This federal funding opportunity announcement solicits applications for the Bureau of Ocean Energy Management's Multi-Agency Rocky Intertidal Network program. The program provides $2.575 million over five years to continue monitoring 32 rocky intertidal sites along the west coast of the United States. The objectives are to determine spatial and temporal trends for selected species and communities; measure diversity, size structure, and changes over time and in response to impacts. The single source cooperative agreement will be awarded to the University of California-Santa Cruz. Applications are due by July 31, 2023. The award period is expected to begin on August 30, 2023. Eligible applicants are limited to the University of California-Santa Cruz. Applications must meet requirements for technical and scientific merit, work plan, staff qualifications, budget, and dissemination of results. The program is assigned to federal grant 15.423 for the Bureau of Ocean Energy Management's Environmental Studies program.

FOA M23AS00335.pdf

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Ocean Energy Management

BOEM - Acquisition Policy and Financial Assistance

M23AS00335

07/31/2023

Table of Contents A. Program Description

A1. Authority

A2. Background, Purpose and Program Requirements

A3. Technical Assistance and Information for Prospective Applicants

B. Federal Award Information

B1. Total Funding

B2. Expected Award Amount

B3. Anticipated Dates

B4. Period of Performance

B5. Numbers of Awards

B6. Type of Award

B7. Other Federal Information

C. Eligibility Information

C1. Eligible Applicants

C2. Cost Sharing or Matching

C3. Other

D. Application and Submission Information

D1. Address to Request Application Package

D2. Content and Form of Application Submission

D3. Unique Entity Identifier and System for Award Management (SAM)

D4. Submission Dates and Times

D5. Intergovernmental Review

D6. Funding Restrictions

D7. Other Submission Requirements

D8. Application Checklist

E. Application Review Information

E1. Criteria

E2. Review and Selection Process

E3. CFR - Regulatory Information

E4. Anticipated Announcement and Federal Award Dates

F. Federal Award Administration Information

F1. Federal Award Notices

F2. Administrative and National Policy Requirements

F3. Reporting

G. Federal Awarding Agency Contact(s)

G2. Administrative/Budget Questions Program Office Contact

G3. Grants Staff Contact

G4. Technical Support

H. Other Information

A. Program Description

A1. Authority

The Outer Continental Shelf (OCS) Lands Act Amendments of 1978, 92 Stat. 653, codified at 43 U.S.C. 1346, which authorizes the Secretary of the Interior to conduct studies of any area or region "to establish information needed for assessment and management of environmental impacts on the human, marine, and coastal environments of the outer Continental Shelf and the coastal areas which may be affected by oil and gas or other mineral development." The Secretary of the Interior is also authorized to, by agreement "utilize, with or without reimbursement, the services, personnel, or facilities of any Federal, State, or local government agency" to carry out the Act. 43 U.S.C. 1346(c)

A2. Background, Purpose and Program Requirements

Purpose

The purpose of this study is to evaluate impacts to rocky shore species from OCS activities. The rocky intertidal areas established by the Multi-Agency Rocky Intertidal Network (MARINe) represent over 20 years of continuous monitoring adjacent to Outer Continental Shelf (OCS) facilities off southern California. National Parks, Marine Sanctuaries, California State Agencies and their citizens depend on this information to evaluate potential impacts and manage water quality, protected areas, public health and natural resources. Results from this study were used in oil spill resource damage assessments, listing and endangered species consultations of black abalone, California Marine Protected Area designations, and California Areas of Special Biological Significance assessments. MARINe data remain essential for assessing damages and predicting recovery from oils spills. MARINe data were used in past spills including one Federal pipeline and two tanker oil spills offshore California, and a pipeline oil spill near several Platforms in 2015. MARINe sites established offshore of Oregon adjacent to a potential lease area have established an ecological baseline condition of the shoreline before wave energy devices are deployed offshore. These sites also provide a strong latitudinal comparison to California sites, which can monitor for and help prepare for baseline assessments in areas considered for the BOEM National Program Oil and Gas Program.

This study implements BOEM’s Outer Continental Shelf Lands Act mandate to monitor the marine and coastal environments adjacent to OCS operations.

Background

Potential impacts to the shoreline are of particular concern in the Pacific Region because OCS operations are located close to shore. Public concern about these potential impacts has a considerable influence on planning and operations. BOEM and its 43 partners in MARINe (Multi-Agency Rocky Intertidal Network) biannually monitor over 130 established shoreline rocky intertidal sites from California to British Columbia. BOEM makes up approximately one third of the MARINe partnership by funding 32 monitoring sites spread across over 600 miles of coastline, all adjacent to existing oil and gas OCS operations in southern California and planned OCS wave energy activities off Oregon. MARINe employs standardized field protocols to collect biological and physical attributes. MARINe hosts a shared publicly available database and website, which gets about 5 data requests and 250 website hits a month. BOEM continues to participate in the management of MARINe.

