FR3470-5.223_Signed.pdf

PDF 4 MB Posted

Attached to
Ottawa National Forest Paint River Bridge Replacement Federal contract opportunity
Solicitation number
12445523B0005
Issued by
Department of Agriculture Forest Service

About this file

This document package includes construction drawings and specifications for a bridge replacement project on Ottawa National Forest land in Michigan. The project involves replacing a 68-foot single span timber panel-lam bridge with pile bent abutments over the South Branch of the Paint River. Key specifications include using treated structural timber for superstructure and substructure components, installing a 440 linear foot underdrain system and salvaging 80 tons of riprap. Temporary traffic control and detour plans are provided. The related federal contract opportunity is a pre-solicitation notice for the Ottawa National Forest Paint River Bridge Replacement with solicitation number 12445523B0005 to be issued by the US Department of Agriculture Forest Service.

View the file

Other files for this federal contract opportunity

Other files attached to Ottawa National Forest Paint River Bridge Replacement, newest first.
File Type Posted
Paint - 100 pct Supplemental Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

PROJECT SITE

PROJECT LOCATION:

SHEET OF

United States Department of Agriculture Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 TITLE SHEET 12/17/2020

C-01 QUANTITIES, DESIGN DATA, GENERAL NOTES 12/17/2020

C-02 TEMPORARY TRAFFIC CONTROL PLAN 12/17/2020

C-03 TYPICAL SECTIONS 12/17/2020

C-04 PLAN & PROFILE 12/17/2020

C-05 PLAN OF STRUCTURE 12/17/2020

C-06 ABUTMENT PLAN AND ELEVATION 12/17/2020

C-07 STRUCTURE DETAILS 12/17/2020

C-08 SOIL BORINGS 12/17/2020

FROM THE US HWY 2/M-73 INTERSECTION IN IRON RIVER,

MICHIGAN, HEAD WEST ON US HWY 2 FOR 5.9 MILES. TURN RIGHT

ONTO AMVETS HWY AND AFTER 0.6 MILES TURN LEFT ONTO

BEECHWOOD STORE RD. CONTINUE STRAIGHT ONTO BASSWOOD

RD FOR 2.2 MILES. TURN RIGHT ONTO GOLD MINE RD AND

CONTINUE 0.1 MILES TO BRIDGE LOCATION.

/7/

:0 9 J

AL

LE

N U:

\U

-0

U

SD

A

FS

-F

Y2 0 A

E

ID

IQ

4B

RI

DG

ES

T

O 1\D

W

GS

\P

AI

NT

R

IV

ER

B

AS

E.

DW

G;

EASTERN REGION

OTTAWA NATIONAL FOREST - IRON RIVER RANGER DISTRICT

IRON COUNTY

MICHIGAN

FR 3470-5.223 OVER SOUTH BRANCH PAINT RIVER

BRIDGE REPLACEMENT

STRUCTURE NUMBER: 090703000034772 (LAT 46.1835, LONG -88.7874)

STRUCTURE DESCRIPTION:

68 FOOT (OVERALL LENGTH) SINGLE SPAN TIMBER PANEL-LAM WITH

AN ASPHALT WEARING SURFACE AND TIMBER PILE BENT ABUTMENTS.

DESIGN SPEED: 45 MPH

AADT: <200

RECOMMENDED BY:

FOREST ENGINEER

DISTRICT RANGER

DATE

APPROVED:

