Form 66 CDRL.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
B901 Chiller Repair GAFB
Solicitation number
FA303024Q0046
Issued by

About this file

This document is a Schedule of Material Submittals for a federal contract opportunity related to repairing a 50-ton air-cooled chiller at Goodfellow Air Force Base. The solicitation number is FA303024Q0046, and the contract is for 90 days after date of award. The repair work includes replacing various components of the chiller, such as condenser coils, fan motors, and refrigerant. The contractor must also reprogram and fully operationalize the unit upon completion of the repairs. This is a firm-fixed-price contract, and the magnitude is between $25,000 and $100,000. A site visit is scheduled for August 12, 2024, and questions are due by August 15, 2024. This requirement was previously solicited and subsequently cancelled due to a change in scope.

View the file

Other files

File Type Posted
Solicitation - FA303024Q0046.pdf PDF
Statement of Work Updated.pdf PDF
(CUI) BAL B901 Chiller.pdf PDF
Images and Equipment.pdf PDF
Wage Determination.pdf PDF
Contractor Guide 2021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSCAPITAL PROJECT:PROJECT TITLE: B901 50 tn air-cooled chiller repairsSOLICITATION/CONTRACT NO.:
TO BE COMPLETED BY THE PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.)CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYOPERATING INSTRUCTIONSSEE PARA ON COPIESOTHERS AS SPECIFIEDREQUIRED SUBMISSION DATEDATE RECEIVED IN CON-TRACTINGDATE TO CIVIL ENGINEER-INGRETURN SUSPENSE DATEFOLLOW UPDATE CONTRACTOR NOTIFIEDCONTRACT-TOR RE-SUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
2Part 1, 1.7.1 Accident Prevention Plan4(e)FIO
3Part 1, 1.9.4 Dumpster Location4(c)GA
4Part 1, 1.12 Warranties4(b)GA
5Part 1, 1.13.1 Parking and Storage Area4(c)GA
6Part 1, 1.14.1.1 Work Clearance Request, AF Form 1034(e)GA
7Part 1, 1.14.2 Planned Outages414 Days Prior (d)GA
8Part 1, 1.15, Disposition of Waste Materials4(b)FIO
9Part 2, 2.2, Environmental Hazardous Waste Record4(a)GA
Part 2, 2.4.1, Certificate certifing no asbestos was used in construction4(b)FIO
8Part 2, 2.5, Hazardous Materials, SDS4(c)GA
9Part 2, 2.8, Air Emissions Report4Monthly (d)FIO
10Part 2, 2.9, Construction Waste Management Form Submittal4(d)GA
11Part 2, 2.11.2.2 Construction Product minimums4(d)GA
Part 3, 3.4, Parts and Materials4(e)GA
12Part 4, 4.3 Daily Reports4(d)GA
AF Form 66
When applicable:
(a) As soon as possible but in no case later than 45 calendar days after NTP
(b) Prior to Final Inspection
(c) Prior to Use.
(d) As Required.
(e) Prior to Start of Construction

PAGE &P OF &N

FORM66.xls