Demo Bldg 673 - Addendum 1r.pdf

PDF 146 KB Posted

Attached to
Demo Bldg 673, Forbes Field, Topeka, KS
Solicitation number
FMATOC-12-R-0003
Issued by

About this file

Amendment 1 which includes Demo Bldg 673 Addendum 1r original date 20 Aug 12 from HTK and revised as of 22 Aug 12 pdf file

View the file

Other files

File Type Posted
Wage Rate for Bldg 673.doc DOC document
Demo 673 Drwgs.zip ZIP file
MATOC Task Order Form Bldg 673.doc DOC document
Demo 673 Specs Folder.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Demo Building 673

GUQE0072995

HTK Project # 0503.06-013

Addenda #1 1

Addendum #1

August 20, 2012

ISSUED BY:

HTK Architects, P.A.

2900 SW MacVicar Avenue Topeka, Kansas 66611-1790 Contact: Zach Snethen Telephone: 785-266-5373

NOTICE ALL BIDDERS FOR THE:

Demo Building 673

GUQE0072995

HTK Project No. 0503.06-013

You are instructed to read and to note the following described changes, corrections, clarifications, omissions, deletions, additions, approvals and statements pertinent to the Contract Bid and Construction Documents.

The Amendment No. 1 is a part of the Contract Bid and Construction Documents and shall govern in the performance of the Work.

Total pages: 18 total pages

Article A1-0 Original Drawings:

A. Original drawings are available for review.

Download at https://dl.dropbox.com/u/4091279/Original Bldg 673.pdf

Article A1-1 Section 01010:

A. 1.2,A. should read: This project consists of demolition of building 673, site features and final site grading.

Article A1-2 Waste Management:

A. Attached section 017419 Construction Waste Management and Disposal B. All debris shall be legally disposed of off Base property.

C. Concrete, pavement and masonry debris may be crushed on site.

a. Removal from Base property is still required.

b. Crushing operations must take place on site and not on adjacent roadways or lawns.

Article A1-3 Hazardous Materials:

A. Provide $20,000 allowance for testing and removal of hazardous materials.

Article A1-4 Turf:

A. Attached section 329200 - Turf

Article A1-5 Miscellaneous:

A. Owner will remove copier and other electronic office equipment and supplies from the building.

B. Items noted for salvage: Owner will remove what they want prior to the contractor beginning work. All items not removed shall become the contractor’s possession.

C. Utilities running to the building shall be removed and capped at nearest junction box / manhole.

D. A monitoring well exists just west of the building and noted on the plans. This well shall remain in place.

https://dl.dropbox.com/u/4091279/Original%20Bldg%20673.pdf�

Demo Building 673

GUQE0072995

HTK Project # 0503.06-013

Addenda #1 2

E. Fill and compaction requirements remain as noted in the specifications.

Article A1-6 Sign Relocation:

A. Ref attached detail for new base for sign.

B. Verify final location with owner.

C. Brick matching the existing will be provided by the owner to be installed by the contractor.

END OF ADDENDUM ONE

Demo Building 673 Forbes Field Topeka, Kansas HTK Project # 0503.06-012

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-1

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Salvaging nonhazardous demolition and construction waste.

2. Recycling nonhazardous demolition and construction waste.

3. Disposing of nonhazardous demolition and construction waste.

1.3 DEFINITIONS

A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.

C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.

D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.

F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.

1.4 PERFORMANCE REQUIREMENTS

A. General: Achieve end-of-Project rates for salvage/recycling of 75 percent by weight of total non-hazardous solid waste generated by the Work. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials, including but not limited to the following:

1. Demolition Waste:

a. Concrete.

b. Concrete reinforcing steel.

c. Brick.

d. Concrete masonry units.

e. Wood studs.

f. Wood joists.

g. Plywood and oriented strand board.

h. Wood paneling.

i. Wood trim.

j. Structural and miscellaneous steel.

k. Rough hardware.

l. Roofing.

m. Insulation.

n. Doors and frames.

o. Door hardware.

p. Windows.

q. Glazing.

Demo Building 673 Forbes Field Topeka, Kansas

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-2

r. Metal studs.

s. Gypsum board.

t. Acoustical tile and panels.

u. Equipment.

v. Cabinets.

w. Plumbing fixtures.

x. Piping.

y. Supports and hangers.

z. Valves.

aa. Mechanical equipment.

bb. Refrigerants.

cc. Electrical conduit.

dd. Copper wiring.

ee. Lighting fixtures.

ff. Lamps.

gg. Ballasts.

hh. Electrical devices.

ii. Switchgear and panelboards.

jj. Transformers.

