About this file

This is a Final Project Manual for the construction of a new Operations and Maintenance (O&M) Building and Equipment Shed at John Franks Wildlife Management Area (WMA) in Louisiana. The project encompasses the design and construction of a new O&M building with associated infrastructure as detailed in the construction documents. The manual serves as the comprehensive guide for project execution, including specifications, standards, and requirements that contractors must follow throughout the construction phase. The document establishes the technical framework and quality standards necessary for the successful completion of the facility, which will support operations and maintenance activities at the wildlife management area.

The Final Project Manual contains the detailed construction specifications, plans, and requirements that form the basis of the contract. This document outlines the technical parameters, materials standards, construction methodologies, and quality assurance measures that bidders and contractors must adhere to during project execution. The manual provides the essential reference material for understanding the full scope of work, ensuring that all parties involved in the construction process maintain consistency with the original project design and performance requirements established by the state of Louisiana.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NNoovveemmbbeerr 22002266

PPRROOJJEECCTT MMAANNUUAALL

JJoohhnn FFrraannkkss WWMMAA

OO&&MM BBuuiillddiinngg && EEqquuiippmmeenntt SShheedd

PPrreeppaarreedd FFoorr::

RReedd RRiivveerr WWaatteerrwwaayy CCoommmmiissssiioonn PPrroojjeecctt NNoo.. 2255--0022

CCoonnttrraacctt NNoo.. RRRRWW--885500

PREPARED BY:

Civil Design Group, LLC Prevot Design Services, APAC 1125 Hawn Avenue 601 Spring Street Shreveport, LA 71107 Shreveport, LA 71101 Phone: 318.674.9616 Phone: 318.227.9244

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

B

ID

John Franks WMA O&M Building & Equipment Shed

Red River Waterway Commission

Project No. 25-02

Contract No. RRW-850

Seals & Certifications

Specification Division/Sections prepared under my responsible supervision:

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

DIVISION 05 – METALS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

DIVISION 08 – OPENINGS

DIVISION 09 – FINISHES

DIVISION 10 – SPECIALTIES

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 – SPECIAL CONSTRUCTION

11-12-26

Mark W. Prevot, AIA, NCARB

Architect – Louisiana License No. 4652

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T O S

UBM

IT

11/12/2026

Red River Waterway Commission

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

Gary M. Clark, P.E.

Engineer – Louisiana License No. 28002

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Section 03 30 00 Cast-in-Place Concrete

Section 05 12 00 Structural Steel

Shannon McCown, P.E.

Engineer – Louisiana License No. 28614

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

B

ID

Shannon McCown Texas Stamp

DIVISION 22 – PLUMBING

DIVISION 23 – HEATING, VENTILATION AND AIR CONDITIONING

Thomas G. Sanders, P.E.

Mechanical Engineer – Louisiana License No. 28647

DIVISION 26 – ELECTRICAL

DIVISION 27 – COMMUNICATION

Rickey L. Watson, P.E.

Electrical Engineer – Louisiana License No. 30744

11-12-26

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

John Franks WMA O&M Building &

Equipment Shed - Project No. 25-022 00 01 10 - 1 Table of Contents

SECTION 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

Seals Pages

00 01 10 - Table of Contents

00 01 15 - List of Drawing Sheets

Advertisement

00 21 13 - Instructions to Bidders

00 22 13 – Supplemental Instructions to Bidders

00 31 00 - Available Project Information (Soil Study)

