FLTWDSMS-RI_PM Vol 1 of 1_Bid Set_261104.pdf

PDF 7 MB Posted

Attached to
Flatwoods Middle School Roadway Improvements No. 02208.100
Solicitation number
191-IFB-2026-22
Issued by
Halifax County, Charlotte City, North Carolina

About this file

This is a project manual and bid set for the Flatwoods Middle School Roadway Improvements project (Project No. 02208.100), a construction project for Harnett County Schools located in Lillington, North Carolina. The project involves the construction of a roundabout intersection at the crossroad of US Route 401, Joel Johnson Road, and Becker Road, along with associated stormwater and waterline improvements. The design is being prepared by SfL+a Architects and Timmons Group as the civil engineer. Sealed bids will be received at the Harnett County School Central Offices, 601 South Main Street, Lillington, NC 27546, until 3:00 PM on Thursday, December 10, 2026, with bids to be opened and read aloud at 3:05 PM in the Board Room. A pre-bid conference and site tour will be conducted on Tuesday, November 17, 2026, at 3:30 PM at the Flatwoods Middle School facility. All requests for information must be submitted in writing by Thursday, November 24, 2026, with the final addendum to be issued no later than Monday, November 30, 2026. The contractor is required to commence work on or about January 4, 2027, with substantial completion targeted for July 1, 2027, and final completion required within 30 days thereafter.

The base bid shall be submitted on a stipulated sum basis and must include quantities and unit prices for various allowances related to woven geo-textile fabric, removal of unsuitable soils, and replacement materials. The contract includes a general contingency allowance of $100,000.00. Contract documents indicate that the successful bidder will be determined as the lowest responsive and responsible bidder and must provide a bid guarantee of five percent (5%) of the bid amount, along with 100 percent Performance Bond and 100 percent Labor and Material Payment Bond. The bidder is required to carry public liability, workers' compensation, and other insurance as stipulated in the General Conditions. All applicable federal, state, and local taxes must be included in the proposal. Pursuant to North Carolina Session Law 2026-41, Section 22.5, statutory minority- and women-owned business participation goals and associated good-faith-effort requirements have been repealed, and no minority or women-owned business participation percentage or associated affidavit shall be required except where applicable federal law or funding requirements provide otherwise. The owner reserves the right to reject any or all bids and may defer award for a period of ninety (90) days after the due date of bids.

View the file

Other files

File Type Posted
Notice To Bidders.pdf PDF
Flatwoods RAB - Roadway 100P V3_sealed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

421 Fayetteville Street Suite 1450

Raleigh, NC 27601 www.sfla.biz

PROJECT MANUAL

Divisions 00 - 39

Architect’s Project Number: 02208.100

Flatwoods Middle School Roadway Improvements Crossroad Intersection of US Route 401, Joel Johnson Road, and Becker Road Lillington, NC 27546

Harnett County Schools 601 South Main Steet Lillington, North Carolina 27546

November 4, 2026 Bid Set

Set Number: ___________

Bid Set 11/04/26

Flatwoods Middle School Roadway Improvements - 02208.100

Project Title Page 00 01 01 - 1

SECTION 00 01 01

PROJECT TITLE PAGE

Date November 4, 2026 Bid Set

Project Identification Flatwoods Middle School Roadway Improvements Crossroad Intersection of US Route 401, Joel Johnson Road, and Becker Road Lillington, NC 27546

Architect Project No.: 02208.100

Owner Harnett County Schools 601 South Main Street Lillington, NC 27546 Phone: 910-893-8151

Architect SfL+a Architects, PA One City Plaza 421 Fayetteville Street, Suite 1450 Raleigh, NC 27601 Phone: 919-573-6350

Civil Engineer Timmons Group 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 Phone: 919-866-4951

END OF SECTION

Seals Page 00 01 07 - 1

SECTION 00 01 07

SEALS PAGE

Architect

SfL+a Architects, PA NC Corporate Registration NC Registration Number 50676

Architect

SfL+a Architects, PA Robert Ward Ferris NC Registration Number 6184

Civil Engineer

Timmons Group Evan Brigham NC Registration Number 055560

END OF SECTION

11/4/2026

Table Of Contents 00 01 10 - 9

SECTION 00 01 10

TABLE OF CONTENTS

Divisions 00 - 39

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 01 - Project Title Page 00 01 07 - Seals Page 00 01 10 - Table Of Contents 00 11 16 - Notice To Bidders 00 21 13 - Information For Bidders 00 41 00 - Bid Form /Attachments 00 52 00 - Owner-Contractor Agreement (Harnett CS - Section C) 00 61 13.13 - Performance Bond Form 00 61 13.16 - Labor And Material Bond Form 00 62 16 - Certificate of Insurance Sample 00 62 76.13 - Sales Tax Form 00 72 00 - General Conditions (Harnett CS - Section V) 00 73 00 - Supplemental Conditions (Harnett CS - Section SC)

SPECIFICATIONS GROUP

DIVISION 01 - GENERAL REQUIREMENTS

01 02 00 - General Sitework Requirements 01 10 00 - Summary 01 21 00 - Allowances 01 22 00 - Unit Prices 01 26 00 - Contract Modification Procedures 01 29 00 - Payment Procedures 01 30 00 - Administrative Requirements 01 31 26 - Electronic Communication Protocols 01 32 00 - Construction Progress Documentation 01 33 00 - Submittal Procedures 01 40 00 - Quality Requirements 01 50 00 - Temporary Facilities And Controls 01 60 00 - Product Requirements 01 73 00 - Execution 01 77 00 - Closeout Procedures 01 78 23 - Operation And Maintenance Data 01 78 39 - Project Record Documents

