FLL - Armor Painting - RTA - Specs.pdf
PDF 3 MB Posted
- Attached to
- Ft Loudon Wall Armor Painting Federal contract opportunity
- Solicitation number
- W912P522B0012
About this file
This document outlines a federal contract opportunity for painting armor at Fort Loudoun Lock. The project involves removing loose rust, paint, and other materials from upstream approach wall corner armor, chamber corner armor, downstream approach wall corner armor, and check posts totaling approximately 2,000 linear feet. Optional work includes painting vertical armor at mooring bit recesses and ladder recesses totaling around 100 and 400 linear feet respectively. The contractor will conduct all work in accordance with specifications and plans over a 217-day period of performance beginning from notice to proceed. A pre-bid site visit is scheduled for August 4, 2022. Questions regarding proposals, bonds, or procedures must be submitted through Bidder Inquiry in ProjNet. Bids shall be submitted electronically through PIEE. The solicitation number is W912P522B0012 and the agency is the US Army Corps of Engineers Nashville District.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912P522B0012_Amendment 0001 Final.pdf | ||
| FLL - Armor Painting - RTA - Specs.pdf | ||
| FLL - Armor Painting - RTA - BID.pdf | ||
| FLL - Armor Painting - RTA - Folio.pdf | ||
| FLL - Armor Painting - RTA - BID.pdf | ||
| FN Pre_Bid or Site Visit Form_ FLL Wall Armory.pdf | ||
| Site _Visit Form _ FLL Wall Armory.pdf | ||
| Solicitation W912P522B0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No. Contract #W912P522B0012
US Army Corps Of Engineers Nashville District
Fort Loudoun Lock
Armor Painting Project
Fort Loudoun Lock Lenoir City, TN
RTA
SPECIFICATIONS
JULY 2022
THIS PAGE INTENTIONALLY LEFT BLANK
COVER PAGE Page 2
Fort Loudoun Lock Armor Painting
Contract #W912P5-22-B-0012 RTA
Contract #W912P5-22-B-0012 RTA Fort Loudoun Lock
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00 GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 PRICE AND PAYMENT PROCEDURES
01 32 01 PROJECT SCHEDULE FOR SMALL CONTRACTS
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 95 00 FORMS AND ATTACHMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 83 00 LEAD REMEDIATION
DI VI SI ON 09 - FI NI SHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION
1.2 Location
1.2.1 Conditions of Work
1.2.2 Coordination with Lock Operations
1.3 MEASUREMENT AND PAYMENT
1.4 ACCIDENT PREVENTION
1.5 COORDINATION CONFERENCES
1.6 COORDINATION WITH OTHER CONTRACTORS
1.7 EVALUATION OF CONTRACTOR PERFORMANCE
1.8 SUBMITTALS
1.9 PARTNERING
1.10 Daily Cleanup and Disposal
1.11 Protection and Restoration of Existing Facilities
1.12 CONTRACTOR'S STAGING AREA, EQUIPMENT AND MATERIAL STORAGE
1.13 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
1.14 FEDERAL HOLIDAYS
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 AVAILABILITY AND USE OF UTILITY SERVICES
3.1.1 Contractor Responsibilities
3.1.2 Interruptions of Utilities
3.1.3 Coordination With the Government
-- End of Section Table of Contents --
SECTION 01 00 00 Page 1
SECTION 01 00 00 Page 2
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 GENERAL
1.1 DESCRIPTION
The Contractor is required to furnish all necessary technical expertise, planning, management, supervision, inspection, personnel, parts, tools, fuel, equipment, vehicles and transportation, materials and supplies, except as otherwise provided for herein, required to perform the work in this contract. All work shall be completed as specified, detailed and/or in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, contained in the contract or incorporated by reference. Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR) whether it is referenced or not referenced, current at time of award.
1.2 Location
Fort Loudoun Lock
6699 Hwy 321 South, Lenoir City, TN 37772
1.2.1 Conditions of Work
Fort Loudoun Lock operates 20 hours per day (0700 to 0300 ET), seven (7) days per week.
Work Timeline: Onsite work must be performed between October 17, 2022 and March 31, 2023
The navigation traffic during the construction period may vary.
Contractor will coordinate with operations and lock master. Contractor to ensure painting operations do not interfere with lock operations.
1.2.2 Coordination with Lock Operations
The Contractor shall perform all work in a manner that will not interfere with the duties of the lock personnel and navigation. The contractor will be permitted to work 6 days per week (Monday - Saturday). Daytime closures will be possible between (0800 to 1800 Monday - Friday). Work performed on Saturday from 0800 to 1800 shall not impede Navigation. The lockmaster will coordinate saturday work efforts with the contractor when feasible.
Particular care shall be taken during all operations under this contract to prevent damage to any operating equipment or facilities at the project.
The Contractor shall continuously maintain safe access to all areas of the lock project for lock operating personnel, unless otherwise directed by the Contracting Office.
1.3 MEASUREMENT AND PAYMENT
No separate payment will be made for the work covered under this section, except as otherwise provided. The costs thereof shall be included in the item to which the work pertains. Payment for the work required under this
SECTION 01 00 00 Page 3 contract will be made as listed in the bidding schedule and as described in Section 01 22 00 PRICE AND PAYMENT PROCEDURES.
