Fowlerville Community Schools Full Pole Barn RFP.pdf

PDF 422 KB Posted

Attached to
Cold Storage Pole Barn
Solicitation number
RFP-FVPS-250000001306-1
Issued by
Kent County, Michigan

About this file

This is a Request for Proposals (RFP) issued by Fowlerville Community Schools in Michigan for the complete build, installation, and furnishing of one cold storage agricultural pole barn. The project includes construction of a 30' x 40' pole barn with 14' walls and a 10' x 40' lean-to section, site preparation with concrete slabs, preparation for electrical power, installation of multiple doors (including two 10' x 12' roll-up doors, two 36" x 84" service doors, and one 8' x 10' roll-up door), and four 36" x 50" single hung windows. Proposals are due February 24, 2025 at 2:00 PM, with an optional project walk-through scheduled for February 18, 2025 at 10:00 AM. The project must be completed by May 30, 2025 and invoiced by June 20, 2025.

The contractor must provide a minimum 3-year warranty on all design, materials, and workmanship, comply with Michigan Prevailing Wage laws, and is responsible for all permits, drawings, and inspections. A 5% bid bond is required, along with performance and payment bonds in accordance with state law. The contractor must provide insurance certificates for general and professional liability. The district will evaluate proposals based on cost, adherence to specifications, relevant experience (especially in K-12 settings), qualifications, timeliness, responsiveness, and team compatibility. The project timeline indicates bid review and contract award will occur between February 24-27, 2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fowlerville Community Schools REQUEST FOR PROPOSALS FOR: Complete Build, Install, and Furnishing of 1 Cold Storage Pole Barn

PROPOSALS DUE:

Monday, February 24, 2025 at 2:00 PM Fowlerville Community Schools Central Office

7677 Sharpe Rd. Ste A Fowlerville, MI 48836

PROJECT WALK-THROUGH (OPTIONAL):

Tuesday, February 18, 2025 AT 10:00 AM Fowlerville Community Schools Central Office

7677 Sharpe Rd. Ste A Fowlerville, MI 48836

CONTACT INFORMATION:

Superintendent Matthew Stuard

Email: stuardm@fowlervilleschools.org Phone: 517-223-6000 7677 Sharpe Rd. Ste A Fowlerville, MI 48836

Maintenance Director Martin Sabo

Email: SaboN@FowlervilleSchools.org Phone: 810-623-8645 7677 Sharpe Rd. Ste A

NO ORAL, TELEPHONIC, TELEGRAPHIC OR FACSIMILE PROPOSALS WILL BE ACCEPTED.

NO PROPOSALS WILL BE ACCEPTED AFTER 2:00 PM ON 2/24/2025.

NOTICE IS HEREBY GIVEN THAT THE BOARD OF EDUCATION OF FOWLERVILLE COMMUNITY SCHOOLS WILL RECEIVE SEALED BID PROPOSALS UNTIL 2/24/2025 at 2:00 PM AT THE CENTRAL OFFICE OF FOWLERVILLE COMMUNITY

SCHOOLS. THE BOARD, OR ITS DESIGNEE, WILL OPEN AND READ EACH RECEIVED BID AT A COMMUNITY MEETING

AT 2:30 PM ON MONDAY, FEBRUARY 24, 2025.

Location for bid opening:

Fowlerville High School – Lab A

735 N. Grand

PROJECT SCOPE:

The proposal is for the complete build, installation, and furnishing of 1 cold storage Agricultural pole barn. The work will include the following:

1. Construction of a 30' x 40' pole barn with 14' walls and a 10' x 40' lean-to section.

2. Site preparation including a 6" concrete slab and underlayment the the structure and a 4” slab underneath the lean to.

3. Preparation for electrical power for lighting, receptacles (not installation of electrical)

4. Door sizes:

○ 2 - 10’ x 12’ Roll-up Doors (on opposing gable ends); manual and power options.

○ 2 - 36” x 84”' Service Doors (on gable ends; installed to the right of roll up doors)

○ 8' x 10' Roll-up Door (centered on the side which opens to the additional 10' x 40' lean-to section); manual and power options.

5. Window sizes:

○ 4 - 36” x 50” Single Hung Windows (2 per side; spaced symmetrically)

6. The building’s exterior aesthetic should complement the surrounding school campus structures.

7. Michigan Prevailing Wage laws must be adhered to.

8. The contractor is responsible for permits, drawings, and inspections.

9. Project must be completed by Friday, May 30, 2025.

10. Project must be invoiced by June 20, 2025.

INSTRUCTIONS AND REQUIREMENTS:

A. Proposal Submission

● Submit two (2) copies of the complete proposal to:

Mr. Matthew Stuard, Superintendent Fowlerville Community Schools 7677 W. Sharpe Road, Ste A Fowlerville, MI 48836

● The lower left corner of the envelope should be marked:

PROPOSAL FOR “Complete Build, Install, and Furnishing of 1 Cold Storage Pole Barn”

● Proposals must be received no later than 2:00 PM on February 24, 2025.

● Proposals will be reviewed based on the lowest responsible bidder and may be accepted in whole or in part.