Table Of Contents 00 01 10 - 10

DIVISION 02 - EXISTING CONDITIONS

02 41 13 - Selective Site Demolition

DIVISIONS 03 - 30 (Not Used)

DIVISION 31 - EARTHWORK

31 10 00 - Site Clearing 31 20 00 - Earthwork 31 25 00 - Erosion Control

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 16 - Asphalt Pavement 32 17 00 - Pavement Markings, Signs And Specialties 32 92 00 - Lawns and Grasses

DIVISION 33 - UTILITIES

33 10 00 - Exterior Water System 33 41 00 - Storm Drainage

DIVISIONS 34 - 39 (Not Used)

Notice to Bidders 00 11 16 - 1

SECTION 00 11 16

NOTICE TO BIDDERS

Harnett County Schools invites single prime bids on the Project known as the “Flatwoods Middle School Roadway Improvements”. Sealed bids will be received at the office of the Harnett County School Central Offices, 601 South Main Street, Lillington, NC 27546, until 3:00 PM on Thursday, December 10, 2026, for the construction of the indicated Project. All bids will be opened and read aloud starting at 3:05 PM in the Board Room. This Project will be bid and awarded in accordance with G.S143-128 and G.S. 143-129.

The Work of the Project includes, but is not limited to the construction of a roundabout intersection with associated stormwater and waterline improvements.

A Pre-Bid Conference will be held on Tuesday, November 17, 2026, at 3:30 PM at the Flatwoods Middle School facility located at 3600 US-401, Lillington, NC 27546. The meeting will convene at the Metcon construction trailer. A tour of the Project site will commence immediately after the meeting. All requests for information (RFIs) or questions regarding this solicitation must be submitted in writing no later than Thursday, November 24, 2026. Responses and clarifications, as applicable, will be issued through official addenda. The final addendum will be issued no later than Monday, November 30, 2026. All addenda will be posted on the Harnett County Schools website under Bid Opportunities and shall become part of the official bid documents. All questions after that time shall be submitted via email to the Design Consultant at SfL+a Architects, 421 Fayetteville Street, Suite 1450, Raleigh, NC 27601 via email to:

mkick@sfla.biz .

Contract Documents, including plans and specifications, may be obtained from the Harnett County Schools website at: https://www.harnett.k12.nc.us/about-us/building-projects-and-bid-opportunities, or complete plans and specifications may be examined at the offices of SfL+a Architects, 421 Fayetteville Street, Suite 1450, Raleigh, NC 27601 during normal office hours beginning Wednesday, November 4, 2026. Complete digital plans and specification are available on request by email to: mkick@sfla.biz .

Each proposal shall be accompanied by a Bid Guarantee of five percent (5%) of the bid in cash, certified check or a fully executed Bid Bond. The deposit shall be retained by the Owner if the successful bidder fails to execute the contract within ten (10) days after award or fails to give satisfactory surety as required herein. (General Statutes of North Carolina, Chapter 143, Article 8, Section 129.) No bid may be withdrawn for a period of ninety (90) days after the opening thereof. The successful bidder will be required to furnish 100% Performance Bond and a 100% Labor and Material Payment Bond.

Pursuant to North Carolina Session Law 2026-41, Section 22.5, statutory minority- and women-owned business participation goals and associated good-faith-effort requirements have been repealed.

Harnett County Schools encourages participation by all qualified businesses, including small businesses and North Carolina Small Business Enterprises (NCSBEs) certified through the North Carolina Department of Administration, Division of Purchase & Contract.

All qualified bidders and subcontractors shall have an equal opportunity to compete for contracts without regard to race, color, religion, sex, national origin, or other legally protected classifications. No minority-or women-owned business participation percentage or associated affidavit shall be required under the repealed State statutory provisions, except where applicable federal law or funding requirements provide otherwise.

The Harnett County Schools reserves the right to reject any and all bids, waive informalities and irregularities in bidding, and to accept bids that are considered to be in the best interest of the School System.

END OF DOCUMENT

Bid Set 11/04/26 mailto:johnsonville@sfla.biz https://www.harnett.k12.nc.us/about-us/building-projects-and-bid-opportunities mailto:johnsonville@sfla.biz

Information for Bidders 00 21 13 - 1

SECTION 00 21 13

INFORMATION FOR BIDDERS

A-1. SUBMISSION OF BIDS AND BID OPENING:

A. Bids will be received by Harnett County Schools and will be opened and read at the times and places set forth in the solicitation. Bidders, or their representative, and other interested persons may be present at the opening of proposals.

B. The envelopes containing the bids must be sealed and addressed to Harnett County Schools, 601 South Main Street, Lillington, NC 27546 and marked on the outside of the envelope “Proposal for Flatwoods Middle School Roadway Improvements”, and with the name of the Bidder and bidder’s North Carolina State Contractor's Registration Number.

C. The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

A-2. BIDDING DOCUMENTS:

A. Bidding Documents include the Information for Bidders, Form of Proposal and the proposed Contract Documents, including any Addenda issued prior to receipt of bids. All requirements and obligations of the Bidding Documents are hereby incorporated by reference into the Contract Documents and are binding on the Successful Bidder upon award of the contract.