1.4 ACCIDENT PREVENTION
Accident prevention requirements for this project are stated in Section
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.
1.5 COORDINATION CONFERENCES
Routine coordination conferences will be scheduled by the Contracting Officer throughout the life of this contract. Coordination conferences will be held to discuss contract administration, Contractor quality control, phasing, scheduling, and other aspects relating to the required work. The Corps of Engineers and the Contractor will be represented at each of these meetings. Similar information concerning replacement personnel shall be forwarded to the Contracting Officer, should any replacement be required at any time during the life of this contract.
Coordination conferences will be scheduled to occur when notified by the Contracting Officer.
1.6 COORDINATION WITH OTHER CONTRACTORS
The Contractor has primary responsibility to initiate the coordination and communication in a timely manner with the Contracting Officer to schedule activities of others and minimize or eliminate conflicts with others. The Contracting Officer will then determine the appropriate course of communicating with the others involved. In many cases, the Contracting Officer may determine that the Contractor should communicate directly with others while ensuring the Contracting Officer is timely informed of the decisions of the communications or actively involved in the communications.
1.7 EVALUATION OF CONTRACTOR PERFORMANCE
The Contractor's performance will be evaluated in accordance with FAR Part
42.15 in the areas of quality, schedule, cost control, management, utilization of small businesses, and regulatory compliance at minimum.
The evaluation will include a written narrative and rating of either exceptional, very good, satisfactory, marginal, or unsatisfactory for each. The format for the evaluation is attached at the end of Section
01 95 00 FORMS AND ATTACHMENTS.
The Contractor's review of the evaluation shall be completed electronically at the CPARS website, http://www.cpars.gov . This website also includes guidance and the user's manual.
Upon contract award, the Contractor shall provide the Contracting Officer with the name and e-mail address of the Contractor's Representative to be registered into the system. Following initial completion by the Government, the Contractor will have sixty (60) calendar days to review, comment, and return the evaluation.
1.8 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 01 00 00 Page 4
SD-01 Preconstruction Submittals
Work Plan and Layout of Work; G After award of the contract, the Contractor shall, in writing, submit a Work Plan to the Contracting Officer detailing the activities to take place during the performance of this contract.
The plan shall include activities for the protection of historical, archaeological, and cultural resources; clearing methods, painting operations; and placement processes for materials. The Contractor shall not begin work until approval of the Work Plan.
1.9 PARTNERING
In order to most effectively accomplish this contract, the Government urges the Contractor to join the Government in establishing a cohesive and professional project management team. Through this "partnering" relationship both entities would strive to draw on the strengths of each organization for the ultimate goal of assuring that the project's intended results are achieved, within budget and on schedule. This endeavor seeks an environment that nurtures team building, cooperation and trust between the Government and the Contractor. The partnering relationship would be bilateral in make-up, and participation will be totally voluntary.
1.10 Daily Cleanup and Disposal
Work areas shall be kept reasonably neat on a daily basis. Debris resulting from the work, such as empty paint cans, packing cases, scrap lumber, oil and grease spills, and other debris shall be collected, removed, and disposed of off-site at least once per week. Government trash cans, dump boxes and other containers shall not be used. Liquid waste shall not be disposed of in existing drains.
1.11 Protection and Restoration of Existing Facilities
Existing facilities shall be protected whether or not shown on the drawings. Upon completion of the work, existing facilities, not included as a portion of the work, shall be left in a condition equal to the original condition prior to the contract. Costs for repair and restoration of any facilities shall be considered to be incidental to and included in the contract price. The contractor is advised that the existing facilities are listed on the National Register of Historic Places.
1.12 CONTRACTOR'S STAGING AREA, EQUIPMENT AND MATERIAL STORAGE
The Contractor may use areas within the defined work limits as staging area. The contractor shall not clear vegetation in order to solely accommodate a staging area. Should the contractor need area beyond the defined work limits and within the total property lines, the contractor should submit a detailed schedule, description of work, justification for additional area and rehabilitation plan for approval by the COR prior to occupying the area. Overnight staging of vehicles and equipment onsite to include any hazardous, toxic or waste shall not rest below an elevation of 370'.
SECTION 01 00 00 Page 5
1.13 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract.
