Folger_Stable_Arena_Footing_Replacement.pdf

PDF 373 KB Posted

Attached to
Folger Stable Arena Footing Replacement
Solicitation number
2027-RFP-00030
Issued by
San Mateo County, California

About this file

Folger Stable Arena Footing Replacement

This is a project specification document issued by the San Mateo County Parks Department for the replacement of arena footing at Folger Stable. The project involves the complete removal and replacement of existing arena footing material to improve safety and functionality for equestrian activities. The scope of work includes site preparation, disposal of existing materials, and installation of new footing to specified depth and composition standards. The project is located at a County park facility and requires compliance with County standards and specifications. Specific response deadlines, site visit schedules, and pre-bid meetings are detailed within the procurement documents to ensure bidder understanding of project requirements and site conditions.

The project is funded through San Mateo County Parks Department capital improvement budgets dedicated to facility maintenance and enhancement. Pricing shall be submitted on a fixed-price, lump-sum basis for the complete footing replacement work. The County anticipates awarding the contract to the qualified bidder offering the most responsive and competitive proposal. Small business set-asides and local vendor preferences may apply in accordance with County procurement policies. The successful contractor will be required to maintain schedule adherence, provide required insurance and bonding, and comply with all applicable County and state regulations throughout the project duration.

View the file

Other files

File Type Posted
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County of San Mateo

Request for Proposals (RFP) for Folger Stable Arena

Footing Replacement

Parks Department

RFP No. 2027-RFP-00030

RFP Contact: Austin Lam alam@smcgov.org

1. Introduction and Schedule

The County of San Mateo (the “County” or “SMC”) covers most of the San Francisco Peninsula. The region covers 744 mi and is home to nearly 800,000 residents and 20 incorporated cities. The County provides for the health and welfare of all people within its borders and serves as the local government for the unincorporated areas. Innovation thrives here in industries including bioscience, computer software, green technology, hospitality, financial management, health care, education and transportation. The

County prides itself on how that prosperity fosters its commitment to protecting and enhancing the health, safety, welfare and natural resources of the community.

1.1. Summary

The County of San Mateo (“County”) covers most of the San Francisco Peninsula. The region covers 744 mi2 and is home to approximately 750,000 residents. The County is made up of 20 incorporated cities.

The County provides for the health and welfare of all people within its borders and serves as the local government for the unincorporated areas. Innovation thrives here in industries including bioscience, computer software, green technology, hospitality, financial management, health care, education, and transportation. The County prides itself on how that prosperity fosters its commitment to protecting and enhancing the health, safety, welfare, and natural resources of the community.

The San Mateo County Parks Department (“Department”) serves nearly three million visitors every year.

Visitors have many options when visiting the County’s unique park system. With 24 parks and recreation areas, over 16,000 acres of park land, and 190 miles of trail, the Department provides healthy outdoor activities, educational opportunities, and lasting memories.

Due to the diversity of the park system, visitors can enjoy an array of recreational opportunities, including walking; running; hiking; biking; picnicking; horseback riding; sailing; kite surfing; fishing; camping;

gardening; tidepooling; volunteering; learning; sports courts; and playing on playgrounds.

1.2. Background

The Folger Stable riding arena, approximately 90’ x 200’, requires replacement of its footing. The existing compacted base must be verified to ensure it is appropriate for the arena’s current drainage before additional materials are added. The project involves importing the necessary sand and textile to be mixed with the existing footing, followed by laser grading and grooming to achieve a finished surface that meets correct footing standards.

1.3. Contact Information

Project Contact:

Rogelio Castaneda Park Ranger IV Email: rcastaneda@smcgov.org Phone: (650) 851-1210

Procurement Contact:

Austin Lam Management Analyst Email: alam@smcgov.org Phone: (650) 599-1367 mailto:rcastaneda@smcgov.org tel:(650)851-1210 mailto:alam@smcgov.org tel:(650)599-1367

Page 3 of 17 Release date of August 6, 2026

Department:

Parks Department

Department Head:

Emma Gonzalez Director

1.4. Timeline

RFP Released August 6, 2026

Pre-Proposal Meeting (Mandatory) August 12, 2026, 11:30am

Folger Stable 4040 Woodside Rd.