MARINe and BOEM’s specific monitoring efforts have affected decisions made within BOEM and other agencies. Declines in black abalone populations at MARINe sites near OCS facilities led to their listing as endangered (see January 14, 2009, Federal Register Notice). Analysis revealed that OCS operations were not responsible for this decline. In 2013, a fatal sea star disease has rapidly spread across the coastline to MARINe sites from Alaska to San Diego causing a 90% decline in the population. MARINe assessed the spread of the disease and continues to be a source of information for the media and public.

Partnerships are fostered through MARINe with local, state, federal, and Tribal government agencies involved in monitoring research. This is an important cooperative agreement with the State of California as the key source of rocky intertidal information being used across California to determine changes in Marine Life Protected Areas and Areas of Special Biological Significance. MARINe received the 2012 Partners in Conservation Award from the Secretary of the Interior for its contribution to science through this unique effort.

Objectives

This study provides for the continued monitoring of 32 rocky intertidal sites on the mainland shore immediately adjacent to OCS oil and gas facilities offshore southern California and a potential OCS wave energy facility offshore Oregon. The following objectives are necessary to meet this goal:

Determine spatial and temporal trends for selected species and communities at 32 sites along the U.S. West Coast.

Determine species diversity and other community metrics and compare among sites, in particular, between OCS and non-OCS sites.

Measure size-structure (as a proxy for age class) of black abalone, owl limpets, and sea stars change over time and in response to punctuated impacts.

Proactively engage with Native American Tribal Nations to better understand their practices of coastal harvest and their current and/or ancestral ties to coastal areas and possess multi-generational knowledge of these habitats.

Catalog of Federal Domestic Assistance (CFDA) Number 15.423 Authorization Legislation Section 1346 of the Outer Continental Shelf Lands Act (OCSLA) mandates the conduct of environmental and socioeconomic studies needed for the assessment and management of environmental impacts on the human, marine, and coastal environments which may be affected by oil and gas or other mineral development. OCSLA Section 1345 authorizes the use of cooperative agreements with affected States to meet the requirements of OCSLA, including sharing of information, joint utilization of available expertise, formation of joint monitoring arrangements to carry out applicable Federal and State laws, regulations, and stipulations relevant to outer continental shelf operations both onshore and offshore.

A3. Technical Assistance and Information for Prospective Applicants

B. Federal Award Information

B1. Total Funding

Estimated Total Funding $2,575,000

B2. Expected Award Amount

Maximum Award Amount $2,575,000 Minimum Award Amount $2,525,000

B3. Anticipated Dates

Award Start Date August 30, 2023

B4. Period of Performance

Length of Project Periods 60-month project period with five 12-month budget periods

Project Period l Expectation Duration in Months 60-month project period with five 12-month budget periods.

When allocating funds across years, approximately 15 percent will be set aside for requisitioning at end of project. This may provide an incentive for PIs to provide all deliverables. This percentage is variable and will be set to ensure flow of funds does not disrupt progress of the work.

B5. Numbers of Awards

Expected Number of Awards

B6. Type of Award

Funding Instrument Type CA - Cooperative Agreement

B7. Other Federal Information

Type of Competition Open to All Eligible Applicants

C. Eligibility Information

C1. Eligible Applicants

06 – Public and State controlled institutions of higher education 25 – Others (see text field entitled “Additional Information on Eligibility” for clarification) Additional Information on Eligibility Single Source Cooperative Agreement with University of California-Santa Cruz.

C2. Cost Sharing or Matching

Cost Sharing/Matching Requirement No Percentage of Cost Sharing / Matching Requirement:

C3. Other

Excluded Parties:

BOEM conducts a review of the SAM.gov Exclusions database for all applicant entities and their key project personnel prior to award. The Bureau cannot award funds to entities or their key project personnel identified in the SAM.gov Exclusions database as ineligible, prohibited/restricted or otherwise excluded from receiving Federal contracts, certain subcontracts, and certain Federal assistance and benefits, as their ineligibility condition applies to this Federal program.

D. Application and Submission Information

D1. Address to Request Application Package

The application must be submitted through the www.Grants.gov portal.

The applicant can locate the application package by visiting the Grants.gov portal and searching on CFDA number 15.423 or Announcement M23AS00335 in the Grants.gov search engine. See sections D3 and D7 for more information on the application process.

D2. Content and Form of Application Submission

SF-424, Application for Federal Assistance In addition to the SF-424 Application for Federal Assistance applicants must submit the following:

SF-424a Budget Information - Non-Construction Programs SF-424b Assurances - Non-Construction Programs Project Narrative Budget Narrative with Federally Negotiated Indirect Cost Rate Agreement Budget Worksheet Grants.gov Lobbying Form Complete SF-LLL only if lobbying has occurred.

These forms will be with the Grants.gov announcement package.

Project Summary BOEM-MARINe (Multi-Agency Rocky Intertidal Network) (National Studies List (NSL) #

PC-23-01)

Project Narrative The Project Narrative should include the Proposal Cover Sheet and Proposal Text.