B. Late Proposals

Any proposal received after the specified time will not be considered.

C. Proposal Withdrawal

Proposals may be withdrawn with written notice prior to the deadline or in person by the firm's representative.

D. Questions

All inquiries must be made no later than 3 business days prior to the submission deadline to:

Martin Sabo Phone: (810) 623-8645, Email: SaboM@FowlervilleSchools.org

E. Proposal Review & Evaluation Criteria

The District will evaluate proposals based on:

● Cost: Total cost and breakdown of services.

● Adherence to specifications: Conformance to content and presentation.

● Relevant experience: Previous experience with similar projects, especially in K-12 settings.

● Qualifications: Qualifications and experience of the assigned team.

● Timeliness: Ability to complete the work on time.

● Responsiveness: Ability to meet quickly with District officials as needed.

● Team compatibility: Ability to work collaboratively with the District’s team.

F. Proposal Selection

The District reserves the right to reject any or all proposals. Selection will be based on cost, experience, and project approach.

INSURANCE AND BONDS REQUIREMENTS:

● Insurance: The selected contractor must provide insurance certificates for general and professional liability.

● Bid Bond: A 5% deposit is required for bid bonding.

● Performance and Payment Bonds: Required in accordance with state law.

WARRANTY:

The contractor must provide a minimum 3-year warranty on all design, materials, and workmanship from the date of final acceptance by the District.

PROJECT TIMELINE:

● Bid Period: 2/9/2025 to 2/24/2025

● Review and Award Contract: 2/24/2025 to 2/27/2025

● Project Start: TBD

● Project Completion: 6/20/2025

By submitting a proposal, the contractor agrees to comply with all specifications and requirements set forth in this Request for Proposal.

Complete build, install and furnishing of 1 cold storage pole barn - PART 3 – PROPOSAL DETAILS

I. CONTRACTOR INFORMATION

The following information will be considered by the District for the purpose of determining the

Contractor's "responsibility" and present capability to perform the work. The District's determination is not limited to the information below or any other information required by this

RFP.

Name of Firm: __________________________________________________

Year Established ________________________________________________

Address: _______________________________________________________

Telephone Number: ______________________________________________

Facsimile Number: _______________________________________________

Contact Person Email Address: _____________________________________

A. Business Organization

1. Individual _____ Partnership ______ Corporation _____ Other _____

2. Identify the number of years the firm has provided the type of improvements required herein, and provide a brief history of the firm's experience with the required work.

3. List the firm's officers and the staff that will be dedicated to this project.

4. Provide the hourly rate for firm personnel in the event they provide Additional Services (i.e., services beyond the originally agreed scope of the project).

5. List any subcontractors or sub-consultants you propose using to provide services.

Firm Name City/State Specialty # of years

1. ________________________________________________________________________

2. ________________________________________________________________________

3. ________________________________________________________________________

4. ________________________________________________________________________

6. What is your firm's present workload? Provide a list of all scheduled and unscheduled construction projects currently being handled by your firm, including an indication of approximate cost and percentage of completion for each project.

7. What is your General Liability Insurance coverage:

i. Total amount of protection provided.

ii. Amount of deductible, if any.

iii. Name, address, phone # and contact the person of the Insurance Company.

8. What is your Professional Liability coverage, if any:

i. Total amount of protection provided.

ii. Amount of deductible, if any.

iii. Name, address, phone # and contact the person of the Insurance Company.

9. Within the last 5 years have you had litigation, arbitration or a claim filed against or settled with your company by a client (in the educational market or otherwise) or have you filed the same against any other client? If yes, explain each in detail.

10. Has your firm ever been terminated, for cause or for convenience, prior to completion of a project or has your firm ever terminated a contract, for cause or for convenience, prior to completion of a project? If yes, please explain.

B. Approach to Services

1. Describe how your firm stays up-to-date on construction code and regulatory requirements applicable to your work. ______________________________________________________

2. Some of the construction work may occur while school is in session. Describe how your firm will minimize any interruptions to our day-to-day operations.

3. Some of the construction work may occur while school is in session. Describe how your firm will minimize any interruptions to our day-to-day operations.

4. Discuss the method of on-site observation and project management you will use for our Project, and how you will ensure a prompt response should the same be required.

5. Add any additional information about your design and/or construction approach that you will use for this Project that you believe to be exceptional.

II. PROJECT DESCRIPTION

A. Project Outline

Fowlerville Community Schools is seeking proposals for the site preparation, furnishing, and installation of one (1) cold storage agricultural pole barn on the existing property at Fowlerville High School Campus.

The scope of work for this project includes the following key components:

1. Construction of a 30' x 40' pole barn with 14' walls and a 10' x 40' lean-to section.

2. Site preparation including a 6" concrete slab and underlayment the the structure and a 4” slab underneath the lean to.

3. Preparation for electrical power for lighting, receptacles (not installation of electrical)

4. Door sizes:

○ 2 - 10’ x 12’ Roll-up Doors (on opposing gable ends); manual and power options.