Woodside, CA 94062

Deadline for Questions and Comments August 17, 2026, 5:00pm

Proposal Due Date and Time August 21, 2026, 5:00pm

2. Scope of Work

2.1. 2. Scope of Work

2.1 Scope of Work

Folger Stable Arena Footing Replacement

Summary

The County of San Mateo Parks Department is seeking a qualified contractor to replace the footing in the

Folger Stable Arena. The arena, approximately 90’ x 200’ in size, requires the verification of the compacted base, importation of new sand and textile materials, mixing with existing footing, and laser grading to achieve a high-quality finished product. The contractor will ensure that the footing meets all relevant standards for equestrian arenas.

2.2 Detailed Specifications

A. Verification of Compacted Base:

o Any deficiencies in the compacted base must be reported to the County of San Mateo for further instructions.

B. Footing Materials:

Page 4 of 17 Release date of August 6, 2026 o Import the appropriate amount of new sand and textile materials to be mixed with the existing footing.

o Sand must be clean, washed, and free of contaminants.

o Textile materials must be of high quality, suitable for equestrian use, and free of any harmful substances.

C. Mixing and Installation:

o Mix new sand and textile materials with the existing footing to achieve the correct footing standards.

o Ensure the mixture is evenly distributed across the entire arena.

D. Laser Grading and Grooming:

o Laser grade the footing to ensure a level and consistent surface.

o Groom the footing to a final finished product, ensuring it meets all relevant standards for equestrian arenas.

E. Standards and Compliance:

o All work must comply with the following standards:

▪ United States Equestrian Federation (USEF) standards for arena footing.

▪ American Society for Testing and Materials (ASTM) standards for materials used in equestrian arenas.

2.3 Service Requirements

A. Project Management:

o Contractor must provide a project manager to oversee all aspects of the footing replacement.

o Regular updates must be provided to the County of San Mateo project coordinator.

B. Site Preparation and Safety:

o Contractor is responsible for preparing the site, including any necessary clearing or grading.

o All work must be conducted in a manner that ensures the safety of workers, County staff, and the public.

C. Quality Assurance:

o Contractor must implement a quality assurance program to ensure all work meets the specified standards.

o Any issues identified during the project must be promptly addressed and corrected.

Page 5 of 17 Release date of August 6, 2026

D. Environmental Considerations:

o All materials and methods used must be environmentally friendly and comply with local, state, and federal regulations.

2.5 Delivery Requirements

A. Delivery of Materials:

o All materials must be delivered to the Folger Stable Arena site.

o Delivery times must be coordinated with the County of San Mateo to minimize disruption to the facility’s operations.

B. Final Inspection and Approval:

o Upon completion, a final inspection will be conducted by the County of San Mateo to ensure all work meets the specified standards.

o Any deficiencies identified during the inspection must be corrected by the contractor at no additional cost to the County.

2.6 Additional Requirements

A. California Labor Code/Prevailing Wage

1. Prevailing Wage and Labor Compliance

a. Services requested under this solicitation may include work that constitutes a "public work" as defined in California Labor Code Sections 1720 et seq. Any work assignment, task order, or other authorized service that is determined to be a public work shall be performed in accordance with all applicable provisions of the California Labor Code governing public works.The successful Proposer shall be required to comply with all applicable provisions of the California Labor Code, including, but not limited to, Sections

1720 et seq., 1770 et seq., 1771, 1771.4, 1774-1776, 1777.5, 1813, 1815, 1860, and 3700, for any task order or work assignment subject to prevailing wage requirements.For all applicable work, the successful Proposer shall be required to:

• Pay not less than the applicable prevailing rates of wages as determined by the

California Department of Industrial Relations (DIR). Current prevailing wage determinations are available on the DIR website at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm.

