FOP IDIQ 4 Comment Card.pdf

PDF 273 KB Posted

Attached to
Suborbital/Hosted Orbital Flight and Payload Integration Services 4 Federal contract opportunity
Solicitation number
80AFRC23R0001
Issued by
National Aeronautics and Space Administration Armstrong Flight Research Center

View the file

Other files for this federal contract opportunity

Other files attached to Suborbital/Hosted Orbital Flight and Payload Integration Services 4, newest first.
File Type Posted
80AFRC23R0001 - Revised_10Feb2023.pdf PDF
Attachment 1 - Performance Work Statement.pdf PDF
Exhibit A - Pricing Exhibit.pdf PDF
Attachment 2 - Past Performance Questionnaire.pdf PDF
80AFRC23R0001 - Draft RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRFP

CONTRACT PRICING

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (DEC 2022) ALTERNATE I (NOV 2021)

C.2 ADDENDUM to 52.212-4, CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATION AND CERTIFICATIONS (DEC 2014)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS CONTRACTORS (NOV 2021)

1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (JAN 2011 [DEVIATION

21-1852.215-84 OMBUDSMAN (NOV 2011)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

1852.237-72 ACCESS TO SENSITIVE INFORMATION (JUN 2005)

1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)

C.3 NFS 1852.228-78-CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE EXPLORATION ACTIVITIES UNRELATED TO THE INTERN

C.4 FLIGHT SUCCESS CRITERIA

C.5 EXPANDED CAPABILITIES

C.6 POST AWARD MODIFICAITONS

C.7 MILESTONE PAYMENTS, EVENTS, AND COMPLETION CRITERIA

Table C.7-1, Flight Services Milestone Schedule for Standard Launch/flight/Flight Services (Slots)

Table C.7-2, Flight Services Milestone Schedule for Standard Launch/flight/Flight Services (Seats)

C.8 DOMESTIC SOURCE CRITERIA

C.9 FLIGHT SCHEDULE

C.9.1 Postponement Allowance

C.9.2 Launch/Flight Delays

C.10 EXCUSABLE DELAYS FOR FLIGHT PAYLOAD SERVICES

C.11 FAR 52.216-18 ORDERING (AUG 2020)

C.12 FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)

C.13 FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)

C.14 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.15 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

C.16 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.17 NFS 1852.216-80 TASK ORDERING PROCEDURE (OCT 1996) ALTERNATE 1 (APR 2018)

C.18 AWARD OF SUBSQUENT TASK ORDERS

C.19 NFS 1852.225-70 EXPORT LICENSES (FEB 2000)

C.20 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT)(Mar 1989)

C.21 ON-RAMP OF NEW CONTRACTORS

C.22 EXPANSION OF PERFORMANCE CAPABILITIES

C. 23 FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLENT STATUTES OR EXECUTIVE ORDERS-COMMERCIA

SECTION D: CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS

D.1 LIST OF ATTACHMENTS

SECTION E: SOLICITATION PROVISIONS

E.1 FAR 52.212-1 INSTRUCTIONS TO OFFERORS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

TAILORED PARAGRPHS IN 52.212-1

Paragraph (c)

Paragraph (e)

E.2 ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS-COMMERCIAL PRDUCTS AND COMMERCIAL SERVICES

SECTION E.2.1 INSTRUCTIONS TO OFFERORS

LISTING OF PROVISIONS INCORPORATED BY REFERENCE

FAR 52.204-7 SYSTEM FOR AWARD MANAGEMET (OCT 2018)

FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

FAR 52.204-22 ALTERNATE LINE ITEM PROPOSAL (JAN 2017)

GOVERNMENT FAR SUPPLEMENT (48 CFR CHAPTER 18) PROVISIONS

FAR 52.216-1 TYPE OF CONTRACT (APR 1984)

FAR 52.216-27 SINGLE OR MULTIPLE AWARD (OCT 1995)

FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)

FAR 52.252-1 SOLICIATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

NFS 1852.215-81 PROPOSAL PAGE LIMITATIONS (APR 2015)

NFS 1852.233-70 PROTESTS TO GOVERNMENT (DEC 2015)

