Forest Park Monument Signs Contract Docs and .pdf
PDF 3 MB Posted
- Attached to
- Forest Park Monument Signs
- Solicitation number
- PE-63170-NONST-2024-000000004
- Issued by
- Clayton County, Georgia
About this file
This document contains the Contract Documents and Technical Specifications for the Forest Park Monument Signs project in Forest Park, Georgia. The work consists of furnishing and installing all materials, labor, tools, equipment, and related services required for a complete project, including the construction of five monument signs at various locations within the city. The project will be funded with local City of Forest Park funds. A pre-bid conference is scheduled for June 13, 2024, and sealed bids will be received until July 11, 2024. The project is to be substantially completed within 150 calendar days and ready for final payment within 180 calendar days after the contract times commence. The total base bid includes a $50,000 contingency allowance for additional work as directed by the owner. Bidders must provide bid security, a contractor's statement of legal status and financial capability, and other required documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
AND
TECHNICAL SPECIFICATIONS
FOREST PARK
MONUMENT SIGNS
PROJECT NO.: 05302024
235 Corporate Center Drive., Suite 200, Stockbridge, GA 30281 / Phone: 770.389.8666
400 Pike Boulevard, Lawrenceville, GA / Phone: 770.338.8181
CITY OF FOREST PARK
I
TABLE OF CONTENTS
CONTRACT DOCUMENTS
AND
TECHNICAL SPECIFICATIONS
PART 1 – BIDDING / AGREEMENTS / BONDS / CONDITIONS
I. INVITATION TO BID
II. INSTRUCTION TO BIDDERS
III. BID FORMS
IV. BID BOND
V. CONTRACTOR FURNISHED DOCUMENTS
VI. CONTRACTOR AFFIDAVIT AND AGREEMENT
VII. FORM OF AGREEMENT
VIII. NOTICE TO PROCEED
II
IX. PERFORMANCE BOND
X. PAYMENT BOND
XI. CERTIFICATE OF CONTRACTOR’S ATTORNEY
XII. CERTIFICATE OF OWNER’S ATTORNEY
XIII. GENERAL CONDITIONS
XIV. SUPPLEMENTARY CONDITIONS
XV. REFERENCE VERIFICATION AND RELEASE FORM
PART II – TECHNICAL SPECIFICATIONS
SECTION 01100 SUMMARY
SECTION 01200 PRICE AND PAYMENT PROCEDURES
SECTION 01300 ADMINISTRATIVE REQUIREMENTS
SECTION 01323 CONSTRUCTION PROGRESS SCHEDULES
SECTION 01330 SUBMITTAL PROCEDURES
SECTION 01400 QUALITY REQUIREMENTS
SECTION 01500 TEMPORARY FACILITIES AND CONTROLS
SECTION 01600 PRODUCT REQUIREMENTS
SECTION 01630 PRODUCT SUBSTITUTION PROCEDURES
SECTION 01700 EXECUTION AND CLOSEOUT PROCEDURES
END
SECTION I
INVITATION TO BID
DATE: MAY 30, 2024
Sealed unit price bids will be received by the City of Forest Park Georgia from prospective contractors for the City’s “Forest Park – Monuments Signs” project. The work consists of furnishing and installing all materials, labor, tools, equipment, and related services required for a complete project. This project includes but is not limited to providing the construction of a complete installation of five (5) “Monument Signs” at locations within the City, work is to include all traffic control, demolition, erosion and sediment control, clearing/trimming, grading, signage, landscaping and all other activities and appurtenances to provide a complete
“Forest Park – Monument Signs” project in Forest Park, Georgia.
The activity is proposed to be funded with local City of Forest Park funds. This project will be permitted by the City of Forest Park and the selected contractor must comply with local and state laws including but not limited to provisions covering construction contracts.
Complete sets of the Contract Documents, Technical Specifications and the Contract Drawings may be obtained from the Issuing Office from the City’s preferred website:
https://www.forestparkga.gov/rfps. Documents are also available at:
https://www.bidnetdirect.com/georgia/cityofforestpark and at the Georgia Procurement
Registry website located at: https://ssl.doas.state.ga.us/PRSapp/PRindex.jsp. Bidders are solely responsible for maintaining a complete set of Contract Documents, Technical
Specifications, Contract Drawings, and project Addenda or Modifications to assure that they possess all project changes and addendums prior to bidding. Any project Addenda or https://www.forestparkga.gov/rfps https://www.bidnetdirect.com/georgia/cityofforestpark https://ssl.doas.state.ga.us/PRSapp/PRindex.jsp
SECTION I
modifications will be available only on the City’s preferred website;
https://www.forestparkga.gov/rfps.