Uniform Public Works Bid Form

Bid Bond

Performance Bond

Labor & Materials Payment Bond

Attestations Affidavit

Contractor Affidavit

Employee Affidavit

Non-Collusion Affidavit

00 50 00 - Contracting Forms and Supplements

00 52 00 - Agreement Form

00 72 00 - General Conditions

00 73 00 - Supplementary Conditions

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01 10 00 - Summary

01 20 00 - Price and Payment Procedures

01 30 00 - Administrative Requirements

01 32 16 - Construction Progress Schedule

01 35 53 - Security Procedures

01 40 00 - Quality Requirements

01 41 00 - Regulatory Requirements

01 42 16 - Definitions

01 50 00 - Temporary Facilities and Controls

01 51 00 - Temporary Utilities

01 52 13 - Field Offices and Sheds

01 60 00 - Product Requirements

01 60 01 - Substitution Request Form

01 70 00 - Execution and Closeout Requirements

01 78 00 - Closeout Submittals

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

00 01 10 - 2 Table of Contents

01 79 00 – Demonstration and Training

DIVISION 02 -- EXISTING CONDITIONS

DIVISION 03 -- CONCRETE

03 30 00 – Cast-in-Place Concrete

DIVISION 04 -- MASONRY

DIVISION 05 -- METALS

05 12 00 – Structural Steel

05 40 00 – Cold-Formed Metal Framing

05 50 00 - Metal Fabrications

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

06 10 53 - Miscellaneous Rough Carpentry

06 41 00 - Architectural Wood Casework

06 83 16 - Fiberglass Reinforced Paneling

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

07 21 00 - Thermal Insulation

07 21 19 - Foamed-In-Place Insulation

07 25 00 – Air-Weather Barriers

07 41 13 - Metal Roof Panels

07 42 13 - Metal Wall Panels

07 62 00 - Sheet Metal Flashing and Trim

07 84 00 - Firestopping

07 92 00 - Joint Sealants

DIVISION 08 -- OPENINGS

08 11 13 - Hollow Metal Doors and Frames

08 14 16 - Flush Wood Doors

08 31 00 - Access Doors and Panels

08 33 23 - Overhead Coiling Doors

08 43 13 - Aluminum-Framed Storefronts

08 71 00 – Door Hardware

08 80 00 - Glazing

08 91 00 - Louvers

DIVISION 09 -- FINISHES

09 21 16 - Gypsum Board Assemblies

09 30 00 - Tiling

09 51 00 - Acoustical Ceilings

09 65 00 - Resilient Flooring

09 91 13 - Exterior Painting

09 91 23 - Interior Painting

DIVISION 10 -- SPECIALTIES

10 14 00 - Signage

10 28 00 - Toilet, Bath, and Laundry Accessories

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

00 01 10 - 3 Table of Contents

10 44 00 - Fire Protection Specialties

DIVISION 11 -- EQUIPMENT (NOT USED)

11 30 13 - Residential Appliances

DIVISION 12 -- FURNISHINGS

12 24 00 - Window Shades

12 36 00 - Countertops

DIVISION 13 – SPECIAL CONSTRUCTION

13 34 19 – Metal Building Systems

DIVISION 22 – PLUMBING

22 05 00 – Common Work Results for Plumbing

22 05 03 – Plumbing Piping

22 07 00 – Plumbing Insulation

22 09 00 – Cleaning and Testing for Plumbing Systems

22 40 00 – Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

23 05 00 – Common Work Results for HVAC

23 05 90 – Cleaning and Testing for HVAC

23 05 93 – Testing, Adjusting, and Balancing for HVAC

23 07 00 – HVAC Insulation

23 09 00 – Temperature Controls

23 30 00 – HVAC Air Distribution

23 35 00 – HVAC Equipment

23 42 00 – Air Purification System

DIVISION 26 – ELECTRICAL

26 00 00 – Electrical

26 05 05 – Selective Demolition for Electrical

26 05 19 – Low-Voltage Electrical Power Conductors and Cables

26 05 26 – Grounding and Bonding for Electrical Systems

26 05 33 – Raceway and Boxes for Electrical Systems

26 05 53 – Identification for Electrical Systems

26 09 23 – Lighting Control Devices

26 20 00 – Low-Voltage Electrical Distribution

26 27 26 – Wiring Devices

26 43 00 – Surge Protective Devices

26 50 00 - Lighting

DIVISION 27 – COMMUNICATIONS

27 05 00 – Fire Alarm System

DIVISION 31 -- EARTHWORK

31 00 00 – Earthwork

31 10 00 – Site Clearing

31 25 00 – Erosion Controls and Turf Establishment

31 31 16 – Termite Control

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

00 01 10 - 4 Table of Contents

DIVISION 32 -- EXTERIOR IMPROVEMENTS

32 13 13 – Concrete Paving

32 31 00 – Chain Link Fences and Gates

32 40 00 – Pavement Markings

DIVISION 33 -- UTILITIES

33 05 13 – Manholes, Junctions Boxes and Catch Basins

33 10 00 – Water Utilities

33 31 00 – Gravity Sanitary Sewer Utilities

33 40 00 – Storm Drainage Utilities

END OF SECTION 00 01 10

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Equipment Shed - Project No. 25-02 00 01 15 - 1 List of Drawing Sheets

SECTION 00 01 15

LIST OF DRAWING SHEETS

T-100 TITLE SHEET

C-101A GENERAL NOTES

C-101B LEGEND – EXISTING & PROPOSED

C-101C EXISTING CONDITIONS PLAN

C-102 DEMOLITION PLAN

C-103 GEOMETRIC LAYOUT PLAN

C-104A BASE BID – GRADING & DRAINAGE PLAN

C-104B BASE BID + ALT. NO. 1 – GRADING & DRAINAGE PLAN

C-104C BASE BID + ALT. NO. 1&2 – GRADING & DRAINAGE PLAN

C-105 PAVING AND JOINT PLAN & PARTIAL GRADING & DRAINAGE PLAN (BASE BID)