• Maintain and submit certified payroll records in accordance with California Labor

Code Section 1776 and any other applicable reporting requirements.

• Comply with all applicable California overtime laws.

https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm

Page 6 of 17 Release date of August 6, 2026

• Comply with apprenticeship requirements, workers' compensation requirements, and all other applicable labor compliance obligations imposed by state law.

▪ Failure to comply with applicable public works requirements may result in the withholding of payments, assessment of penalties, contract termination, or any other remedies authorized by law.2. Department of Industrial Relations (DIR)

RegistrationPursuant to California Labor Code Sections 1725.5 and 1771.1:

• Each Proposer, and any subcontractor identified in its proposal, must be registered with DIR as of the proposal submission deadline and shall include its current DIR registration number in its proposal. Proposals submitted by an unregistered Proposer will be deemed non-responsive, unless a statutory exception applies.

• Any subcontractor engaged by the successful Proposer after submission of its proposal, including any substituted subcontractor, shall be registered with DIR before performing any work subject to California public works laws, unless a statutory exception applies.

• The successful Proposer shall be required to maintain active DIR registration throughout the performance of any applicable work assignments and shall ensure that all subcontractors performing applicable public works are properly registered.

b. 3. Compliance MonitoringPursuant to California Labor Code Section 1771.4, any work assignment or task order that is subject to California public works requirements will be subject to compliance monitoring and enforcement by the California Department of

Industrial Relations. The successful Proposer will be required to cooperate with all applicable monitoring, reporting, recordkeeping, and enforcement requirements.

B. Performance and Payment Bonds

1. Pursuant to Civil Code section 9550, the County is required to obtain a payment bond, in an amount equal to one hundred percent (100%) of the project price, for any project involving a public work of improvement with a value exceeding $25,000. This requirement is not waivable by the County. The County also reserves the right, in its sole discretion, to require a performance bond, in a form and amount acceptable to the County, for any task order regardless of dollar value. Any required bonds shall be in a form acceptable to the County and furnished prior to commencement of work under the applicable task order. The cost of any required bonds shall be included in the Contractor’s pricing unless otherwise specified by the County.

C. Insurance, Permits, and Approvals:

o Contractor is responsible for obtaining the necessary insurance:

▪ Comprehensive General Liability…………. $1,000,000;

Page 7 of 17 Release date of August 6, 2026

▪ Motor Vehicle Liability Insurance…………. $1,000,000; and

▪ Professional Liability……….………………. $1,000,000.

o Contractor is responsible for obtaining all necessary permits and approvals required for the project.

o Contractor is responsible for maintaining all required registrations, including with the

California Department of Industrial Relations, and any other certifications necessary to perform public works under this contract.

D. Warranty:

o Contractor must provide a minimum one-year warranty on all materials and workmanship.

By submitting a proposal, the contractor agrees to comply with all terms and conditions outlined in this

Scope of Work. The County of San Mateo reserves the right to reject any or all proposals, waive any informalities, and accept the proposal deemed to be in the best interest of the County.

2.2. Notices

In Section 4, ‘Pricing Proposal,’ labor and materials are each listed with a quantity of ‘1’ for formatting purposes only. Please include in these line items all anticipated labor and material costs required to complete the project in full.

The Performance Measure for this project is: The completed arena footing meets the specifications outlined in the Scope of Work, including proper base verification, correct material mix, and final laser grading and grooming, as confirmed by County staff inspection.

3. Submission Requirements

3.1. Submission Deadline

Proposals must be electronically received by 5:00 pm, on Friday, August 21, 2026 via eProcurement system.

Allow sufficient time for the upload to complete by the Due Date and Time. Partial uploads will automatically terminate, and proposals will be rejected. The eProcurement system submission time will be the official submission time. The County will not be responsible for and may not accept proposals that are late due to slow internet connections or for any other failure of the eProcurement system.

