FN1472-19_AIR_COMPRESSOR.docx

DOCX document 31 KB Posted

Attached to
AIR COMPRESSOR
Solicitation number
FN1472-19
Issued by

About this file

FN1472-19 AMEND 1 AIR COMPRESSOR

View the file

Other files

File Type Posted
FN1472-19_AIR_COMPRESSOR_RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

AMENDMENT #1
01/24/2019

6. ISSUED BY

CODE

7. ADMINISTERED BY (If other than Item 6)

See Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code)

(x)

9A. AMENDMENT OF SOLICITATION NO.

FN1472-19

X

9B. DATED (SEE ITEM 11)

02/ x

01/16/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE

DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :

D. OTHER (Specify type of modification and authority)

E. IMPORTANT : Contractor is not, x is required to sign this document and return 2 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

COMMODITY: Air Compressor SEE ATTACHED

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Tiffani Balestrini, Contract Specialist

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

BY

(Signature of the person authorized to sign)

(Signature of contracting officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR(48 CFR) 53.243

This amendment hereby answers questions associated with FN1472-19 for an Air Compressor for Ashland KY.

Q: Can you provide the CFM (Cubic Feet/Minute) required for the Air Compressor?

A: The CFM requirement is no less than 525 cubic feet per minute.

Q: This does not mention anything about installation. My quote will not include install. Is that Ok?

A: The install will be handled by the maintenance detail here at Ashland. However , a technician will be needed for no less than 16 hours to cover the controls portion and operations of the equipment.

Q: For the compressor, do they know what model they are replacing? I can quote the equivalent. I need to know if they want a fixed or variable speed and if they want an oil free or oil flooded rotary screw.

A: We are replacing a QMA 100 Quincy rotary screw compressor. But do to the expansion of the factory with newer more modern replacement equipment and a paint spraying booth, our factory needs a 125 horsepower variable speed compressor.

Q: What dew point do they need? Another way to ask this would be: do they know what kind of dryer they need? Desiccant or refrigerated?

A: The dryer will be a 38 degree refrigerant dryer.

Q: What size receiver would they like? Does it require any special coatings? Is vertical okay? The spec says “ISO quality”. What ISO quality rating do they need?

A: The receiving tank will have to be horizontal due to height restrictions and no less than 1000 gallons. No special finish as it will be placed indoors and as long as it meets the specifications outlined in ISO 16528 or section 8 division 1 of ASME code pertaining to a pressure vessel.

The closing date and time for submission of proposals has been extended from Friday, January 25, 2019 at 2:00 pm EST until Tuesday January 29, 2019 at 2:00 pm EST.

Except as provided herein, all other terms and conditions remain unchanged.

File details come from the government source that posted it.