1. Proposal Cover Sheet: The cover sheet of the proposal shall contain the following information:

a. Project Title:

b. PI(s):

1. Name:

2. Address:

3. Phone:

4. E-mail:

c. Name of State Agency or University/Department:

d. Contact Information for Technical and Administrative Negotiations

e. Project Status: New/Continuation

f. Project Duration: (years or months)

g. Proposed Start Date:

h. Proposed Draft Final Report Submission Date:

i. Proposed Completion Date:

j. Amount Requested From BOEM:

k. Amount and Sources of Non-Federal Match

l. Total Project Cost:

m. Signature, Name, and Contact Information of State or University PI and Co-Investigator:

n. Proposal Endorsement, including Signature, Name, Contact Information of State

Authorizing Official or Sponsoring University Department Dean or Institute Director:

o. Signature, Name and Contact Information of Authorized State Official, Office of

Sponsored Programs, or Appropriate Cooperative Ecosystem Studies Unit, etc.

2. Proposal Text: The proposal must be in 11–12 point Times New Roman, Arial, or similar font with 1”-page margins. Non-conforming proposals will not be considered. Text, figures, etc. in support of items a-i below should be no longer than 15 pages.

Please include the following in the Proposal:

a. Abstract

b. Background/Relevance to BOEM Issues, Information Needs, and Research Topics: Give a brief introduction to the research proposed. Specify the contribution to science related to the program issues and the benefits that the public will receive from the project.

Explain why the work is important and how the proposal addresses BOEM goals. Provide a brief summary of findings or outcomes of any prior work you have completed in this area.

c. Objectives/Hypotheses: Clearly define goals of the project.

d. Methods/Analyses: Provide a clear description of planned research methodologies and analyses.

e. Project Deliverables and Planned Products: Applicant shall provide plans for executing the project tasks listed in the attached Statement of Work, including a rough timeline for these deliverables.

f. Staffing Plan: All key personnel (including graduate student workers) shall be identified by name. List the Principle Investigator first, followed by the names of other individuals.

Indicate the role and anticipated level of effort for each key participant offering unique or specific contributions to the project (oceanographer, geochemist, field assistant, etc.). If names of any key participants are unknown, a proposal addendum with the names and curricula vitae must be submitted prior to award.

g. Performance Measures: Applicant shall suggest specific measures that will be used to monitor project progress, including progress of sub-awardees (e.g., quality and timely deliverables, timely completion of fieldwork or other project components, draft peer-reviewed articles). These performance measures will be incorporated in the cooperative agreement award and reviewed as part of any continuation request.

h. Critical Starting Dates (e.g., for season-limited field work): Identify any critical starting dates and the reason why project success is dependent upon that start date.

i. Publication and Presentation: BOEM strongly encourages the Awardee to publish project reports in scientific and technical journals, and present results to the scientific community, appropriate professional organizations, and local, State, and/or Federal agencies as part of the project (please also see Section H). These publications and meetings should be included in the proposal and budget.

j. Bibliography: List all references cited in the text, as well as references that are relevant to the current proposal from your past work in the field.

k. Curricula Vitae (maximum two pages) for each identified key participant. Emphasize previous experience in the field of study that the proposal addresses.

l. Letters of Commitment: Provide signed letters of commitment by matching fund grantors, contractors, and sub-grantees.

SF 424A, Budget Information for Non-Construction Programs

Applicants must show funds requested from this Federal program separately from any other Federal sources of funding. In the “Budget Summary” section of the appropriate SF-424 budget form, use the first row for funding requested from this Federal program. Use subsequent row(s) for funding requested from this Federal program. Use subsequent row(s) for other Federal funding. Enter each Federal program’s CFDA number(s) in the corresponding fields on the form.

Federal award recipients and subrecipients are subject to Federal award cost principles per the “DOI Standard Award Terms and Conditions”. The CFDA number(s) for this program appears on the first page of this announcement.

Budget Narrative/Detailed Spreadsheet Describe and justify requested budget items and costs. Detail how the SF-424 Budget Information, Object Class Category totals were determined. For personnel salary costs, include the baseline salary figures and the estimates of time. Describe any item of cost that requires prior approval under the Federal cost principles. See 2 CFR 200.407 “Prior written approval (prior approval)” for more information. If equipment purchased previously with Federal funds is available for the project, provide a list of that equipment and identify the Federal funding source.

1. Budget Spreadsheet: Include information in a format that provides personnel, travel, services, supplies, equipment, tuition, and indirect costs on an annual basis for both the requested BOEM funds and for the anticipated match funds if applicable. Detail how the SF-424 Budget Information, Object Class Category totals were determined.

2. Budget Narrative: This information will provide more details than the SF-424a form and will provide adequate information for the Contracting Officer to conduct a detailed analysis of the costs to determine they are reasonable, allowable, and allocable. Describe and justify requested https://www.doi.gov/grants/doi-standard-terms-and-conditions budget items and costs.

