UF-109
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | UF-109 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7.1 | Transport Vessels | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16.1 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental/Hazwaste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22 | Develop & Maintain Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.1 | Personnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedures | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib and Base Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting and Aligning Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull & Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull & Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas Free, Close all tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Tank/ Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Identify Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Tank/ Void Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Access Cover Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Tank Close-out Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Main Deck Non-skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Visual Inspection for Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Main Deck UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| Total Price: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor, G&A and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.