A Pre-Bid Conference will be held on Thursday, June 13th 2024 at 11:00 AM EST at the
City of Forest Park City Hall, City Council Meeting Room located at 745 Forest Parkway, Forest Park GA, 30297. Attendance of this meeting is “Strongly Encouraged”. A site tour is scheduled immediately following the Pre-Bid Conference.
Any questions pertaining to the requirements of the Contract Documents and Technical
Specifications, either procedural or technical, shall be in writing and are to be submitted to the
City of Forest Park; Attention: Procurement Department, via email at procurement@forestparkga.gov by Thursday, June 27th 2024 at 5:00 PM EST, Reference:
“Forest Park – Monument Signs”. Sealed Bids will be received by the City of Forest Park at
Forest Park City Hall, City Council Meeting Room located at 745 Forest Parkway, Forest Park
GA, 30297 until Thursday, July 11th 2024 at 2:00 PM and then publicly opened and read aloud.
No bid may be modified, withdrawn, or canceled for a period of sixty (60) days after the time designated for the receipt of Bids or until the Bidder is notified by the City; whichever is sooner. The City reserves the right to accept or reject any and all bids and to waive irregularities, technicalities, and formalities.
Each bid shall be accompanied by a Bid Bond in an amount of not less than five percent (5%) of the total bid amount. The Bid Bond may be in the form of a bond issued by a surety acceptable to the City or a cashier’s check made payable to the City of Forest Park, Georgia.
The entire Bid Bond shall be forfeited to the City of Forest Park as liquidated damages if the bidder fails to execute the Contract and provide Performance and Payment Bonds within fifteen
(15) days after being notified that he has been awarded the Contract.
The successful bidder will be required to furnish a contract Performance Bond and a Payment
Bond, each in the sum of one hundred percent (100%) of the total amount of the Bid and provide insurance coverage as required in the Contract Documents.
Note: For more information, please refer to the Instruction to Bidders and the Contract
Documents, which govern and supersede this Invitation to Bid.
https://www.forestparkga.gov/rfps procurement@forestparkga.gov%20
SECTION II
Instruction to Bidders - Page i
CITY OF FOREST PARK
MONUMENT SIGNS
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
Article 1 – Defined Terms
Article 2 – Copies of Bidding Documents
Article 3 – Qualifications of Bidders
Article 4 – Examination of Bidding Documents, Other Related Data, and Site
Article 5 – Pre-Bid Conference
Article 6 – Site and Other Areas
Article 7 – Interpretations and Addenda
Article 8 – Bid Security
Article 9 – Contract Times
Article 10 – Liquidated Damages
Article 11 – Substitute and “Or-Equal” Items
Article 12 – Subcontractors, Suppliers and Others
Article 13 - NOT USED
Article 14 – Preparation of Bid
Article 15 – Basis of Bid; Comparison of Bids
Article 16 – Submittal of Bid
Article 17 – Modification and Withdrawal of Bid
Article 18 – Opening of Bids
Article 19 – Bids to Remain Subject to Acceptance
Article 20 – Evaluation of Bids and Award of Contract
Article 21 – Contract Security and Insurance
Article 22 – Signing of Agreement
SUBMITTAL
CHECKLIST…………………………………………………………………………………..…
FORM 7 - Contractor’s Statement of Legal Status and Financial Capability……………………….30
FORM 8 - Certification Regarding Debarment, Suspension, And Other Matters…………………...34
Instruction to Bidders - Page 1
WELCOME SIGNAGE
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to
Bidders have the meanings indicated below:
A. Owner - City of Forest Park, Georgia
B. Issuing Office (City of Forest Park) – The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
C. Contract Bid Number – The official number associated with the contract bid as determined by the date of release for the official bid by the City of Forest Park.
D. Plan Holders List – All Bidders who attend the Prebid Conference to be included on the
Plan Holders List. The City of Forest Park will maintain the official Plan Holders List for this project.