A-3. BIDDER'S REPRESENTATIONS:

Each Bidder by submitting his Bid represents that:

A. He has read and understands that Bidding Documents and his Bid is made in accordance therewith; and Bidder agrees to be bound by the terms and requirements set forth in the Bidding and Contract Documents;

B. He has visited the site, has familiarized himself with the local conditions under which the Work is to be performed herein, and has correlated his observations with the requirements of the proposed Contract Documents;

C. The Bidder acknowledges and represents that he has made allowances for normal inclement weather indigenous to the Project Site, in his estimating, planning and scheduling of the Work. The Bidder hereby certifies that the work shall be completed, in place, in full accordance with the Contract Documents, within the time limits specified;

D. He has received the General and any Supplementary Conditions for the Project.

A-4. SITE CONDITIONS AND CONDITIONS OF THE WORK:

A. Each bidder must acquaint himself thoroughly as to the character and nature of the work to be done. Each bidder furthermore must make a careful examination of the site of the work and inform himself fully as to the difficulties to be encountered in the performance of the work, the facilities for delivering, storing and placing materials and equipment, and other conditions relating to construction and labor.

Information for Bidders 00 21 13 - 2

B. No plea of ignorance of conditions that exist or may hereafter exist on the site of the work, or difficulties that may be encountered in the execution of the work, as a result of failure to make necessary investigations and examinations, will be accepted as an excuse for any failure or omission on the part of the successful Bidder to fulfill in every detail all the requirements of the Contract Documents and to complete the work or the consideration set forth therein, or as a basis for any claim whatsoever.

C. Insofar as possible, the Successful Bidder, in carrying out his work, must employ such methods or means as will not cause interruption of or interference with the work of the Owner or any separate contractor.

A-5. BIDDER'S QUESTIONS, ADDENDA AND INTERPRETATIONS:

A. Bidders and Sub-bidders shall promptly notify the Design Consultant of any ambiguity, inconsistency or error which they may discover upon examination of the Bidding and Contract Documents or of the site and local conditions. No interpretation of the meaning of the drawings, specifications or other contract documents will be made to any Bidder orally.

B. Every request for such interpretation should be in writing addressed to the Design Consultant with a copy forwarded to the Owner.

C. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Bidding Documents which, if issued, will be transmitted to all prospective Bidders (at the respective addresses furnished for such purposes) not later than three calendar days prior to the date fixed for the opening of bids. Neither the Design Consultant nor the Owner will be responsible for any other explanations or interpretations of the proposed documents. Failure of any Bidder to receive any such addendum or interpretation shall not relieve any bidder from any obligation under his bid as submitted.

All addenda so issued shall become part of the Contract Documents.

D. Each Bidder shall ascertain prior to submitting his bid that he has received all Addenda issued, and he shall acknowledge receipt and inclusion in his proposal of all Addenda.

E. He has received the General and any Supplementary Conditions for the Project.

A-6. SECURITY FOR FAITHFUL PERFORMANCE:

A. The Successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum, as security for the payment of all persons performing labor and furnishing materials under this Contract. The Performance Bond and the Labor and Material Payment Bond shall be delivered to the Owner not later than the date of execution of the Contract.

A-7. LIABILITY INSURANCE AND WORKMEN'S COMPENSATION:

A. The Successful Bidder will be required to carry public liability and workmen's compensation and other insurance in the amounts and under the terms stipulated under the General Conditions.

Information for Bidders 00 21 13 - 3

A-8. RIGHT TO REJECT BIDS:

A. The Owner expressly reserves the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept that bid which in its judgment, best serves the interest of the Owner.

A-9. EQUAL PRODUCTS AND SUBSTITUTIONS:

A. Unless specifically stated to the contrary, any Bidder may, with Owner’s written approval, use any article, device, product, material, fixture, form or type of construction which in the judgment of the Design Consultant is equal to that specified considering quality, workmanship, economy of operation, durability, suitably for the purpose intended, and acceptability for use on the project. Approval by the Owner prior to bid opening is mandatory and acceptance of substitutions will be in the form of an Addendum to the Specifications issued to all prospective Bidders indicating that the additional makes or brands are equivalent to those specified. Nothing in this paragraph is intended to restrict or inhibit free and open competition on school system projects. The bidder may request approval for substitutions after award of the contract in accordance with the contract General Conditions.

A-10. PREPARATION AND SUBMITTAL OF FORM OF BID:

A. Bids shall be submitted utilizing the Form of Proposal as bound herein, or otherwise provided with the Contract Documents, and shall be complete in every respect. The total bid amount shall be entered in words and figures in the space provided. Where applicable, the unit price or lump sum items, and their extensions, shall be entered in figures in the respective columns provided for each bid item. All entries shall be typewritten or printed in ink. The signatures of all persons shall be in longhand. Any entry of amount that appears on the face of the bid to have involved an erasure, deletion, white-out and/or substitution or other such change or alteration, shall show by them the initials of the person signing the bid and the date of the change or alteration. A failure to comply with this requirement may be cause for disqualification of the bid.

B. For Unit Price bids, in the event of any discrepancies between the unit prices and the extensions thereof or the total bid amount, the unit prices shall govern. For Lump Sum bids, in the event of a discrepancy between the bid amount in writing and that in figures, the written value shall govern.

C. Bids shall not contain any restatement or qualifications of work to be done, and alternate bids will not be considered unless called for. No oral bids or modifications will be considered.