C-106A UTILITY PLAN

C-106B WELL BUILDING PLAN

C-107A TYPICAL SECTIONS & DETAILS

C-107B TYPICAL SECTIONS & DETAILS

C-107C TYPICAL SECTIONS & DETAILS

C-108A EROSION CONTROL PLAN

C-108B EROSION CONTROL DETAILS

A-001 GENERAL INFORMATION & SHEET INDEX

A-002 CRITICAL DIMENSIONS AND CLEARANCES

A-003 INTERIOR PARTITION TYPES

A-010 LIFE SAFETY PLAN AND CODE ANALYSIS

AS-101 ARCHITECTURAL SITE PLAN

AD-101 ALTERNATE NO. 2 – BUILDING RENOVATION DEMOLITION PLAN

A-100 ARCHITECTURAL DIMENSION PLAN

A-101 BASE BID – 0&M BUILDING ARCHITECTURAL FLOOR PLAN

A-102 ALTERNATE NO. 1 – EQUIPMENT SHED FLOOR PLAN & ELEVATION

A-103 ALTERNATE NO. 2 – BUILDING RENOVATION FLOOR PLAN & ELEVATION

A-104 BASE BID – WELL BUILDING ARCHITECTURAL FLOOR PLAN

A-111 REFLECTED CEILING PLAN

A-141 ROOF PLAN

A-201 EXTERIOR ELEVATIONS

A-301 BUILDING SECTION

A-311 WALL SECTIONS

A-321 WALL SECTION DETAILS

A-401 ENLARGED PLANS AND INTERIOR ELEVATIONS

A-411 INTERIOR ELEVATIONS

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Equipment Shed - Project No. 25-02 00 01 15 - 2 List of Drawing Sheets

A-421 MILLWORK SECTIONS

A-422 MILLWORK SECTIONS

A-501 ROOM FINISH AND OPENING SCHEDULES DOOR AND FRAME TYPES

A-502 OPENING DETAILS

S-100 FOUNDATION PLAN & NOTES

S-101 ALTERNATE NO. 1 – EQUIPMENT SHED FOUNDATION PLAN & NOTES

S-102 WELL BUILDING FOUNDATION PLAN & SECTION

S-200 FOUNDATION SECTIONS & DETAILS

S-201 FOUNDATION SECTIONS & DETAILS

S-300 PERIMETER WALL & MEZANINE FRAMING PLAN

S-301 ALTERNATE NO. 2 – EQUIP. BUILDING RENOVATION STRUCTURAL PLAN & DETAILS

S-401 FRAMING SECTIONS & DETAILS

ME1.1 SITE PLAN – MECHANICAL & ELECTRICAL

M1.1 BUNKHOUSE HVAC PLANS (BASE BID)

M2.1 HVAC SECTIONS

M3.1 HVAC SCHEDULES & GENERAL NOTES

M4.1 HVAC DETAILS

P1.1 BUNKHOUSE WASTE & VENT PLAN (BASE BID)

P1.2 BUNKHOUSE WATER PLAN (BASE BID)

P2.1 PLUMBING FIXTURE SCHEDULES

P3.1 PLUMBING DETAILS

P3.2 PLUMBING DETAILS & RISERS

E1.1 FLOOR PLANS – BUNKHOUSE ELECTRICAL (BASE BID)

E1.2 EQUIPMENT SHED (ALT#1) & EQUIPMENT BUILDING RENOVATION (ALT#2)

ELECTRICAL PLANS

E2.1 ELECTRICAL SCHEDULES AND DETAILS

E2.2 ELECTRICAL DETAILS

END OF SECTION BID

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

ADVERTISEMENT FOR BIDS

RED RIVER WATERWAY COMMISSION

JOHN FRANKS WMA O&M BUILDING & EQUIPMENT SHED PROJECT

PROJECT NO. 25-02, CONTRACT NO. RRW-850

SEALED BIDS for the JOHN FRANKS WMA O&M BUILDING & EQUIPMENT SHED PROJECT will be received by the Red River Waterway Commission (Issuing Office) at 5941 Hwy 1 By-Pass, Natchitoches, LA 71458, mailing address: P.O. Box 776, Natchitoches, LA 71458, Phone: 318- 352-7446, until 2:00 P.M. (CST) Thursday, December 17, 2026. Any bid received after the specified time and date will not be considered.

Contract Documents, Drawings, and Specifications may be examined at the following location:

5941 Hwy 1 By-Pass

Natchitoches, LA 71458 318-352-7446

The Scope of Work includes but is not limited to the construction of a new O&M Building with related infrastructure as indicated in the Construction Documents (Bid Documents), which includes Drawings, Project Manual and Addenda (if any).

Bidding Documents on a USB flash drive may be obtained from the office of the Owner: Red River Waterway Commission Office at 5941 Hwy 1 By-Pass, Natchitoches, LA 71458. Bidding documents will be available on or about Thursday, November 12, 2026. Prime Bidders must obtain Bidding Documents from the Owner. Bids received from Contractors utilizing any other bidding document source will be returned unopened.

NOTE: LOUISIANA LICENSED CONTRACTOR REQUIRED FOR THIS PROJECT WITH A

MAJOR CLASSIFICATION OF BUILDING CONSTRUCTION.

