-12.02, “Unavoidable Delays,” of the Standard Construction Specifications.
No extension of time will be granted for a delay caused by a shortage of materials unless the Contractor furnishes to the Engineer documentary proof that he has made every effort to obtain such materials from all known sources, within reasonable reach of the work in a diligent and timely manner. The documentary proof shall indicate that the inability to obtain such materials, when originally planned, did in fact cause a delay in final completion of the entire work which could not be compensated for by revising the sequence of the Contractor's operations. The term "Shortage of Materials" as used in this section, shall not apply to materials, articles, parts, or equipment which are processed, made, constructed, fabricated, or manufactured to meet the specific requirements of the contract. Only the physical shortage of material will be considered under these provisions as a cause for extension of time. Delays in obtaining materials due to priority in filling orders will not constitute a shortage of materials.
No extension of time will be granted for the need to open the bridge if necessary for mariner traffic.
7-15 TIME OF COMPLETION
As set forth in Section 7-15, "Time of Completion", of the Standard Construction Specifications, the time for completion of this contract shall be Thirty (30) working days, with the first working day occurring on or before November 2nd, 2026.
- 12 -
SECTION 8 – MEASUREMENT AND PAYMENT
8-1.03 PAYMENT FOR MOBILIZATION
Contractor’s attention is directed to Section 8-1.03.B of the Standard Construction Specifications, Section 9, “Payment,” of the State Specifications and these Special Provisions.
Mobilization shall be paid based on State Specification 9-1.16D, “Mobilization,” and State Specification 8- 1.14E, “Payment Adjustment for Termination.”
8-1.03.B MOBILIZATION A PAY ITEM
Section 8-1.03.B, “Mobilization a Pay Item,” is hereby deleted and replaced with the following:
When the Contract or proposed Schedule of Values includes a separate item for mobilization, payment for mobilization will include full compensation for the furnishing of all labor, materials, tools, equipment, administrative costs, and incidentals for mobilization.
For contracts less than $25million:
(1) When 5 percent of the original contract amount is earned, 50 percent of the amount bid for mobilization, or 5 percent of the original contract amount, whichever is lesser, may be paid.
(2) When 10 percent of the original contract amount is earned, 75 percent of the amount bid for mobilization or 7.5 percent of the original contract amount, whichever is lesser, may be paid.
(3) When 20 percent of the original contract amount is earned, 95 percent of the amount bid for mobilization, or 9.5 percent of the original contract amount, whichever is lesser, may be paid.
(4) When 50 percent of the original contract amount is earned, 100 percent of the amount bid for mobilization, or 10 percent of the original contract amount, whichever is lesser, may be paid.
(5) Upon completion of all work on the project, payment of any amount bid for mobilization in excess of 10 percent of the original contract amount will be paid.
The Agency will not pay additional mobilization compensation for work under a Contract Change Order unless necessitated solely for the performance of Contract Change Order work and prior written approval is obtained from the Agency. Payment for additional mobilization is subject to retention per Section 8-7, “Retention,” of these Specifications.
8-10 LIQUIDATED DAMAGES FOR DELAY
The Contractor shall pay liquidated damages for this contract to the County of Sacramento the sum of THREE THOUSAND – SIX HUNDRED DOLLARS ($3,600.00) per day for failure to complete all contract items, for each and every calendar day's delay in finishing the work in excess of the number of working days prescribed elsewhere in these Special Provisions.
- 13 -
SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE
The Contractor’s attention is directed to Section 7-1.01, "Order of Work," in these Special Provisions.
Area Plan for Emergency Response to Hazardous Materials Incidents in Sacramento County is on file with the Sacramento County Department of Transportation for Contractor’s reference:
• http://www.emd.saccounty.net/EC/CUPA/Documents/AreaPlan_Final2016.pdf
10-2 AIR POLLUTION CONTROL
Contractor’s attention is directed to Section 14-9, "Air Quality," of the State Specifications, and these Special Provisions.
Add to the end of section 14-9.02:
The US EPA has established the National Emission Standards for Hazardous Air Pollutants (NESHAP). Under the Health & Safety Code § 39658(b)(1), demolition and rehabilitation activities must comply with 40 CFR 61, Subpart M (National Emission Standard for Asbestos).
The Contractor shall notify the US EPA and the California Air Resources Board of demolition activities even if the activities will not disturb asbestos-containing material.
The Contractor may obtain an Asbestos NESHAP Notification of Demolition and Renovation Form at the California Air Resources Board's website:
http://www.arb.ca.gov/enf/asbestos/asbestos.htm Instead of the 10 working days specified at the website, the Contractor shall mail or deliver the form with the necessary attachments at least 15 days before starting demolition or rehabilitation activities to:
SACRAMENTO AIR QUALITY MANAGEMENT DISTRICT
777 12TH STREET, 3RD FLOOR
SACRAMENTO CA 95814
916-874-4800 The Contractor shall also submit a copy to the County of Sacramento, via an electronic submittal, CD,DVD, flash drive, or hard copies at the address(s) listed in Section 3-7 “Execution of Contract” of the Standard Construction Specifications.
