FORM C - RFP Price Form v2.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
RE-Bid Bird Control Services RFP# 92-19
Solicitation number
BD-19-1206-40000-40000-41130
Issued by
Suffolk County, Massachusetts

About this file

This document is a pricing form (FORM C) for a RE-Bid for Bird Control Services RFP#92-19 issued by the Massachusetts Bay Transportation Authority (MBTA). The RFP seeks to establish a contract for various bird control services and materials, including labor, pigeon deterrents, netting, and energized systems. The estimated quantities for these items are provided, and the contract term is two years with the MBTA reserving the right to adjust quantities as needed. Responses must be submitted through the COMMBUYS procurement portal.

The pricing form lists eight line items with unit costs and extended costs, including a $5,000 allowance for miscellaneous services. The unit costs are firm for the two-year contract period, and the total of the eight line items will be the basis for award. The MBTA notes that the quantities provided are estimates, and the authority reserves the right to increase or decrease the quantities as necessary without changing the unit prices.

View the file

Other files

File Type Posted
Addendum 1~3.pdf PDF
Addendum 2~2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form C

Form C: Requested RFP Pricing Form REVISED
Bird Control Service

Date: 6/18/19

No.Item DescriptionQuantityUnitUnit CostExtended Cost
1Labor Rate Bird Control services Straight Time1350HR$ - 0
2Generic Blunt Stainless Steel Pigeon (4 inch wide) per LF4000LF$ - 0
3Perma Net or Equivalent (color TBD at site by owner)10000SF$ - 0
4Spring Guard 3 Row System4000LF$ - 0
5Gull Guard Energized System Per LF2000LF$ - 0
6Ridge Control 5 Row System Per LF1000LF$ - 0
7VoltTape Energized Per LF2000LF$ - 0
8Misc. ServicesAllowance1$ 5,000.00$ 5,000.00
GRAND TOTAL EXTENDED LUMP SUM (lines 1-8)$ 5,000.00
Notes:
1. Unit costs are firm for two (2) years. Purchase Orders will be issued for each fiscal year. Grand Total Lump sum will be divided for each P.O.
2. Basis of award(s) is total of Items 1 to 8.
3. The quantities set forth herein are merely estimates of what may be required under the contract, and the MBTA reserves the right to increase or diminish the quantities in any of the items as he/she may deem necessary, without change of price per unit.
4. Bird Netting must be available within 1 week to install.

Sheet1

File details come from the government source that posted it. Updated .