NOTE: The County does not maintain the eProcurement system and is not liable for site failures or technical problems. To resolve technical issues, contact OpenGov Technical Support by using the real time chat located in the lower right hand corner of the screen, or via email at procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com https://procurement.opengov.com/portal/smcgov

Page 8 of 17 Release date of August 6, 2026

3.2. Pre-submission Registration

Organizations or individuals interested in responding to this solicitation must register online with the

County of San Mateo at:

• https://procurement.opengov.com/portal/smcgov

It is recommended that organizations complete this registration as soon as possible. The County will not be responsible for and may not accept proposals that are late due to a failure to register in the eProcurement system.

3.3. Submission via eProcurement Portal

Required Documents

Please refer to the Technical Proposal section for submittal documents and requirements.

Electronic Submissions

Include the proposer name and the RFP title and number in each filename. Submit proposals via the eProcurement website, allowing sufficient time for the upload to complete by the Due Date and Time. As noted above, the eProcurement portal submission time will be the official submission time, and partial uploads will automatically terminate, and proposals will be rejected. Contact eProcurement Portal with technical questions regarding this site.

Conflicts between Certain Requirements

Prior to the submission deadlines and solely relating to a determination of the timeliness of questions, comments, and proposal submissions, information displayed on the eProcurement portal site will take precedence in the event of a discrepancy between that information and the information within the solicitation documents. For all other discrepancies, the information in the solicitation documents will take precedence.

Format

Documents should be created in the following format:

• Text should be Times New Roman (12-point minimum font size) and unjustified (i.e., with a ragged-right margin)

• Pages should have margins of at least one inch on all sides (excluding headers and footers)

• If the proposal is lengthy, a Table of Contents should be included.

• PDF format is preferred.

Errors in Proposals

The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are late, incomplete, missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any remaining RFP requirements.

https://procurement.opengov.com/portal/smcgov https://procurement.opengov.com/portal/smcgov/projects/283743/document?section=2736104

Page 9 of 17 Release date of August 6, 2026

3.4. Procurement Preference for Local Businesses and Local Non-Profits

The County of San Mateo has adopted a Procurement Preference for Local Businesses Ordinance (County

Ord. Code Ch. 2.89.) The purpose of this Ordinance is to promote a strong local economy by giving preference to local businesses, local non-profits, local small and micro businesses, and local small and micro non-profits in County procurements, to the extent consistent with the law and interests of the public. The County’s process for applying local preferences to competitive procurements is set forth in

County Ordinance Code Section 2.89.030. The Ordinance and exemptions (e.g. the ordinance will be exempt when all bids or proposals received are from Non-Profit Organizations) can be reviewed here:

Chapter 2.89 - PROCUREMENT PREFERENCE FOR LOCAL BUSINESSES | Code of Ordinances |

San Mateo County, CA | Municode Library

The requirements for bidders to establish eligibility for a local preference for this solicitation are detailed below in Section III (Submission Requirements) The Ordinance does not apply if a procurement is determined to be exempt (County Ord. Code sec. 2.89.050), and the County reserves the right to waive application of the Ordinance to this procurement if determined to be in the best interests of the County

(County Ord. Code sec. 2.89.060).

4. Minimum Qualifications, Local Preference Ordinance, and Technical Proposal

4.1. Minimum Qualifications

4.1.1. Has Proposer has been providing similar services for a minimum of four (4) years within the last seven (7) years?*

☐ Yes

☐ No

*Response required

4.1.2. Account manager has a minimum of two (2) years of experience within the last five (5) years in providing account services?*

☐ Yes

☐ No

*Response required

4.1.3. Vendor is not excluded, suspended, or debarred from the System for Award

Management (SAM).*

SAM.gov

☐ Please confirm

*Response required

4.1.4. What is the registered Business Name and Unique Entity ID (UEI) No.? (If Applicable)

• UEI number can be obtained by registering your business through SAM.GOV

• Should you be in the process of obtaining your UEI number, please enter the digits ‘123’ temporarily for your response below in order to proceed with proposal. This temporary number should be replaced with the correct registration number for submission of the proposal.