E. Owner’s Representative – Falcon Design Consultants, LLC, an independent consulting engineering firm, is the City of Forest Park’s appointed Owner’s Representative for this project.
F. Design Engineer – Precision Planning Inc., an independent engineering design firm, is the design Engineer of record for this project.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 A. Complete sets of the Bidding Documents in the number and for the amount stated in the
Advertisement or Invitation to Bid are to be obtained from the Issuing Office. The Issuing
Office will maintain the Plan Holders List for this project
B. Complete sets of the Contract Documents, Technical Specifications and the Contract
Drawings may be obtained from the Issuing Office from the City’s preferred website:
https://www.forestparkga.gov/rfps. Documents are also available at:
https://www.bidnetdirect.com/georgia/cityofforestpark and at the Georgia Procurement
Registry website located at: https://ssl.doas.state.ga.us/PRSapp/PRindex.jsp.
C. Bidders are solely responsible for maintaining a complete set of Contract Documents, Technical Specifications, Contract Drawings, and project Addenda or Modifications to assure that they possess all project changes and addendums prior to bidding.
D. All bid documents will be posted online at the sites shown in Article 2.01 – Paragraph
B.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
https://www.forestparkga.gov/rfps https://www.bidnetdirect.com/georgia/cityofforestpark https://ssl.doas.state.ga.us/PRSapp/PRindex.jsp
Instruction to Bidders - Page 2
CITY OF FOREST PARK
MONUMENT SIGNS
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit written evidence with bid such as financial data, previous experience, present commitments, and such other data as may be called for below.
A. Required Bidder Qualification Statement with Supporting Data (Business License, Corporate Resolution to Bid, Financial Statement, Current Workload, etc.)
B. Georgia Contractor License
ARTICLE 4 – EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED
DATA, AND SITE
4.01 Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
1. Those reports known to Owner of explorations and tests of subsurface conditions at or contiguous to the Site, including but limited to a geotechnical report.
2. Those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
B. Copies of reports and drawings, if any, referenced in Paragraph 4.01.A will be made available by Owner to any Bidder upon written request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein as provided in Paragraph 4.02 of the General Conditions has been identified and established in Paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify any reports and drawings known to Owner relating to a Hazardous Environmental Condition identified at the Site.
B. Copies of reports and drawings referenced in Paragraph 4.03.A will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the
Instruction to Bidders - Page 3
CITY OF FOREST PARK
MONUMENT SIGNS
Contract Documents, but the “technical data” contained therein as provided in Paragraph
4.06 of the General Conditions has been identified and established in Paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective
Bidders with respect to subsurface conditions, other physical conditions, and Underground
Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General
Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental
Condition uncovered or revealed at the Site which was not shown or indicated in the
Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 4.06 of the General Conditions. On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.05 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and the other related data identified in the Bidding Documents;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work;
D. consider the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents;
and (3) Bidder’s safety precautions and programs;
E. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
F. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
Instruction to Bidders - Page 4
CITY OF FOREST PARK
MONUMENT SIGNS
G. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
H. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work; and
I. refer to the submittal checklist and submit bid documents in the order according to the submittal checklist.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article 4, that without exception the
Bid is premised upon performing and furnishing the Work required by the Bidding
Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the
Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding
Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – PRE-BID CONFERENCE
5.01 A PRE-BID CONFERENCE will be held on Thursday, June 13th 2024 at 11:00 AM
EST at the City of Forest Park City Hall, City Council Meeting Room located at 745 Forest
Parkway, Forest Park GA, 30297. A site tour is scheduled immediately following the Pre-
Bid Conference. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are “Strongly Encouraged” to attend and participate in the conference.
Engineer will transmit to all prospective Bidders such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 6 – SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by
Contractor.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions pertaining to the requirements of the Contract Documents and Technical
Specifications, either procedural or technical, shall be in writing and are to be submitted to the City of Forest Park; Attention: Procurement Department at procurement@forestparkga.gov. Interpretations or clarifications considered necessary by the City in response to such questions will be issued by Addenda to all parties recorded by Issuing Office on the Plan Holders List as having attended the Prebid Conference.