2. Construction Waste:

a. Masonry and CMU.

b. Lumber.

c. Wood sheet materials.

d. Wood trim.

e. Metals.

f. Roofing.

g. Insulation.

h. Gypsum board.

i. Piping.

j. Electrical conduit.

k. Packaging: Regardless of salvage/recycle goal indicated in "General" Paragraph above, salvage or recycle 100 percent of the following uncontaminated packaging materials:

1) Paper.

2) Cardboard.

3) Boxes.

4) Plastic sheet and film.

5) Polystyrene packaging.

6) Wood crates.

7) Plastic pails.

1.5 ACTION SUBMITTALS

A. Waste Management Plan: Submit Contractor’s Construction Waste and Recycling Plan within 7 days of date established for commencement of the Work.

1.6 INFORMATIONAL SUBMITTALS

A. Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit report. Use Contractor’s Reuse, Recycling, and Disposal Report. The Plan must include, but is not limited to the following information:

1. Contractor’s name and project identification information.

2. Generation point of waste.

3. Procedures to be used.

4. Names and locations of re-use and recycling facilities/sites.

5. Total quantity of waste in tons (tonnes).

6. Quantity of waste salvaged, both estimated and actual in tons (tonnes).

7. Quantity of waste recycled, both estimated and actual in tons (tonnes).

8. Total quantity of waste recovered (salvaged plus recycled) in tons (tonnes).

9. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.

Demo Building 673 Forbes Field Topeka, Kansas

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-3

B. Waste Reduction Calculations: Before request for Substantial Completion, submit calculated end-of- Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.

C. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.

D. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

E. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

F. Qualification Data: For refrigerant recovery technician.

G. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

1.7 QUALITY ASSURANCE

A. Waste Management Coordinator Qualifications: Experienced firm, with a record of successful waste management coordination of projects with similar requirements, that employs a LEED-Accredited Professional, certified by the USGBC, as waste management coordinator.

B. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.

C. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.

D. Waste Management Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." Review methods and procedures related to waste management including, but not limited to, the following:

1. Review and discuss waste management plan including responsibilities of waste management coordinator.

2. Review requirements for documenting quantities of each type of waste and its disposition.

3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays.

4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities.

5. Review waste management requirements for each trade.

1.8 WASTE MANAGEMENT PLAN

A. General: Develop a waste management plan according to ASTM E 1609 and requirements in this Section.

Plan shall consist of waste identification, waste reduction work plan, and cost/revenue analysis. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.

B. Waste Identification: Indicate anticipated types and quantities of demolition and construction waste generated by the Work. Use Contractor’s Reuse, Recycling, and Disposal Report (Att. B). Include estimated quantities and assumptions for estimates.

C. Waste Reduction Work Plan: List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator. Use Contractor’s Construction waste and Recycling Plan. Include points of waste generation, total quantity of each type of waste, quantity for each means of recovery, and handling and transportation procedures.

1. Salvaged Materials for Reuse: For materials that will be salvaged and reused in this Project, describe methods for preparing salvaged materials before incorporation into the Work.

2. Salvaged Materials for Sale: For materials that will be sold to individuals and organizations, include list of their names, addresses, and telephone numbers.

Demo Building 673 Forbes Field Topeka, Kansas

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-4

3. Salvaged Materials for Donation: For materials that will be donated to individuals and organizations, include list of their names, addresses, and telephone numbers.

4. Recycled Materials: Include list of local receivers and processors and type of recycled materials each will accept. Include names, addresses, and telephone numbers.

5. Disposed Materials: Indicate how and where materials will be disposed of. Include name, address, and telephone number of each landfill and incinerator facility.

6. Handling and Transportation Procedures: Include method that will be used for separating recyclable waste including sizes of containers, container labeling, and designated location where materials separation will be performed.

D. Cost/Revenue Analysis: Indicate total cost of waste disposal as if there was no waste management plan and net additional cost or net savings resulting from implementing waste management plan. Include the following:

1. Total quantity of waste.

2. Estimated cost of disposal (cost per unit). Include hauling and tipping fees and cost of collection containers for each type of waste.