Pursuant to L.R.S. 38:2212.E.(1), bidders have the option to submit their bids and bid bonds electronically. To view bids, download, and receive bid notices by email, your company/agency will need to register with Bidnet Direct at bidnetdirect.com. If you need help registering or with completing an e-bid, please call 800-835-4603 (M-F) 7 a.m. to 7 p.m. (CST). Bidders must register as bidder with Red River Waterway Commission.

BID SECURITY equal to five percent (5%) of the Total Bid shall be in the form of a bid bond, certified check or cashier’s check as prescribed by LA RS 38:2218 must be attached to and made a part of the bid. If a bid bond is provided it shall be on the provided form and only on the provided form. Bid bonds must be written by a qualified company licensed to do business in Louisiana.

The successful bidder will be required to furnish a Performance Bond and Payment Bond written by a company licensed to do business in Louisiana in an amount equal to one hundred percent (100%) of the contract amount pursuant to the requirements noted in L.R.S. 38:2219 A. (1)(a), (b), and (c).

For this project, Liquidated Damages will apply in the amount of Five Hundred ($500) per day for each consecutive working day which the work is not completed, beginning with the first day beyond the established completion date of 300 calendar days from Contract Commencement.

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

No bid may be withdrawn for a period of forty-five (45) days after actual date of the opening thereof.

The Owner reserves the right to reject any and all bids in accordance with Title 38 of the L.R.S.

In accordance with L.R.S. 38:2212.B(1), the provisions and requirements stated in the Bidding Documents shall not be considered as informalities and shall not be waived.

A NON-MANDATORY PRE-BID CONFERENCE will be held on Wednesday, December 9, 2026 at 10:00 a.m. (CST) at the Red River Waterway Commission office at 5941 Hwy 1 By-Pass, Natchitoches, LA 71458.

Natchitoches Times Publication Dates:

November 12th, November 19th, and November 26th, 2026.

Colin S. Brown, Executive Director

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Equipment Shed – Project No. 25-02

00 21 13 - 1 Instructions to Bidders

SECTION 00 21 13

INSTRUCTIONS TO BIDDERS

SUMMARY

1.01 SEE AIA A701, INSTRUCTIONS TO BIDDERS BOUND IN THE PROJECT MANUAL.

END OF SECTION 00 21 13

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

Document A701

– 2018 Instructions to Bidders

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

ADDITIONS AND DELETIONS:

The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.

This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.

FEDERAL, STATE, AND LOCAL

LAWS MAY IMPOSE

REQUIREMENTS ON PUBLIC

PROCUREMENT CONTRACTS.

CONSULT LOCAL AUTHORITIES

OR AN ATTORNEY TO VERIFY

REQUIREMENTS APPLICABLE TO

THIS PROCUREMENT BEFORE

COMPLETING THIS FORM.

It is intended that AIA Document G612™–2017, Owner’s Instructions to the Architect, Parts A and B will be completed prior to using this document.

for the following Project:

(Name, location, and detailed description)

John Franks WMA O&M Building & Equipment Shed

THE OWNER:

(Name, legal status, address, and other information)

Red River Waterway Commission 5941 Highway 1 Bypass P.O. Box 776 Natchitoches, LA 71458

THE PROFESSIONAL OF RECORD:

(Name, legal status, address, and other information)

Prevot Design Services, LLA 601 Spring Street Shreveport, LA 71101

TABLE OF ARTICLES

1 DEFINITIONS

2 BIDDER’S REPRESENTATIONS

3 BIDDING DOCUMENTS

4 BIDDING PROCEDURES

5 CONSIDERATION OF BIDS

6 POST-BID INFORMATION

7 PERFORMANCE BOND AND PAYMENT BOND

8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

ARTICLE 1 DEFINITIONS

§ 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions.

§ 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents.

§ 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents.

§ 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents.

§ 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids.

§ 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.

§ 1.7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, as described in the Bidding Documents.

§ 1.8 A Bidder is a person or entity who submits a Bid and who meets the requirements set forth in the Bidding Documents.

§ 1.9 A Sub-bidder is a person or entity who submits a bid to a Bidder for materials, equipment, or labor for a portion of the Work.

ARTICLE 2 BIDDER’S REPRESENTATIONS

§ 2.1 By submitting a Bid, the Bidder represents that:

.1 the Bidder has read and understands the Bidding Documents;

.2 the Bidder understands how the Bidding Documents relate to other portions of the Project, if any, being bid concurrently or presently under construction;

.3 the Bid complies with the Bidding Documents;

.4 the Bidder has visited the site, become familiar with local conditions under which the Work is to be performed, and has correlated the Bidder’s observations with the requirements of the Proposed Contract Documents;

.5 the Bid is based upon the materials, equipment, and systems required by the Bidding Documents without exception; and

.6 the Bidder has read and understands the provisions for liquidated damages, if any, set forth in the form of Agreement between the Owner and Contractor.

ARTICLE 3 BIDDING DOCUMENTS

§ 3.1 Distribution § 3.1.1 Bidders shall obtain complete Bidding Documents, as indicated below, from the issuing office designated in the advertisement or invitation to bid, for the deposit sum, if any, stated therein.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall obtain Bidding Documents.)