https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU https://library.municode.com/ca/san_mateo_county/codes/code_of_ordinances?nodeId=TIT2AD_ART2.8INFIPRCOCO_CH2.89PRPRLOBU https://sam.gov/content/home

Page 10 of 17 Release date of August 6, 2026

4.2. Technical Proposal

4.2.1. Introduction and Executive Summary *

Submit a letter of introduction and executive summary of the proposal. The letter must contain:

• Name, title and contact information (email, phone, and address) for representative of proposer that is responsible for communication related to this RFP.

• Name, title, contact information, and signature of person authorized to obligate firm to perform the commitment contained in the proposal.

Submission of the letter will constitute a representation by proposer that it is willing and able to perform the commitments contained in the proposal and has not violated the terms of this RFP.

*Response required

4.2.2. Statement of Minimum Qualifications *

Describe how the proposer meets the minimum qualifications as set forth in Minimum Qualifications of this RFP.

Submission of the Minimum Qualifications checklist is not a substitute for providing a detailed written response.

*Response required

4.2.3. Project Approach*

This section should correlate to the Scope of Work . Proposer should give a short summary describing how it will perform the relevant work

*Response required

4.2.4. Milestones and Schedule*

Describe your proposed approach to tasks/milestones. Attach proposed schedule, describing time frame and ability to complete the project.

*Response required

4.2.5. Firm Qualifications *

Attach information regarding background and qualifications, including the following:

• A brief description of the proposer.

• A description of not more than three (3) projects similar in size and scope conducted by the proposer, including the client, reference and telephone numbers, primary staff members involved, budget, schedule, and project summary. Descriptions should be limited to one (1) page for each project.

• If subcontractors are anticipated, identify them (if known) and provide information on how they will be used.

*Response required

Page 11 of 17 Release date of August 6, 2026

4.2.6. References*

Provide 1 references for each of the following, including the name, address, and telephone number of recent clients (preferably other public agencies):

*Response required

5. Pricing Proposal

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Materials 1 $

2 Labor 1 $

TOTAL

6. Evaluation and Selection Criteria

The proposals will be evaluated by a selection committee with relevant expertise. The County intends to evaluate the proposals generally in accordance with the criteria itemized below. Proposers with the highest scoring proposals may be interviewed by the committee to make the final selection.

No. Evaluation Criteria Scoring Method Weight (Points)

1. Project Approach Points Based 30 (37.5% of Total)

2. Firm Qualifications Points Based 25 (31.3% of Total)

3. Price Points Based 25 (31.3% of Total)

7. Instructions to Proposers

7.1. Instructions

Proposers are encouraged to attend a pre-proposal conference on Wednesday, August 12, 2026, at 11:30 am, to be held at Folger Stable 4040 Woodside Rd. Woodside, CA 94062 and site visit, following the pre-proposal conference. All questions will be addressed at this conference and any available new information will be provided at that time. If you have further questions regarding the RFP, please post them on the eProcurement portal.

The site visit will cover:

• Review of site layout

Page 12 of 17 Release date of August 6, 2026

7.2. Communications

A. As of the issuance date of this RFP and continuing until it is canceled or an award is made, no proposer or person acting on behalf of a prospective proposer may discuss any matter relating to the RFP with any officer, agent, or employee of the County, other than through eProcurement portal, to the Authorized Contact Person, or as outlined in the evaluation or protest procedures.

B. Proposers (including any agent, owner, employee, board members, or other such affiliates) shall not offer any gift, favor, or other personal benefit to any County officer or employee during the procurement process for this agreement, including during the solicitation period and contract negotiations.

Violation of the foregoing prohibitions may result in a proposer being found non-responsible and barred from participating in this or future procurements.