3. Total cost of disposal (with no waste management).

4. Revenue from salvaged materials.

5. Revenue from recycled materials.

6. Savings in hauling and tipping fees by donating materials.

7. Savings in hauling and tipping fees that are avoided.

8. Handling and transportation costs. Include cost of collection containers for each type of waste.

9. Net additional cost or net savings from waste management plan.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 PLAN IMPLEMENTATION

A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.

1. Comply with operation, termination, and removal requirements in Division 01 Section "Temporary

Facilities and Controls."

B. Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan.

C. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.

1. Distribute waste management plan to everyone concerned within three days of submittal return.

2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.

D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold.

2. Comply with Division 01 Section "Temporary Facilities and Controls" for controlling dust and dirt, environmental protection, and noise control.

3.2 SALVAGING DEMOLITION WASTE

A. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.

3. Store items in a secure area until installation.

4. Protect items from damage during transport and storage.

Demo Building 673 Forbes Field Topeka, Kansas

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-5

5. Install salvaged items to comply with installation requirements for new materials and equipment.

Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.

B. Salvaged Items for Sale and Donation: Not permitted on Project site.

C. Salvaged Items for Owner's Use: Salvage items for Owner's use and handle as follows:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area designated by Owner.

5. Protect items from damage during transport and storage.

D. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave door hardware attached to doors.

E. Equipment: Drain tanks, piping, and fixtures. Seal openings with caps or plugs. Protect equipment from exposure to weather.

F. Plumbing Fixtures: Separate by type and size.

G. Lighting Fixtures: Separate lamps by type and protect from breakage.

H. Electrical Devices: Separate switches, receptacles, switchgear, transformers, meters, panelboards, circuit breakers, and other devices by type.

3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL

A. General: Recycle paper and beverage containers used by on-site workers.

B. Recycling Incentives: Revenues, savings, rebates, tax credits, and other incentives received for recycling waste materials shall be represented in bid documents.

C. Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.

D. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan.

1. Provide appropriately marked containers or bins for controlling recyclable waste until removed from

Project site. Include list of acceptable and unacceptable materials at each container and bin.

a. Inspect containers and bins for contamination and remove contaminated materials if found.

2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.

3. Stockpile materials away from construction area. Do not store within drip line of remaining trees.

4. Store components off the ground and protect from the weather.

5. Remove recyclable waste from Owner's property and transport to recycling receiver or processor.

3.4 RECYCLING DEMOLITION WASTE

A. Asphalt Paving: Grind asphalt to maximum 4-inch (100-mm) size.

1. Crush asphaltic concrete paving and screen to comply with requirements in Division 31 Section

"Earth Moving" for use as general fill.

B. Asphalt Paving: Break up and transport paving to asphalt-recycling facility.

C. Concrete: Remove reinforcement and other metals from concrete and sort with other metals.

1. Pulverize concrete to maximum 4-inch (100-mm) size.

Demo Building 673 Forbes Field Topeka, Kansas

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-6

2. Crush concrete and screen to comply with requirements in Division 31 Section "Earth Moving" for use as satisfactory soil for fill or subbase.

D. Masonry: Remove metal reinforcement, anchors, and ties from masonry and sort with other metals.

1. Pulverize masonry to maximum 4-inch (100-mm) size.

a. Crush masonry and screen to comply with requirements in Division 31 Section "Earth Moving" for use as general fill.

b. Crush masonry and screen to comply with requirements in Division 32 Section "Plants" for use as mineral mulch.

2. Clean and stack undamaged, whole masonry units on wood pallets.

E. Wood Materials: Sort and stack members according to size, type, and length. Separate lumber, engineered wood products, panel products, and treated wood materials.

F. Metals: Separate metals by type.

1. Structural Steel: Stack members according to size, type of member, and length.

2. Remove and dispose of bolts, nuts, washers, and other rough hardware.

G. Asphalt Shingle Roofing: Separate organic and glass-fiber asphalt shingles and felts. Remove and dispose of nails, staples, and accessories.

H. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location.

Remove edge trim and sort with other metals. Remove and dispose of fasteners.

I. Acoustical Ceiling Panels and Tile: Stack large clean pieces on wood pallets and store in a dry location.

J. Metal Suspension System: Separate metal members including trim, and other metals from acoustical panels and tile and sort with other metals.

K. Piping: Reduce piping to straight lengths and store by type and size. Separate supports, hangers, valves, sprinklers, and other components by type and size.

L. Conduit: Reduce conduit to straight lengths and store by type and size.

3.5 RECYCLING CONSTRUCTION WASTE

A. Packaging:

1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location.