D. All applicable Federal, State and Local taxes shall be included in the Bidder’s proposal.

A-11. MODIFICATION OR WITHDRAWAL OF BID:

A. A bidder may withdraw his bid from consideration if such bid was based upon a mistake.

B. Prior to the time and date designated for receipt of bids, any bid submitted may be modified or withdrawn by notice to the party receiving bids at the place designated for receipt of bids. Such notice shall be in writing over the signature of the Bidder.

C. Withdrawn bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with this Information for Bidders.

Information for Bidders 00 21 13 - 4

A-12. DETAILED BID BREAKDOWN:

A. If the Owner directs, the Bidder shall provide a detailed breakdown of his bid acceptable to the Owner. In addition to verifying accounting requirements, the breakdown may be used by the Owner to determine whether the Bidder has grossly misjudged the requirements of any area. Failure to provide the requested detailed breakdown may result in rejection of the bid proposal.

A-13. AWARD OF CONTRACT:

A. The contract will be awarded to the lowest responsive and responsible bidder, taking into consideration quality, performance, and the time specified in the bids for the performance of the contract.

B. The lowest bidders shall be determined by the aggregate amount of the unit prices set forth in the form of bid, if work is bid on a unit price basis, or the aggregate amount of the Base Bid, plus any Alternates selected by the Owner.

C. A Responsible Bidder shall mean a Bidder who has the capability, in all respects, to perform fully the contract requirements and the moral and business integrity and reliability which will assure good faith performance. In determining responsibility, the following criteria will be considered:

1. The ability, capacity and skill of the Bidder to perform the contract or provide the service required;

2. Whether the bidder can perform the contract or provide the service promptly, or within the time specified, without delay or interference;

3. The character, integrity, reputation, judgment, experience and efficiency of the Bidder;

4. The quality of performance of previous contracts or services. For example, the following information will be considered:

a. The administrative and consultant cost overruns incurred by Owners on previous contracts with Bidder,

b. The Bidder's compliance record with contract general conditions on other projects,

c. The submittal by the bidder of excessive and/or unsubstantiated extra cost proposals and claims on other projects,

d. The Bidder's record for completion of the work within the Contract Time or within Contract Milestones and Bidders compliance with scheduling and coordination requirements on other projects,

e. The Bidder's demonstrated cooperation with the Owner or the Design Consultant and other contractors on previous contracts,

f. Whether the work performed and materials furnished on previous contracts was in accordance with the Contract Documents;

Information for Bidders 00 21 13 - 5

5. The previous and existing compliance by the bidder with laws and ordinances relating to contracts or services;

6. The sufficiency of the financial resources and ability of the Bidder to perform the contract or provide the service;

7. The quality, availability and adaptability of the goods or services to the particular use required;

8. The ability of the Bidder to provide future maintenance and service for the warranty period of the contract;

9. Whether the Bidder has been declared in default on a project;

10. Whether the bidder has demonstrated a good faith effort to use MBEs as subcontractors;

11. Such other information as may be secured by the Owner having a bearing on the decision to award the contract, to include, but not limited to:

a. The ability, experience and commitment of the Bidder to properly and reasonably plan, schedule, coordinate and execute the Work,

b. Whether the Bidder has ever been debarred from bidding or found ineligible for bidding on any other projects.

D. The purpose of the above is to enable the Owner, in its opinion, to select the lowest responsible bidder. The ability of the low Bidder to provide the required bonds will not of itself demonstrate responsibility of the Bidder.

E. The Owner reserves the right to require from the Bidder within twenty-four (24) hours of bid opening: (1) submissions of references to include a listing of previous and current projects, including a listing of public school construction projects completed in North Carolina, (2) financial statements indicating current financial status, prepared in accordance with generally accepted accounting principles, by a CPA licensed to do business in North Carolina, and (3) any other information deemed necessary in order to establish the responsiveness and responsibility of the bidder.

F. The Owner reserves the right to defer award of this contract for a period of ninety (90) days after the due date of bids. During this period of time, the Bidder shall guarantee the prices quoted in his bid.

Bid Form 00 41 00 - 1

SECTION 00 41 00

BID FORM

STIPULATED SUM

PROJECT NUMBER: 02208.100

PROJECT NAME: Flatwoods Middle School Roadway Improvements

DATE: December 10, 2026

The undersigned, as Bidder, hereby declares that the only person or persons interested in this proposal as principal or principals is or are named herein and that no other person than herein mentioned has any interest in this proposal or in the contract to be entered into; that this proposal is made without connection with any other person, company or parties making a bid or proposal; and that it is in all respects fair and in good faith without collusion or fraud.

The bidder further declares that he has examined the site of the work and informed himself fully in regard to all conditions pertaining to the place where the work is to be done; that he has examined the Contract Documents relative thereto and he has taken special note that work shall be guaranteed for a period of one year after acceptance by Owner; and he has read all special provisions furnished prior to the opening of bids; that he has satisfied himself relative to the work to be performed.

The bidder proposes and agrees if this proposal is accepted to contract with the Owner in the form of contract specified, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation and labor necessary to complete the work as stated below in full and in complete accordance with the Contract Documents, as prepared by SfL+a Architects, with a definite understanding that no money will be allowed for extra work except as set forth in the Contract Documents for the sum of:

BASE BID

________________________________________________________Dollars ($____________________)

Site/Civil Subcontractor_____________________________________________License No.:__________

Utility Subcontractor _______________________________________________License No.:__________

Other Subcontractor ________________________________________________License No.:__________

The bidder further proposes and agrees to commence work on a date to be specified in a written Notice to Proceed, estimated to be on or about January 4, 2027, and shall be substantially complete with the work by July 1st, 2027. The bidder also agrees to a Final Completion within 30 days from the date of the Certificate of Substantial Completion of each of the denoted substantial completion dates.

