ADVANCE NOTICE Solicitation: FQ19267/NAC Project Description: Rail Heavy Repair & Overhaul Facility and New Carrollton West Yard Facilities

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T:\FO5131\PDEC\BRANCH\ON-CALL TOS\MCAP\PROJECTS\FQ201000_HEAVY REPAIR AND OVERHAUL\ADVANCE NOTICE\FQ19267_ADVANCE NOTICE 060719

FINAL.DOCX

ADVANCE NOTICE

Solicitation: FQ19267/NAC

Project Description: Rail Heavy Repair & Overhaul Facility and New Carrollton

West Yard Facilities

Description of Work

The Washington Metropolitan Area Transit Authority (WMATA) is seeking the services of a Design Builder to complete the design, construction, testing, and commissioning of the following:

1) A heavy repair and overhaul (HRO) facility for Metrorail vehicles and a Car Track Equipment Maintenance facility supporting non-revenue rail vehicles.

2) New Carrollton West Yard Facilities (WYF)

HRO- Includes operational, administrative, ancillary spaces, and service bays to accommodate about 40 rail cars; a rail car truck shop, rail car storage tracks to accommodate up to 24 rail cars, a traction power substation, a diesel rail vehicle fueling facility, a yard operations control tower, loading docks for heavy trucks, an employee parking garage. The project will include a new rail connection from the project site to the Outbound Metrorail Orange Line between the Landover and New Carrollton Metrorail Stations.

WYF- Includes up to seven new storage tracks; a three-story operations building; a new yard control tower and pedestrian bridge linking to the operation building.

A Progressive Design Build procurement approach will be used to select a Contractor to deliver the Project with an expected completion date of December 2023. The estimated cost range is about $300 - $400 million. A Disadvantage Business Enterprise (DBE) participation percentage goal has yet to be established for this project.

The RFQ documents (ie. RFQ FQ19267/NAC) are expected to be available early July 2019 on Fedbizopps and on the WMATA Internet website at https://www.wmata.com/business/procurement_and_contracting

All questions shall be directed to the Contract Administrator, Mr. Nichel Crooks ncrooks@wmata.com or at (202) 962-1440.