Questions received after Thursday, June 27th 2024 at 5:00 PM EST may not be answered.
file://///fdc-vault/Music/Skip/Projects/Forest%20Park/Welcome%20Signs/Contract%20Documents/procurement@forestparkga.gov%20
Instruction to Bidders - Page 5
CITY OF FOREST PARK
MONUMENT SIGNS
Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer and all Addenda will be transmitted to all bidders listed on the Plan Holders List.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of
5 percent of Bidder’s maximum Bid price and in the form of a certified check, bank money order, or a Bid bond (on the form attached) issued by a surety meeting the requirements of
Paragraphs 5.01 and 5.02 of the General Conditions.
8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the
Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider
Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults. The
Bid security of other Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of even days after the
Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of consecutive calendar days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, or those substitutes or “or-equal” materials and equipment approved by Engineer and identified by Addendum. The materials and equipment described in the Bidding Documents establish a standard of required type, function and quality to be met by any proposed substitute or “or-equal” item. No item of material or equipment will be considered by Engineer as a substitute or “or-equal” unless written request for approval has been submitted by Bidder and has been received by
Engineer at least 10 days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Paragraph 6.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or
Instruction to Bidders - Page 6
CITY OF FOREST PARK
MONUMENT SIGNS
disapproval of a proposed item will be final. If Engineer approves any proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS AND OTHERS
12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the
Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of all such
Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by
Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of
Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
12.02 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to
Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.
12.03 Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom Contractor has reasonable objection.
Instruction to Bidders - Page 23
FOREST PARK
MONUMENT SIGNS
ARTICLE 14 – PREPARATION OF BID
14.01 The Bid Form is included with the Bidding Documents. Additional copies may be obtained from Engineer.
14.02 All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section listed therein.
14.03 A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown.
14.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown.
14.05 A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
14.06 A Bid by an individual shall show the Bidder’s name and official address.
14.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
14.08 All names shall be printed in ink below the signatures.
14.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form in addition to submitting the Acknowledgement of
Addenda Form 11.
14.10 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
14.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the
Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
Instruction to Bidders - Page 24
FOREST PARK
MONUMENT SIGNS
ARTICLE 15 – BASIS OF BID; COMPARISON OF BIDS
15.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B. The value of items required by the Contract Documents but not show in the line items on the Bid Form shall be included in the unit price of the line item that relates to this work.
C. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.
D. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
15.02 Allowances
A. A project contingency allowance of $ 50,000.00 is included into the total base bid for this project. This allowance is for additional work as directed by the Owner. Monies not utilized by the Owner for this project will be removed from the final contract price at the completion of the project by use of a Change Order.
ARTICLE 16 – SUBMITTAL OF BID
16.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid
Form is to be completed and submitted with the Bid security and the following documents.
Please refer to the submittal checklist to track the preparation and order of submittal of certain required information with the Bid.:
A. Required Bid security;
B. List of 5 Project References;
C. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such license within the time for acceptance of Bids;
D. Copy of Contractor’s License [or] Evidence of Bidder’s ability to obtain a State
Contractor’s License and a covenant by Bidder to obtain the following said license within the time for acceptance of Bids; and/or
E. Georgia Department of Transportation Prequalification Certification for Roads
F. Certificate of Insurance (listing Forest Park as the Certificate Holder);
G. Contractor Affidavit and Agreement;
Instruction to Bidders - Page 25
FOREST PARK
MONUMENT SIGNS
H. Contractor’s Statement of Legal Status and Financial Capability;
I. Certification Regarding Debarment, Suspension, and Other Matters;
J. Non-Collusion Affidavit;
K. Bidder’s Contact Directory;
L. Acknowledgment of Addenda;
M. Required Bidder Qualification Statement with Supporting Data for the following:
1. Organizational Structure/Key Personnel and Resumes: The Bidder’s
Organizational Structure Section should introduce the proposed Bidder team by:
1.1. Provide the Bidder’s Management Organizational Chart both graphically and in narrative format. The Organizational chart and narrative should provide a description of the Bidder’s views on how it will organizationally provide the Services.
1.2. Provide a description of how the organizational structure will facilitate managing the Services requested and how an efficient flow of information will be realized from the organizational structure.
1.3. Provide resumes for key personnel you intend to assign to this Project for the following positions: Principal-in-charge, Project Manager and On-
Site/Quality Assurance Supervisor. Submission of these names constitutes a commitment to use these individuals if the Bidder is awarded a Contract, and changes may be made only with the prior written consent of the City.