R9 DIRECTOR OF ENGINEERING DATE

DATE

FOREST SUPERVISOR DATE

R9 BRIDGE PROGRAM MANAGER DATE

THE REGULATED WASTE ACTIVITY IDENTIFICATION NUMBER

FOR THIS PROJECT IS: MIK124707325

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

QUANTITIES

DESIGN DATA

GENERAL NOTES

G.JUNTTILA

J.ALLEN

S. WRIGHT

U28-00286

MOBILIZATION15101 LPSM 1

ITEM NO. DESCRIPTION UNITS QUANTITY

SUMMARY OF PROJECT QUANTITIES

CONSTRUCTION SURVEY AND STAKING, METHOD 1, TOLERANCE CLASS C15201 MILE

SILT FENCE15702 LNFT

REMOVAL OF OLD STRUCTURE20304 LPSM

RIPRAP, CLASS IV25101 CUYD

GEOTEXTILE, TYPE IV, CLASS I25116 SQYD

AGGREGATE BASE, GRADING D, COMPACTION METHOD B30103 CUYD

ASPHALT CEMENT, MICHIGAN STATE DOT GRADE LVSP40312 TON

SEEDING, DRY METHOD62503 LPSM

MULCHING, DRY METHOD62509 LPSM

TEMPORARY TRAFFIC CONTROL63501 LPSM

0.057

12 INCH TIMBER PILES, FURN AND DRIVEN55101 LNFT

FURNISH PILE DRIVING EQUIPMENT55151 LPSM

TREATED STRUCTURAL TIMBER, SUPERSTRUCTURE AND SUBSTRUCTURE55706 LPSM

ROADWAY EXCAVATION20401 CUYD 130

TURBIDITY CURTAIN15712 SQYD 72

CLEARING AND GRUBBING, DISPOSAL METHOD F20102 ACRE 0.1

STRUCTURE EXCAVATION20801 CUYD 320

STRUCTURAL BACKFILL20803 CUYD 100

SAWCUTTING AND JOINT SEALING41406 LNFT 32

OBJECT MARKERS63306 EACH 4

FURNISHING AND PLACING TOPSOIL62403 CUYD 35

GENERAL NOTES:

EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS OR IN THE SUPPLEMENTAL SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE FHWA STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14.

THE PROPOSED IMPROVEMENTS COVERED BY THESE PLANS ARE IN ACCORDANCE WITH:

AASHTO: "GUIDELINES FOR GEOMETRIC DESIGN OF LOW-VOLUME ROADS, "2ND EDITION, 2019"

AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION, 2020

FSH 7709.56b TRANSPORTATION STRUCTURES HANDBOOK (USDA FOREST SERVICE) TIMBER BRIDGES: DESIGN, CONSTRUCTION, INSPECTION, AND MAINTENACE (USDA FOREST SERVICE)

NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION 2018

THE EXISTING STRUCTURE SHALL BE CHECKED AT THE TIME OF STARTING CONSTRUCTION TO SEE THAT ITS RELATIONSHIP TO THE PROPOSED WORK IS AS SHOWN ON THESE PLANS AND ANY DIFFERENCES REQUIRING CHANGES IN THE NEW WORK SHALL BE REPORTED TO THE PROJECT ENGINEER.

THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE ENTIRE EXISTING BRIDGE, INSTALLATION OF THE NEW BRIDGE AS SHOWN HEREIN AND PER THE MANUFACTURER'S DRAWINGS AND SPECIFICATIONS, CONSTRUCTION OF THE APPROACHES TO THE LIMITS SHOWN, SLOPE RESTORATION AND RIPRAP.

TRAFFIC CONTROL FOR DETOUR SHALL BE IN ACCORDANCE WITH THE CURRENT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).

THE STATIONING AS SHOWN ON THESE PLANS FOR REFERENCE POINTS "A" AND "B" (CENTERLINE OF PROPOSED BRIDGE AT THE ENDS OF THE BRIDGE SLAB) ARE BELIEVED TO BE CORRECT. IT SHALL, HOWEVER, BE CHECKED AT THE TIME OF STARTING CONSTRUCTION, AND IF THE STATIONING SHOWN ON THE PLANS IS INCORRECT, IT SHALL BE

REPORTED TO THE ENGINEER.

THE CONTRACTOR SHALL COORDINATE ALL OF THEIR WORK AND ANY UTILITY COMPANIES RELOCATION WORK AT NO ADDITIONAL COST TO THE PROJECT.

FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 174, THE CONTRACTOR SHALL DIAL "811" A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED.

MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO MAY NOT BE A PART

OF THE "MISS DIG" ALERT SYSTEM.

WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXPECTED WATER LEVELS DURING CONSTRUCTION.

NO MATERIAL SHALL BE ALLOWED TO ERODE INTO THE WATER COURSE, NOR SHALL MATERIAL BE PLACED INTO THE WATER COURSE EXCEPT AS SHOWN ON THESE PLANS.

ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE ON THIS PROJECT.

THE CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE CONTRACTING OFFICER IF HERITAGE RESOURCES OR HUMAN REMAINS ARE ENCOUNTERED.

NO WORK SHALL BE PERFORMED ON FEDERAL HOLIDAYS OR WEEKENDS WITHOUT PRIOR APPROVAL FROM THE CONTRACTING OFFICER.

THE CONTRACTOR SHALL PERFORM ALL IN-STREAM WORK BETWEEN MAY 15TH AND SEPTEMBER 15TH.

DESIGN DATA:

THE DESIGN OF THIS BRIDGE IS BASED ON 1.2 TIMES THE CURRENT AASHTO LRFD BRIDGE DESIGN SPECIFICATION HL-93 LOADING WITH THE EXCEPTION THAT THE DESIGN TANDEM PORTION OF THE HL-93 LOAD DEFINITION SHALL BE REPLACED BY A SINGLE 60 KIP AXLE LOAD BEFORE APPLICATION OF THIS 1.2 FACTOR.

ADDITIONALLY, THE LANE LOAD PORTION IS NOT INCLUDED. THE RESULTING LOAD IS DESIGNATED HL-93 MODIFIED. LIVE LOAD DEFLECTION DOES NOT EXCEED 1/800

OF THE SPAN LENGTH.

TIMBER BRIDGE RAILING MEETS TEST LEVEL 2 REQUIREMENTS OF NCHRP REPORT 350.

LOAD RATING (RATING FACTORS):

HL-93 MODIFIED

INVENTORY RATING (STRENGTH I, FLEXURE)...................................................................................................................6.65

OPERATING RATING (STRENGTH I, FLEXURE)...................................................................................................................8.62

OPERATING RATING (SERVICE I, DEFLECTION).................................................................................................................1.40

HL-93 (FEDERAL)

INVENTORY RATING (STRENGTH I, FLEXURE)...................................................................................................................6.21

OPERATING RATING (STRENGTH I, FLEXURE)...................................................................................................................8.05

OPERATING RATING (SERVICE I, DEFLECTION).................................................................................................................1.31

MICHIGAN LEGAL (CONTROLLING)

TRUCK 17 (STRENGTH I, FLEXURE)......................................................................................................................................6.63

TRUCK 17 (SERVICE I, DEFLECTION)....................................................................................................................................1.04

OVERLOAD CLASS (STRENGTH II, FLEXURE).........................................................................................MICHIGAN CLASS A

NOTE: THE LOAD RATING DOES NOT INCLUDE A FUTURE WEARING SURFACE.

DEAD LOAD:

THE DESIGN UNIT WEIGHT FOR ALL TIMBERS IS 50 PCF.

THE BRIDGE RAILING LOAD = 85 PLF (PER SIDE).

THE DESIGN UNIT WEIGHT FOR ASPHALT IS 140 PCF.

HYDRAULIC DATA:

100 YEAR FREQUENCY

DRAINAGE AREA..........................................................................................................................................77.0 SQ MI

Q100..................................................................................................................................................................1500 CFS

VELOCITY THRU STRUCTURE........................................................................................................................5.47 FPS

BRIDGE OPEN AREA THRU STRUCTURE..............................................................................................364.74 SQ FT

FLOW AREA THRU STRUCTURE............................................................................................................235.14 SQ FT

HIGH WATER ELEVATION............................................................................................................................1510.80 FT

SCOUR CRITICAL CODE

SPECIFICATIONS:

GRADING:

ALL DOUGLAS FIR-LARCH TO BE GRADED PER WCLIB STANDARD GRADING RULES.

SOUTHERN PINE TO BE GRADED PER SPIB.