7.3. Contract Award

A. Award Procedure

Contract negotiations are neither an offer nor guarantee that a contract will be executed. A contract award, if any is made, will be to the responsive, responsible proposer offering the overall best value to the County for the services and goods described in this solicitation, or as applicable, for a specific portion of the services and goods described. Any agreement reached will be memorialized in a formal agreement using the attached template, executed by the appropriate authority.

B. Notice of Intent to Award

If a decision is made to take steps to enter into an agreement with one or more proposers, the

County will post a Notice of Intent to Award or otherwise notify proposers the remaining proposers of their non-selection. Notice may instead be provided by including approval of the agreement as an item on an agenda for a meeting of the Board of Supervisors.

C. Commencement of Performance

After all parties have signed the agreement, the County will notify the contractor and performance may proceed. Prior to execution of the agreement by the County, no County employee may authorize work under the agreement. Any work performed prior to the full execution of the Agreement may not be compensated.

D. Levine Act DisclosureThe Levine Act (California Government Code Section 84308) imposes certain requirements on parties contracting with the County of San Mateo related to campaign contributions to County “officers,” including elected County officers and candidates seeking elective office, who may participate in making a decision on certain County contracts. Elected

County officers in San Mateo County include: the San Mateo County Board of Supervisors, Assessor-County Clerk-Recorder, County Controller, Coroner, District Attorney, Sheriff, and Tax

Collector-Treasurer.Generally, under current County policy, approval by the Board of

Supervisors is required for any agreement for services above $200,000, and agreements for

Page 13 of 17 Release date of August 6, 2026 services below that threshold may be approved by Department heads.If your proposal is selected, you will be required to certify compliance with the Levine Act.As part of this process, you will need to certify and warrant that you have fully complied, and will remain in full compliance, with all applicable requirements of the Levine Act in connection with the

Agreement, including making any required disclosures of campaign contributions to County

Officers, which includes but may not be limited to elected County Officers. Elected County

Officers include members of the San Mateo County Board of Supervisors, as well as the

Assessor-County Clerk-Recorder, Controller, Coroner, District Attorney, Sheriff, and Tax

Collector-Treasurer. Any campaign contribution required to be disclosed under the Levine Act in connection with this Agreement shall be disclosed on the County of San Mateo Levine Act

Disclosure Form, a copy of which is available from the County upon request.Parties are solely responsible for accurate certification and disclosure. The Levine Act is complex, and this brief description is not legal advice. For example, certain contributions must be aggregated when determining whether contributions have exceeded the $500 threshold. If your proposal is selected, you are urged to review the Levine Act and consider consulting an attorney.

7.4. Term

Parks Department is issuing Request for Proposal (RFP) No. 2027-RFP-00030 for Folger Stable Arena

Footing Replacement.

The agreement shall have a term of one (1) year. The County’s standard contract template has been included with this solicitation. The awarded contractor will be expected to sign an agreement prepared by the County using this template. Please ensure that your firm has completed legal review of these contract terms. If your firm wishes to request exceptions to these standard terms, submit a Contract Exceptions

Request by the Deadline for Questions, Comments and Contract Exceptions listed in the Solicitation

Schedule below. The County will consider Contract Exceptions Requests but reserves the right to reject requested modifications to its standard terms.

8. Terms and Conditions for Receipt of Proposals

8.1. Errors, Omissions and Inquiries regarding the RFP

Proposers are responsible for reviewing all portions of this RFP. Proposers are to notify the department, in eProcurement portal, if the proposer discovers any ambiguity, discrepancy, omission, or apparent error in the RFP. Such notification should be made promptly after discovery, but in no event later than five business days prior to the deadline for receipt of proposals. Modifications and clarifications will be made by addenda as provided below.

Inquiries regarding the RFP should be lodged in eProcurement portal.

8.2. Objections to RFP Terms

Should a proposer object on any ground to any provision or legal requirement set forth in this RFP, the proposer must, not more than ten calendar days after the RFP is issued, provide written notice to the department, via eProcurement portal, setting forth with specific grounds for the objection.

