Maintenance, Repair and Preservation of YC-1633
Solicitation number
N4523A20R1081
Issued by

About this file

This solicitation seeks a firm-fixed-price contract for maintenance, repair, and preservation of an open lighter barge, YC-1633, for the Department of the Navy. Work includes removing zinc anodes and blasting and preserving exterior surfaces, conducting visual and ultrasonic inspections of the hull and structures, opening and cleaning tanks for gas-freeing and air testing, and repairs to fenders, hatches, and non-skid surfaces. The expected period of performance is September 23, 2020 to December 8, 2020 at the contractor's facility. This is a total small business set-aside under NAICS code 336611 with a size standard of 1,250 employees, requiring HUBZone certification to propose. Proposals are due by September 2020 and award will be made to the lowest priced technically acceptable offer in accordance with FAR 15.101-2.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YC-1633

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC-1633DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirerments$0.00$0.00$0.00$0.00$0.00
1.16.1Maintain Preservation OQE Records$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste Managemment$0.00$0.00$0.00$0.00$0.00
1.21Gas Free$0.00$0.00$0.00$0.00$0.00
1.22Develop and Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking & Undocking$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning of Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.10Shift the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.12Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard UT Inspection$0.00$0.00$0.00$0.00$0.00
3.3.1Tow Padeye Repairs$0.00$0.00$0.00$0.00$0.00
3.3.2Rubber Fender Bracket Repairs$0.00$0.00$0.00$0.00$0.00
3.3.3Longitudinal Framing Repairs$0.00$0.00$0.00$0.00$0.00
3.3.4Zinc Stud Repair$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean Tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank touch Up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Repairs$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch Repairs$0.00$0.00$0.00$0.00$0.00
3.4.8Tow Bridle Box Preservation$0.00$0.00$0.00$0.00$0.00
3.4.9Final Air test$0.00$0.00$0.00$0.00$0.00
3.4.10Tank Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non Skid Repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural defects$0.00$0.00$0.00$0.00$0.00
3.5.3Ultrasonic Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:
Total Bid:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor, G&A and Profit rates used to calculate the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

File details come from the government source that posted it. Updated .