Form D Rate Schedule.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Water Quality Treatment to Combat Harmful Algal Blooms in Lake Okeechobee
Solicitation number
ITN-08442
Issued by
Martin County, Florida

About this file

This document is a Request for Proposal (RFP) from the Florida Department of Environmental Protection for Water Quality Treatment Services to Combat Harmful Algal Blooms in Lake Okeechobee. The services requested include developing a Nutrient Extraction Plan, conducting public outreach, creating a Quality Assurance Project Plan, obtaining treatment permits, staging, Total Phosphorous and Nitrogen Removal, demobilization, and providing a Post-Treatment Assessment Report. The initial contract term is 3 years with an optional 3-year renewal. Responses are due by a specified date, and modifications and addenda have been issued.

The pricing is provided in a rate schedule with fixed costs per unit of phosphorus and nitrogen removed, as well as fixed payments for certain deliverables. The rates include 3% annual inflation. There are no set-asides, and the current incumbent is not specified. Funding requirements and sources are not detailed in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

FORM D
RATE SCHEDULE
Instructions
The Rate Schedule's orange cells will be populated with the Respondent's total cost or fixed rate to provide the deliverable as described in Section 4 , Scope of Work. Any changes, alterations, additions, etc. to this Rate Schedule layout or calculations may result in the Respondent being deemed Non-Responsive by the Department. Respondent must not modify formulas within the Rate Schedule.
The awarded Contractor(s) shall charge these rates herein for completion of the work outlined in the Scope of Work. The following assumptions shall be used in applying the rates:
• Respondents shall use these rates to calculate their pricing for the tasks and deliverables in Section 4, Scope of Work.
• Prices shall be in U.S. dollars.
• 3% inflation per year is used in the rate schedule for pricing purposes and an actual inflation rate may be negotiated later.
1)Enter a numeric Rate for each Deliverable for each year of the initial contract term and each year of the renewal contract term.
2)Review Data entries for accuracy.

3) DO NOT ADJUST FORM D

4) Ensure the Rate Schedule is signed by an authorized Representative.

ITN 2024016 LAKE OKEECHOBEE

State of Florida Department of Environmental Protection

RATE SCHEDULE

FORM D

Attention! Do not change any forumlas within the Rate Schedule. Any changes, alterations, additions, etc. to this Rate Schedule layout or calculations may result in the Respondent being deemed Non-Responsive by the Department.

The Contractor's rates are all‐inclusive and in accordance with the Scope of Work INITIAL CONTRACT TERM - NOT TO EXCEED RATES OPTIONAL RENEWAL CONTRACT TERM - NOT TO EXCEED RATES****