1.3.1. Resumes should be organized as follows:
1.3.2. Name and Title;
1.3.3. Professional Background;
1.3.4. Current and Past Relevant Employment;
1.3.5. Education; and
1.3.6. Certifications.
2. Overall Project Experience, Qualifications, and Performance on Previous
Similar Projects
2.1. Describe the Bidder company’s history of experience providing general contracting services for a city or commercial property of similar size and scope including but not limited to fire stations or other government buildings, major shopping malls, office parks, major office complexes, hotels or convention facilities, government buildings, facilities or complexes, or major colleges/universities.
2.2. Provide detail evidence that is currently providing general contracting services.
Instruction to Bidders - Page 26
2.3. Provide the number of years responder has operated under current company name
2.4. Provide a matrix of five (5) relevant projects within the last five (5) years of similar size and scope, including client name, project description, project value, role of the individual, project completion date, reference contact name, phone number and e-mail address. Refer to Section XVII- Form 5
3. Management and Staffing Plan
3.1. Describe how the project will be organized and managed, ensuring that staffing needs are met for the delivery of services and duties as outlined in
Exhibit A. Clearly outline the estimated staffing for each service area.
3.2. Describe your processes, procedures and methodology for monitoring quality control and required outcome for services being provided. The plan should include the name and title of the inspector, frequency of each inspection, and all forms that will be used to document the inspections.
3.3. Describe your process for reporting capabilities and provide sample reports for this project, i.e., performance measures, quality of work, and deliverables.
3.4. Provide a list of resources and include a list of equipment with quantity of each.
4. Quality Control Plan Approach
4.1. Bidder must submit an executive level plan describing the management process the Bidder will implement to ensure all work and services performed are of the highest quality. The approach should include a description of the
Bidder's process as it pertains to shop drawings, product and materials submittals, inspection of subcontractor/subconsultant work and materials, means and methods of conducting Quality Control testing, etc. Describe the
Bidder's corrective action plan. Describe how the Bidder's organizational structure supports this plan and clearly identify responsible and accountable parties (Do not provide the Bidder's existing Quality Control Manual).
5. Procurement Plan
5.1. Bidder must submit an executive level approach (3 pages maximum) to the competitive and open procurement of subcontractors/subconsultants, materials, supplies and equipment required to complete a project. The plan must address the bonding requirements it will require of the subcontractors as well as any bonding assistance available to subcontractors. Include your ability to purchase material and supplies for this project to meet the construction schedule.
Instruction to Bidders - Page 27
FOREST PARK
MONUMENT SIGNS
6. Safety Record and Experience
6.1. Each Bidder must demonstrate that it is committed to implementing a first-rate safety program and that it has an exceptional safety and environmental record. Each Bidder must submit their current Experience Modification Rate
(EMR). If an EMR is not available, each Bidder and its proposed subcontractors/subconsultants must submit a written statement detailing each one's safety records on its last 5 projects listed in the Bidder’s reference., Include contact names and phone numbers where the City can verify the safety record statement. Each Bidder must provide a Log and Summary of
OSHA violations and any fines or settlements for the past 36 months. Attach
OSHA Form 300A - Work Related Injuries and Illnesses, as required by the
U. S. Department of Labor, for the past 36 months (Provide OSHA
Recordable Incident Rate (Year 2017) and OSHA Lost Days Away Incident
Rate (Year 2017). This is applicable to site construction and installation activities only. (Do not submit the Bidder's Safety Manual).
16.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or Invitation To Bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the
Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. The Bidder’s Georgia
General Contractor’s license number shall be clearly printed on the exterior of the envelope containing the sealed bid.
16.03 Bids may be mailed to the City of Forest Attention: A. Girard Greeter; 745 Forest Parkway, Forest Park GA, 30297.
16.04 The sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED – FOREST PARK –
MONUMENT SIGNS – PROJECT NO.: 05302024”; The Bidder’s Georgia General
Contractor’s license number shall be clearly printed on the exterior of the envelope containing the sealed bid.
16.05 Bid packages submitted shall include one (1) complete set of bid documents, as required by this section, with original signatures and seals as required and this document set shall be labeled “Original”. Additionally, two (2) complete copy sets of the bid documents, as required by this section, labeled “Copy” shall be included in the bid package.