While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
a. U.S. Department of Labor Veterans employment: www.vets.gov/
b. Federal veteran employment information: www.fedshirevets.gov/index.aspx
c. Veterans’ Employment and Training Service (VETS):
http://www.dol.gov/vets/
d. Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/
e. U.S. Army Warrior Transition Command Search for Candidates:
http://wct.army.mil/modules/employers/e1-searchCandidates.html
f. Hiring Our Heroes initiative:
www.uschamberfoundation.org/hiring-our-heroes
1.14 FEDERAL HOLIDAYS
Do not schedule work on Federal holidays.
b. 2022 Federal Holiday Schedule
Dat e Hol i day New Year’s Day – Friday, December 31, 2021 Martin Luther King, Jr – Monday, January 17, 2022 Washington’s Birthday – Monday, February 15, 2022 Memorial Day – Monday, May 30, 2022 Independence Day – Monday, July 4, 2022 Labor Day – Monday, September 5, 2022 Columbus Day – Monday, October 10, 2022 Veterans Day – Friday, November 11, 2022 Thanksgiving Day – Thursday, November 24, 2022 Christmas Day – Monday, December 24, 2022
c. 2023 Federal Holiday Schedule
Dat e Hol i day New Year’s Day – Friday, December 31, 2022 Martin Luther King, Jr – Monday, January 17, 2023 Washington’s Birthday – Monday, February 21, 2023 Juneteeth - Monday, June 20, 2023 Memorial Day – Monday, May 30, 2023 Independence Day – Monday, July 4, 2023 Labor Day – Monday, September 5, 2023 Columbus Day – Monday, October 10, 2023
SECTION 01 00 00 Page 6
Veterans Day – Friday, November 11, 2023 Thanksgiving Day – Thursday, November 24, 2023 Christmas Day – Monday, December 26, 2023
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 AVAILABILITY AND USE OF UTILITY SERVICES
3.1.1 Contractor Responsibilities
a. The Contractor shall be responsible for the availability of utilities for use on the project. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to and paid for by the Contractor. The Contractor shall carefully conserve any utilities furnished without charge.
b. The contractor will be allowed to use existing electricity and raw water utilities located about the lock area. Any utilities needed beyond those already in place shall be provided by the contractor and at the contractor's expense..
c. The Contractor is responsible for providing restroom and drinking water facilities for all personnel associated with this contract.
3.1.2 Interruptions of Utilities
a. No utility services shall be interrupted by the Contractor to make connections, to relocate, or for any purpose without approval of the Contracting Officer.
b. Request for Permission to shut down services shall be submitted in writing to the Contracting Officer not less than seventeen (17) days prior to date of proposed interruption. The request shall give the following information:
(1) Nature of Utility (Gas, L.P. or H.P., Water, etc.)
(2) Size of line and location of shutoff.
(3) Buildings and services affected.
(4) Hours and date of shutoff.
(5) Estimated length of time services will be interrupted.
c. Services shall not be shutoff until receipt of approval of the proposed hours and date from the Contracting Officer.
d. Shutoffs which will cause interruption of Government work operations as determined by the Contracting Officer shall be accomplished during regular non-work hours or on non-work days of the Using Agency.
e. Operation of valves on water mains will be by Government personnel.
Where shutoff of water lines interrupts service to fire hydrants or fire sprinkler systems, the Contractor shall arrange his operations and have sufficient material and personnel available to complete the work without undue delay or to restore service without delay in event of emergency.
f. Electrical conduit of 110v are available throughout the project site.
SECTION 01 00 00 Page 7
g. Clean water will not be provided by USACE. The contractor will be required to provide their own clean water.
3.1.3 Coordination With the Government
For the purpose of coordinating with the Government, the Contractor shall schedule interactions with the Government during the normal business hours of Monday through Friday 7:30 a.m. to 4:00 p.m. Eastern Time with the exception of Federal Holidays. Federal Holidays are listed in paragraph FEDERAL HOLIDAYS of this section. The Government will make every effort to make design determinations and approve segments of completed work during the performance of this contract in a timely manner.
-- End of Section --
SECTION 01 00 00 Page 8
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Location
1.1.2 Scope
1.1.2.1 Base - Horizontal Armor - Upstream Approach Wall Corner
Armor
1.1.2.2 Base - Horizontal Armor - Chamber Wall Corner Armor
1.1.2.3 Base - Horizontal Armor - Downstream Approach Wall Corner
Armor
1.1.2.4 Base - Check Posts on Top of Lock Wall
1.1.2.5 Option 01 - Vertical Armor - Mooring Bit Recess Armor
1.1.2.6 Lock Outages
1.1.2.7 Fort Loudoun Lock Elevations
1.1.3 Lead Base Paint
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 11 00 Page 1
SECTION 01 11 00 Page 2
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Location
Fort Loudoun Lock: This facility is listed on the National Register of Historic Places.
1.1.2 Scope
All items listed below shall be cleaned, prepared to remove existing loose dirt/paint and painted according to Section 09 97 02 PAINTING: HYDRAULICS STRUCTURES. The existing paint is expected to have low levels of lead.
Plans to paint the items below must be approved by the Contracting Officer prior to work being performed.
Only one wall (river or land) of the lock shall be painted at one time. A section (upper approach, chamber wall or lower approach section) shall be painted in full prior to painting another section. The paint system has to dry to satisifcatory standards before moving to the next section.
1.1.2.1 Base - Horizontal Armor - Upstream Approach Wall Corner Armor
Features of work for the Upstream Approach Wall Corner Armor include painting of horizontal corner armor and angle iron upstream of the upper miter gates on both Land and River walls. The contractor may coordinate if any site conditions impact this work. The upstream horizontal corner armor is a approximately 550 feet on the river side and 230 feet on the land side. Each section of the wall to be painted YELLOW color as specified in Section 09 97 02. Contractor is NOT to clean or paint over existing horizontal with chrevon pattern.