2. Polystyrene Packaging: Separate and bag materials.

3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site.

For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood.

4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.

B. Wood Materials:

1. Clean Cut-Offs of Lumber: Grind or chip into small pieces.

2. Clean Sawdust: Bag sawdust that does not contain painted or treated wood.

C. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location.

1. Clean Gypsum Board: Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding.

3.6 DISPOSAL OF WASTE

A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site.

Demo Building 673 Forbes Field Topeka, Kansas

CONSTRUCTION AND DEMOLITION MATERIALS RECYCLING REQUIREMNTS 017419-7

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn waste materials.

C. Disposal: Remove waste materials and dispose of at designated spoil areas on Owner's property.

D. Disposal: Remove waste materials from Owner's property and legally dispose of them.

END OF SECTION 017419

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-1

SECTION 329200 - TURF AND GRASSES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Seeding.

2. Meadow grasses and wildflowers.

B. Related Sections:

1. Division 31 Section "Site Clearing" for topsoil stripping and stockpiling.

2. Division 31 Section "Earth Moving" for excavation, filling and backfilling, and rough grading.

3. Division 32 Section “Plants” for exterior planting.

1.3 DEFINITIONS

A. Finish Grade: Elevation of finished surface of planting soil.

B. Manufactured Topsoil: Soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

C. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and molluscicides. It also includes substances or mixtures intended for use as a plant regulator, defoliant, or desiccant.

D. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses.

E. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in-place surface soil; imported topsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce a soil mixture best for plant growth.

F. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or top surface of a fill or backfill before planting soil is placed.

G. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter and soil organisms.

H. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbed areas, the surface soil is typically topsoil, but in disturbed areas such as urban environments, the surface soil can be subsoil.

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

1. Pesticides and Herbicides: Include product label and manufacturer's application instructions specific to this Project.

B. Product data for the following:

1. Graphite Seed Coat

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-2

C. Certification of Grass/Wildflower Seed: From seed vendor for each grass-seed monostand or mixture stating the botanical and common name, percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging.

1. Certification of each seed mixture for turfgrass and prairie grass. Include identification of source and name and telephone number of supplier.

D. Qualification Data: For qualified landscape Installer.

E. Product Certificates: For soil amendments and fertilizers from manufacturer.

F. Material Test Reports: For existing native surface topsoil, existing in-place surface soil, and imported or manufactured topsoil.

G. Maintenance Instructions: Recommended procedures to be established by Owner for maintenance of turf and prairie meadows during a calendar year. Submit before expiration of required initial maintenance periods.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: A qualified landscape Installer whose work has resulted in successful native turf and prairie meadow establishment.

1. Experience: Three (3) years' experience in turf and native prairie meadow installation in addition to requirements in Division 01 Section "Quality Requirements."

2. Installer's Field Supervision: Require Installer to maintain an experienced full-time supervisor on

Project site when work is in progress.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Seed and Other Packaged Materials: Deliver seed and packaged materials in original, unopened containers showing weight, certified analysis, name and address of manufacturer, and indication of conformance with state and federal laws, as applicable.

B. Bulk Materials:

1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existing turf areas or plants.

2. Provide erosion-control measures to prevent erosion or displacement of bulk materials, discharge of soil-bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, or walkways.

3. Accompany each delivery of bulk fertilizers, lime, and soil amendments with appropriate certificates.

1.7 PROJECT CONDITIONS

A. Planting Restrictions: Plant during one of the following periods. Coordinate planting periods with initial maintenance periods to provide required maintenance from date of planting completion.

1. Turf Seed: Sow lawn seed during normal planting seasons for type of lawn required.

B. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit planting to be performed when beneficial and optimum results may be obtained. Apply products during favorable weather conditions according to manufacturer's written instructions.

1.8 MAINTENANCE SERVICE

A. Initial Turf and Meadow Maintenance Service: Provide full maintenance by skilled employees of landscape Installer. Maintain as required in Part 3. Begin maintenance immediately after each area is planted and continue until acceptable turf/grass stands are established but for not less than the following periods:

1. Seeded Turf: 90 days from date of planting completion.

a. When initial maintenance period has not elapsed before end of planting season, or if turf is not fully established, continue maintenance during next planting season. The Installer shall

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-3

be responsible for the proper care of turf lawns until turf is a minimum of 2 ½” tall with a density sufficient for 3 mowings.