Bid Form 00 41 00 - 2

ALLOWANCES

The Base Bid for general construction Work is to include Allowances. The requirements for Allowances are as follows, and as further detailed in Section 01 21 00 - Allowances and the Contract Documents.

Quantity Allowances (QA) QA-1: Woven Geo-Textile Separation and Stabilization Fabric In-Place........................................................20 Square Yards QA-2: Removal of Unsuitable Soils

(Bulk) Offsite ........................................................................................100 Cubic Yards QA-3: Removal of Unsuitable Soils

(Trench) Offsite.......................................................................................20 Cubic Yards QA-4: Replacement of Removed Unsuitable Soils with

Off-Site Suitable Soils In-Place ...........................................................100 Cubic Yards QA-5: Replacement of Removed Unsuitable Soils with

Off-Site Aggregate Base Course In-Place...........................................100 Cubic Yards QA-6: Replacement of Removed Unsuitable Soils with

Off-Site 57 Stone In-Place....................................................................100 Cubic Yards

Contingency Allowances (CA) CA-1: General Contingency Allowance: .................................................................$100,000.00

ALTERNATES

Should any Alternates be accepted, the amounts written below shall be the amount to be added to or deducted from the Base Bid. The requirements for Alternates are as follows, and as further detailed in Section 01 23 00 - Alternates and the Contract Documents.

None

UNIT PRICES

Unit Prices quoted and accepted shall apply throughout the life of the contract, except as specifically noted.

Unit Prices shall be applied, as appropriate, to compute the total value of changes in the scope of the Work in accordance with the Contract Documents. The requirements for Unit Prices are as follows, and as further detailed in Section 01 22 00 - Unit Prices and the Contract Documents.

Unit Price No. 1: Woven Geo-Textile ...................................................$ __________/ Square Yard

Unit Price No. 2: Removal of Unsuitable Soils (Bulk) ........................$ ___________/ Cubic Yard

Unit Price No. 3: Removal of Unsuitable Soils (Trench) ....................$ ___________/ Cubic Yard

Unit Price No. 4: Replacement of Removed Unsuitable Soils with Off-Site Suitable Soils..............................................$ ___________/ Cubic Yard

Unit Price No. 5: Replacement of Removed Unsuitable Soils with Off-Site Aggregate Base Course .............................$ ___________/ Cubic Yard

Unit Price No. 6: Replacement of Removed Unsuitable Soils with Off-Site 57 Stone ......................................................$ ___________/ Cubic Yard

Bid Form 00 41 00 - 3

PROPOSAL SIGNATURE PAGE

The undersigned further agrees that in the case of failure on his part to execute the said contract and the bonds within ten (10) consecutive calendar days after being given written notice of the award of contract, the certified check, cash or bid bond accompanying this bid shall be paid into the funds of the Owner's account set aside for the project as liquidated damages for such failure; otherwise, the certified check, cash or bid bond accompanying this proposal shall be returned to the undersigned.

Attach certified check, cash, or bid bond to this Proposal.

Respectfully submitted this ____________ day of __________________________________ 20 ______

(Name of Firm or Corporation Making Bid)

WITNESS: By: ______________________________________

___________________________________________Title: _____________________________________ (Proprietorship or Partnership) (Owner, Partner, President or Vice President only)

Address: ___________________________________

License No.: ________________________________

ATTEST:

By: _______________________________________

Title: ______________________________________ (Corporate Secretary or Assistant Secretary only) (CORPORATE SEAL)

Addenda Received and Used in Computing Bids:

Addendum No. 1 Dated ___________________

HARNETT COUNTY SCHOOLS

CERTIFICATION REGARDING CONFLICT OF INTEREST

Solicitation Number: ________________________________________

Vendor/Company Name: _________________________________________________

CERTIFICATION

In accordance with applicable North Carolina law, including N.C.G.S. §§ 14-234 and 14-234.1, and the conflict-of-interest policies of Harnett County Schools (HCS), the undersigned certifies that the vendor has reviewed its relationships and interests for actual or potential conflicts of interest associated with this solicitation or resulting contract.

The vendor hereby certifies that:

1. To the best of its knowledge, after reasonable inquiry, no undisclosed actual or potential conflict of interest exists involving the vendor, its officers, employees, proposed subcontractors, or other parties participating in this solicitation.

2. The vendor has disclosed any known financial, ownership, employment, family, or other relationship involving an HCS employee, Board of Education member, or other individual participating in the procurement process that may create an actual or potential conflict of interest.

3. The vendor will promptly notify HCS in writing if an actual or potential conflict of interest arises or becomes known during the solicitation process or contract performance.

4. The vendor understands that disclosure does not automatically disqualify it from consideration.

HCS will evaluate disclosed circumstances under applicable law and Board policy, with appropriate legal review.

5. The vendor acknowledges that a failure to disclose a material conflict of interest may result in appropriate action by HCS, consistent with applicable law and the terms of the solicitation or contract.