1.1.2.2 Base - Horizontal Armor - Chamber Wall Corner Armor
Features of work for the Chamber Wall Corner Armor include painting of horizontal corner armor sections between the upstream and downstream miter gates. This includes painting both horizontal corner armor and angle irons on the land and river sides. The contractor is to maintain the horizontal paint line throughout. The contractor may coordinate if any site conditions impact this work. The land side is to be painted first in full. The chamber horizontal corner armor is a combined total length of approximately 825 linear feet. Each section of the wall to be painted ALUMINUM color as specified in Section 09 97 02. This task also includes painting the tow haulage "mule" device and supporting metal for the device Yellow.
SECTION 01 11 00 Page 3
1.1.2.3 Base - Horizontal Armor - Downstream Approach Wall Corner Armor
Features of work included in the Downstream Approach Wall Corner Armor include painting of horizontal corner armor downstream of the lower miter gates. This section includes painting both horizontal corner armor on the land and river sides. The downstream horizontal corner armor is a approximately 650 feet on the river side and 100 feet on the land side.
The diagonal and various levels for the stairway will remain untouched.
The contractor will maintain the horizontal paint line throughout. The contractor may coordinate if any site conditions impact this work. The contractor will paint horizontal armor in this area. Each section of the wall to be painted YELLOW as specified in Section 09 97 02. The contractor will paint any angle iron in this area. Contractor will NOT clean or paint over existing horizontal with chrevon pattern.
1.1.2.4 Base - Check Posts on Top of Lock Wall
There are 50 check posts located on top of the lock to be painted as specified in Section 09 97 02. Contractor will refer to drawing 43, 220A-1 "Check Post" for color specifics. Top 4 inches must be YELLOW and everything below is ALUMINUM color. The site has several types of check posts. Contractor to make best effort to make the paint dimensions similar.
1.1.2.5 Option 01 - Vertical Armor - Mooring Bit Recess Armor
The Chamber contains several recesses throughout each side. Each Mooring Recess contains two vertical edge armor sides. Each recess (includes both sides) shall be painted from the top of the chamber down to upper targeted pool elevation. This equates to less than 100 linear ft. Refer to section
1.1.4 "Fort Loudoun Lock Elevations" below for targeted water elevations.
There are 4 mooring bit recesses in the lock chamber. Color paint as ALUMINUM as specified in Section 09 97 02.
1.1.2.6 Lock Outages
Lock outages will be scheduled between the Contractor, COR & Lockmaster to permit sufficient time to clean, surface prep, removal of existing loose lead-based paint system, paint and allow paint to cure.
1.1.2.7 Fort Loudoun Lock Elevations
Contractor will reference Tennessee Valley Authority (TVA) lake elevations (https://www.tva.com/environment/lake-levels/Fort- Loudoun) on a consistent basis to adquately determine work capabilities. Contractor will inform the COR of any potential impacts to time and schedule. Elevations below are approximate.
Lock Elevation
- Upperstream: Top of Chamber and Lock Wall = 822.0'
- Downstream: Top of Lock Wall = 772.85'
Targeted Elevation
- Upstream: = 815.0'
- Downstream: = 750.0'
1.1.3 Lead Base Paint
Lead based paint was determined in recent testing. Test results will be
SECTION 01 11 00 Page 4 provided as reference.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 11 00 Page 5
SECTION 01 11 00 Page 6
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 Lead Based Paint
1.3 PAYMENT ITEMS
1.3.1 Mobilization & Demobilization
1.3.1.1 Payment
1.3.1.2 Unit of Measure
1.3.2 HORIZONTAL ARMOR - UPSTREAM APPROACH WALL CORNER ARMOR
1.3.2.1 Payment
1.3.2.2 Unit of Measure
1.3.3 HORIZONTAL ARMOR - CHAMBER WALL CORNER ARMOR
1.3.3.1 Payment
1.3.3.2 Unit of Measure
1.3.4 HORIZONTAL ARMOR - DOWNSTREAM APPROACH WALL CORNER ARMOR
1.3.4.1 Payment
1.3.4.2 Unit of Measure
1.3.5 CHECK POSTS ON TOP OF LOCK WALL
1.3.5.1 Payment
1.3.5.2 Unit of Measure
1.3.6 VERTICAL ARMOR - MOORING BIT RECESS ARMOR
1.3.6.1 Payment
1.3.6.2 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 22 00 Page 1
SECTION 01 22 00 Page 2
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Weight Certificates
1.2 Lead Based Paint
The contractor shall consider all existing paint to have lead and incorporate expenses for the proper removal of paint chips collected during the cleaning and preparation process in each payment item as described below. This price will include consideration for all materials, equipment, and labor; and all other related appurtenances.
1.3 PAYMENT ITEMS
Payment items for the work of this contract for which payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular payment item, shall be included in the listed payment item most closely associated with the work involved. The payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, environmental monitoring, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.3.1 Mobilization & Demobilization
1.3.1.1 Payment
Payment shall be made at the contract price per job for "Mobilization & Demobilization". Payment shall be inclusive of all labor, materials and equipment. Payment shall be made in accordance with FAR 52.236-7004
PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.