Please include the following:

a. Salaries and Wages. List positions, rate of compensation, and estimates of time spent on the project for employees.

b. Fringe Benefits/Labor Overhead. Indicate the rates/amounts in conformance with normal accounting procedures. Explain what costs are covered in this category and the basis of the rate computations. Provide a copy of the negotiated rate agreement, if available.

c. Lab Analyses. Briefly itemize cost of all analytical work.

d. Supplies. Enter the cost for all tangible property. Include the cost of office, laboratory, computing, and field supplies separately. Provide detail on any specific item that represents a significant portion of the proposed amount. Provide a statement that supplies will be purchased in accordance with 2 CFR 200.317 (State Governments) or 2 CFR 200.318-327.

e. Equipment. Show the cost of all special-purpose equipment necessary for achieving the objectives of the project. “Special-purpose equipment” means scientific equipment having a useful life of more than 1 year and having an acquisition cost of $5,000 or more per item. Each item should be itemized and include a full justification and a dealer or manufacturer quote, if available. Title to non-expendable personal property shall be vested solely with the recipient. Under no circumstances shall property title be vested in a sub-tier recipient. Provide a statement that equipment will be purchased in accordance with 2 CFR 200.317 (State Governments) or 2 CFR 200.318-327 and managed in accordance with 2 CFR 200.313.

General-purpose equipment (used also for purposes other than this project) must be purchased from the applicant’s operating funds.

f. Services or Consultants. Identify the tasks or problems for which such services would be used. List the contemplated sub-recipients by name (including consultants), the estimated amount of time required, and the quoted rate per day or hour. Sub-applicant proposals should provide cost breakdowns at the same level of detail as the Applicant’s proposal. If contract employees are hired, include their total time, rate of compensation, job titles, and roles. Provide a statement that salaries will be charged at the actual rate and that the rate is comparable to others doing similar work within the organization.

g. Travel. State the purpose of the trip and itemize the estimated travel costs to show the number of trips required, the destinations, the number of people traveling, the per diem rates, the cost of transportation, and any miscellaneous expenses for each trip.

Calculations of other special transportation costs (such as charges for use of applicant-owned vehicles or vehicle rental costs) should also be shown.

h. Publication Costs. Indicate an estimate of labor and other unique costs associated with preparation of the draft final report. If publication of results of the research in the peer-reviewed literature (identify likely publications) is anticipated, include costs of drafting or graphics, reproduction, page or illustration charges, and a minimum number of reprints.

i. Other Direct Costs. Itemize the different types of costs not included elsewhere.

j. Total Direct Charges. Sum of above items.

k. Indirect Charges (Overhead). Indirect cost/general and administrative (G&A) cost. Show the proposed rate, cost base, and proposed amount for indirect costs based on the cost principles applicable to the Applicant’s organization. If the Applicant has separate rates for recovery of labor overhead and G&A costs, each charge should be shown. Provide a copy of the negotiated rate agreement with the applicant’s federal cognizant audit agency.

l. Amount Proposed. Sum of Total Direct Charges and Indirect Charges (Overhead).

Conflict of Interest Disclosure Per the Financial Assistance Interior Regulation (FAIR), 2 CFR §1402.112, applicants must state in their application if any actual or potential conflict of interest exists at the time of submission.

Please reference the Federal Activities Inventory Reform Act for additional details.

(a) Applicability.

(1) This section intends to ensure that non-Federal entities and their employees take appropriate steps to avoid conflicts of interest in their responsibilities under or with respect to Federal financial assistance agreements.

(2) In the procurement of supplies, equipment, construction, and services by recipients and by subrecipients, the conflict of interest provisions in 2 CFR 200.318 apply.

(b) Notification. (1) Non-Federal entities, including applicants for financial assistance awards, must disclose in writing any conflict of interest to the DOI awarding agency or pass-through entity in accordance with 2 CFR 200.112.

(2) Recipients must establish internal controls that include, at a minimum, procedures to identify, disclose, and mitigate or eliminate identified conflicts of interest. The recipient is responsible for notifying the Financial Assistance Officer in writing of any conflicts of interest that may arise during the life of the award, including those that have been reported by subrecipients.

(c) Restrictions on lobbying. Non-Federal entities are strictly prohibited from using funds under a grant or cooperative agreement for lobbying activities and must provide the required certifications and disclosures pursuant to 43 CFR part 18 and 31 U.S.C. 1352.

(d) Review procedures. The Financial Assistance Officer will examine each conflict of interest disclosure on the basis of its particular facts and the nature of the proposed grant or cooperative agreement, and will determine whether a significant potential conflict exists and, if it does, develop an appropriate means for resolving it.(e) Enforcement. Failure to resolve conflicts of interest in a manner that satisfies the government may be cause for termination of the award.

Failure to make required disclosures may result in any of the remedies described in 2 CFR 200.338, Remedies for noncompliance, including suspension or debarment (see also 2 CFR part 180).

Single Audit Reporting Statement All U.S. states, local governments, federally recognized Indian tribal governments, and non-profit organizations expending $750,000 USD or more in Federal award funds in the applicant’s fiscal year must submit a Single Audit report for that year through the Federal Audit Clearinghouse’s Internet Data Entry System. U.S. state, local government, federally recognized Indian tribal government, and non-profit applicants must state if your organization was or was not required to submit a Single Audit report for the most recently closed fiscal year. If your organization was required to submit a Single Audit report for the most recently closed fiscal year, provide the EIN associated with that report and state if it is available through the Federal Audit Clearinghouse website.

https://www.ecfr.gov/cgi-bin/text-idx?SID=2cb9f6d1c1c131ed576a5e65845ef3fa&mc=true&node=se2.1.1402_1112&rgn=div8 https://www.doi.gov/pam/programs/acquisition/fair-activities-inventory-reform-act https://harvester.census.gov/facides/Account/Login.aspx https://harvester.census.gov/facides/Account/Login.aspx https://harvester.census.gov/facdissem/Main.aspx https://harvester.census.gov/facdissem/Main.aspx

Certification Regarding Lobbying Applicants requesting more than $100,000 in Federal funding must certify to the statements in 43 CFR Part 18, Appendix A-Certification Regarding Lobbying. If this application requests more than $100,000 in Federal funds, the Authorized Official’s signature on the appropriate SF-424, Application for Federal Assistance form also represents the entity’s certification of the statements in 43 CFR Part 18, Appendix A.