Bid documents shall be available as indicated in the Bid Advertisement.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

§ 3.1.2 Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return the paper Bidding Documents in good condition within ten days after receipt of Bids. The cost to replace missing or damaged paper documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the paper Bidding Documents, and the Bidder’s deposit will be refunded.

§ 3.1.3 Bidding Documents will not be issued directly to Sub-bidders unless specifically offered in the advertisement or invitation to bid, or in supplementary instructions to bidders.

§ 3.1.4 Bidders shall use complete Bidding Documents in preparing Bids. Neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete Bidding Documents.

§ 3.1.5 The Bidding Documents will be available for the sole purpose of obtaining Bids on the Work. No license or grant of use is conferred by distribution of the Bidding Documents.

§ 3.2 Modification or Interpretation of Bidding Documents § 3.2.1 The Bidder shall carefully study the Bidding Documents, shall examine the site and local conditions, and shall notify the Architect of errors, inconsistencies, or ambiguities discovered and request clarification or interpretation pursuant to Section 3.2.2.

§ 3.2.2 Requests for clarification or interpretation of the Bidding Documents shall be submitted by the Bidder in writing and shall be received by the Architect at least seven days prior to the date for receipt of Bids.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Bidders shall submit requests for clarification and interpretation.)

All inquiries shall be directed to:

Gary Clark Civil Design Group, LLC gclark@cdg-apec.com

§ 3.2.3 Modifications and interpretations of the Bidding Documents shall be made by Addendum. Modifications and interpretations of the Bidding Documents made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3 Substitutions § 3.3.1 The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance, and quality to be met by any proposed substitution.

§ 3.3.2 Substitution Process § 3.3.2.1 Written requests for substitutions shall be received by the Architect at least ten days prior to the date for receipt of Bids. Requests shall be submitted in the same manner as that established for submitting clarifications and interpretations in Section 3.2.2.

§ 3.3.2.2 Bidders shall submit substitution requests on a Substitution Request Form if one is provided in the Bidding Documents.

§ 3.3.2.3 If a Substitution Request Form is not provided, requests shall include (1) the name of the material or equipment specified in the Bidding Documents; (2) the reason for the requested substitution; (3) a complete description of the proposed substitution including the name of the material or equipment proposed as the substitute, performance and test data, and relevant drawings; and (4) any other information necessary for an evaluation. The request shall include a statement setting forth changes in other materials, equipment, or other portions of the Work, including changes in the work of other contracts or the impact on any Project Certifications (such as LEED), that will result from incorporation of the proposed substitution.

§ 3.3.3 The burden of proof of the merit of the proposed substitution is upon the proposer. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

§ 3.3.4 If the Architect approves a proposed substitution prior to receipt of Bids, such approval shall be set forth in an Addendum. Approvals made in any other manner shall not be binding, and Bidders shall not rely upon them.

§ 3.3.5 No substitutions will be considered after the Contract award unless specifically provided for in the Contract Documents.

§ 3.4 Addenda § 3.4.1 Addenda will be transmitted to Bidders known by the issuing office to have received complete Bidding Documents.

(Indicate how, such as by email, website, host site/platform, paper copy, or other method Addenda will be transmitted.)

Addenda will be issued via the same format as the Bid Documents.

§ 3.4.2 Addenda will be available where Bidding Documents are on file.

§ 3.4.3 Addenda will be issued no later than three days prior to the date for receipt of Bids, except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids.

§ 3.4.4 Prior to submitting a Bid, each Bidder shall ascertain that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid.

ARTICLE 4 BIDDING PROCEDURES

§ 4.1 Preparation of Bids § 4.1.1 Bids shall be submitted on the forms included with or identified in the Bidding Documents.

§ 4.1.2 All blanks on the bid form shall be legibly executed. Paper bid forms shall be executed in a non-erasable medium.

§ 4.1.3 Sums shall be expressed in both words and numbers, unless noted otherwise on the bid form. In case of discrepancy, the amount entered in words shall govern.

§ 4.1.4 Edits to entries made on paper bid forms must be initialed by the signer of the Bid.

§ 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter "No Change" or as required by the bid form.

§ 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may, without forfeiture of the bid security, state the Bidder’s refusal to accept award of less than the combination of Bids stipulated by the Bidder. The Bidder shall neither make additional stipulations on the bid form nor qualify the Bid in any other manner.

§ 4.1.7 Each copy of the Bid shall state the legal name and legal status of the Bidder. As part of the documentation submitted with the Bid, the Bidder shall provide evidence of its legal authority to perform the Work in the jurisdiction where the Project is located. Each copy of the Bid shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further name the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached, certifying the agent’s authority to bind the Bidder.

§ 4.1.8 A Bidder shall incur all costs associated with the preparation of its Bid.

§ 4.2 Bid Security § 4.2.1 Each Bid shall be accompanied by the following bid security:

(Insert the form and amount of bid security.)