The Contractor shall submit a copy of the notification form and attachments as informational submittals before starting demolition or rehabilitation activities.
If unanticipated asbestos-containing material is discovered during the demolition or rehabilitation activities, the Contractor shall immediately stop work in that area and notify the Engineer. The Agency will use other forces to remove and dispose of the material. The Contractor shall not resume work in the area until authorized.
The Contractor shall notify the Sacramento Air Quality Management District of a change to demolition or rehabilitation activities, including a revised work plan or the discovery of unanticipated asbestos-containing materials, within 2 days of the change or discovery.
http://www.emd.saccounty.net/EC/CUPA/Documents/AreaPlan_Final2016.pdf http://www.arb.ca.gov/enf/asbestos/asbestos.htm
- 14 -
Full compensation for conforming to the requirements of this section, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
10-4 EROSION SEDIMENT AND WATER POLLUTION CONTROL
At reasonable times and upon presentation of credentials and other documents as may be required by law, the Contractor shall allow authorized agents of the Central Valley Regional Water Quality Control Board, State Water Resources Control Board, Department of Fish and Wildlife, United States Environmental Protection Agency and the local storm water management agency to:
A. Enter upon the construction site and the Contractor’s facilities pertinent to the work;
B. Have access to and copy records that must be kept as specified in a permit;
C. Inspect the construction site and related soil stabilization practices and sediment control measures; and D. Sample or monitor for the purpose of ensuring compliance with the Permit.
The Contractor shall notify the Engineer immediately upon request from the regulatory agencies to enter, inspect, sample, monitor or otherwise access the project site or the Contractor’s records.
Unless arrangements for disturbance of areas outside the project limits are made by the Department and made part of the contract, it is expressly agreed that the Department assumes no responsibility whatsoever to the Contractor or property owner with respect to any arrangements made between the Contractor and property owner to allow disturbance of areas outside the project limits.
10-4.06 WATER POLLUTION CONTROL PROGRAM (WPCP)
The Contractor shall be required to prepare a Water Pollution Control Plan (WPCP) per Section 10-4.06 “Water Pollution Control Plan (WPCP)” of the Standard Construction Specifications. The WPCP shall be submitted to the Engineer and subject to review and comment by the County Department of Water Resources. Water Pollution Control shall conform to the requirements of the current edition of the County of Sacramento Improvement Standards.
Throughout the project, the active, soil-disturbed area of the project site shall be not more than 1 acre. The Engineer may approve, on a case-by-case basis, expansions of the active, soil-disturbed area limit.
The Contractor shall amend the WPCP, graphically and in narrative form, whenever there is a change in construction activities or operations which may affect the discharge of significant quantities of pollutants to surface waters, ground waters, municipal storm drain systems or when deemed necessary by the Engineer. The WPCP shall be amended if the WPCP is in violation of any permit condition, or has not effectively achieved the objective of reducing pollutants in storm water discharges. Amendments shall show additional control measures or revised operations, including those in areas not shown in the initially approved WPCP, which are required on the project to control water pollution effectively. Amendments to the WPCP shall be submitted to the Engineer for review and approval in the same manner specified for the initially approved WPCP. Approved amendments shall be dated and logged in the WPCP. Upon approval of the amendment, the Contractor shall implement the additional control measures or revised operations.
10-4.09 PAYMENT
The contract ALLOWANCE for preparation of the WATER POLLUTION CONTROL PLAN shall include
- 15 -full compensation for furnishing all labor, materials, tools, equipment and incidentals for doing all the work involved in developing, preparing, obtaining approval of, revising and amending the Plan as specified in the Standard Construction Specifications, these Special Provisions, and as directed by the Engineer, and no additional compensation will be allowed therefor. The total amount to be paid for the work included in the ALLOWANCE for Water Pollution Control Plan shall be the amount of the allowance actually utilized in the course of preparing the plan and no additional compensation will be allowed therefor.
10-4.10 BMP SCHEDULE OF VALUES
An electronic submittal, flash drive, or hard copies of the Best Management Practices (BMP) Schedules of Values included in the Appendices of these Special Provisions are to be submitted to the Engineer when the WPCP is submitted.
On the BMP Schedule of Values, the Contractor shall provide a unit price for all BMP’s except those listed as “PROCEDURAL” as shown in the table below. Payment for these procedural BMP’s is included in the prices paid for the various other items of work and no additional compensation will be paid.