B. Watering: Provide and maintain temporary piping, hoses, and lawn-watering equipment to convey water from sources and to keep lawns and prairie grass uniformly moist to a depth of 4 inches.

1. Lay out temporary lawn-watering system and arrange watering schedule to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly seeded areas.

2. Water lawn at the minimum rate of 1 inch per week.

C. Continuing Maintenance Proposal: From Installer to Owner, in the form of a standard yearly (or other period) maintenance agreement, starting on date initial maintenance service is concluded. State services, obligations, conditions, and terms for agreement period and for future renewal options.

PART 2 - PRODUCTS

2.1 SEED

A. Grass Seed: Fresh, clean, new-crop seed complying with the tolerance for purity and germination established by the Official Seed Analysts of North America.

1. Seed Mixture: Provide seed of grass species and varieties, proportions by weight, and minimum percentages of purity, germination, and maximum percentage of weed seed as indicated on the Schedule below.

B. Seeded Lawn Areas (seed blend)

1. Seeded lawn areas shall consist of a blend of 90% Turf-type Tall Fescue and 10% Kentucky

Bluegrass. The blend may consist of any of the varieties in the following Schedule, or approved equal.

2. All Turf-Type Fescues shall have a minimum 70% average endophyte level.

3. Architect to have final approval of all seed blends and mixes.

Name Min. Pct. Germ. Min. Pct. Max. Pct.

Coyote Turf-Type Tall Fescue 85 98.85 0

Pure Seed Weed Seed

Falcon II Turf-Type Tall Fescue 85 98.85 0 Jaguar 3 Turf-Type Tall Fescue 85 98.85 0 Rembrandt Turf-Type Tall Fescue 85 98.85 0 Millennium Turf-Type Tall Fescue 85 98.85 0

Midnight Kentucky Bluegrass 85 95 0 Moonlight Kentucky Bluegrass 85 95 0 Fairfax Kentucky Bluegrass 85 95 0

2.2 INORGANIC SOIL AMENDMENTS

A. Herbicides: EPA registered and approved, of type recommended by manufacturer.

B. Water: Potable

C. Seed Coat: Cross-linked modified acrylic polymer with graphite. CAS# 71042-87-0 (Polymer), CAS# 7782-42-5 (Graphite.)

D. Lime: ASTM C 602, agricultural liming material containing a minimum of 80 percent calcium carbonate equivalent and as follows:

1. Class: O, with a minimum of 95 percent passing through No. 8 (2.36-mm) sieve and a minimum of

55 percent passing through No. 60 (0.25-mm) sieve.

2. Provide lime in form of ground dolomitic limestone.

E. Sulfur: Granular, biodegradable, and containing a minimum of 90 percent sulfur, with a minimum of 99 percent passing through No. 6 (3.35-mm) sieve and a maximum of 10 percent passing through No. 40 (0.425-mm) sieve.

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-4

F. Iron Sulfate: Granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

G. Aluminum Sulfate: Commercial grade, unadulterated.

H. Perlite: Horticultural perlite, soil amendment grade.

I. Agricultural Gypsum: Minimum 90 percent calcium sulfate, finely ground with 90 percent passing through No. 50 (0.30-mm) sieve.

J. Sand: Clean, washed, natural or manufactured, and free of toxic materials.

2.3 ORGANIC SOIL AMENDMENTS

A. Compost: Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8.0; moisture content 35 to 55 percent by weight; 100 percent passing through 1/2-inch (13-mm) sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:

1. Organic Matter Content: 50 to 60 percent of dry weight.

2. Feedstock: Agricultural, food, or industrial residuals; biosolids; yard trimmings; or source-separated or compostable mixed solid waste.

B. Sphagnum Peat: Partially decomposed sphagnum peat moss, finely divided or granular texture, with a pH range of 3.4 to 4.8.

C. Muck Peat Mulch: Partially decomposed moss peat, native peat, or reed-sedge peat, finely divided or of granular texture, with a pH range of 6 to 7.5, and having a water-absorbing capacity of 1100 to 2000 percent.

2.4 FERTILIZERS

1. Turf areas may be fertilized with a controlled release, nitrogen-only fertilizer at a rate of 0.25-0.75 pounds of actual nitrogen per 1,000 square feet. Apply fertilizer in June during active growing period of grass.

2.5 TOPSOIL

A. ASTM D 5268, pH 5.5-7.0, 4 percent organic material minimum, free of stones 1 inch and larger in any dimension, and other extraneous materials harmful to plant growth.