ARTICLE 17 – MODIFICATION AND WITHDRAWAL OF BID
17.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
17.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with
Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may
Instruction to Bidders - Page 28
FOREST PARK
MONUMENT SIGNS
withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 18 – OPENING OF BIDS
18.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to
Bid and, unless obviously non-responsive, read aloud publicly. A Bid Tabulation of the amounts of the Base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 19 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
19.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 20 – EVALUATION OF BIDS AND AWARD OF CONTRACT
20.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible.
20.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that
Bidder and the rejection of all Bids in which that Bidder has an interest.
20.03 In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the
Bid Form or prior to the Notice of Award.
20.04 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the
Supplementary Conditions.
20.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work in accordance with the Contract Documents.
20.06 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Owner.
ARTICLE 21 – CONTRACT SECURITY AND INSURANCE
21.01 Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance.
Instruction to Bidders - Page 29
FOREST PARK
MONUMENT SIGNS
When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds.
ARTICLE 22 – SIGNING OF AGREEMENT
22.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the required number [SIX (6)] of unsigned counterparts of the Agreement along with the other Contract Documents which are identified in the Agreement as attached thereto.
Within 15 calendar days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten calendar days thereafter, Owner shall deliver one fully signed counterpart to Successful
Bidder with a complete set of the Drawings with appropriate identification.
Instruction to Bidders - Page 30
FOREST PARK
MONUMENT SIGNS
SUBMITTAL CHECKLIST
This table is included for the Bidder’s convenience and may be used to track the preparation and submittal of certain required information with its Bid.
Item
Required Bid Submittal
Check Sheet Check (v)
Please combine the following required items in a section clearly labeled as Volume 1
1 Required Bid Security
2 Local, Small Business, Diversity Program Plan (LSBD Forms 1-4) N/A
3 List of 5 Project References (Form 5)
4 State of Georgia Certificate of Existence
5 Copy of Contractor’s and/or Subcontractor’s License
6 Certificate of Insurance
7 Contractor Affidavit and Agreement (Form 6a)
8 Subcontractor Affidavit (Form 6b)
9 Contractor’s Statement of Legal Status and Financial Capability (Form 7)
Certification Regarding Debarment, Suspension, and
Other Matters (Form 8)
11 Non-Collusion Affidavit (Form 9)
12 Bidder's Contact Directory (Form 10)
13 Acknowledgment of Addenda (Form 11)
Please combine the following required items in a separate section labeled as Volume 2
14 Organizational Structure/Key Personnel/Resumes
9 Experience and Past Performance
10 Management and Staffing Plan
11 Quality Control Plan Approach
12 Procurement Plan
Safety Record and Experience
Instruction to Bidders - Page 31
FOREST PARK
MONUMENT SIGNS
FORM 7
Contractor’s Statement of Legal Status and Financial Capability
For official and confidential use by the City of Forest Park, Georgia
Purpose/Instructions: The following information will be used by the City of Forest Park, Georgia in determining whether or not the identified Contractor has, in the opinion of the City of Forest Park, Georgia, the financial capability to successfully fulfill its obligations to the City.
If space on this form is inadequate for any requested information, please furnish on attached pages with a reference to the appropriate question number on this form.
A. Submission Information:
1. This Statement is being submitted as required by a FOREST PARK Solicitation:
FOREST PARK Solicitation #:
Project Name:
2. This information is current as of (date): ______________________________________
B. Contractor Information
1. Official Company/Entity Name:____________________________________________
(hereinafter “Contractor”)
2. Mailing Address:_________________________________________________________
City/State/Zip: _____________________________________________ __
3. If at this address less than 1 year, prior address:
City/State/Zip: _____
4. Primary contact regarding this information: ____________________________________
5. Telephone Number:______________________________________________________
6. Email Address: _________________________________________________________
C. Development Entity. The Development entity named above is:
□ A sole proprietorship ─ Soc. Sec. #
□ A corporation ─ FID # _____________________________________________
□ A nonprofit or charitable institution or corporation ─ FID #_________________
□ A partnership ─ FID # _______________
□ A business association or a joint venture ─ FID #_________________________
□ A limited liability company ─ FID # ___________________________________
□ A Federal, State, or local government or instrumentality thereof
□ Other / explain: _______________________________________
D. Date and State of Organization. If the Contractor is not an individual or a government
Instruction to Bidders - Page 32
FOREST PARK
agency or instrumentality:
1. Date of organization: ________________________________________
2. State of organization: ________________________________________
E. Contractor Principals. Names of owners, officers, directors, trustees, and principal representatives of the development entity
Name, Title, Address, ZIP Code Description of interest/relationship
% of Ownership
Interest
F. Contractor Affiliations. Is the Contractor a subsidiary or parent of or affiliated with, any other corporation or corporations or any other firm or firms?