Applicants and recipients must not use any federally appropriated funds (annually appropriated or continuing appropriations) or matching funds under a Federal award to pay any person for lobbying in connection with the award. Lobbying is influencing or attempting to influence an officer or employee of any U.S. agency, a Member of the U.S. Congress, an officer or employee of the U.S. Congress, or an employee of a Member of the U.S. Congress connection with the award. Applicants and recipients must complete and submit the SF-LLL, Disclosure of Lobbying Activities if the Federal share of the proposal or award is more than $100,000 and the applicant or recipient has made or has agreed to make any payment using non-appropriated funds for lobbying in connection with the application or award. The SF-LLL form is available on the “Packages” tab of this Funding Opportunity on Grants.gov. See 43 CFR, Subpart 18.100 for more information on when additional submission of this form is required.

Overlap or Duplication of Effort Statement Applicants must provide a statement indicating if there is any overlap between this Federal application and any other Federal application, or funded project, in regards to activities, costs, or time commitment of key personnel. If no such overlap or duplication exists, state, “There are no overlaps or duplication between this application and any of our other Federal applications or funded projects, including in regards to activities, costs, or time commitment of key personnel”.

If any such overlap exists, provide a complete description of overlaps or duplications between this proposal and any other federally funded project or application in regards to activities, costs, and time commitment of key personnel, as applicable. Provide a copy of any overlapping or duplicative proposal submitted to any other potential funding entity and identify when that proposal was submitted, to whom (entity name and program), and when you anticipate being notified of their funding decision.

D3. Unique Entity Identifier and System for Award Management (SAM)

Identifier and System for Award Management (SAM.gov) Registration: This requirement does not apply to individuals applying for funds as an individual (i.e., unrelated to any business or nonprofit organization you may own, operate, or work within), or any entity with an exception to bypass SAM.gov registration with prior approval from the funding bureau or office in accordance with bureau or office policy. All other applicants are required to register in SAM.gov prior to submitting a Federal award application and obtain a Unique Entity Identifier (UEI) which replaces the Data Universal Numbering System (DUNS) number from Dun & Bradstreet in April 2022. A Federal award may not be made to an applicant that has not completed the SAM.gov registration. If an applicant selected for funding has not completed their SAM.gov registration by the time the program is ready to make an award, the program may determine the applicant is not qualified to receive an award. Federal award recipients must also continue to http://www.ecfr.gov/cgi-bin/text-idx?SID=683823273fc0da6a1060883eda593fb8&mc=true&node=pt43.1.18&rgn=div5 http://www.ecfr.gov/cgi-bin/text-idx?SID=683823273fc0da6a1060883eda593fb8&mc=true&node=pt43.1.18&rgn=div5 https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update maintain an active SAM.gov registration with current information through the life of their Federal award(s).

Register with the System for Award Management (SAM)

Applicants can register on the SAM.gov website. The “Help” tab on the website contains User Guides and other information to assist you with registration. The Grants.gov “Register with SAM” page also provides detailed instructions. Applicants can contact the supporting Federal Service Desk for help registering in SAM. Once registered in SAM, entities will be assigned a Unique Entity Identifier (UEI). Entities must renew and revalidate their SAM registration at least once every 12 months from the date previously registered. Entities are strongly encouraged to revalidate their registration as often as needed to ensure their information is up to date and reflects changes that may have been made to the entity’s IRS information. There is no cost to register with SAM.gov. There are third-party vendors who will charge a fee in exchange for registering entities with SAM.gov; please be aware you can register and request help for free. If applicable, foreign entities who want to receive payment directly to a U.S. bank account must enter and maintain valid, current banking information in SAM.

D4. Submission Dates and Times

Application Due Date 07/31/2023 Application Due Date Explanation Electronically submitted application must be submitted no later than 5:00 p.m., EDT, on the listed application due date.

D5. Intergovernmental Review

Prior to application submission, U.S. state and local government applicants should visit the OMB Office of Federal Financial Management website and view the “State Point of Contact (SPOC) List” to determine whether their application is subject to the state intergovernmental review process under Executive Order (E.O.) 12372 “Intergovernmental Review of Federal Programs.”

States not on the list do not participate in the intergovernmental review process, and therefore do not have a SPOC. If you are located within a State that does not have a SPOC, you may send application materials directly to a Federal awarding agency. If your state is on the list, contact the designated entity for more information on the state’s prior review requirements for Federal assistance applications.