1.3.1.2 Unit of Measure
Unit of measure: Job (JOB).
SECTION 01 22 00 Page 3
1.3.2 HORIZONTAL ARMOR - UPSTREAM APPROACH WALL CORNER ARMOR
1.3.2.1 Payment
Payment shall be made at the contract price per linear feet for "UPSTREAM APPROACH WALL CORNER ARMOR". Payment for all costs in connection with cleaning, surface preparation, and painting for the completion of this feature. This price will include consideration for all lead paint chip material removal, equipment, and labor; and all other related appurtenances.
1.3.2.2 Unit of Measure
Unit of measure: linear ft (LF) of lock wall.
1.3.3 HORIZONTAL ARMOR - CHAMBER WALL CORNER ARMOR
1.3.3.1 Payment
Payment shall be made at the contract price per linear feet for "CHAMBER WALL CORNER ARMOR". Payment for all costs in connection with cleaning, surface preparation, and painting for the completion of this feature. This price will include consideration for all lead paint chip paint material removal, equipment, and labor; and all other related appurtenances.
1.3.3.2 Unit of Measure
Unit of measure: linear ft (LF) of lock wall.
1.3.4 HORIZONTAL ARMOR - DOWNSTREAM APPROACH WALL CORNER ARMOR
1.3.4.1 Payment
Payment shall be made at the contract price per linear feet for "DOWNSTREAM APPROACH WALL CORNER ARMOR". Payment for all costs in connection with cleaning, surface preparation, and painting for the completion of this feature. This price will include consideration for all lead paint chip removal, materials, equipment, and labor; and all other related appurtenances.
1.3.4.2 Unit of Measure
Unit of measure: linear ft (LF) of lock wall.
1.3.5 CHECK POSTS ON TOP OF LOCK WALL
1.3.5.1 Payment
Payment shall be made at the contract price per each (EA) "CHECK POSTS ON TOP OF LOCK WALL". Payment for all costs in connection with cleaning, surface preparation, and painting for the completion of this feature. This price will include consideration for all lead paint chip removal, SECTION 01 22 00 Page 4 materials, equipment, and labor; and all other related appurtenances.
1.3.5.2 Unit of Measure
Unit of measure: Each (EA.)
1.3.6 VERTICAL ARMOR - MOORING BIT RECESS ARMOR
1.3.6.1 Payment
Payment shall be made at the contract price per linear feet for "Vertical Armor - Mooring Bit Recess Armor". Payment for all costs in connection with cleaning, surface preparation, and painting for the completion of this feature. This price will include consideration for all lead paint chip removal, materials, equipment, and labor; and all other related appurtenances.
1.3.6.2 Unit of Measure
Unit of measure: linear ft (LF) of wall armor.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 22 00 Page 5
SECTION 01 22 00 Page 6
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 01.10 07
PROJECT SCHEDULE FOR SMALL CONTRACTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PROJECT SCHEDULER QUALIFICATIONS
PART 2 PRODUCTS
2.1 SOFTWARE
2.1.1 Government Default Software
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 BASIS FOR PAYMENT AND COST LOADING
3.2.1 Activity Cost Loading
3.2.2 Withholdings / Payment Rejection
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Level of Detail Required
3.3.2 Activity Durations
3.3.3 Procurement Activities
3.3.4 Mandatory Tasks
3.3.5 Government Activities
3.3.6 Contract Milestones and Constraints
3.3.6.1 Project Start Date Milestone
3.3.6.2 End Project Finish Milestone
3.3.6.3 Interim Completion Dates and Constraints
3.3.6.3.1 Start Phase
3.3.6.3.2 End Phase
3.3.7 Calendars
3.3.8 Open Ended Logic
3.3.9 Default Progress Data Disallowed
3.3.10 Out-of-Sequence Progress
3.3.11 Added and Deleted Activities
3.3.12 Original Durations
3.3.13 Leads, Lags, and Start to Finish Relationships
3.3.14 Retained Logic
3.3.15 Percent Complete
3.3.16 Remaining Duration
3.3.17 Cost Loading of Closeout Activities
3.3.17.1 As-Built Drawings
3.3.18 Anticipated Adverse Weather
3.3.19 Early Completion Schedule and the Right to Finish Early
3.4 PROJECT SCHEDULE SUBMISSIONS
3.4.1 Preliminary Project Schedule Submission
3.4.2 Initial Project Schedule Submission
SECTION 01 32 01 Page 1
3.4.3 Periodic Schedule Updates
3.5 SUBMISSION REQUIREMENTS
3.5.1 Narrative Report
3.5.2 Schedule Reports
3.5.2.1 Activity Report
3.5.2.2 Logic Report
3.5.2.3 Total Float Report
3.5.2.4 Earnings Report by CLIN
3.5.3 Network Diagram
3.5.3.1 Continuous Flow
3.5.3.2 Project Milestone Dates
3.5.3.3 Critical Path
3.5.3.4 Banding
3.5.3.5 Cash Flow / Schedule Variance Control (SVC) Diagram
3.6 PERIODIC SCHEDULE UPDATE
3.6.1 Periodic Schedule Update Meetings
3.6.2 Update Submission Following Progress Meeting
3.7 WEEKLY PROGRESS MEETINGS
3.8 REQUESTS FOR TIME EXTENSIONS
3.8.1 Justification of Delay
3.8.2 Time Impact Analysis (Prospective Analysis)
3.8.3 Forensic Schedule Analysis (Retrospective Analysis)
3.8.4 Fragmentary Network (Fragnet)
3.8.5 Time Extension
3.8.6 Impact to Early Completion Schedule
3.9 FAILURE TO ACHIEVE PROGRESS
3.9.1 Artificially Improving Progress
3.9.2 Failure to Perform
3.9.3 Recovery Schedule
3.10 OWNERSHIP OF FLOAT
3.11 PRIMAVERA P6 MANDATORY REQUIREMENTS
SECTION 01 32 01 Page 2
SECTION 01 32 01.10 07
PROJECT SCHEDULE FOR SMALL CONTRACTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AACE INTERNATIONAL (AACE)
AACE 29R-03 (2011) Forensic Schedule Analysis
AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Scheduler Qualifications; G Preliminary Project Schedule; G Initial Project Schedule; G Periodic Schedule Update; G
1.3 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2-years experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application.
