This is a Statement of Work (SOW) for a minor construction project titled South Apron Blast Shields, Project Number FNWZ 25-0166, dated 16 July 2026. The contract involves fabrication and erection of new Blast Deflector Fences for the B1-B aircraft parking area. All work must comply with the International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL's), and applicable Federal, State, and local regulations.
The base proposal requires providing and installing five (5) Airfield Jet Blast Deflectors with painted position numbers on blast shields for designated aircraft parking positions, including airfield parking removal and painting. Option 1 requires providing and installing two (2) additional Airfield Jet Blast Deflectors with painted numbers, airfield parking removal and painting, removal and repainting of nine (9) Restricted Area signs, and approximately 1,000 feet of 6-inch-wide Restricted Area red line installation. The blast deflectors must be curved, non-perforated, galvanized, corrugated type with minimum 2 oz. zinc coating per Federal Specification WW-P-00405, capable of withstanding 30,000 lbs afterburner thrust at 90 feet. Assembly requires bolting with flat washers and nuts (no welding permitted), with all fasteners cadmium or zinc plated. The base bid period of performance is 60 days from Notice to Proceed, while Option 1 is 14 days. Performance time includes mobilization, submittal approval, material delivery, construction, closeout documents, and DD Form 1354 submission. Contractor must submit shop drawings, material submittals on AF Form 3000, two-week work schedules to the Escort POC, and comply with OSHA guidelines and base safety standards throughout construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sources sought Amendment 1.pdf | ||
| sources sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) South Apron Blast Shields 16 July 2026 FNWZ 25-0166
4.1.1 Blast Deflectors shall be installed on existing concrete. Existing concrete has a minimum thickness of 16”.
Lynnco "Epoxy-Locked" anchors, with Lynnco No. 22 Epoxy Resin were used to lock in place the existing blast deflectors.
5.1 BLAST DEFLECTOR ASSEMBLY:
5.1.1 All components will be assembled by bolting together with flat washers, under heads and nuts. Welding, brazing or burning of holes is not permitted. All nuts and bolts will be tightened to torques specified by manufacturer.
6.1 BLAST DEFLECTOR FINISH:
6.1.1 All bolts, nuts and washers will be cadmium or zinc plated. All structural members, parts, and corrugated metal will be hot dip galvanized with a minimum coating of 2.0 oz. zinc per square foot of surface. Painting of galvanized surfaces is not required, but any galvanized surface badly scratched or marred, will be re-galvanized or otherwise repaired to the satisfaction of the Contracting Officer.
6.1.2 Contractor shall paint the corresponding aircraft parking position number on the front of the blast deflectors.
The Contactor shall provide a 2’x2’ number sign mounted 15’ above the concrete at the midpoint on the backside of the blast deflector. Markings/sign shall follow details 2 and 8 on sheet C2 of the attached drawings.
7.1 BLAST DEFLECTOR ALTERNATIVES:
7.1.1 At the option of the Contracting Officer, and as specified in Paragraph 2, the Contractor may substitute an alternate type of blast deflector, providing that the following information and data is submitted, prior to the time of bid opening and approved in writing.
7.1.2 Contractor will submit for approval a tabulation of results of full-scale instrumented field tests witnessed and certified by an accredited testing laboratory, in which proposed alternate is subject to the intermediate throttle power of similar engines totaling # 30,000 afterburner thrust @ approx. 90 feet distance from the leading edge of the deflector measured along centerline of bast impingement. Tabulation must show the maximum pressure in psi, temperature in degrees F., vibration frequency in CPS, and vibration amplitude in inches, taken at the centerline of blast impingement on deflector. The results of all such readings may not be greater than the readings submitted for the specified deflector, for each corresponding item.
7.1.3 Contractor must submit results of smoke-pot tests behind similar deflectors, demonstrating that smoke and gases are deflected in a vertical direction, with no evidence of smoke dispersal behind deflectors.
7.1.4 Contractor must submit evidence of satisfactory operation for at least two (2) years in actual field service for continued testing of similar aircraft and jet engines.
7.1.5 Contractor must submit detailed design analysis, showing loads and stresses in structural members, deflecting surface and bolted joints, using the maximum pressure measured in Paragraph 7.1.2, as the average pressure for load calculations. Welds subjected to tension or vibration may not be used; all bolts must be heat treated if subjected to blast temperatures.
7.1.6 Because of thermal shock and cavitation effects, which results in cracking and spalling, concrete deflectors may not be used as an alternate. Perforated deflecting surfaces are not acceptable for this use.
8.1 BLAST DEFLECTOR AND ANCHORAGE SHOP DRAWINGS:
8.1.1 The Contractor shall submit shop drawings to the Contracting Officer for approval.
9.1 SAFETY:
9.2 Contractor shall follow Base standard safety & Occupational Safety and Health Administration (OSHA) guidelines throughout construction duration.
Attachment B South Apron Blast Shields
PRICING SCHEDULE FNWZ 25-0166
Attachment C – Pricing Schedule - Page 1 of 1
0001 Base Bid – South Apron Blast Shields (Construction) 529 FUNDS This item includes all survey, design, layout, plant, labor, supplies, equipment, materials, supervision and incidentals required to complete all work in compliance with the Statement of Work and terms & conditions of the contract for South Apron Blast Shields
LS $
0001 Option 1 – South Apron Blast Shields (Construction) 529 FUNDS This item includes all survey, design, layout, plant, labor, supplies, equipment, materials, supervision and incidentals required to complete all work in compliance with the Statement of Work and terms & conditions of the contract for South Apron Blast Shields.
LS $
TOTAL $
CONTRACT PERFORMANCE TIME:
1. Period of Performance
a. Base Bid - The period of performance shall be 60 days from the Notice to Proceed (NTP).
b. Option 1 – The period of performance shall be 14 days from the Notice to Proceed (NTP).
2. Performance time includes mobilization, submittal approval, delivery of materials, actual construction work, close out documents, and submitted DD Form 1354 information when work is completed.