FMO26511 SOW Acceptance.pdf

PDF 128 KB Posted

Attached to
FMO26511 Sinkhole Repair Devens CSMS (MA National Guard)
Solicitation number
BD-27-1069-MILDV-10000-135519
Issued by
Middlesex County, Massachusetts

About this file

This is a Scope of Work (SOW) Acceptance Form for a state contract opportunity involving the Army Corps of Engineers and the Construction Facilities Management Office (CFMO). The project, designated FMO26511, involves repair of a sinkhole at the Ayer Readiness Center located at 81 Barnum Rd, Facility Number 25A15. The sinkhole in the facility's parking lot presents potential hazards and risk of further damage requiring immediate remediation. The contractor's scope of work includes furnishing all material, labor, and equipment necessary to repair the sinkhole and associated drainage infrastructure, including repairing a 15-inch CPE roof drain, repairing 6-inch perforated CPE piping between drywell manholes, and cleaning drywell manholes of accumulated aggregate, sediment, and debris. Additional work may include machine and hydro excavation, confined space entry for inspection and repairs, provision of suitable bedding and backfill materials, and demobilization of personnel and equipment. A mandatory site visit with a CFMO representative is required prior to bid submission, and the contractor must maintain CBYD/811 utility notification throughout the project duration. The point of contact is Jimmy Pereira, reachable at jimmy.pereira.nfg@army.mil or 339.202.3968.

The estimated project cost is $35,000. No specific set-asides are indicated on the form, as all checkbox options are marked as unchecked. The form does not specify response dates, due dates, award dates, or contract term information. Initial qualifications are listed as "N/A," and no incumbent information or funding sources are detailed in the document.

View the file

Other files

File Type Posted
Non-Collusion 1~55.pdf PDF
Authorized Signatory1~1.pdf PDF
Bidders Instructions Sinkhole Repair Devens CSMS.pdf PDF
FMO26511 FORM FOR GENERAL BID.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Acceptance Form

Project_________________________________________ Project Number:__________

Location:_______________________________________ Facility Number:__________

Problem // Issue Description

Scope of Work:

POC Name/Email/Phone:_______________________________________

Initial Qualifications: ________________________________________

Estimated Project Cost: ______________

Environmental State Quartermaster (If State-Share) CFMO Approved

Approve Approve Approve

Hold Hold Hold

*Share with Chief Procurement officer for Review.

Project: CSMS Sinkhole Repair
Project Number: FMO26511
Location: Ayer Readiness Center 81 Barnum Rd
Facility Number: 25A15
Problem Issue Description: Sinkhole has appeared at CSMS Facility Parking lot leading to potential hazards and further damage if not addressed.
Scope of Work: Work shall be done by contract. The Contractor scope shall include furnishing all material, labor, and equipment needed to repair the designated sinkhole. Work may include, but is not limited to, repairing the existing 15" CPE roof drain, repairing the existing 6" perforated CPE piping between the drywell manholes, cleaning all drywell manholes of accumulated aggregate, sediment, and debris, and any other corrective work necessary to restore the system to proper operating condition. Contractor shall call and maintain a CBYD/811 utility notification prior to and throughout the duration of the project. Contractor shall mobilize personnel, equipment, and materials to the site. Contractor shall perform machine and hydro excavation, as required, to safely expose existing utilities, investigate the reported problem area, and facilitate repairs. Contractor shall perform confined space entry into the manhole(s), as required, to inspect existing conditions and complete recommended or necessary repairs. Contractor shall provide suitable bedding and backfill materials, compacted in lifts. Contractor shall demobilize all personnel, equipment, and materials upon completion of the work. The Contractor and a Construction Facilities Management Office (CFMO) representative shall conduct a site visit prior to the bid. The site assessment will be required for any Contractor submitting a proposal. The work is intended to repair drainage and asphalt for safe foot and vehicle traffic.
POC NameEmailPhone: Jimmy Pereira/jimmy.pereira.nfg@army.mil/339.202.3968
Initial Qualifications: N/A
Estimated Project Cost: $35,000
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off

File details come from the government source that posted it. Updated .