PART 2 PRODUCTS
2.1 SOFTWARE
The scheduling software utilized by the contractor to produce and update the schedules required herein must be capable of meeting all requirements of this specification.
2.1.1 Government Default Software
The computer software system utilized by the Contractor to produce the
SECTION 01 32 01 Page 3
Project Schedule shall be a full cost loaded basic schedule. Contractor will ensure schedule is .xer compatible file format.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules.
Prepare each Project Schedule using the Precedence Diagram Method (PDM).
3.2 BASIS FOR PAYMENT AND COST LOADING
The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN must equal the value of the CLIN.
3.2.1 Activity Cost Loading
Activity cost loading must be reasonable and without front-end loading.
Provide additional documentation to demonstrate reasonableness if requested by the Contracting Officer.
3.2.2 Withholdings / Payment Rejection
Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.
In the event that the Contracting Officer directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the Contracting Officer may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.3.2 Activity Durations
Reasonable activity durations are those that allow the progress
SECTION 01 32 01 Page 4 of ongoing activities to be accurately determined between update periods.
Less than 2 percent of all non-procurement activities may have Original Durations (OD) greater than 20 work days or 30 calendar days.
3.3.3 Procurement Activities
Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.
3.3.4 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of SD-01 Preconstruction Submittals (individual activity for each).
b. Submission, review and acceptance of features require design completion
c. Long procurement activities
d. Submission and approval of as-built drawings.
e. Contractor's pre-final inspection.
f. Correction of punch list from Contractor's pre-final inspection.
g. Government's pre-final inspection.
h. Correction of punch list from Government's pre-final inspection.
i. Final inspection.
3.3.5 Government Activities
Show Government and other agency activities that could impact progress.
These activities include, but are not limited to: approvals, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.
3.3.6 Contract Milestones and Constraints
Milestone activities are to be used for significant project events including, but not limited to, project phasing, project start and end activities, or interim completion dates. The use of artificial float constraints such as "zero free float" or "zero total float" are prohibited.
3.3.6.1 Project Start Date Milestone
The first activity in the project schedule must be a start milestone titled "NTP Acknowledged,"
SECTION 01 32 01 Page 5
3.3.6.2 End Project Finish Milestone
The last activity in the schedule must be a finish milestone titled "End Project."
Constrain the project schedule to the Contract Completion Date in such a way that if the schedule calculates an early finish, then the float calculation for "End Project" milestone reflects positive float on the longest path. If the project schedule calculates a late finish, then the "End Project" milestone float calculation reflects negative float on the longest path. The Government is under no obligation to accelerate Government activities to support a Contractor's early completion.
3.3.6.3 Interim Completion Dates and Constraints
3.3.6.3.1 Start Phase
Use a start milestone as the first activity for a project phase. Call the start milestone "Start Phase X" where "X" refers to the phase of work.
3.3.6.3.2 End Phase
Use a finish milestone as the last activity for a project phase. Call the finish milestone "End Phase X" where "X" refers to the phase of work.
3.3.7 Calendars
Schedule activities on a Calendar to which the activity logically belongs. Develop calendars to accommodate any contract defined work period such as a 7-day calendar for Government Acceptance activities, cure times, etc. Develop the default Calendar to match the physical work plan with non-work periods identified including weekends and holidays. Develop seasonal Calendar(s) and assign to seasonally affected activities as applicable.
If an activity is weather sensitive it should be assigned to a calendar showing non-work days on a monthly basis, with the non-work days selected at random across the weeks of the calendar, using the anticipated days provided in the contract clause FAR 52.236-4 Physical Data titled TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. Assign non-work days over a seven-day week as weather records are compiled on seven-day weeks, which may cause some of the weather related non-work days to fall on weekends .