1. Topsoil Source: Reuse surface soil stockpiled on the site. Verify suitability of surface soil to produce topsoil meeting requirements and amend when necessary. Supplement with imported topsoil when quantities are insufficient. Clean topsoil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful to plant growth.

2.6 MULCHES

A. Straw Mulch: Provide air-dry, clean, mildew- and seed-free, salt hay or threshed straw of wheat, rye, oats, or barley. 65% of mulch by weight shall be 10 inches or longer. Combine mulch with colloidal tackifier.

B. Sphagnum Peat Mulch: Partially decomposed sphagnum peat moss, finely divided or of granular texture, and with a pH range of 3.4 to 4.8.

C. Muck Peat Mulch: Partially d5ecomposed moss peat, native peat, or reed-sedge peat, finely divided or of granular texture, with a pH range of 6 to 7.5, and having a water-absorbing capacity of 1100 to 2000 percent.

D. Nonasphaltic Tackifier: Colloidal tackifier recommended by fiber-mulch manufacturer for slurry application;

nontoxic and free of plant-growth or germination inhibitors.

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-5

2.7 EROSION-CONTROL MATERIALS

A. Erosion-Control Blankets: Biodegradable wood excelsior, straw, or coconut-fiber mat enclosed in a photodegradable plastic mesh. Include manufacturer's recommended steel wire staples, 6 inches (150

mm) long. Use on slopes greater than 4:1.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas to be planted for compliance with requirements and other conditions affecting performance.

1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry, concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar, roofing compound, or acid has been deposited in soil within a planting area.

2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions.

3. Suspend soil spreading, grading, and tilling operations during periods of excessive soil moisture until the moisture content reaches acceptable levels to attain the required results.

4. Uniformly moisten excessively dry soil that is not workable and which is too dusty.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

C. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, remove the soil and contamination as directed by Architect and replace with new planting soil.

3.2 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations.

1. Protect grade stakes set by others until directed to remove them.

B. Install erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

3.3 TURF AREA PREPARATION

A. Limit turf subgrade preparation to areas to be planted.

B. Newly Graded Subgrades: Loosen subgrade to a minimum depth of 6 inches (150 mm). Soil clumps or clods shall not be larger than 3 inches (75 mm) in diameter. Remove stones larger than1-1/2 inches (38

mm) in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.

1. Spread planting soil to a minimum depth of 6 inches (150 mm) but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet.

a. Spread approximately 1/2 the thickness of planting soil over loosened subgrade. Mix thoroughly into top 4 inches (100 mm) of subgrade. Spread remainder of planting soil.

C. Preparation of Unchanged Grades:

1. Where lawns are to be planted in areas unaltered or undisturbed by excavating, grading, or surface soil stripping operations, prepare soil as follows:

a. Remove existing grass, vegetation and turf. Do not turn over into soil being prepared for lawns and prairie meadows.

b. Till surface soil to a depth of at least 6 inches. Apply required soil amendments and initial fertilizers (no fertilizer in prairie meadow areas) and mix thoroughly into top 4 inches of soil.

Trim high areas and fill in depressions. Till soil to a homogenous mixture of fine texture.

c. Clean surface soil of roots, plants, sod, stones, clay lumps, and other extraneous materials harmful to plant growth.

d. Remove waste material, including grass, vegetation and turf, and legally dispose of it off of Owner’s property.

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-6

D. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture.

Grade to within plus or minus 1/2 inch (13 mm) of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future.

E. Limit fine grading to areas to be promptly planted.

F. Moisten prepared area before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

G. Before planting, obtain Architect's acceptance of finish grading; restore planting areas if eroded or otherwise disturbed after finish grading.

H. Seedbeds should be permitted to settle or should be firmed by rolling before seeding.

3.4 PREPARATION FOR EROSION-CONTROL MATERIALS

A. Prepare area as specified in "Turf Area Preparation" Article.

B. For erosion-control blanket or mesh, install from top of slope, working downward, and as recommended by material manufacturer for site conditions. Fasten as recommended by material manufacturer.

C. Moisten prepared area before planting if surface is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

3.5 SEEDING NEW LAWNS

A. Sow seed with a Brillion type seeding machine or, where applicable and restricted by steep slopes or other areas not accessible to the seeding machine, broadcast of drop seed methods may be used. Do not broadcast or drop seed when wind velocity exceeds 5 mph. Evenly distribute seed by sowing equal quantities in 2 directions at right angles to each other.