MATERIAL & TREATMENT:

TIMBER PRESERVATION TREATMENT SHALL BE IN ACCORDANCE WITH CURRENT STATE AND/ OR AASHTO SPECIFICATIONS. ALL TIMBER SHALL BE COPPER NAPHTHENATE TREATED, UC4C (MINIMUM).

REFERENCE DESIGN VALUES SHOWN ARE PER AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION, 2020 (U.N.O.)

PILING TO BE SOUTHERN PINE. REFERENCE DESIGN VALUES (KSI): Fco = 1.20, Fbo = 2.40, Fcpo = 0.25, Fvo = 0.11, Eo = 1,500

DECK TO BE 36" 24F-V4 DF-DF GLU-LAM. REFERENCE DESIGN VALUES (KSI): Fbo = 2.40, Fvo = 0.265, Eo = 1,800

SPREADER BEAMS TO BE DOUGLAS FIR-LARCH, NO.1 (BEAMS AND STRINGERS). REFERENCE DESIGN VALUES (KSI): Fbo = 1.35, Fvo = 0.17, Eo = 1,600

BRIDGE RAILPOST TO BE DOUGLAS FIR-LARCH, DENSE SELECT STRUCTURAL (POSTS AND TIMBERS). REFERENCE DESIGN VALUES (KSI): Fbo = 1.75, Fvo = 0.17, Eo = 1,700

GLU-LAM RAIL TO BE DOUGLAS FIR, COMB. SYMBOL 24F-V8, DF/DF. REFERENCE DESIGN VALUES (KSI): Fbxo = 2.40, Fbyo = 1.45, Fvxo = 0.265, Fvyo = 0.23, Exo = 1,800, Eyo = 1,600

ABUTMENT PILE CAPS TO BE DOUGLAS FIR-LARCH, NO.1 (BEAMS AND STRINGERS). REFERENCE DESIGN VALUES (KSI): Fbo = 1.35, Fvo = 0.17, Eo = 1,600

ABUTMENT BACKING TO BE DOUGLAS FIR-LARCH, NO.1 & BETTER (> 2 INCH WIDE). REFERENCE DESIGN VALUES (KSI): Fbo = 1.20, Fvo = 0.18, Eo = 1,800

CURBS & SCUPPERS TO BE DOUGLAS FIR-LARCH NO.1 (POSTS AND TIMBERS) S1S1E. REFERENCE DESIGN VALUES (KSI): Fbo = 1.20, Fvo = 0.17, Eo = 1,600

ALL TIMBER IS ROUGH UNLESS OTHERWISE NOTED.

MISCELLANEOUS:

ALL TIMBER TO BE CUT EXACT LENGTH, DRESSED TO SIZE REQUIRED AND ALL PRACTICAL FRAMING TO BE DONE PRIOR TO TREATMENT.

ALL DECK PLANKS SHALL BE PREDRILLED PRIOR TO TREATMENT.

ALL PLANK FOR DECK PANELS SHALL BE PRECISION END TRIMMED TO LENGTH WITH 1/4" UNDERLENGTH & NO OVERLENGTH TOLERANCE PERMITTED.

DECK PANELS SHALL BE ASSEMBLED WITH 3/8" DIAMETER RING SHANK DOWELS. ALL DOWELS ARE TO BE SIMULTANEOUSLY DRIVEN WITH EQUAL FORCE USING A MECHANICAL PRESS THE FULL LENGTH OF THE DECK.

ENSURING ALL HEADS ARE FLUSH WITH THE SURFACE OF THE TIMBER PLANK. MULTIPLE IMPACT TOOLS ARE NOT TO BE USED TO SET DOWELS BECAUSE OF POTENTIAL FOR WOOD FIBER RUPTURE.

SUBMIT SHOP DRAWINGS FOR BRIDGE DECK AND RAILINGS.

DECK PANELS WILL BE DELIVERED TO JOBSITE AFTER BEING FULLY ASSEMBLED TO FABRICATION PLANT.

ALL HARDWARE TO MEET ASTM A307-97 GALVANIZED TO A153. ALL HIGH STRENGTH HARDWARE TO MEET ASTM A325 OR A449 GALVANIZED TO A153.

