FM66 Expand Hazardous Waste Facility.xlsx
XLSX spreadsheet 84 KB Posted
- Attached to
- B267 Expand Hazardous Waste Facility
- Solicitation number
- FA302225C0003
About this file
This is a Schedule of Material Submittals (AF Form 66) and HAZMAT tracking sheet for project EEPZ216100 "Expand Hazardous Waste Facility" dated May 7, 2024. The submittal schedule outlines required documentation across multiple categories including general construction, environmental, architectural, civil, mechanical, electrical, and special systems. Key submittals include work/construction plans, as-built drawings, hazardous waste reports, Storm Water Pollution Prevention Plan, asbestos-related licenses and notifications, and specifications for explosion-proof electrical components (receptacles, lights, switches, junction boxes, and conduit).
The associated contract FA302225C0003 was awarded to BDM Industrial Services LLC for $476,622.34 on December 13, 2024, by the Department of the Air Force Air Education and Training Command at Columbus AFB. The project involves expanding a hazardous waste storage facility, including site preparation, foundation work, block wall construction, roofing, installation of a rolling door, explosion-proof electrical equipment, and fire protection systems with sprinklers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 1 | Work/Construction/phasing Plan | BASIC | |||||||||||||||||
| 3 | As-Built Drawings | BASIC | |||||||||||||||||
| 4 | Progress Schedule | BASIC | |||||||||||||||||
| 5 | Guarantees and Warranties | BASIC | |||||||||||||||||
| 6 | Superintendent's Qualifications and Experience | BASIC | |||||||||||||||||
| 7 | Qualified Fire Protection Engineer Certifications | SOW |
AF Form 66 (Substitute) GENERAL Page&Pof&N
SCHEDULE OF MATERIAL SUBMITTALS
Environmental
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 8 | Appropriate SDS | BASIC | |||||||||||||||||
| 9 | Hazardous waste report | BASIC | |||||||||||||||||
| 10 | Hazardous Material Report (AF Form 3000) | BASIC | |||||||||||||||||
| 11 | Recycled Material Report/Construction Debris report | BASIC | |||||||||||||||||
| 12 | Storm Water Pollution Prevention Plan with Best Management Practices Identified | BASIC | |||||||||||||||||
| 13 | Weekly Inspection Reports for Projects | BASIC | |||||||||||||||||
| 14 | State Licenses for workers and supervisors (Asbestos) | BASIC | |||||||||||||||||
| 15 | State license for the firm (Asbestos) | BASIC | |||||||||||||||||
| 16 | 10 Day Notification (Demolition and Asbestos) | BASIC | |||||||||||||||||
| 17 | Work Plan | BASIC | |||||||||||||||||
| 18 | Copy of ACM DisposalManifest | BASIC |
AF Form 66 (Substitute) Environmental Page&Pof &N
SCHEDULE OF MATERIAL SUBMITTALS
Architectural
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 19 | Paint | SOW |
AF Form 66 (Substitute) Architectural Page&Pof&N
Civil
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| Concrete Mix |
AF Form 66 (Substitute) CIVIL Page&Pof &N
Mechanical
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 20 | Exhuast Ventilator |
AF Form 66 (Substitute) Mechanical Page&Pof&N
Electrical
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 21 | Explosion Proof Receptacles | SOW | |||||||||||||||||
| 22 | Explosion Proof Lights | SOW | |||||||||||||||||
| 23 | Explosion Proof Switch | SOW | |||||||||||||||||
| 24 | Explosion Proof Junction Box | SOW | |||||||||||||||||
| 25 | Explosion Proof Conduit | SOW |
AF Form 66 (Substitute) Electrical Page&Pof &N
Special Systems
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL | |||||||||||||||||||
| 26 | Sprinkler Head |
AF Form 66 (Substitute) Special Systems Page&Pof &N