A bid security equal to five percent (5%) of the Total Bid (including any Alternates). Bid Security must be in the form of a cashier’s check, certified check or a satisfactory bid bond written by a company with a current A.M Best Rating of ’A’ (Excellent), Financial Size Category ’VII’ with a ’Stable’ Outlook and licensed in the state of Louisiana.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

§ 4.2.2 The Bidder pledges to enter into a Contract with the Owner on the terms stated in the Bid and shall, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder. Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty. In the event the Owner fails to comply with Section 6.2, the amount of the bid security shall not be forfeited to the Owner.

§ 4.2.3 If a surety bond is required as bid security, it shall be written on AIA Document A310™, Bid Bond, unless otherwise provided in the Bidding Documents. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of an acceptable power of attorney. The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 4.2.4 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until (a) the Contract has been executed and bonds, if required, have been furnished; (b) the specified time has elapsed so that Bids may be withdrawn; or (c) all Bids have been rejected. However, if no Contract has been awarded or a Bidder has not been notified of the acceptance of its Bid, a Bidder may, beginning45 days after the opening of Bids, withdraw its Bid and request the return of its bid security.

§ 4.3 Submission of Bids § 4.3.1 A Bidder shall submit its Bid as indicated below:

(Indicate how, such as by website, host site/platform, paper copy, or other method Bidders shall submit their Bid.)

Bids may be submitted as indicated in the Advertisement for Bids.

§ 4.3.2 Paper copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder’s name and address, and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "SEALED BID ENCLOSED" on the face thereof.

§ 4.3.3 Bids shall be submitted by the date and time and at the place indicated in the Advertisement for Bids. Bids submitted after the date and time for receipt of Bids, or at an incorrect place, will not be accepted.

§ 4.3.4 The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

§ 4.3.5 A Bid submitted by any method other than as provided in this Section 4.3 will not be accepted.

§ 4.4 Modification or Withdrawal of Bid § 4.4.1 Prior to the date and time designated for receipt of Bids, a Bidder may submit a new Bid to replace a Bid previously submitted, or withdraw its Bid entirely, by notice to the party designated to receive the Bids. Such notice shall be received and duly recorded by the receiving party on or before the date and time set for receipt of Bids. The receiving party shall verify that replaced or withdrawn Bids are removed from the other submitted Bids and not considered. Notice of submission of a replacement Bid or withdrawal of a Bid shall be worded so as not to reveal the amount of the original Bid.

§ 4.4.2 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids in the same format as that established in Section 4.3, provided they fully conform with these Instructions to Bidders. Bid security shall be in an amount sufficient for the Bid as resubmitted.

§ 4.4.3 After the date and time designated for receipt of Bids, a Bidder who discovers that it made a clerical error in its Bid shall notify the Architect of such error within two days, or pursuant to a timeframe specified by the law of the jurisdiction where the Project is located, requesting withdrawal of its Bid. Upon providing evidence of such error to the reasonable satisfaction of the Architect, the Bid shall be withdrawn and not resubmitted. If a Bid is withdrawn pursuant to this Section 4.4.3, the bid security will be attended to as follows:

(State the terms and conditions, such as Bid rank, for returning or retaining the bid security.)

As indicated in the Supplemental Instructions to Bidders, Paragraph 4.04.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

ARTICLE 5 CONSIDERATION OF BIDS

§ 5.1 Opening of Bids If stipulated in an advertisement or invitation to bid, or when otherwise required by law, Bids properly identified and received within the specified time limits will be publicly opened and read aloud. A summary of the Bids may be made available to Bidders.

§ 5.2 Rejection of Bids Unless otherwise prohibited by law, the Owner shall have the right to reject any or all Bids.

§ 5.3 Acceptance of Bid (Award) § 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsive and responsible Bidder, provided the Bid has been submitted in accordance with the requirements of the Bidding Documents. Unless otherwise prohibited by law, the Owner shall have the right to waive informalities and irregularities in a Bid received and to accept the Bid which, in the Owner’s judgment, is in the Owner’s best interests.

§ 5.3.2 Unless otherwise prohibited by law, the Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bidding Documents, and to determine the lowest responsive and responsible Bidder on the basis of the sum of the Base Bid and Alternates accepted.

ARTICLE 6 POST-BID INFORMATION

§ 6.1 Contractor’s Qualification Statement Bidders to whom award of a Contract is under consideration shall submit to the Architect, upon request and within the timeframe specified by the Architect, a properly executed AIA Document A305™, Contractor’s Qualification Statement, unless such a Statement has been previously required and submitted for this Bid.

§ 6.2 Owner’s Financial Capability A Bidder to whom award of a Contract is under consideration may request in writing, fourteen days prior to the expiration of the time for withdrawal of Bids, that the Owner furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. The Owner shall then furnish such reasonable evidence to the Bidder no later than seven days prior to the expiration of the time for withdrawal of Bids. Unless such reasonable evidence is furnished within the allotted time, the Bidder will not be required to execute the Agreement between the Owner and Contractor.