Page 14 of 17 Release date of August 6, 2026

8.3. Addenda

The County may cancel, revise, or reissue this RFP, in whole or in part, for any reason. Revisions will be posted as Addenda on eProcurement portal. No other revision of this RFP is valid. Proposers shall be responsible for ensuring that their proposals reflects any and all Addenda issued by the County prior to the proposal due date regardless of when a proposal is submitted. Therefore, the County recommends that proposers consult eProcurement portal frequently, including shortly before the proposal due date, to confirm that all Addenda have been downloaded.

8.4. Term of Proposal

Submission of a proposal signifies that the proposed services and prices are valid for the duration of the proposed agreement term and that the quoted prices are genuine and not the result of collusion or any other anti-competitive activity.

8.5. Revision or Withdrawal of Proposal

A proposer may revise a proposal on the proposer’s own initiative at any time before the deadline for submission of proposals. The proposer must submit the revised proposal in the same manner as the original on or before the proposal due date.

A proposer may withdraw a proposal at any time before the deadline for submission of proposals. After that time, whether or not a new RFP is issued for the same subject matter, withdrawal of a proposal may preclude the proposer from participating in the procurement as a proposer or subcontractor, except that an original equipment manufacturer may participate indirectly through a reseller.

8.6. Errors and Omissions in Proposal

The County will not be liable for any errors in proposals. Proposals may be rejected as unresponsive if they are incomplete, are missing pages or information, or cannot be opened for any reason. The County may waive minor irregularities, but such waiver will not modify any of the remaining RFP requirements.

8.7. No Commitment

Neither submission of a proposal nor the County’s receipt of proposal materials confers any right to the proposer nor any obligation on the County. This RFP does not commit the County to award a contract.

8.8. Financial Responsibility

The County shall have no financial responsibility for any costs incurred by a firm in responding to this

RFP or participating in any presentations or negotiations.

8.9. Estimated Quantity

If the RFP results in an indefinite quantity or a requirements agreement, the goods and services actually requested by the County may be less than the maximum value of the agreement and there is no guarantee, either expressed or implied, as to the actual quantity of goods and services that will be authorized under the agreement.

8.10. Public Record

A. General

Page 15 of 17 Release date of August 6, 2026

1. All proposals, protests, and information submitted in response to this solicitation will become the property of the County and will be considered public records. As such, they may be subject to public review.

2. Any contract arising from this RFP will be a public record.

3. The County is not seeking proprietary information and will not assert any privileges that may exist on behalf of the proposer.

4. Submission of any materials in response to this RFP constitutes:

▪ Consent to the County’s release of such materials under the Public Records Act without notice to the person or entity submitting the materials; and

▪ Waiver of all claims against the County and/or its officers, agents, or employees that the

County has violated a proposer's right to privacy, disclosed trade secrets, or caused any damage by allowing the proposal or materials to be inspected; and

▪ Agreement to indemnify and hold harmless the County for release of such information under the Public Records Act; and

▪ Acknowledgement that the County will not assert any privileges that may exist on behalf of the person or entity submitting the materials.

8.11. Reservations of Rights by the County

The issuance of this RFP does not constitute an agreement by the County that any contract will actually be entered into by the County. The County expressly reserves the right at any time to:

• Waive or correct any defect or informality in any response, proposal, or proposal procedure;

• Reject any or all proposals;

• Reissue an RFP;

• Prior to submission deadline for proposals, modify all or any portion of the selection procedures, including deadlines for accepting responses, the specifications or requirements for any materials, equipment or services to be provided under this RFP, or the requirements for contents or format of the proposals;

• Procure any materials, equipment or services specified in this RFP by any other means; or

• Determine that no project will be pursued.

8.12. No Waiver

No waiver by the County of any provision of this RFP shall be implied from any failure by the County to recognize or take action on account of any failure by a proposer to observe any provision of this RFP.