3.3.8 Open Ended Logic
Only two open ended activities are allowed: the first activity "NTP Acknowledged" may have no predecessor logic, and the last activity -"End Project" may have no successor logic.
Predecessor open ended logic may be allowed in a time impact analyses upon the Contracting Officer's approval.
3.3.9 Default Progress Data Disallowed
Actual Start and Finish dates must not automatically update with default mechanisms included in the scheduling software. Updating of the percent complete and the remaining duration of any activity must be independent functions. Disable program features that calculate one of these parameters from the other. Activity Actual Start (AS) and Actual Finish
SECTION 01 32 01 Page 6
(AF) dates assigned during the updating process must match those dates provided in the Contractor Quality Control Reports. Failure to document the AS and AF dates in the Daily Quality Control report will result in disapproval of the Contractor's schedule.
3.3.10 Out-of-Sequence Progress
Activities that have progressed before all preceding logic has been satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Contracting Officer.
Propose logic corrections to eliminate out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule. Address out of sequence progress or logic changes in the Narrative Report and in the periodic schedule update meetings.
3.3.11 Added and Deleted Activities
Do not delete activities from the project schedule or add new activities to the schedule without approval from the Contracting Officer. Activity ID and description changes are considered new activities and cannot be changed without Contracting Officer approval.
3.3.12 Original Durations
Activity Original Durations (OD) must be reasonable to perform the work item. OD changes are prohibited unless justification is provided and approved by the Contracting Officer.
3.3.13 Leads, Lags, and Start to Finish Relationships
Lags must be reasonable as determined by the Government and not used in place of realistic original durations, must not be in place to artificially absorb float, or to replace proper schedule logic.
a. Leads (negative lags) are prohibited.
b. Start to Finish (SF) relationships are prohibited.
3.3.14 Retained Logic
Schedule calculations must retain the logic between predecessors and successors ("retained logic" mode) even when the successor activity(s) starts and the predecessor activity(s) has not finished (out-of-sequence progress). Software features that in effect sever the tie between predecessor and successor activities when the successor has started and the predecessor logic is not satisfied ("progress override") are not be allowed.
3.3.15 Percent Complete
Update the percent complete for each activity started, based on the realistic assessment of earned value. Activities which are complete but for remaining minor punch list work and which do not restrain the initiation of successor activities may be declared 100 percent complete to allow for proper schedule management.
3.3.16 Remaining Duration
Update the remaining duration for each activity based on the number of
SECTION 01 32 01 Page 7 estimated work days it will take to complete the activity. Remaining duration may not mathematically correlate with percentage found under paragraph entitled Percent Complete.
3.3.17 Cost Loading of Closeout Activities
Cost load the "Correction of punch list from Government pre-final inspection" activity(ies) not less than 1 percent of the present contract value. Activity(ies) may be declared 100 percent complete upon the Government's verification of completion and correction of all punch list work identified during Government pre-final inspection(s).
3.3.17.1 As-Built Drawings
If there is no separate contract line item (CLIN) for as-built drawings, cost load the "Submission and approval of as-built drawings" activity not less than $35,000 or 1 percent of the present contract value, which ever is greater, up to $200,000. Activity will be declared 100 percent complete upon the Government's approval.
3.3.18 Anticipated Adverse Weather
Paragraph applicable to contracts with clause FAR 52.236-4 Physical Data entitled TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. Reflect the number of anticipated adverse weather delays allocated to a weather sensitive activity in the activity's calendar.
3.3.19 Early Completion Schedule and the Right to Finish Early
An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.
a. No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and manhours) and the Government agreeing that the schedule is reasonable and achievable.
b. The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project to meet the contractor's accelerated work.
3.4 PROJECT SCHEDULE SUBMISSIONS
Provide the submissions as described below. The data CD/DVD, reports, and network diagrams required for each submission are contained in paragraph SUBMISSION REQUIREMENTS. If the Contractor fails or refuses to furnish the information and schedule updates as set forth herein, then the Contractor will be deemed not to have provided an estimate upon which a progress payment can be made.
Review comments made by the Government on the schedule(s) do not relieve the Contractor from compliance with requirements of the Contract Documents.
3.4.1 Preliminary Project Schedule Submission
Within 15 calendar days after contract award submit the Preliminary Project Schedule defining the planned operations detailed for the first 90 calendar days for approval. The approved Preliminary Project Schedule
SECTION 01 32 01 Page 8 will be used for payment purposes not to exceed 90 calendar days after NTP. Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule. The Preliminary Project Schedule may be summary in nature for the remaining performance period. It must be early start and late finish constrained and logically tied as specified. The Preliminary Project Schedule forms the basis for the Initial Project Schedule specified herein and must include all of the required plan and program preparations, submissions and approvals identified in the contract (for example, Quality Control Plan, Safety Plan, and Environmental Protection Plan) as well as design activities, planned submissions of all early design packages, permitting activities, design review conference activities, and other non-construction activities intended to occur within the first 90 calendar days. Government acceptance of the associated design package(s) and all other specified Program and Plan approvals must occur prior to any planned construction activities. Activity code any activities that are summary in nature after the first 90 calendar days with Bid Item (CLIN) code (BIDI), Responsibility Code (RESP) and Feature of Work code (FOW).