CONSTRUCTION NOTES:

TIMBER DECK PANELS ARE MARKED IN THE SHOP FOR USE IN FIELD PLACEMENT OF THE PANELS ON THE CAPS, e.g. A1, B1, C1, ETC.

DOWEL LAMINATED DECK:

PANEL "A" IS PLACED FIRST IN IT'S FINAL POSITION ON THE CAPS. NEXT DRILL THE 11/16" DIA. HOLES THRU PANEL INTO CAP IN EACH END OF PANEL AT THE LOCATION SHOWN AND FASTEN THE 3/4" DIA. DM. HD. DR.

SPKS. NEXT PLACE PANEL "B" SO THAT ITS UPPER SPLICE BLOCK IS DIRECTLY OVER THE LOWER SPLICE BLOCK ON PANEL "A" AND DRAW TIGHT TOGETHER. THEN DRILL THE 9/16" DIA. HOLES THRU LOWER SPLICE BLOCK AND DRIVE THE 5/8" DM. HD. DR. SPIKES IN LOCATION SHOWN. THEN DRILL HOLES THRU PANEL INTO CAP AND FASTEN THE 3/4" DM. HD. DR. SPKS. THEREAFTER, SUCCESSIVELY PLACE PANELS "C", "D", "E", AND "F" IN THE SAME MANNER, ENSURING ALL PANELS ARE DRAWN TIGHT TOGETHER BEFORE AND FASTENING OCCURS.

STEEL BANDING ON PANELS IS TO BE REMOVED AFTER PANELS HAVE BEEN PLACED IN THEIR FINAL POSITION ON THE CAPS.

ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE USED ARE TO BE 1/16" SMALL THAN THE SPIKE SIZE.

ALL HOLES DRILLED FOR BOLTS ARE TO BE 1/16" LARGER THAN BOLT SIZE.

HOLES DRILLED FOR 3/4" LAG BOLTS ARE TO BE 9/16" IN DIAMETER FOR THE THREADED PORTION OF THE BOLT AND 13/16" FOR THE SHANK.

ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH TIMBER TO HAVE ON PLATE WASHER BETWEEN NUT & TIMBER, OR BOLT HEAD & TIMBER.

ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH STEEL TO HAVE ONE CUT WASHER BETWEEN NUT & STEEL, OR BOLT HEAD & STEEL.

SET THREADS ON ALL BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.

ABUTMENTS TO BE BACKFILLED WITH CLEAN GRANULAR FILL PER PLAN.

ALL TIMBER CUT OR DRILLED IN THE FIELD SHALL BE TREATED WITH COPPER NAPHTHENATE.

CONSTRUCTION REQUIREMENTS SHALL CONFORM TO STATE SPECIFICATIONS UNLESS OTHERWISE NOTED.

ALTHOUGH ALL PRACTICAL PRE-FRAMING WILL BE DONE PRIOR TO TREATING, SOME CUTTING & DRILLING WILL BE REQUIRED IN THE FIELD.

PREBORING55105 LNFT 440

UNDERDRAIN SYSTEM, 6 INCH60501 LNFT 80

SALVAGED RIPRAP25104 CUYD 42

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

TEMPORARY TRAFFIC

CONTROL PLAN

G.JUNTTILA

J.ALLEN

S. WRIGHT

U28-00286

MOUNTED

ON BARRICADE

DETOUR NOTES:

THE DETOUR ROUTE IS 17.2 MILES LONG AND TAKES

APPROXIMATELY 30 MINUTES.

W20-3

R11-2

W20-3

W20-3

ALL SIGNS, EXCEPT THOSE MOUNTED ON TYPE III BARRICADES

SHALL BE MOUNTED ON DRIVEN POSTS AT A 7 FOOT BOTTOM

HEIGHT.