D6. Funding Restrictions

Indirect Costs: Individuals Indirect Costs: Organizations The Federal awarding agency that provides the largest amount of direct funding to your organization is your cognizant agency for indirect costs, unless otherwise assigned by the White http://www.sam.gov https://www.grants.gov/help/html/help/Register/RegisterWithSAM.htm https://www.grants.gov/help/html/help/Register/RegisterWithSAM.htm

House Office of Management and Budget (OMB). If the Department of the Interior is your organization’s cognizant agency, the Interior Business Center will negotiate your indirect cost rate. Contact the Interior Business Center by phone 916-930-3803 or using the IBC Email Submission Form. See the IBC Website for more information.

Organizations must have an active Federal award before they can submit an indirect cost rate proposal to their cognizant agency. Failure to establish an approved rate during the award period renders all costs otherwise allocable as indirect costs unallowable under the award.

Required Indirect Cost Statement to be submitted with Application All organizations must include the applicable statement from the following list in their application, and attach to their application any documentation identified in the applicable statement:

We are:

A U.S. state or local government entity receiving more than $35 million in direct Federal funding each year with an indirect cost rate of [insert rate]. We submit our indirect cost rate proposals to our cognizant agency. Attached is a copy of our most recently approved rate agreement/certification.

A U.S. state or local government entity receiving less than $35 million in direct Federal funding with an indirect cost rate of [insert rate]. We have prepared and will retain for audit an indirect cost rate proposal and related documentation.

A [insert your organization type; U.S. states and local governments, do not use this statement] that has previously negotiated or currently has an approved indirect cost rate with our cognizant agency. Our indirect cost rate is [insert rate]. [Insert either: “Attached is a copy of our most recently approved but expired rate agreement. In the event an award is made, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award is made.” or “Attached is a copy of our current negotiated indirect cost rate agreement.”]

A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency. Our indirect cost rate is [insert rate]. If we receive an award, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award date.

A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency and has an indirect cost rate that is lower than 10%. Our indirect cost rate is [insert rate; must be lower than 10%]. However, if we receive an award we will not be able to meet the requirement to submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after award. We request as a condition of award to charge a flat indirect cost rate of [insert rate; must be lower than 10%] against [insert a clear description of the direct cost base against which your rate is charged (e.g., salaries; salaries and fringe benefits; or modified total direct costs). However, please note that your organization cannot charge indirect costs in excess of the indirect costs that would be recovered if applied against modified total direct costs as defined in §2 CFR 200.68]. We understand that we must notify the Service in writing if we establish an approved rate with our cognizant agency at any point during the award period.

A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency and has an indirect cost rate that is 10% or higher. Our indirect cost rate is [insert your organization’s indirect rate; must be 10% or higher]. However, if we receive an award we will not be able to meet the requirement to submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after award. We request as a condition of award to charge a flat de minimis indirect cost rate of 10% to be charged against modified total direct project costs as defined in 2 CFR §200.68. We understand that we must notify the Service in writing if we establish a negotiated rate with our cognizant agency at any point during the award period. We understand that additional Federal funds may not be available to support an unexpected increase in indirect costs during the project period and that such changes are subject to review, negotiation, and prior approval by the Service.

A [insert your organization type] that is submitting this proposal for consideration under the [“Program Title”], which has a Department of the Interior-approve indirect cost rate cap of [insert program rate]. If we have an approved indirect cost rate with our cognizant agency, we understand that we must apply this reduced rate against the same direct cost base as identified in our approved indirect cost rate agreement per the Financial Assistance Interior Regulation (FAIR) 2 CFR §1402.414. If we do not have an approved indirect cost rate with our cognizant agency, we understand that must charge indirect costs against the modified total direct cost base defined in 2 CFR §200.68 “Modified Total Direct Cost (MTDC)”. We understand that we must request prior approval from [insert Bureau Here] to use the 2 CFR 200 MTDC base instead of the base identified in our approved indirect cost rate agreement. We understand that [Insert Bureau Here] approval of such a request will be based on: 1) a determination that our approved base is only a subset of the MTDC (such as salaries and wages); and 2) that use of the MTDC base will still result in a reduction of the total indirect costs to be charged to the award. In accordance with 2 CFR §200.405, we understand that the indirect costs are not recovered due to a voluntary reduction to our federally negotiated rate are not allowable for recovery via any other means.

A [insert your organization type] that will charge all costs directly.

Prohibited Uses of Awards Funds Reimbursement of Pre-Award Costs

D7. Other Submission Requirements

Please be aware that the electronic submission process requires first time users to register using an e- Authentication process. This registration process can be somewhat complex and can take up to 3 weeks to complete. Be advised that it is virtually impossible to begin the process of electronic submission for the first time if you start just a few days before the due date. If you are from a university, contact your Office of Sponsored Programs. They may already have completed the registration process and should work with you to submit the application.

If you have any questions or problems with the registration process, or the completion of the application package, please contact the grants.gov help desk at 1-800-518-4726 or support@grants.gov.