Page 16 of 17 Release date of August 6, 2026

8.13. Cooperative Agreement (Piggyback)

This competitive solicitation is being conducted as a Cooperative Procurement. The services, terms and conditions of any agreement resulting from this solicitation may be used by other organizations as a

Cooperative Agreement.

This provision in no way commits any affiliate to procure services from any awarded contractor, nor does it guarantee that any additional orders will result. At their discretion, and subject to their own procurement policies, interested organizations may make use of this competitive procurement and contract directly from the awarded contractor.

9. Protest Procedures

9.1. Protest of Non-Responsiveness Determination

Within five (5) working days of the County's issuance of a notice of non-responsiveness, any firm that has submitted a proposal and believes that the County has incorrectly determined that its proposal is non-responsive may submit a written notice of protest. Such notice of protest must be received by the County on or before the fifth working day following the County's issuance of the notice of non-responsiveness. The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest.

9.2. Protest of Contract Award

Within five (5) working days of the County's issuance of a notice of intent to award the contract, any firm that has submitted a responsive proposal and believes that the County has incorrectly selected another proposer for award may submit a written notice of protest. Such notice of protest must be received by the

County on or before the fifth working day after the County's issuance of the notice of intent to award.

The notice of protest must include a written statement specifying in detail each and every one of the grounds asserted for the protest. The protest must be signed by an individual authorized to represent the proposer, and must cite the law, rule, local ordinance, procedure or RFP provision on which the protest is based. In addition, the protestor must specify facts and evidence sufficient for the County to determine the validity of the protest.

9.3. Delivery of Protests

All protests must be received by the due date. If a protest is mailed, the protestor bears the risk of non-delivery within the deadlines specified herein. Protests should be transmitted by a means that will objectively establish the date the County received the protest. Protests or notice of protests made orally

(e.g., by telephone) will not be considered. Protests must be delivered to:

Protests@smcgov.org

Subject: Folger Stable Arena Footing Replacement, 2027-RFP-00030

Page 17 of 17 Release date of August 6, 2026

1. Introduction and Schedule
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Scope of Work
2.1. 2. Scope of Work
2.2. Notices
3. Submission Requirements
3.1. Submission Deadline
3.2. Pre-submission Registration
3.3. Submission via eProcurement Portal
3.4. Procurement Preference for Local Businesses and Local Non-Profits
4. Minimum Qualifications, Local Preference Ordinance, and Technical Proposal
4.1. Minimum Qualifications
4.1.1. Has Proposer has been providing similar services for a minimum of four (4) years within the last seven (7) years?*
4.1.2. Account manager has a minimum of two (2) years of experience within the last five (5) years in providing account services?*
4.1.3. Vendor is not excluded, suspended, or debarred from the System for Award Management (SAM).*
4.1.4. What is the registered Business Name and Unique Entity ID (UEI) No.? (If Applicable)
4.2. Technical Proposal
4.2.1. Introduction and Executive Summary *
4.2.2. Statement of Minimum Qualifications *
4.2.3. Project Approach*
4.2.4. Milestones and Schedule*
4.2.5. Firm Qualifications *
4.2.6. References*
5. Pricing Proposal
6. Evaluation and Selection Criteria
7. Instructions to Proposers
7.1. Instructions
7.2. Communications
7.3. Contract Award
7.4. Term
8. Terms and Conditions for Receipt of Proposals
8.1. Errors, Omissions and Inquiries regarding the RFP
8.2. Objections to RFP Terms
8.3. Addenda
8.4. Term of Proposal
8.5. Revision or Withdrawal of Proposal
8.6. Errors and Omissions in Proposal
8.7. No Commitment
8.8. Financial Responsibility
8.9. Estimated Quantity
8.10. Public Record
8.11. Reservations of Rights by the County
8.12. No Waiver
8.13. Cooperative Agreement (Piggyback)
9. Protest Procedures
9.1. Protest of Non-Responsiveness Determination
9.2. Protest of Contract Award
9.3. Delivery of Protests

File details come from the government source that posted it. Updated .