Bid Set 11/04/26Flatwoods Middle School Roadway Improvements - 02208.100__________________________________________________________________________________________________

ATTACHEMENT 1A 00 41 00 - 4

REQUIRED ATTACHMENT - COMPLETE, SIGN, AND SUBMIT WITH BID

CONFLICT-OF-INTEREST DISCLOSURE

Select one:

No Conflict: The vendor certifies that no actual or potential conflict of interest is known after ☐ reasonable inquiry.

Conflict Disclosed: The vendor identifies an actual or potential conflict of interest below.☐

Individual or Company Involved: ____________________________________________

Nature of Actual or Potential Conflict:

Proposed Remedy or Mitigation, if applicable:

AUTHORIZED CERTIFICATION

I certify that the information provided is true and accurate to the best of my knowledge and that I am authorized to execute this certification on behalf of the vendor.

Authorized Signature: _____________________________________ Date: ______________

Printed Name: __________________________________ Title: ________________________

Vendor/Company Name: _____________________________________________________

Statutory References: N.C.G.S. §§ 14-234 and 14-234.1. This certification is required by Harnett County Schools as part of its procurement procedures, subject to applicable law and Board policies.

Bid Set 11/04/26__________________________________________________________________________________________________Flatwoods Middle School Roadway Improvements - 02208.100

00 41 00 - 5 ATTACHEMENT 1B

DEBARMENT AND SUSPENSION CERTIFICATION

Project: Flatwoods Middle School Roadway Improvements

Solicitation/Project Number: __________________________________

CERTIFICATION

The undersigned bidder certifies, to the best of its knowledge and belief, that neither the bidder nor any of its principals is currently debarred, suspended, declared ineligible, or otherwise excluded from participation in public contracts by the United

States Government or the State of North Carolina.

For this certification, “principals” includes officers, directors, owners, partners, and individuals with primary management or supervisory responsibilities for the bidder or proposed contract.

The bidder further certifies and acknowledges that:

1. The information provided is true and accurate as of the date signed.

2. The bidder will immediately notify Harnett County Schools in writing of any change in its eligibility status or that of its principals before contract award or during contract performance.

3. Harnett County Schools may verify eligibility through applicable federal and state government records.

4. A false or misleading certification may be considered in determining bidder responsibility and may result in rejection of the bid, contract termination, or other remedies available under applicable law and the contract documents.

BIDDER ACKNOWLEDGMENT (select one)

I CERTIFY that neither the bidder nor its principals is excluded as described above.☐

I AM UNABLE TO CERTIFY without exception. A written explanation is attached for HCS review.☐

AUTHORIZED REPRESENTATIVE

Company/Legal Business Name: _________________________________________________

Business Address: ______________________________________________________________

Printed Name / Title: ___________________________________________________________

Signature: __________________________________________ Date: ___________________

Telephone: __________________________ Email: __________________________________

Submission: Return this completed and signed form with the bid as required by the solicitation.

00 41 00 - 6 ATTACHEMENT 2

Bid Set 11/04/26Flatwoods Middle School Roadway Improvements - 02208.100__________________________________________________________________________________________________

E-Verify Compliance Certification

Solicitation / Contract Number: __________________________________________

Company / Contractor Name: _____________________________________________

Certification

Pursuant to N.C.G.S. § 143-133.3 and Article 2 of Chapter 64 of the North Carolina General Statutes, the undersigned certifies that the contracting company complies with all applicable E-Verify requirements.

The contractor further certifies that:

1. It complies with N.C.G.S. § 64-26 to the extent applicable to its business operations and workforce.

2. It will require all subcontractors performing services under this contract to comply with the applicable provisions of Article 2 of Chapter 64 of the North Carolina General Statutes.

3. It will maintain compliance throughout the performance of the contract.

4. It will promptly notify Harnett County Schools of any material change affecting its compliance with these requirements.

The undersigned represents that they are authorized to execute this certification on behalf of the company.

Company Name: ________________________________________________

Authorized Signature: ________________________________________________

Printed Name and Title: ________________________________________________

Date: _____________________________

Statutory references: N.C.G.S. § 143-133.3; N.C.G.S. §§ 64-25 and 64-26.

This certification is intended for inclusion in HCS solicitations and covered contracts. Applicable statutory exemptions remain in effect.

Flatwoods Middle School Roadway Improvements - 02208.100 Bid Set 11/04/26__________________________________________________________________________________________________

ATTACHEMENT 3 00 41 00 - 7

COMPANIES BOYCOTTING ISRAEL DIVESTMENT ACT CERTIFICATION

Solicitation Compliance Form

Solicitation Number: _________________________________________________

Company/Vendor Name: ______________________________________________

Pursuant to the North Carolina Divestment From Companies Boycotting Israel Act, N.C.G.S. §§ 147-

86.80 through 147-86.83, companies identified as restricted companies are prohibited from entering into contracts with the State of North Carolina or its political subdivisions, including Harnett County Schools, except as otherwise provided by law.

The undersigned certifies that:

1. The company is not identified as a restricted company on the applicable Final Divestment and Do-Not-Contract List established pursuant to North Carolina law.

2. The company will not knowingly utilize subcontractors identified as restricted companies in performing work under this contract.

3. The company will immediately notify Harnett County Schools if its eligibility status changes during the solicitation process or contract performance.

4. The undersigned is authorized to execute this certification on behalf of the company.

Acknowledgment: The undersigned understands that contracts with restricted companies are subject to the provisions of N.C.G.S. § 147-86.82, including applicable restrictions and consequences of noncompliance.

Authorized Signature: __________________________________ Date: ______________

Printed Name: _____________________________________________________

Title: _____________________________________________________________

Statutory Reference: N.C.G.S. §§ 147-86.80 through 147-86.83.