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.233

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

TYPICAL SECTIONS

G.JUNTTILA

J.ALLEN

S. WRIGHT

U28-00286

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

PLAN & PROFILE

G.JUNTTILA

J.ALLEN

S. WRIGHT

LEGEND

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

PLAN OF STRUCTURE

G.JUNTTILA

J.ALLEN

S. WRIGHT

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

ABUTMENT

PLAN & ELEVATION

G.JUNTTILA

J.ALLEN

S. WRIGHT

U28-00286

GENERAL NOTES:

SEE SHEET C-01 FOR A LIST OF ALL MATERIAL GRADES.

ALL TIMBER (EXCEPT PILES) AND HARDWARE IS TO BE PAID FOR AS:

TREATED STRUCTURAL TIMBER, SUPERSTRUCTURE AND SUBSTRUCTURE

GEOTEXTILE FABRIC TO BE STAPLED TO BACKSIDE OF ABUTMENTS AND WINGS.

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

STRUCTURE

DETAILS

G.JUNTTILA

J.ALLEN

S. WRIGHT

U28-00286

NOTES:

ALL HARDWARE PENETRATING THE TOP OR BOTTOM EDGE OF THE DECK PLANK SHALL PASS THROUGH THE CENTER OF THAT DIMENSION.

FIELD DRILLED HOLES IN THE LOWER SPLICE BLOCK OF EACH PANEL ARE TO BE DRILLED COMPLETELY THROUGH THE BLOCK TO PREVENT SPLITTING

WHEN INSTALLING THE 5/8" DRIVE SPIKES.

THE CONTRACTOR SHALL INSTALL NELSON 8" COMPOSITE SHIMS OR EQUAL (SUPPLIED BY BRIDGE MANUFACTURER) IN ALL LOCATIONS WHERE THE TOP OF THE SPREADER BEAM DOES NOT CONTACT THE BOTTOM OF THE DECK USING MULTIPLE SHIMS AS REQUIRED TO SHIM ENTIRE BOARD WIDTH.

ONCE INSERTED, INSTALL A #8 x 1-1/2" LONG COATED DECK SCREW BEHIND EACH SHIM TO HOLD TIGHT IN PLACE. THE CONTRACTOR SHALL RE-TIGHTEN ALL NUTS ON THE LAST DAY OF CONSTRUCTION IN THE PRESENCE OF THE CONTRACTING OFFICER TO ENSURE ALL NUTS ARE PROPERLY

TIGHTENED. SET THREADS ON ALL BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.

HIGH STRENGTH (A449) DOME HEAD BOLTS DO NOT HAVE FINS UNDER THE HEAD AT THE SHANK.

FASTEN 3"x4" PAVING STRIP, S4S, TO DECK W/ (2) 60d NAILS @ 18" CENTERS. PRE-DRILL HOLES TO AVOID SPLITTING. PAVING STRIPS ARE NOT

APPLICABLE FOR BID ALTERNATIVE.

ALL TIMBER AND HARDWARE SHOWN SHALL BE PAID FOR AS: TREATED STRUCTURAL TIMBER, SUPERSTRUCTURE AND SUBSTRUCTURE.

CONTRACTOR SHOULD BE AWARE OF THE POTENTIAL TO HIT THE R.S. NAILS IN THE PREFABRICATED DECK PANELS WHEN INSTALLING THE CURB BOLTS FOR THE CURB & SCUPPER ATTACHMENT. A 3/4" HOLE SAW IS RECOMMENDED IN DRILLING THROUGH THE R.S. NAILS FOR THIS ATTACHMENT.

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

EASTERN REGION

FR 3470-5.223

OVER

S BR PAINT RIVER

OTTAWA

NATIONAL FOREST

IRON RIVER

RANGER DISTRICT

SOIL BORINGS

G.JUNTTILA

J.ALLEN

S. WRIGHT

2021-01-27T11:11:04-0600
BRYAN HEWITT
2021-01-28T16:01:31-0600
ANTHONY HOLLAND
2021-01-28T18:25:09-0600
DARLA LENZ
Regional Bridge Program Manager
2021-02-02T13:15:10-0600
Jeffrey W. Dulka
I am approving this document
2021-02-04T16:23:43-0600
JOSIAH KIM