COMMUNICATIONS REGARDING THIS SOLICITATION

Electronic Submission of Proposals - Proposal Marking and Delivery Through GOVERNMENT's EFSS Box (NOV 2021)

PROPOSAL CONTENT

VOLUME I: TECHNICAL/MANAGEMENT CAPABILITY VOLUMNE

VOLUME II: PAST PERFORMANCE

VOLUME III: PRICE

PROPOSAL DUE DATE

E.3 52.212-2 EVALUATION-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) ADDENDUM TO FAR 52.212-2, EVALUATION COMMERCIAL PRODUCTS AND COMMERCIA SERVICESTECHNICAL/MANAGEMENT CAPABILITY ACCEPTABILITY

PAST PERFORMANCE

PRICE

BAISIS OF AWARD

E.4 FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS-COMMERCIAL ITEMS (DEC 2022), Alternate 1 (OCT 2014)

E.4.1 FAR 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2022), Alternate 1 (SEP 2015)

E.4.2 FAR 52.227-15 REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTED COMPUTER SOFTWARE (DEC 2007)

E.4.3 DOMESTIC SOURCE CERTIFICATION (PUBLIC LAW 105-303, TITLE II, SECTION 201)

PWS

1. Background

2. Objective

3. Scope

4. General Requirements

4.1 Qualified Vehicles and Qualified Vehicle Families

4.1.1 Suborbital Rockets

4.1.2 Rocket-Powered Lander Vehicles

4.1.3 High-Altitude Balloons

4.1.4 Orbital Platforms

4.2 Operating Requirements

4.2.1 Independent Operations

4.2.2 Government Oberservers

4.2.3 Commercial Operations

4.3 Payload Requirements

4.3.1 Security and Recoverability

4.3.2 Accessibility

4.3.3 Manifesting/De-Manifesting

4.4. NASA Spaceflight Participant (SFP) Capability

R i f S i l P fil4.4.1 Roles

4.4.2 Flightworthiness & Flight Safety Approvals for

O i i SFT4.4.3 Accessibility

4.4.4 Manifesting/De-Manifesting

4.5 Flight Schedule

4.6 Mishap-Related Requirements

4.6.1 The Contractor shall notify…

4.6.2 The Contractor shall conduct…

4.6.3 The Contractor shall maintain…

4.7 ITAR/Export Control Restrictions and Payload/SFP

C fli5. Flight Profile Requirements

5.1 Profile 1 (P1): Reduced gravity with space environment

5.2 Profile 2 (P2): Exposure to high-altitude and long duration fli5.2.1 Exposure to high altitude

5.2.2 Exposure to altitude and long-duration flight

5.3 Profile 3 (P3): Space environment with free-fall descent

5.4 Profile 4 (P4): Controlled descent with controlled vertical l i5.5 Profile 5 (P5): Controlled high-altitude ascent and

5.6 Profile 6 (P6): Hosting on Orbital Platforms

6. Other Requirements

6.1 Data Collection

6.2 Reviews and Documents

6.2.1 Payload User Guide (PUG)

6.2.2 Mission Implementation Document (MID)

6.2.3 Payload Acceptance and Readiness Review (PRR)

6.2.4 Flight Readiness review (FRR) for Flight with Space

Fli P i i (SFP)6.3 Flight Service Requirements

6.3.1 Flight Approvals

6.3.2 Flight Operations Responsibility

6.4 Payload Integration

6.4.1 The Contractor shall integrate…

6.4.2 The Contractor shall manage…

6.4.3 The Contractor shall ensure…

6.4.4 Pre/Post-Flight Payload Support Facilities:…

6.4.5 The Contractor shall ensure…

7. Special Projects

7.1 Special Projects

7.2 Non-Standard Services (NSS)

8. General Deliverables

8.1 Payload User's Guide (PUG)

8.2 Mission Implentation Document (MID)

8.3 Flight Data Report

9. Definitions

ATTACHMENT

Attachment 1 - PWS

Attachment 2 - PAST PERFORMANCE QUESTIONNAIRE

EXHIBIT A - PRICING SPREADSHEET

File details come from the government source that posted it. Updated .