Briefly, when you submit a grant application package to Grants.gov, you will receive a confirmation screen as well as three additional emails over two business days from Grants.gov informing you of your application processing status: 1. Confirmation screen

2. Submission Receipt (with “Track My Application” link) 3. Submission Validation (or Rejection with Errors) 4. Agency Retrieval

CONFIRMATION: Submission Confirmation Screen.

After you submit your grant application package, a confirmation screen will appear on your computer screen. This screen confirms that you have submitted an application to Grants.gov.

NOTIFICATION 1: Submission Receipt Email Within two business days after your application package has been received by the Grants.gov system, you will receive a submission receipt email which indicates that your submission has entered the Grants.gov system and is ready for validation. This email also contains a tracking number for use while tracking the status of the submission as well as a “Track My Application” link, to use to see the progress of your submission.

NOTIFICATION 2: Submission Validation Receipt Email – This is the important one!

After you receive the submission receipt email, the next email you will receive will be a message validating or rejecting your submitted application package with errors. The Grants.gov system is designed to check for technical errors within the submitted application package. Grants.gov does not review application content for award determination. Grants.gov will not post the application if there are errors. Failure to correct errors and submit by the date and time for closing may not be a reason for accepting a late application.

NOTIFICATION 3: Grantor Agency Retrieval Email Once your application package has passed validation it is delivered to the grantor for award determination and further approval. After the grantor has confirmed receipt of your application, you will be sent a third and final email from Grants.gov. The grantor may also assign your application package an agency specific tracking number for use within their internal system. IF YOU HAVE NOT RECEIVED THIS E- MAIL

WITHIN FOUR DAYS OF THE CLOSING DATE, PLEASE CONTACT THE

CONTRACTING OFFICER.

If you need help entering your proposal, you can reach the Grants.gov Contact Center at: 1- 800- 518- 4726. Their hours of operation are Monday-Friday, 7:00 a.m. to 9:00 p.m., Eastern Time, and they are closed on Federal Holidays.

During the application period an applicant may submit a revised or corrected proposal through grants.gov. Include a cover letter as the first page of the proposal stating that the proposal is revised and indicating that the previous submittal is to be withdrawn from consideration. See Section 11, Application Preparation Instructions, which describes requirements for the proposal and other application components.

Please allow sufficient time for the proposal to be submitted electronically through Grants.gov and allow time for possible computer delays. Applicants are strongly advised mailto:support@grants.gov not to wait until the last minute for submission. A proposal received after the closing date and time will NOT be considered for award. If the BOEM determines that a proposal will not be considered for award due to lateness, the applicant will be notified immediately.

D8. Application Checklist

SF-424, Application for Federal Assistance or Application for Federal Assistance-Individual

SF-424B or D, Assurances

Project Narrative

SF-424A or C, Budget Information

Budget Narrative

Indirect Cost Statement and related documentation (when applicable)

Conflict of Internet Disclose (when applicable)

SF-LLL, Disclosure of Lobbying Activites (when applicable)

E. Application Review Information

E1. Criteria

1. Scientific Quality and Impact (20%): Maximum Points: 20 Is the proposed study of high scientific quality with clear objectives? What is the relevance to BOEM's mission?

2. Work Plan/Methodology (20%): Maximum Points: 20 Is the strategy coherent and clear? Are the scientific objectives appropriate for the proposed timeframe? Are the geographic areas selected for the study appropriate? Are the proposed methods appropriate and adequate to meet the objectives? Are logistics adequately addressed?

Does the proposal address contingency plans for missed field work, equipment failure, and other problems?

3. Experience/Competence of Research Personnel (20%): Maximum Points: 20 Has the applicant demonstrated (through bibliographic references, relevant education, experience, awards, etc.) that they are capable of doing the proposed research? Has the applicant demonstrated a thorough knowledge of the scientific problem? Have products been on schedule and within budget?

4. Budget Justification and Clarity (20%): Maximum Points: 20

Is project staffing sufficient (e.g., experience, knowledge and skills) to accomplish the proposed goals? Are field expenses, supplies, lab work, and other expenses appropriate? Are expenses adequately itemized?

5. Planned Products and Dissemination of Results (20%): Maximum Points: 20 Are the products clearly defined? Will they be useful for offshore energy planning and decision-making? Will the results be published in a peer-reviewed form? Does the proposal indicate the Principal Investigator will provide data and metadata in a format that meets Federal data standards? Will the products be accessible and comprehensible to the public?

E2. Review and Selection Process

The proposal will be reviewed by BOEM scientists and program managers, and possibly external peer reviewers. Reviewers have expertise in Federal offshore programs and/or the specific scientific discipline of the proposal.

E3. CFR - Regulatory Information

BOEM will review and consider applications for funding in accordance with the following policy documents:

President’s September 2, 2020 memorandum entitled Memorandum on Reviewing Funding to State and Local Government Recipients of Federal Funds that Are Permitting Anarchy, Violence, and Destruction in American Cities.