§ 6.3 Submittals § 6.3.1 After notification of selection for the award of the Contract, the Bidder shall, as soon as practicable or as stipulated in the Bidding Documents, submit in writing to the Owner through the Architect:

.1 a designation of the Work to be performed with the Bidder’s own forces;

.2 names of the principal products and systems proposed for the Work and the manufacturers and suppliers of each; and

.3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work.

§ 6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.

§ 6.3.3 Prior to the execution of the Contract, the Architect will notify the Bidder if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder. If the Owner or Architect has reasonable objection to a proposed person or entity, the Bidder may, at the Bidder’s option, withdraw the Bid or submit an acceptable substitute person or entity. The Bidder may also submit any required adjustment in the Base Bid or Alternate Bid to account for the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder. In the event of either withdrawal or disqualification, bid security will not be forfeited.

§ 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were proposed and shall not be changed except with the written consent of the Owner and Architect.

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND

§ 7.1 Bond Requirements § 7.1.1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder.

§ 7.1.2 If the furnishing of such bonds is stipulated in the Bidding Documents, the cost shall be included in the Bid. If the furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum.

§ 7.1.3 The Bidder shall provide surety bonds from a company or companies lawfully authorized to issue surety bonds in the jurisdiction where the Project is located.

§ 7.1.4 Unless otherwise indicated below, the Penal Sum of the Payment and Performance Bonds shall be the amount of the Contract Sum.

(If Payment or Performance Bonds are to be in an amount other than 100% of the Contract Sum, indicate the dollar amount or percentage of the Contract Sum.)

§ 7.2 Time of Delivery and Form of Bonds § 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to commence sooner in response to a letter of intent, the Bidder shall, prior to commencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Section 7.2.1.

§ 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312, Performance Bond and Payment Bond.

§ 7.2.3 The bonds shall be dated on or after the date of the Contract.

§ 7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix to the bond a certified and current copy of the power of attorney.

ARTICLE 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS

§ 8.1 Copies of the proposed Contract Documents have been made available to the Bidder and consist of the following documents:

.1 AIA Document A101™–2017, Standard Form of Agreement Between Owner and Contractor, unless otherwise stated below.

(Insert the complete AIA Document number, including year, and Document title.)

.2 AIA Document A101™–2017, Exhibit A, Insurance and Bonds, unless otherwise stated below.

.3 AIA Document A201™–2017, General Conditions of the Contract for Construction, unless otherwise stated below.

.4 Building Information Modeling Exhibit, if completed:

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

AIA Document A701 – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This document was produced at 12:10:19 CT on 11/06/2026 under Order No.4104245727 which expires on 12/30/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (2020161345)

.5 Drawings

Number Title Date Specification 00 15 00 List of Drawing Sheets

.6 Specifications

Section Title Date Pages Specification 00 10 00 Table of Contents

.7 Addenda:

Number Date Pages

TBD

.8 Other Exhibits:

(Check all boxes that apply and include appropriate information identifying the exhibit where required.)

[ ] AIA Document E204™–2017, Sustainable Projects Exhibit, dated as indicated below:

(Insert the date of the E204-2017.)

[ ] The Sustainability Plan:

Title Date Pages

[ X ] Supplementary and other Conditions of the Contract:

Document Title Date Pages Specification Section 00 73 00 Supplementary

Conditions

.9 Other documents listed below:

(List here any additional documents that are intended to form part of the Proposed Contract Documents.)

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

00 22 13 - 1 Supplemental Instructions to Bidders

SECTION 00 22 13

SUPPLEMENTAL INSTRUCTIONS TO BIDDERS

ARTICLE 1 - GENERAL

1.01 DEFINITIONS

A. THE BIDDING DOCUMENTS include the following:

00 01 10 Table of Contents

Advertisement for Bids Louisiana Uniform Public Works Bid Form Bid Bond Performance Bond Labor and Materials Payment Bond Attestations Affidavit Contractor Affidavit Employee Affidavit Non-Collusion Affidavit

00 21 13 Instructions to Bidders (AIA Document A701, 2018 edition) 00 22 13 Supplemental Instructions to Bidders 00 50 00 Contracting Forms and Supplements 00 52 00 Agreement Form (AIA Document A101, 2017 edition) 00 72 00 General Conditions (AIA Document A201, 2017 edition) 00 73 00 Supplementary Conditions

Specification Sections: as indicated in the Project Manual.

Drawings: as indicated in the Project Manual.

Addenda issued during the bid period and acknowledged in the Bid Form.

B. All definitions set forth in the General Conditions of the Contract for Construction, AIA Document

A201 - 2017 edition are applicable to the Bidding Documents.

C. Addenda are written or graphic instruments issued by the Architect prior to the opening of bids which modify or interpret the bidding documents by addition, deletions, clarifications or corrections.