□ Yes □ No
If Yes, provide the following information:
Corporation/Firm Relationship to
Contractor
Common
Officers/Directors/Owners/
Trustees/Representatives
Name
Address
Name
Address
If the Contractor is different than the parent corporation or firm, will the parent corporation or firm guarantee performance under this bid?
Instruction to Bidders - Page 33
G. Bankruptcy. Has the Contractor or the parent corporation (if any), or any subsidiary or affiliated corporation of the Contractor or said parent corporation, or any of the Contractor’s officers or principal members, shareholders or investors filed for bankruptcy, either voluntary or involuntary, within the past 10 years?
If Yes, provide the following information:
Name Court Date Status
H. Loan Defaults. Has the Contractor or the parent corporation (if any), or any subsidiary or affiliated principal members, shareholders or investors defaulted on a loan or other financial obligation?
(attach additional sheets if needed)
If Yes, explain: ____________________________________________________
I. Criminal Litigation. Is the Contractor or the parent corporation (if any), or any subsidiary or affiliated corporation of the Contractor or said parent corporation, or any of the Contractor’s officers or principal members, shareholders or investors party to any past or pending criminal litigation?
If Yes, provide the following information, and attach any additional information or explanation deemed necessary:
Date Filed Court Charge/Current Status
J. Civil Litigation. Is the Contractor or the parent corporation (if any), or any subsidiary or affiliated principal members, shareholders or investors party to any pending civil litigation that could potentially impact the financial capability of the Contractor to complete the proposed development?
Instruction to Bidders - Page 34
FOREST PARK
MONUMENT SIGNS
If Yes, provide the following information, and attach any additional information or explanation deemed necessary:
Date Filed Court Current Status
K. Conflict of Interest. Does any member or employee of the City of Forest Park, Georgia have any direct or indirect personal interest in the Contractor or in the redevelopment or rehabilitation of the property being proposed by the Contractor?
If Yes, explain:
L. Previous Forest Park Projects. Has the Contractor or its parent entity (if any), or any subsidiary or affiliated entity of the Contractor or said parent corporation, or any of the Contractor’s officers or principal members, shareholders or investors had any previous contractual relationship with the
City of Forest Park?
Project Name Description Date
Instruction to Bidders - Page 35
FOREST PARK
MONUMENT SIGNS
FORM 8
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER
MATTERS
The Bidder, , certifies to the best of its knowledge and belief, that it and its principals:
1. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal, State, or local department or agency;
2. Have not within a three-year period preceding this Bid been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or Contract under a public transaction; violation of Federal or State antitrust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;
3. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with the commission of any of the offenses enumerated in paragraph (2) of this certification; and
4. Have not within a three-year period preceding this application/Bid had one or more public transactions (Federal, State, or local) terminated for cause or default.
Where the bidder is unable to certify to any of the statements in this certification, such bidder shall attach an explanation to this Bid.
The bidder certifies or affirms the truthfulness and accuracy of the contents of the statements submitted on or with this certification.
Signature of Authorized Agent
Name/Title of Authorized Agent
Before me, a Notary Public, personally appeared the above named and swore that the statements contained in the foregoing document are true and correct.
Subscribed and sworn to me this day of , .
Notary Public Signature
My Commission Expires: [SEAL]
SECTION III
Page i
CITY OF FOREST PARK
BID FORM
BID DATE: JULY 11th, 2024
BID TIME: 2:00 PM EST
Page ii
CITY OF FOREST PARK
MONUMENT SIGNS
TABLE OF CONTENTS
Page
Article 1 – Bid Recipient
Article 2 – Bidder’s Acknowledgements
Article 3 – Bidder’s Representations
Article 4 – Bidder’s Certification
Article 5 – Basis of Bid
Article 6 – Time of Completion
Article 7 – Attachments to This Bid
Article 8 – Defined Terms
Article 9 – Bid Submittal
CITY OF FOREST PARK
MONUMENT SIGNS
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
City of Forest Park, Georgia
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the Owner in the form included in the Bidding Documents and to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques,…