PROCEDURAL BMP’s UNIT CALTRANS
BMP #
COUNTY
DETAIL UNIT PRICE
Scheduling NONE SS-1 PROCEDURAL
Preservation of Existing Vegetation NONE SS-2 PROCEDURAL
Street Sweeping NONE SC-7 PROCEDURAL
Wind Erosion Control NONE WE-1 PROCEDURAL
Water Conservation Practices NONE NS-1 PROCEDURAL
Paving, Sealing, Sawcutting & Grinding Operations NONE NS-3 PROCEDURAL
Illegal Connection and Illicit Discharge Detection & Reporting NONE NS-6 PROCEDURAL
Potable Water/Irrigation NONE NS-7 PROCEDURAL
Vehicle and Equipment Cleaning NONE NS-8 PROCEDURAL
Vehicle and Equipment Fueling NONE NS-9 PROCEDURAL
Vehicle and Equipment Maintenance NONE NS-10 PROCEDURAL
Pile Driving Operations NONE NS-11 PROCEDURAL
Concrete Curing NONE NS-12 PROCEDURAL
Material and Equipment Use over Water NONE NS-13 PROCEDURAL
Concrete Finishing NONE NS-14 PROCEDURAL
Structure Demolition/Removal over or Adjacent to Water NONE NS-15 PROCEDURAL
- 16 -
PROCEDURAL BMP’s UNIT CALTRANS
BMP #
COUNTY
DETAIL UNIT PRICE
Material Delivery and Storage NONE WM-1 PROCEDURAL
Material Use NONE WM-2 PROCEDURAL
Stockpile Management NONE WM-3 PROCEDURAL
Spill Prevention and Control NONE WM-4 PROCEDURAL
Solid Waste Management NONE WM-5 PROCEDURAL
Hazardous Waste Management NONE WM-6 PROCEDURAL
Contaminated Soil Management NONE WM-7 PROCEDURAL
Concrete Waste Management NONE 11-6 PROCEDURAL
Sanitary and Septic Waste Management NONE WM-9 PROCEDURAL
Liquid Waste Management NONE WM-10 PROCEDURAL
Weekly Inspection Report NONE PROCEDURAL
Erosion and sediment control BMPs shall be placed, monitored for effectiveness, and maintained throughout the construction process. The following precautions shall be implemented regardless of the season:
1. A stabilized construction site access shall be constructed at any construction staging and/or stockpile site as determined appropriate by the Engineer.
2. Temporary stockpiling of construction materials, including vehicles and portable equipment, supplies, fuels and chemicals, will be restricted to designated construction staging areas within the project area.
3. Any wet season requirement shall be implemented if conditions exist which may cause erosion and sedimentation.
4. The contractor shall not be limited to the requirements listed above, but shall be responsible for implementing whatever measures are necessary to prevent erosion and sedimentation.
The Contractor shall demonstrate the ability and preparedness to fully implement soil stabilization practices and sediment control measures to protect soil-disturbed areas on the project site before the onset of precipitation. A quantity of soil stabilization and sediment control materials shall be maintained on site equal to 100 percent of that sufficient to protect unprotected, soil-disturbed areas on the project site. A detailed plan for the mobilization of sufficient labor and equipment shall be maintained to fully deploy control measures required for the protection of soil-disturbed areas on the project site prior to the onset of precipitation. A current inventory of control measure materials and the detailed mobilization plan shall be included as part of the WPCP.
The wet season is hereby defined as the period between October 1st and April 30th. Erosion control (i.e.
soil stabilization) BMPs shall be applied during the wet season. All other BMPs included in the approved
- 17 -
WPCP shall be installed/implemented and maintained year round.
Throughout the wet season:
1. Soil-disturbed areas of the project site shall be considered to be non-active whenever soil disturbance activities are to be discontinued for a period of 20 or more days and the areas are fully protected. Areas that will become non-active during the wet season shall be fully protected with soil stabilization practices and sediment control measures within 10 days of the discontinuance of soil disturbing activities or prior to the onset of precipitation, whichever is first to occur.
2. Active soil-disturbed areas of the project site shall be fully protected at the end of each day with soil stabilization practices and sediment control measures unless fair weather is predicted through the following workday. The Contractor shall monitor the weather forecast on a daily basis. The National Weather Service forecast shall be used. An alternative weather forecast proposed by the Contractor may be used if approved by the Engineer. If precipitation is predicted prior to the end of the following workday, construction scheduling shall be modified, as required and functioning control measures shall be deployed prior to the onset of the precipitation.
3. Inspections of the construction site shall be conducted by the Contractor to identify deficient measures, as follows:
A. Prior to a forecast storm;
B. After any precipitation which causes runoff capable of carrying sediment from the construction site;
C. At 24 hour intervals during extended precipitation events; and D. Routinely, a minimum of once every 2 weeks.
If the Contractor or the Engineer identifies a deficiency in the implementation or functioning of an identified control measure, the deficiency shall be corrected immediately. The deficiency may be corrected at a later date and time if requested by the Contractor and approved by the Engineer in writing, but not later than the onset of subsequent precipitation. The correction of deficiencies shall be at no additional cost to the County.
The Contractor shall implement, year-round and throughout the duration of the project, control measures included in the WPCP for sediment tracking,…