1. Do not use wet seed or seed that is moldy or otherwise damaged in transit or storage.

B. Sow seed at the following rates:

1. Seeded Lawns: 3 to 4 lb. per 1,000 sq. ft.

C. Rake seed lightly into top 1/8 (3 mm ) inch of topsoil, roll lightly, and water with fine spray.

D. Installer to use a turf-type netting product to aid in establishment.

E. Protect seeded slopes exceeding 4:1 against erosion with erosion control blankets installed and stapled according to manufacturer’s recommendations.

F. Protect seeded areas with slopes less than 4:1 against erosion by spreading fiber mulch after completion of seeding operations. Spread uniformly to form a continuous blanket over seeded areas. Spread by hand, blower, or other suitable equipment.

G. Protect seeded areas against hot, dry weather or drying winds by applying peat mulch within 24 hours after completion of seeding operations. Soak and scatter uniformly to a depth of 3/16 inch (4.8 mm) and roll to a smooth surface.

3.6 RECONDITIONING LAWNS

A. Recondition existing lawn areas damaged by Contractor’s operations, including storage of materials or equipment and movement of vehicles. Also recondition lawn areas where settlement or washouts occur or where minor regarding is required.

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-7

B. Remove grass, vegetation and turf from diseased or unsatisfactory areas; do not bury into soil. Remove topsoil containing foreign materials resulting from Contractor’s operations, including oil drippings, fuel spills, stone, gravel, and other construction materials, and replace with new topsoil.

C. Where substantial lawn remains, mow, dethatch, core aerate, and rake. Remove weeds before seeding.

Where weeds are extensive, apply selective herbicides as required. Do not use pre-emergent herbicides.

D. Remove waste and foreign materials, including weeds, soil cores, grass, vegetation and turf, and legally dispose of it off Owner’s property.

E. Till stripped, bare, and compacted areas thoroughly to a depth of 6 inches.

F. Apply required soil amendments and initial fertilizers and mix thoroughly into top 4 inches of soil. Provide new planting soil as required to fill low spots and meet new finish grades.

G. Apply seed and protect with straw mulch as required for new lawns.

H. Water newly planted areas and keep moist until new grass is established.

3.7 TURF MAINTENANCE

A. Maintain and establish turf by watering, fertilizing, weeding, mowing, trimming, replanting, and performing other operations as required to establish healthy, viable turf. Roll, regrade, and replant bare or eroded areas and remulch to produce a uniformly smooth turf. Provide materials and installation the same as those used in the original installation.

1. Fill in as necessary soil subsidence that may occur because of settling or other processes.

Replace materials and turf damaged or lost in areas of subsidence.

2. In areas where mulch has been disturbed by wind or maintenance operations, add new mulch and anchor as required to prevent displacement.

3. Apply treatments as required to keep turf and soil free of pests and pathogens or disease. Use integrated pest management practices whenever possible to minimize the use of pesticides and reduce hazards.

B. Watering: Install and maintain temporary piping, hoses, and turf-watering equipment to convey water from sources and to keep turf uniformly moist to a depth of 4 inches (200 mm).

1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

2. Water turf with fine spray at a minimum rate of 1 inch (25 mm) per week unless rainfall precipitation is adequate.

C. Mowing: Mow as needed while grass is establishing in order to control the growth of weeds. Do not mow native meadow areas.

D. Fertilizing: Fertilize at rates and times recommended for types of grass planted. (Do not fertilize prairie meadow areas.)

3.8 SATISFACTORY TURF

A. Turf installations shall meet the following criteria as determined by Architect:

1. Satisfactory Seeded Turf: At end of maintenance period, a healthy, uniform, close stand of grass has been established, free of weeds and surface irregularities, with coverage exceeding 90 percent over any 10 sq. ft. (0.92 sq. m) and bare spots not exceeding 5 by 5 inches (125 by 125 mm).

B. Use specified materials and methods to reestablish turf that does not comply with requirements and continue maintenance until turf is satisfactory.

3.9 CLEANUP AND PROTECTION

A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.

Demo Building 673 Forbes Field, Topeka, Kansas

TURF AND GRASSES 329200-8

B. Erect temporary fencing or barricades and warning signs as required to protect newly planted areas from traffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings are established.

C. Remove nondegradable erosion-control measures after grass establishment period.