This is a Justification for an Exception to Fair Opportunity (D&F) document approving a modification to an existing task order under the Base Infrastructure Modernization (BIM) Multiple Award Program.

The document authorizes merging Task Order 5 (FA8726-26-F-B050) and Task Order 6 (FA8726-26-F-B051) under a single task order, both awarded to SMS Data Products Group, Inc. on June 3, 2026. Task Order 5 covers six Air National Guard bases (101 Air Refueling Wing Bangor ME; 110 Fighter Wing Battle Creek MI; 134 Air Refueling Wing McGhee Tyson TN; 134 Air Refueling Wing GSU Chattanooga TN; 157 Air Refueling Wing Pease NH; 175 Wing Warfield MD), while Task Order 6 covers seven bases (115 Fighter Wing Truax Field WI; 121 Air Refueling Wing Rickenbacker OH; 121 Air Refueling Wing GSU Zanesville OH; 128 Air Refueling Wing General Mitchell Milwaukee WI; 178 Wing Springfield-Beckley OH; 178 Wing GSU 123 Air Control Squadron Blue Ash OH; 180 Fighter Wing Toledo OH). Both orders involve a five-year performance period (12-month base plus four one-year options) providing modernized network infrastructure-as-a-Service, including site surveys, design, deployment, and operations. The modification is justified under RFO 16.507-6(b)(3) as a logical follow-on to previously competed orders that achieve administrative efficiencies and cost savings (approximately $393,400) by consolidating three CDRLs. Both task orders were set aside for Small Businesses and competitively awarded under Fair Opportunity. The approval authority is JOSEPH J. BUZZELL, Competition Advocate, with approvals dated August-September 2026.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction

May 2026 Page 3 of 6May 2026 Page 3 of 6

Ultimately, given the nature of the work to be performed, maintaining two separate Task Orders for work that can instead be performed through a single Task Order covering both groups of bases only serves to incur additional administrative burden without presenting any operational benefits to the Government.

(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:

The anticipated price/cost to the Government has already been determined fair and reasonable based on originally awarded competitions. The price/cost of each proposal was evaluated in the evaluations of proposals in response to their respective solicitations and each were found fair and reasonable therein. As this action will merge the two Task Orders for no additional costs beyond those already captured and established by each Task Order as being fair and reasonable, the price/cost to the Government is fair and reasonable.

(6) Other facts supporting the justification:

Both Task Orders were set aside for Small Businesses and the BIM Multiple Award Program has a class Determination & Findings addressing consolidation and substantial bundling.

Merging the performance of the two Task Orders does not represent an impact on the Small Business strategy, as offerors were able to receive award for one or both Task Orders and merging both Task Orders would not impact the ability nor interest of Small Businesses regarding competition. The BIM Multiple Award Program is a substantially bundled acquisition, with a class Determination and Findings for Substantial Bundling and Consolidation approved by the Senior Procurement Executive on 11 December 2023.

The ceiling of the BIM Multiple Award Program is $8,750,000,000.00 with $ in ceiling remaining; individual IDIQs under the BIM Multiple Award Program do not have their own independent ceilings. This action does not change the total awarded amount to date.

(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:

The BIM Multiple Award Program is driven by competing Task Orders, and as these two Task Orders were awarded on the basis of competition under Fair Opportunity and this action merely combines the work of two independently competed Task Orders, there are no barriers to Fair Opportunity represented by this action nor the surrounding circumstances.

(8) Program Manager's certification that supporting data is accurate and complete:

As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.

(9) Contracting Officer's certification that the justification is accurate and complete:

As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.

(10) Approving Official's determination that one of the circumstances in RFO 16.507-6(b) applies to the order.

As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.

May 2026 Page 5 of 6May 2026 Page 5 of 6

Instructions for Completing the Template

(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).

(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts.

(Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).

(4) Include the appropriate exception from RFO 16.507-6(b) and the supporting rationale. RFO 16.507-2(a) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding the micro-purchase threshold unless a statutory exception applies. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.

RFO 16.507-6(b)(1): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.

RFO 16.507-6(b)(2): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information.

Supporting documentation may be attached to the back of the document. General statements are not acceptable.

RFO 16.507-6(b)(3): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information.

General statements are not acceptable.

RFO 16.507-6(b)(4): “It is necessary to place an order to satisfy a minimum guarantee.”

RFO 16.507-6(b)(5): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”

RFO 16.507-6(b)(6): “For DoD, the order satisfies one of the exceptions permitting the use of other than full and open competition listed in part 6.103 (10 U.S.C. 3406(c)(5)). The public interest exception must not be used unless Congress is notified in accordance with 10 U.S.C. 3204(a)(7).”

Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of fair opportunity could

May 2026 Page 6 of 6 not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.

If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.

(5) Provide any other facts supporting the use of exceptions to the fair opportunity process.

(6) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

New RFO 6.103 Exceptions for drop down 6.103-1 Only one responsible source and no other supplies or services will satisfy agency requirements 6.103-2 Unusual and compelling urgency 6.103-3 Industrial mobilization; engineering, developmental, or research capability; or expert services 6.103-5 Authorized or required by statute 6.103-6 National security 6.103-7 Public interest

File details come from the government source that posted it. Updated .