Other&Misc
| Project No: | Project Title: | Date: | |||||||||||||||||
| EEPZ216100 | Expand Hazardous Waste | 7-May-24 | |||||||||||||||||
| LINE NO. | ITEM DESCRIPTION | SPEC REF | NUMBER OF COPIES REQUIRED | DATE KTR REQUIRES APPROVAL | DATE RECEIVED KTR | DATE TO CIVIL ENG | DATE RECEIVED FROM CE | DATE CONTRACTOR NOTIFIED APR DISAPR | CONTRACT RESUBMIT DUE | CONTRACT RESUBMITTAL RECEIVED | FINAL APPROVAL RCVD KTR NOTIFIED | ||||||||
| Certificate of Compliance | Shop Drawings | Samples | Color Selction | Manufacturer's Recommendations | Manufacturer's Warranty | Catalog Data | Operating Instructions | Other | |||||||||||
| GENERAL |
AF Form 66 (Substitute) Other and Misc Page&Pof &N
HAZMAT Tracking Sheet
| Contractor Hazardous Materials Usage Tracking Form | |||||
| Return this form to Contracting/Project Manager with Manufacturers original SDS | |||||
| EEPZ216100 | Expand Hazardous Waste | Contract # | |||
| Start Date: | End Date: | Cotractor: | |||
| Product Name as seen on SDS | |||||
| Process (How is material used) | Part # | Manufacturer | Type of | ||
| Container | Size of Container | Total |
Quantity
| Used | EESOH MSN | |
| 1 | ||
| Process: | ||
| 2 | ||
| Process: | ||
| 3 | ||
| Process: | ||
| 4 | ||
| Process: | ||
| 5 | ||
| Process: | ||
| 6 | ||
| Process: | ||
| 7 | ||
| Process: | ||
| 8 | ||
| Process: | ||
| 9 | ||
| Process: | ||
| 10 | ||
| Process: | ||
| 11 | ||
| Process: | ||
| 12 | ||
| Process: | ||
| 13 | ||
| Process: | ||
| 14 | ||
| Process: | ||
| 15 | ||
| Process: | ||
| 16 | ||
| Process: | ||
| 17 | ||
| Process: | ||
| 18 | ||
| Process: | ||
| 19 | ||
| Process: | ||
| 20 | ||
| Process: | ||
| 21 | ||
| Process: | ||
| 22 | ||
| Process: | ||
| 23 | ||
| Process: | ||
| 24 | ||
| Process: | ||
| 25 | ||
| Process: | ||
| 26 | ||
| Process: | ||
| 27 | ||
| Process: | ||
| 28 | ||
| Process: |
Example and Instructions
| WORKSHEET INSTRUCTIONS | ||
| BLOCK | DESCRIPTION | INFORMATION REQUIRED |
| A | Project Number | Project number or Opportunity number assigned to the project by Civil Engineering. |
| B | Project Title | The title of the project. |
| C | Contract Number | The contract number or delivery order assigned by contracting. |
| D | Product Name | The name of the product as listed on the SDS. |
| E | Process | A Brief description of the work performed with each material. |
| F | Part # | The part number as listed on the SDS. |
| G | Manufacturer | The name of the Manufacturer of the product (not the distributor) |
| H | Type of Container | The type of container that the product comes in. Example: can, barrel, bottle, container, cylinder, drum, etc… |
| I | Size of Container | Size as listed on container. Example: oz, lbs, Liter, Quart, Gallon, etc… |
| J | Total Quantity Used | This will be the amount that you anticipate using for the first submission. At the conclusion of the project you will need to provide a final list with updated quantities. |
| K | EESOH MSN | This is the Material Stock Number assigned for EESOH-MIS tracking. (The Air Force Hazardous Materials Manager will provide this number) |
NOTE: Complete the HAZMAT Tracking Sheet located on the first TAB of this Excel spreadsheet with all hazardous materials to be used during the duration of the construction project. Once completed, save the sheet as a .pdf file and submit to the contracting officer with an AF Form 3000 Submittal form. This data will need to be submitted prior to construction start. When construction is complete, you will submit a final revised report with updated quanties.
image1.emf
File details come from the government source that posted it. Updated .