○ 2 - 36” x 84”' Service Doors (on gable ends; installed to the right of roll up doors)

○ 8' x 10' Roll-up Door (centered on the side which opens to the additional 10' x 40' lean-to section); manual and power options.

5. Window sizes:

○ 4 - 36” x 50” Single Hung Windows (2 per side; spaced symmetrically)

6. Building Design:

○ Color Scheme: The building’s exterior colors must harmonize with the surrounding structures on the Fowlerville High School campus, ensuring aesthetic consistency with the school’s architecture.

7. Permits, Drawings, and Inspections: The contractor is responsible for acquiring all necessary permits, preparing the required architectural and engineering drawings, and ensuring compliance with all applicable inspections, including those required by the State of Michigan

8. Project must be completed by Friday, May 30, 2025.

9. Project must be invoiced by June 20, 2025.

B. Warranty

The selected contractor will be required to provide a minimum three-year (3) warranty covering all design, materials, and workmanship. The warranty period will begin from the date of final acceptance of the project by the District. Additionally, the contractor must provide an itemized statement of warranties for all specific products included in the proposal, with all warranties documented in writing and submitted to the District.

C. Contract Terms

The District will enter into a single (1) contract with the selected contractor. The District will not issue separate contracts with any trade contractors or sub-consultants for the work, as all services and deliverables will be managed under the main contract.

D. Permits and Inspections

The contractor acknowledges that obtaining all required permits for the project, including those necessary from the State of Michigan, is their responsibility. Unless the District specifically provides otherwise in accordance with 1937 PA 306, a state inspector will be required to oversee the services performed as part of the project.

REQUEST FOR PROPOSAL FOR Complete build, install and furnishing of 1 cold storage pole barns PART 4 –

PROPOSAL SUMMARY

This proposal has been prepared to provide the District with all the information requested in the RFP.

The undersigned certifies that the RFP has been carefully examined and that the proposal contained herein meets or exceeds the scope of services as outlined herein and that any items that have been deleted from and/or added to the requested scope of services (including, but not limited to, the proposed contract language) are clearly noted as follows:

Signed this ____ day of ______________, 202____.

Firm Name: __________________________________________________________________

Address: __________________________________________________________________

Phone Number: __________________________ Fax Number: ________________________

If a corporation, indicated State of incorporation and affix seal.

Attest: ___________________________________________________________________

By: __________________________________________________________

ATTACHMENT “A”

[Familial Disclosure Statement]

AFFIDAVIT OF STATE OF MICHIGAN, COUNTY OF Fowlerville by __________________________ (insert name of affiant)

___________________________________ makes this Affidavit under oath and states as follows:

(insert name of affiant)

1. I am a/the:

President / Vice-President / Chief Executive Officer / Member / Partner / Owner / Other (please specify)

________________________ of [insert name of contractor], a bidder for Fowlerville Community Schools.

2. I have personal knowledge and/or I have personally verified that the following are all of the familial relationships existing between the owner(s) and the employee(s) of the aforementioned contractor and the school district's superintendent and/or board members: ______

3. I have authority to bind the aforementioned contractor with the representations contained herein, and I am fully aware that the school district will rely on my representations in evaluating bids for the required services.

4. I declare the above information to be true to the best of my knowledge, information and belief. I could completely and accurately testify regarding the information contained in this affidavit if requested to do so.

_________________________________________ Dated: ________________ (signature of affiant)

Subscribed and sworn before me in _________________ County, Michigan, on the ___ day of

_________________, 202____ ____________________________________________(signature) _____________________________________________ (printed) Notary public, State of Michigan, County of ________________ My Commission expires on _____________________________ Acting in the County of ________________________________

ATTACHMENT “B”

[Iran Economic Sanctions Act Certification]

I am the _______________ of ____________________________, or I am bidding in my Title Bidder individual capacity ("Bidder"), with authority to submit a binding bid for the Complete build, install and furnishing of 1 cold storage pole barns for Fowlerville Community Schools. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the school district will rely on my representations in evaluating bids.

I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.

(signature)

(printed)

(date)

Attachment “C”

BID SHEET

Complete build, install and furnishing of 1 cold storage pole barns work to start ________(enter date)

Total cost for all work, warranties and materials $__________________

Please list any conditions not met as described:

Please list any Voluntary Alternates and details below:

Fowlerville Community Schools
PROPOSALS DUE:
PROJECT WALK-THROUGH (OPTIONAL):
CONTACT INFORMATION:
NO ORAL, TELEPHONIC, TELEGRAPHIC OR FACSIMILE PROPOSALS WILL BE ACCEPTED.
NO PROPOSALS WILL BE ACCEPTED AFTER 2:00 PM ON 2/24/2025.
PROJECT SCOPE:
INSTRUCTIONS AND REQUIREMENTS:
A. Proposal Submission
B. Late Proposals
C. Proposal Withdrawal
D. Questions
E. Proposal Review & Evaluation Criteria
F. Proposal Selection
INSURANCE AND BONDS REQUIREMENTS:
WARRANTY:
PROJECT TIMELINE:
A. Project Outline
B. Warranty
C. Contract Terms
D. Permits and Inspections

File details come from the government source that posted it. Updated .