Form 66 CDRL.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- B901 Chiller Repair GAFB
- Solicitation number
- FA303024Q0046
About this file
This document is a Schedule of Material Submittals for a federal contract opportunity related to repairing a 50-ton air-cooled chiller at Goodfellow Air Force Base. The solicitation number is FA303024Q0046, and the contract is for 90 days after date of award. The repair work includes replacing various components of the chiller, such as condenser coils, fan motors, and refrigerant. The contractor must also reprogram and fully operationalize the unit upon completion of the repairs. This is a firm-fixed-price contract, and the magnitude is between $25,000 and $100,000. A site visit is scheduled for August 12, 2024, and questions are due by August 15, 2024. This requirement was previously solicited and subsequently cancelled due to a change in scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA303024Q0046.pdf | ||
| Statement of Work Updated.pdf | ||
| (CUI) BAL B901 Chiller.pdf | ||
| Images and Equipment.pdf | ||
| Wage Determination.pdf | ||
| Contractor Guide 2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | CAPITAL PROJECT: | PROJECT TITLE: B901 50 tn air-cooled chiller repairs | SOLICITATION/CONTRACT NO.: | |||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | OPERATING INSTRUCTIONS | SEE PARA ON COPIES | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACT-TOR RE-SUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||
| 2 | Part 1, 1.7.1 Accident Prevention Plan | 4 | (e) | FIO | ||||||||||||||||
| 3 | Part 1, 1.9.4 Dumpster Location | 4 | (c) | GA | ||||||||||||||||
| 4 | Part 1, 1.12 Warranties | 4 | (b) | GA | ||||||||||||||||
| 5 | Part 1, 1.13.1 Parking and Storage Area | 4 | (c) | GA | ||||||||||||||||
| 6 | Part 1, 1.14.1.1 Work Clearance Request, AF Form 103 | 4 | (e) | GA | ||||||||||||||||
| 7 | Part 1, 1.14.2 Planned Outages | 4 | 14 Days Prior (d) | GA | ||||||||||||||||
| 8 | Part 1, 1.15, Disposition of Waste Materials | 4 | (b) | FIO | ||||||||||||||||
| 9 | Part 2, 2.2, Environmental Hazardous Waste Record | 4 | (a) | GA | ||||||||||||||||
| Part 2, 2.4.1, Certificate certifing no asbestos was used in construction | 4 | (b) | FIO | |||||||||||||||||
| 8 | Part 2, 2.5, Hazardous Materials, SDS | 4 | (c) | GA | ||||||||||||||||
| 9 | Part 2, 2.8, Air Emissions Report | 4 | Monthly (d) | FIO | ||||||||||||||||
| 10 | Part 2, 2.9, Construction Waste Management Form Submittal | 4 | (d) | GA | ||||||||||||||||
| 11 | Part 2, 2.11.2.2 Construction Product minimums | 4 | (d) | GA | ||||||||||||||||
| Part 3, 3.4, Parts and Materials | 4 | (e) | GA | |||||||||||||||||
| 12 | Part 4, 4.3 Daily Reports | 4 | (d) | GA |
| AF Form 66 |
| When applicable: |
| (a) As soon as possible but in no case later than 45 calendar days after NTP |
| (b) Prior to Final Inspection |
| (c) Prior to Use. |
| (d) As Required. |
| (e) Prior to Start of Construction |