D. A Bid is a complete and properly signed proposal to do the Work or designated portion thereof for the sums stipulated therein supported by data called for by the Bidding Documents.

E. Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described as the base, to which Work may be added for sums stated in Alternate Bids.

F. An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to the amount of the Base Bid if the corresponding change in project scope or materials or methods of construction described in the Bidding Documents is accepted.

G. A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials or services as described in the Contract Documents. A Unit Price shall contain its pro-rata share of overhead so

BID

D

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

00 22 13 - 2 Supplemental Instructions to Bidders that the sum of the products obtained by multiplying the quantity shown for each item by a unit price Bid represents the total bid. Any bid not conforming to this requirement shall be rejected as informal.

H. A Bidder is one who submits a Bid for a prime contract with the Owner for the Work described in the proposed Contract Documents.

I. A Sub-bidder is one who submits a bid to a Bidder for materials or labor for a portion of the Work.

J. Where the word "Architect" is used in any of the Documents, it shall refer to the Prime Designer of the project, an Architect, Engineer or Landscape Architect.

ARTICLE 2 - BIDDER'S REPRESENTATIONS

2.01 Each Bidder by making his bid represents that:

A. He has read and understands the Bidding Documents and his Bid is made in accordance therewith.

B. He has visited the site and has familiarized himself with the local conditions under which the Work is to be performed.

C. His Bid is based upon the materials, systems and equipment described in the Bidding Documents as advertised and as modified by Addenda, and by submitting a bid he represents that in his opinion they are appropriate for the construction of a sound and suitable building project.

2.02 The Bidder must be fully qualified under any Federal, State or Local licensing law for Contractors in effect at the time and at the location of the Work before submitting his bid. In the State of Louisiana, Revised Statutes 37:2150, et seq. will be considered, if applicable. The Contractor shall be responsible for determining that all of his Sub-bidders or prospective Sub-contractors are duly licensed in accordance with law.

2.03 Bidder submitting lowest acceptable bid and any other Bidders who the Owner may designate shall, if required, submit a sworn statement of his qualifications to satisfactorily complete the Contract for this project. Submit in duplicate the form of Bidder’s Qualification Statement, AIA Document A305, latest edition.

2.04 Bidder shall, if required, submit for examination by the Owner or Owner’s authorized representative concerning sub-contractors, suppliers, materials, and equipment proposed for the project, a detailed breakdown of each lump-sum bid, and other matters deemed pertinent to the Bidder’s ability to satisfactorily complete the Contract for this project.

ARTICLE 3 - BIDDING DOCUMENTS

3.01 COPIES

A. Bidding Documents may be obtained as stated in the Advertisement for Bids. If a deposit is required, the deposit will be refunded as stated in the Advertisement for Bids. No deposits will be refunded on Bidding Documents returned later than ten (10) days after receipt of bids.

B. Complete sets of Bidding Documents shall be used in preparing bids; neither the Owner nor the

Architect assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

OCUM

ENTS M

UST B

E O

BTAIN

ED F

ROM

R

RW

C T

O S

UBM

IT

00 22 13 - 3 Supplemental Instructions to Bidders

C. The Owner or Architect in making copies of the Bidding Documents available on the above terms, do so only for the purpose of obtaining bids on the Work and do not confer a license or grant for any other use.

3.02 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS

A. Bidders shall promptly notify the Architect of any ambiguity, inconsistency or error which they may discover upon examination of the Bidding Documents or of the site and local conditions.

B. Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request to the Architect, to reach him at least seven (7) days prior to the date for receipt of bids.

C. Any interpretation, correction or change of the Bidding Documents will be made by Addendum.

Interpretations, corrections or changes of the Bidding Documents made in any other manner will not be binding, and bidders shall not rely upon such interpretations, corrections and changes.

3.03 SUBSTITUTIONS

A. The materials, products and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution.

B. It is recognized there may be other brands that could likely serve the needs of the Project. However, it should be understood by the Bidder that the use of brand names and numbers is to establish standards and styles of products that have been judged to meet the need. Such use of brand names is in no way designed or intended to restrict the bidding, but contrarily, to invite bids of comparable products that would equally satisfy the requirements stated herein.

C. No substitution will be considered unless written request for approval has been submitted by the proposer and has been received by the Architect at least seven (7) days prior to the date for receipt of bids in accordance with Section 01 60 00. Each such request shall be made on the form provided in this project manual in Section 01 60 00 and shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including model numbers, drawings, cuts, performance and test data and any other information necessary for an evaluation including cost information. A statement setting forth any changes in other materials, equipment or work that incorporation of the substitute would require shall be included. The burden of proof of the merit of the proposed substitute is upon the proposer. The Architect's decision of approval or disapproval of a proposed substitution shall be final.

D. If the Architect approves any proposed substitution, such approval will be set forth in an Addendum.

Bidders shall not rely upon approvals made in any other manner.

3.04 ADDENDA

A. Addenda will be uploaded to the digital plan room.

B. Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose.

C. Addenda shall not be issued within…