3.4.2 Initial Project Schedule Submission
Submit the Initial Project Schedule for approval within 42 calendar days after notice to proceed is issued. The schedule must demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period. No payment will be made for work items not fully detailed in the Project Schedule.
3.4.3 Periodic Schedule Updates
Update the Project Schedule on a regular basis, monthly at a minimum.
Provide a draft Periodic Schedule Update for review at the schedule update meetings as prescribed in the paragraph PERIODIC SCHEDULE UPDATE MEETINGS. These updates will enable the Government to assess Contractor's progress.
a. Update information including Actual Start Dates (AS), Actual Finish Dates (AF), Remaining Durations (RD), and Percent Complete is subject to the approval of the Government at the meeting.
b. AS and AF dates must match the date(s) reported on the Contractor's Quality Control Report for an activity start or finish.
3.5 SUBMISSION REQUIREMENTS
Submit the following items for the Preliminary Schedule, Initial Schedule, and every Periodic Schedule Update throughout the life of the project:
3.5.1 Narrative Report
Provide a Narrative Report with each schedule submission. The Narrative Report is expected to communicate to the Government the thorough analysis of the schedule output and the plans to compensate for any problems, either current or potential, which are revealed through that analysis.
Include the following information as minimum in the Narrative Report:
a. Identify and discuss the work scheduled to start in the next update period.
b. A description of activities along the two most critical paths where
SECTION 01 32 01 Page 9 the total float is less than or equal to 20 work days.
c. A description of current and anticipated problem areas or delaying factors and their impact and an explanation of corrective actions taken or required to be taken.
d. Identify and explain why activities based on their calculated late dates should have either started or finished during the update period but did not.
e. Identify and discuss all schedule changes by activity ID and activity name including what specifically was changed and why the change was needed. Include at a minimum new and deleted activities, logic changes, duration changes, calendar changes, lag changes, resource changes, and actual start and finish date changes.
f. Identify and discuss out-of-sequence work.
3.5.2 Schedule Reports
The format, filtering, organizing and sorting for each schedule report will be as directed by the Contracting Officer. Typically, reports contain Activity Numbers, Activity Description, Original Duration, Remaining Duration, Early Start Date, Early Finish Date, Late Start Date, Late Finish Date, Total Float, Actual Start Date, Actual Finish Date, and Percent Complete. Provide the reports electronically in .pdf format. The following lists typical reports that will be requested:
3.5.2.1 Activity Report
List of all activities sorted according to activity number.
3.5.2.2 Logic Report
List of detailed predecessor and successor activities for every activity in ascending order by activity number.
3.5.2.3 Total Float Report
A list of all incomplete activities sorted in ascending order of total float. List activities which have the same amount of total float in ascending order of Early Start Dates. Do not show completed activities on this report.
3.5.2.4 Earnings Report by CLIN
A compilation of the Total Earnings on the project from the NTP to the data date, which reflects the earnings of activities based on the agreements made in the schedule update meeting defined herein. Provided a complete schedule update has been furnished, this report serves as the basis of determining progress payments. Group activities by CLIN number and sort by activity number. Provide a total CLIN percent earned value, CLIN percent complete, and project percent complete. The printed report must contain the following for each activity: the Activity Number, Activity Description, Original Budgeted Amount, Earnings to Date, Earnings this period, Total Quantity, Quantity to Date, and Percent Complete (based on cost).
SECTION 01 32 01 Page 10
3.5.3 Network Diagram
The Network Diagram is required for the Preliminary, Initial and Periodic Updates. Depict and display the order and interdependence of activities and the sequence in which the work is to be accomplished. The Contracting Officer will use, but is not limited to, the following conditions to review compliance with this paragraph:
3.5.3.1 Continuous Flow
Show a continuous flow from left to right with no arrows from right to left. Show the activity number, description, duration, and estimated earned value on the diagram.
3.5.3.2 Project Milestone Dates
Show dates on the diagram for start of project, any contract required interim completion dates, and contract completion dates.
3.5.3.3 Critical Path
Show all activities on the critical path. The critical path is defined as the longest path.
3.5.3.4 Banding
Organize activities using the WBS or as otherwise directed to assist in the understanding of the activity sequence. Typically, this flow will group activities by major elements of work, category of work, work area and/or responsibility.
3.5.3.5 Cash Flow / Schedule Variance Control (SVC) Diagram
With each schedule submission, provide a SVC diagram showing 1) Cash Flow S-Curves indicating planned project cost based on projected early and late activity finish dates, and 2) Earned Value to-date.
3.6 PERIODIC SCHEDULE UPDATE
3.6.1 Periodic Schedule Update Meetings
Conduct periodic schedule update meetings for the purpose of reviewing the proposed Periodic Schedule Update, Narrative Report, Schedule Reports, and progress payment. Conduct meetings at least monthly within five days of the proposed schedule data date. Provide a computer with the scheduling software loaded and a projector which allows all meeting participants to view the proposed schedule during the meeting.