SERVICEUnit RateInitial Contract Term Year 1Initial Contract Term Year 2Initial Contract Term Year 3SERVICEUnit RateRenewal Contract Term Year 4Renewal Contract Term Year 5Renewal Contract Term Year 6
DELIVERABLE 1Nutrient Extraction Plan (NEP) for Lake Okeechobee to Combat Algal BloomsDELIVERABLE 6 (RENEWAL)Total Phosphorous RemovalFixed Rate Cost Per 1 kg (2.204 lbs.)$ - 0
Task 1a. Draft Nutrient Extraction PlanOne Time Fixed PaymentDEP's Total Phosphorus Quarterly Extraction Target: 3 kg (6.61 lbs.)Fixed Rate X 3 Kg$0.00with 3% inflationwith 3% inflation
Task 1b. Nutrient Extraction PlanTask 6. TP Removal Q1Quarter one$0.00$0.00$0.00
Task 1. Not To Exceed Total$ - 0Task 6. TP Removal Q2Quarter two$0.00$0.00$0.00
Task 6. TP Removal Q3Quarter three$0.00$0.00$0.00
DELIVERABLE 2Public Outreach and Communication.Task 6. TP Removal Q4Quarter four$0.00$0.00$0.00
Task 2a. Virtual Public Outreach Meeting and MaterialsOne Fixed PaymentTask 6 Annual$0.00$0.00$0.00
Task 2b. Final Virtual Public Outreach Meeting and MaterialsTask 2. Not To Exceed Total$ - 0Task 6.RENEWAL Term Not To Exceed Total$0.00
DELIVERABLE 3Quality Assurance Project Plan (QAPP)
Task 3a. Draft QAPPOne Fixed PaymentDELIVERABLE 7 (RENEWAL)Total Nitrogen RemovalFixed Rate Cost Per 1 kg (2.204 lbs.)$ - 0
Task 3b. Final QAPPTask 3. Not To Exceed Total$ - 0DEP's Total Nitrogen Quarterly Extraction Target: 12 kg (26.455 lbs.)Fixed Rate X 12 Kg$0.00with 3% inflationwith 3% inflation
Task 7. TN Removal Q1Quarter one$0.00$0.00$0.00
DELIVERABLE 4Treatment Permits; Apply and ObtainTask 7. TN Removal Q2Quarter two$0.00$0.00$0.00
Task 4a. Treatment Permit ApplicationOne Fixed Payment$ - 0Task 7. TN Removal Q3Quarter three$0.00$0.00$0.00
Task 4b. Treatment Permit, Confirm IssuanceOne Fixed Payment$ - 0Task 7. TN Removal Q4Quarter four$0.00$0.00$0.00
Task 4. Not To Exceed Total$0.00Task 7 Annual$0.00$0.00$0.00
Task 7. RENEWAL Term Not To Exceed Total$0.00
DELIVERABLE 5Staging
Task 5. Staging*One Fixed Payment*$ - 0
DELIVERABLE 8 (RENEWAL)Deliverable 8. Demobilization**One Fixed Payment**$ - 0
DELIVERABLE 6Total Phosphorous RemovalFixed Rate Cost Per 1 kg (2.204 lbs.)$ - 0
DEP's Total Phosphorus Quarterly Extraction Target: 3 kg (6.61 lbs.)Fixed Rate X 3 Kg$0.00with 3% inflationwith 3% inflationDELIVERABLE 9 (RENEWAL)Post-Treatment Assessment Report (PTAR)
Deliverable 6. TP Removal Q1Quarter one$0.00$0.00$0.00Task 9b. Post-Treatment Assessment Report (PTAR)***One Fixed Payment***$ - 0
Deliverable 6. TP Removal Q2Quarter two$0.00$0.00$0.00
Deliverable 6. TP Removal Q3Quarter three$0.00$0.00$0.00OPTIONAL RENEWAL 3 Year Contract Term Not To Exceed Total$0.00
Deliverable 6. TP Removal Q4Quarter four$0.00$0.00$0.00
Task 6 Annual$0.00$0.00$0.00
Task 6.Initial Contract Term Not To Exceed Total$0.00
DELIVERABLE 7Total Nitrogen RemovalFixed Rate Cost Per 1 kg (2.204 lbs.)$ - 0
DEP's Total Nitrogen Quarterly Extraction Target: 12 kg (26.455 lbs.)Fixed Rate X 12 Kg$ - 0with 3% inflationwith 3% inflation
Deliverable 7. TN Removal Q1Quarter one$0.00$0.00$0.00
Deliverable 7. TN Removal Q2Quarter two$0.00$0.00$0.00
Deliverable 7. TN Removal Q3Quarter three$0.00$0.00$0.00
Deliverable 7. TN Removal Q4Quarter four$0.00$0.00$0.00
Task 7 Annual$0.00$0.00$0.00
Task 7. Initial Contract Term Not To Exceed Total$0.00

DELIVERABLE 8 Deliverable 8. Demobilization** One Fixed Payment** $ - 0

DELIVERABLE 9Post-Treatment Assessment Report (PTAR)
Deliverable 9b. Post-Treatment Assessment Report (PTAR)***One Fixed Payment***$ - 0

Initial 3 Year Contract Term Not To Exceed Total $0.00

NOTE: A) Deliverables 1, 2, 3 and 4 are only paid in year 1 of the initial term. B) Deliverables 5, 6 and 7 can only proceed after Deliverables 1-4 have been accepted in writing by DEP.
* Staging, is a fixed cost paid one time in year 1 of the Initial term. No second payment will be made if the optional renewal term is used.
** Demobilization is a fixed cost paid one time year 3 or if the optional renewal term is used the payment will be in year six (6) only.

Name of Respondent/Company

Printed/Typed Name of Authorized Signatory and Title

Signature Date

Footnotes, notations, and exceptions made to this form will not be considered.

*** Post-Treatment Assessment Report (PTAR) will be provided during the Initial Term and is a fixed cost paid one time in year three (3). If the optional renewal term is used, a second PTAR will be required with the second a fixed cost payment in year six (6).
**** RENEWAL CONTRACT TERM, will only include Deliverables 6 -9.

RFP 2024013

Water Quality Treatment Services to Combat HAB within Lake Okeechobee