Executive Order on Protecting American Monuments, Memorials, and Statues and Combating Recent Criminal Violence (E.O. 13933); and

Guidance for Grants and Agreements in Title 2 of the Code of Federal Regulations (2 CFR 200), as updated in the Federal Register’s 85 FR 49506 on August 13, 2020, particularly on:

o Selecting recipients most likely to be successful in delivering results based on the program objectives through an objective process of evaluating Federal award applications (2 CFR part 200.205), o Prohibiting the purchase of certain telecommunication and video surveillance services or equipment in alignment with section 889 of the National Defense Authorization Act of 2019 (Pub. L. No. 115—232) (2 CFR part 200.216), o Promoting the freedom of speech and religious liberty in alignment with Promoting Free Speech and Religious Liberty (E.O. 13798) and Improving Free Inquiry, Transparency, and Accountability at Colleges and Universities (E.O.

13864) (parts 200.300, 200.303, 200.339, and 200.341), o Providing a preference, to the extent permitted by law, to maximize use of goods, products, and materials produced in the United States (2 CFR part 200.322), and o Terminating agreements in whole or in part to the greatest extent authorized by law if an award no longer effectuates the program goals or agency priorities (2 CFR part 200.340).

E4. Anticipated Announcement and Federal Award Dates

Application is due by 5:00 PM EDT on the application due date in Section D4. BOEM anticipates that award will be made in FY 2023.

F. Federal Award Administration Information

F1. Federal Award Notices

Awards are based on the application submitted to and approved by BOEM are subject to the terms and conditions incorporated into the Notice of Award either by direct citation or by reference to the following: Federal regulations; program legislation or regulation; and special award terms and conditions. Recipient acceptance of a Federal award from the Service carries with it the responsibility to be aware of and comply with all terms and conditions applicable to the award. Recipients indicate their acceptance of the Federal award by starting work, drawing down funds, or accepting the award via electronic means.

F2. Administrative and National Policy Requirements

See the “DOI Standard Terms and Conditions” for the administrative and national policy requirements applicable to DOI awards.

The link to the DOI Standard Terms and Conditions is https://www.doi.gov/grants/doi-standard-terms-and-conditions

Please contact the Federal Awarding Agency Contact in Section G1 below for information on the applicability of these terms and conditions.

Data Availability Per the Financial Assistance Interior Regulation (FAIR), 2 CFR §1402.315: (a) All data, methodology, factual inputs, models, analyses, technical information, reports, conclusions, valuation products or other scientific assessments in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual, resulting from a financial assistance agreement is available for use by the Department of the Interior, including being available in a manner that is sufficient for independent verification. (b) The Federal Government has the right to: (1) Obtain, reproduce, publish, or otherwise use the data, methodology, factual inputs, models, analyses, technical information, reports, conclusions, or other scientific assessments, produced under a Federal award; and (2) Authorize others to receive, reproduce, publish, or otherwise use such data, methodology, factual inputs, models, analyses, technical information, reports, conclusions, or other scientific assessments, for Federal purposes, including to allow for meaningful third-party evaluation.

https://www.doi.gov/grants/doi-standard-terms-and-conditions https://www.doi.gov/grants/doi-standard-terms-and-conditions https://www.ecfr.gov/cgi-bin/text-idx?SID=2cb9f6d1c1c131ed576a5e65845ef3fa&mc=true&node=se2.1.1402_1315&rgn=div8

See the Service’s General Award Terms and Conditions for the general administrative and national policy requirements applicable to Service awards. The Service will communicate any other program- or project-specific special terms and conditions to recipients in their notices of award.

F3. Reporting

Financial Reports All recipients must use the SF-425, Federal Financial Report form for financial reporting. Final reports are due no later than 90 calendar days after the award period of performance end date or termination date. For awards with periods of performance longer than 12 months, recipients are required to submit interim financial reports on the frequency established in the Notice of Award.

Performance Reports Performance reports must contain a comparison of actual accomplishments with the established goals and objectives of the award; a description of reasons why established goals were not met, if appropriate; and any other pertinent information relevant to the project results. At a minimum, all recipients must submit a final performance report. Final reports are due no later than 90 calendar days after the award period of performance end date or termination date. For awards with periods of performance longer than 12 months, recipients are required to submit interim financial reports on the frequency established in the Notice of Award. See Service policy 516 FW 1, Monitoring Financial and Performance Reporting for Financial Assistance for more information.

c. Significant Development Reports Events may occur between the scheduled performance reporting dates which have significant impact upon the supported activity. In such cases, recipients are required to notify the Bureau in writing as soon as the recipient becomes aware of any problems, delays, or adverse conditions that will materially impair the ability to meet the objective of the Federal award. This disclosure must include a statement of any corrective action(s) taken or contemplated, and any assistance needed to resolve the situation. The recipient should also notify [Insert Bureau Here] in writing of any favorable developments that enable meeting time schedules and objectives sooner or at less cost than anticipated or producing more or different beneficial results than originally planned.

d. Real Property Reports Recipients and subrecipients are required to submit status reports on the status of real property in which the Federal government retains an interest. The required frequency of these reports will depend on the anticipated length of the Federal interest period. The Bureau will include recipient-specific real property reporting requirements, including the required data elements, reporting frequency, and report due dates, as applicable.

Conflict of Interest Disclosures Recipients must notify the program immediately in writing of any conflict…

This is the start of the file's text. The full file is on GovTribe.