Restricted Companies List: North Carolina Department of State Treasurer, Divestment and Do-Not- Contract Rules.

https://www.nctreasurer.gov/about/accountability-and-transparency/divestment-and-do-not-contract-rules

This certification is required by Harnett County Schools as part of its procurement compliance procedures for applicable solicitations and contracts.

Flatwoods Middle School Roadway Improvements - 02208.100 Bid Set 11/04/26__________________________________________________________________________________________________

00 41 00 - 8 ATTACHEMENT 4

IRAN DIVESTMENT ACT CERTIFICATION

Solicitation Number (if applicable): ________________________________________

Name of Vendor or Bidder: _______________________________________________

Pursuant to the Iran Divestment Act, N.C.G.S. §§ 147-86.55 through 147-86.63, companies identified as engaging in prohibited investment activities in Iran are ineligible to enter into contracts with the State of North Carolina or its political subdivisions, including Harnett County Schools, except as otherwise permitted by law.

The undersigned hereby certifies that:

1. The vendor or bidder is not identified on the applicable Final Divestment and Do-Not-Contract List established pursuant to N.C.G.S. § 147-86.58.

2. The vendor or bidder will not knowingly utilize subcontractors identified on the applicable restricted-company list in the performance of any contract awarded by Harnett County Schools.

3. The vendor or bidder will promptly notify Harnett County Schools if its eligibility status changes during the solicitation process or contract performance.

4. The undersigned is authorized to execute this certification on behalf of the vendor or bidder.

Certification and Acknowledgment

The undersigned acknowledges that contracts with restricted companies are subject to N.C.G.S. § 147- 86.60, including applicable restrictions and consequences of noncompliance.

Signature: ____________________________________ Date: __________________

Printed Name: ___________________________________________________________

Title: __________________________________________________________________

Company Name: _________________________________________________________

Statutory Reference: N.C.G.S. §§ 147-86.55 through 147-86.63.

Restricted Companies List: North Carolina Department of State Treasurer – Divestment and Do-Not- Contract Rules.

This certification is required by Harnett County Schools as part of its procurement compliance procedures for applicable solicitations and contracts.

Flatwoods Middle School Roadway Improvements - 02208.100 Bid Set 11/04/26__________________________________________________________________________________________________

END OF BID FORM / ATTACHEMENTS

00 41 00 - 9 ATTACHEMENT 5

Section C, Owner-Contractor Agreement C-1

SECTION 00 52 00

OWNER-CONTRACTOR AGREEMENT

PROJECT NUMBER: 02208.100

PROJECT NAME: Flatwoods Middle School Roadway Improvements

THIS AGREEMENT, in four (4) copies, made this (___) day of ___________ Two Thousand and Twenty Six by and between Harnett County Board of Education (herein referred to as the "Owner"), whose mailing address is 601 S Main Street, Lillington, NC 27546 and ______________________________________ (herein referred to as the "Contractor"), whose mailing address is _________________________________________________________.

Correspondence, submittals, and notices relating to or required under this Contract shall be sent in writing to the above addresses; unless either party is notified in writing by the other, of a change in address.

WITNESSETH:

WHEREAS, it is the intent of the Owner to obtain the services of the Contractor in connection with the new construction of Flatwoods Middle School Roadway Improvements (hereinafter referred to as the "Project" or the "Work"); and

WHEREAS, the Contractor desires to perform such construction in accordance with the terms and conditions of this Agreement, NOW, THEREFORE, in consideration of the promises made herein and other good and valuable consideration, the following terms and conditions are hereby mutually agreed to, by and between the Owner and Contractor:

Article 1

DEFINITIONS

1.1 All terms in this Agreement which are defined in the Information for Bidders and the General Conditions shall have the meanings designated therein.

1.2 The Contract Documents are as defined in the General Conditions. Such documents form the Contract, and all are as fully a part thereof as if attached to this Agreement or repeated herein. The Contract Documents consist of the Owner-Contractor Agreement, the General and Supplemental Conditions of the Contract, the Drawings, the Specifications, all Addenda issued prior to bidding, and all Modifications and Change Orders issued after execution of the Contract.

Section C, Owner-Contractor Agreement C-2

Article 2

STATEMENT OF THE WORK

2.1 The Project is the Work identified in the plans and specifications prepared by SfL+a Architects & Timmons Group dated ____________, 2026 for Harnett County Board of Education, Flatwoods Middle School Roadway Improvements, including the following addenda:

A listing of the plans and specifications included in the Contract Documents is attached as Exhibit A.

2.2 The Parties agree that the Project shall include the following alternates:

None

2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items:

List item(s) and proposed deduct/add(s). If none, delete this language list “None”

2.4 The Parties agree that the following allowances are included in the Contract Sum in Section 5.1 below:

List item(s) and proposed allowance(s). If none, delete this language list “None”

2.5 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents.

2.6 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".

Section C, Owner-Contractor Agreement C-3

Article 3

DESIGN CONSULTANT

3.1 The Design Consultant (as defined in the General Conditions) shall be SfL+a Architects whose address is 421 Fayetteville Street, Ste 1450, Raleigh, NC 27601, however, that the Owner may, without liability to the Contractor, unilaterally amend this Article from time to time by designating a different person or organization to act as its Design Consultant and so advising the Contractor in writing, at which time the person or organization so designated shall be the Design Consultant for purposes of this Contract.

Article 4

TIME OF COMMENCEMENT AND COMPLETION

4.1 The Contractor shall commence the Work promptly upon the date established in the Notice to Proceed. If there is no Notice to Proceed, the date of commencement of the Work shall be the date of this Agreement or such other date as may be established herein.

4.2 Time is of the essence. The Contractor shall achieve Final Completion, as defined in the General Conditions on or before the date established for Final Completion in the Supplemental Conditions.

4.3 The Supplemental Conditions contains certain specific dates that shall be adhered to and are the last acceptable dates unless modified in writing by mutual agreement between the Contractor and the Owner. All dates indicate midnight unless otherwise stipulated. The only exceptions to this schedule are defined in the General Conditions under 8.3 DELAYS

AND EXTENSIONS OF TIME.

4.4 Should the Contractor fail to complete the Work on or before the dates stipulated for Substantial Completion and/or Final Completion, or such later date as may result from an extension of time granted by the Owner, he shall pay the Owner, as liquidated damages the sums set forth in the General and Supplemental Conditions.

Section C, Owner-Contractor Agreement C-4

Article 5

CONTRACT SUM

5.1 Provided that the Contractor shall strictly and completely perform all of its obligations under the Contract Documents, and subject only to additions and deductions by Modification or as otherwise provided in the Contract Documents, the Owner shall pay to the Contractor, in current funds and at the time and in the installments hereinafter specified, the sum of __________________________________ Dollars ($___________) herein referred to as the "Contract Sum". This amount includes the base bid and the Alternates in Section 2.2

5.2 The Contract Sum includes the value engineering items and other contract modifications noted in Section 2.3 above that total $______________.

5.3 Unit Prices are established as follows for the Project:

Unit Price No. 1 $ Unit Price No. 2 $ Unit Price No. 3 $ Unit Price No. 4 $ Unit Price No. 5 $ Unit Price No. 6 $ Unit Price No. 7 $ Unit Price No. 8 $

Article 6

PROGRESS PAYMENTS

6.1 The Contractor hereby agrees that on or about the First day of the month for every month during the performance of the Work he will deliver to the Design Consultant an Application for Payment in accordance with the provisions of Article 9 of the General Conditions. This date may be changed upon mutual agreement, stated in writing, between the Owner and Contractor. Payment under this Contract shall be made as provided in the General Conditions. Payments due and unpaid under the Contract Documents shall not bear interest.

Section C, Owner-Contractor Agreement C-5

Article 7

OTHER REQUIREMENTS

7.1 The Contractor shall submit the Performance Bond, Labor and Material Payment Bond and Certification of Insurance as required by the Contract Documents.

7.2 The Owner shall furnish to the Contractor one (1) set of drawings and one (1) set of specifications, at no extra cost, for use in the Construction of the Work. Additional sets of drawings or specifications may be obtained by the Contractor by paying the Owner for the costs of reproduction, handling and mailing.

7.4 The General Conditions, Supplemental Conditions and the plans and specifications, including any addenda, are incorporated herein by reference.

Section C, Owner-Contractor Agreement C-6

IN WITNESS WHEREOF, Harnett County Board of Education (hereinbefore called the "Owner") has caused these presents to be signed and its corporate seal to be hereunto affixed, attested by its Chairperson and Secretary, and ________________ (hereinbefore called "Contractor") has caused these presents to be signed by its President and its Corporate seal to be hereunto affixed, as hereinafter attested, all as of the day and year first above written.

HARNETT COUNTY BOARD OF EDUCATION

__________________________, Board Chairperson (Print Name)

ATTEST:

___________________________, Superintendent (Corporate Seal) (Print Name)

CONTRACTOR

(Contractor Corporate Name)

___________________________, President or Vice-President (Print Name)

ATTEST:

____________________________, Corporate Secretary (Corporate Seal) (Print Name)

This instrument has been preaudited in the manner required by the School Budget and Fiscal Control Act.

(Date)

___________________________, Finance Officer (Print Name

SECTION 00 61 13.13

PERFORMANCE BOND FORM

IT IS HEREBY AGREED that (Insert full name and address of Contractor) as Principal, hereinafter called Contractor, and, (Insert full name and address of Surety) as Surety, hereinafter called Surety, are held and firmly bound unto the as Obligee, hereinafter called Owner, in the amount of __________________________ _________________________________________________ Dollars ($ ), for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these obligations.

WHEREAS, Contractor has by written agreement dated _________________, 20___, entered into a contract with Owner for the construction of (Insert the name of the Project) in accordance with Drawings and Specifications prepared by (Insert full name and address of Architect/Engineer) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor shall promptly and faithfully perform said Contract, then this obligation shall be null and void;

otherwise it shall remain in full force and effect. The Surety hereby waives notice of any alteration or extension of time made by the Owner.

Whenever Contractor shall be, and declared by Owner to be in default, under the Contract, the Owner having performed Owner’s obligations thereunder, the Surety may promptly remedy the default, or shall promptly:

1) Complete the Contract in accordance with its terms and conditions, or

2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest responsible bidder, arrange for a contract between such bidder and Owner, and make available as Work progresses (even though there should be a default or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the contract price; but not exceeding, including other costs and damages for which the Surety may be liable hereunder, the amount set forth in the first paragraph hereof. The term “balance of the contract price,” as used in this paragraph, shall mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly paid by Owner to Contractor.

Any suit under this bond must be instituted before the expiration of any applicable…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .