Fleet_Management_and_Maintenance_Services.pdf

PDF 831 KB Posted

Attached to
Fleet Management and Maintenance Services
Solicitation number
2026-151
Issued by
Polk County, Florida

About this file

This is a Request for Proposal (RFP) #2026-151 issued by the City of St. Cloud, Florida, for fleet management and maintenance services. The City seeks a qualified commercial fleet service provider to manage and maintain its diverse fleet including cars, light-trucks, heavy equipment, police vehicles, fire trucks, ambulances, solid waste vehicles, and specialized equipment. Proposals must be submitted electronically by January 7, 2027, at 10:00 AM. A non-mandatory pre-response conference is scheduled for December 4, 2026, at 9:00 AM, with a question submission deadline of December 23, 2026, at 5:00 PM. The contract will commence within sixty days of execution and has an initial term of three years, with options for two additional one-year extensions for a maximum total contract duration of five years. The City retains authority over fleet policy, vehicle assignment, safety decisions, replacement, and capital investments.

The contract pricing structure comprises three components: Target Services (fixed annual price for maintenance and repairs on licensed on-road vehicles), Non-Target Services (time and materials basis for accident repairs, capital improvements, and equipment modifications), and Transition Costs (additional resources needed during the initial three-month transition period). Proposers must demonstrate a minimum of five years of experience providing fleet management and maintenance services to at least five similar-sized clients and hold a Florida business license. The Target Budget will be adjusted annually based on the Consumer Price Index (CPI-U) for the South Region and fleet size changes, with potential adjustments for unusual costs caused by external events. The contract prohibits subcontracting without prior City written approval, and the contractor must maintain specified performance standards including 85 percent of maintenance and repair completion within 24 hours and 90 percent within 48 hours, plus a 95 percent preventive maintenance program compliance rate. The City provides the existing maintenance facility and equipment; the contractor supplies all labor, parts, materials, tools, and fleet management information systems software.

View the file

Other files

File Type Posted
Appendix_A.xlsx XLSX spreadsheet
Sample_Agreement_RFP.docx DOCX document
Appendix_B.docx DOCX document
Appendix_C.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL (RFP)

2026-151

FLEET MANAGEMENT AND MAINTENANCE SERVICES

City of St. Cloud

1300 9th Street

St. Cloud, FL 34769

RELEASE DATE: November 15, 2026

DEADLINE FOR QUESTIONS: December 23, 2026

RESPONSE DEADLINE: January 7, 2027, 10:00 am

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/stcloud https://procurement.opengov.com/portal/stcloud

City of St. Cloud

REQUEST FOR PROPOSAL (RFP)

Fleet Management and Maintenance Services

I. INTRODUCTION

II. DETAILED SCOPE OF SERVICES AND REQUIREMENTS

III. PROPOSAL CONTENT / FORMAT

IV. EVALUATION CRITERIA

V. INSTRUCTIONS TO BIDDERS

VI. FEDERAL REQUIREMENTS

VII. GENERAL TERMS AND CONDITIONS

Attachments:

A - Appendix A

B - Appendix B

C - Appendix C

D - Sample Agreement RFP

Request For Proposal (RFP) #2026-151 Title: Fleet Management and Maintenance Services

1. INTRODUCTION

1.1. Summary

A. SCOPE OF SERVICES SUMMARY

The City seeks a qualified commercial fleet service provider to deliver fleet management and fleet maintenance services for the City’s fleet. The City’s objectives are to reduce total fleet lifecycle cost and vehicle downtime while improving reliability, safety, functionality, customer service, and accountability. The City seeks a long-term working relationship with a Contractor that can provide measurable performance, sound fleet-management advice, transparent cost information, and continuity of service. The selection of the successful proposer shall be at the

City’s discretion and shall be made in a prompt manner after receipt and evaluation of all responses. If you are interested in preparing a response to this RFP, please complete all the requirements set forth in this RFP document. Under the proposal process, the stipulations set forth herein are fully binding on the proposer to the extent that you confirm acceptance by your electronic signature on the Respondent’s Certification.

B. PRE-RESPONSE CONFERENCE

A non-mandatory pre-response conference is required for this RFP.

C. MINIMUM BIDDER QUALIFICATIONS

In order for a Proposal to be considered by the City, Proposers shall demonstrate, in their proposals, compliance with the following minimum requirements:

o Contractor must demonstrate qualifications and experience in providing professional professional fleet management and maintenance services services.

o Provided fleet management and maintenance services for a minimum of five (5) years and are currently providing these services to at least five (5) clients with fleets that are similar in size and composition to the City’s.

o Licensed to do business in the State of Florida.

D. FUND AVAILABILITY

Any Contract resulting from this solicitation is deemed effective only to the extent that funds are available. The City of St. Cloud abides by the provisions set forth in Florida Statutes relative to appropriations of funds. The ability of the successful Proposer to maintain a sense of fiscal responsibility and budgetary awareness shall be favorably considered in the ranking and award of a contract. This disclosure is being made to assist all Proposers in the gauging of their desire to participate in this Proposal and in the planning and preparation of their written response. The

City reserves the right to negotiate all Proposer fees, costs, charges, for any proposed services or appurtenant requirement.

E. PERSONNEL

The work shall be performed and directed by the key personnel identified in the submittal from the awarded firm to this RFP. The awarded firm shall not subcontract, assign or transfer any work under the agreement without the prior written consent of the City. Subcontractors must be identified in the submittal and shall be subject to the approval of the City. Any changes in the identified personnel shall be subject to the prior review and approval of the City. When directed by the City, subcontractor's personnel whose performance or behavior is determined to be unsatisfactory shall be immediately removed. The awarded firm shall provide a sufficient number of qualified personnel as necessary to effectively carry out its responsibilities under the agreement.

1.2. Background

The City of St. Cloud is a community of approximately 82,000 residents, covering approximately 36 square miles in Osceola County, located in Central Florida. To obtain general information about the City of St. Cloud, access www.stcloudfl.gov.

1.3. Contact Information

Procurement Services

Procurement Services

1300 9th Street

Building A, 2nd Floor

St. Cloud, FL 34769

Email: purchasing@stcloudfl.gov

Phone: (407) 957-7212

Department:

Public Works

Department Head:

Kevin Felblinger

Public Works Director

1.4. Timeline

Release Project Date November 15, 2026

Pre-Proposal Meeting (Non-Mandatory) December 4, 2026, 9:00am

3100 Communications Road, St. Cloud, Florida

34769

Question Submission Deadline December 23, 2026, 5:00pm http://www.stcloud.org/ mailto:purchasing@stcloudfl.gov tel:(407)957-7212

Proposal Submission Deadline January 7, 2027, 10:00am

2. DETAILED SCOPE OF SERVICES AND REQUIREMENTS

2.1. Objective

The City is seeking proposals from commercial fleet service providers to provide fleet management and fleet maintenance services at the existing City facility. The City's ongoing objective is to improve the performance of its fleet – reduce cost and fleet downtime while improving fleet reliability and functionality – through enhanced fleet maintenance practices. The City desires to enter into an agreement that will provide the best value to the City, and that will form the basis of a partnership between the successful service provider, hereinafter “Contractor,” and the City for the achievement of the City's long-term objectives.

The successful Proposer will provide each of the services outlined under the terms of this RFP, and other allied services may be required to assure the continuity of effective and economical operation of the

City's fleet, regardless of their definition as "Target" or "Non Target" services. The successful Proposer will provide all management services, supervision, labor, tools, parts, materials, supplies, office equipment, and sub-contractor services required, unless specifically exempted under the terms of this

RFP, necessary to provide fleet services in accordance with generally accepted fleet practice, and in accordance with the performance standards specified in this RFP.

2.2. Definitions

Each service in this RFP is either a "Target" or a "Non-Target" service. These designations have important procedural and financial implications, as described throughout the remainder of this RFP.

• City: The City of St. Cloud, Florida, including its authorized representatives and departments.

• Proposer: A firm or entity submitting a response to this RFP.

• Contract Administrator: The City employee designated to administer day-to-day contract performance.

• Target Services: The Contractor will provide all services designated Target services within a single annual fixed ("Target") amount as specified in its proposal. The Contractor will bear all risk associated with exceeding the annual cost Target but will share in any savings.

• Non-Target Services: The successful Proposer will provide all services designated as non-Target services on a time and materials basis at rates specified in its proposal. The City and the successful Proposer will cooperate in establishing and managing an annual budget for non-

Target services.

• Vehicle Equivalent Unit (VEU): A relative weighting assigned to an asset class to reflect expected maintenance effort. VEU values proposed by the Contractor are subject to City review and approval.

• Work Order: The electronic record opened for each service event, containing the asset, reported concern, authorization, labor, parts, subcontract costs, status, and completion information.

• Business Day: A day on which the City’s administrative offices are open, excluding City-observed holidays, unless the context expressly provides otherwise.

• OEM: Original equipment manufacturer.

• PM: Preventive maintenance.

• FTE: Full-time equivalent, calculated as 2,080 paid work hours per year for proposal staffing comparisons.

If a requirement is not expressly classified in the Target/Non-Target matrix in Appendix A or in the body of this RFP, the Contractor shall not unilaterally classify the work as Non-Target. The Contractor shall obtain a written classification determination from the Contract Administrator before performing or billing the work, except for emergency actions. The City’s written determination controls for contract administration.

2.3. Fleet Operations in the City

• The City operates a fleet with the bulk of the fleet being cars and light-trucks. However, the fleet also includes solid waste side loading truck, semi-truck, trailers, heavy equipment, police vehicles, fire trucks, and ambulances. Appendix A provides a complete list of the current city vehicles and equipment in the fleet. The Contractor will complete a thorough physical inventory of all vehicles and motor driven equipment within the first 30 days of contract operations. A final list of vehicles subject to target services will be agreed upon by the City and the Contractor including any associated pricing changes as described in a later section of this RFP.

• Note that only licensed on-road vehicles (cars, pickups, SUVs, law enforcement vehicles, vans, solid waste vehicles, fire department vehicles, and trucks) will be covered under the target services portion of any contract that may result from this RFP. Services provided to construction, landscape and miscellaneous equipment will be provided on a non-target time and materials basis. However, City departments will not be required to have this equipment serviced by the

Contractor and may select instead to have this equipment serviced by commercial providers in the area.

• The City will continue to provide general oversight for the fleet including decisions relating to policy, safety, replacement, usage, disposal, etc. The Contractor will provide technical advice in these areas when requested by the City.

2.4. City Responsibilities and Retained Authority

The City retains authority over fleet policy, vehicle assignment and use, safety policy, replacement, acquisition, disposal, capital investment, operating priorities, and final approval of repairs and expenditures where required by this RFP. The Contractor shall provide technical recommendations when requested but shall not make policy, purchasing, disposal, or capital decisions on behalf of the

City.

2.5. Fleet Services Contractor Responsibilities

The Contractor will be responsible for providing all the services described in the subsequent sections of this RFP, and in accordance with the standards of performance outlined therein. In summary, the successful Proposer will be responsible to:

• Provide maintenance and repair services for Target assets and approved Non-Target work to the

City's fleet, using qualified personnel, appropriate tools, parts, materials, supplies, and approved subcontractors. It is expected that the successful Proposer will use the City-owned facility, and its own personnel to provide these services in a manner that (1) reduces overall fleet costs, (2) lowers overall fleet downtime, and (3) does not adversely affect the City’s ability to provide a high level and quality of services to residents.

• Provide fleet management services such as tracking assets and costs in a Contractor provided fleet management information system, writing technical specifications for new vehicles, vehicle documentation services including tags and titles, coordinating fuel card services, coordinating the asset disposal process, working with insurance and subrogation as part of the accident damage repair process, providing recommendations for improving fleet safety, etc.

• Provide technical assistance and guidance to support the City's fleet management decisions regarding fleet size and composition, fleet policy formulation and capital investments in the fleet and fleet facilities.

• Provide uninterrupted services during City-declared emergencies and support the City’s emergency response and recovery activities.

2.6. Contract Period

A. Commencement of Operations

The successful Proposer shall commence performance of services under the terms of this RFP within sixty days (60) of contract execution.

B. Term of the Initial Agreement

The term of the initial contract shall be a period of three (3) years from the start work date specified in the contract.

C. Options to Extend the Initial Agreement

The City reserves the right to extend the term of the contract, at its sole discretion but with the concurrence of the successful Proposer, for two (2) one-year periods, or fractions thereof. The

City will forward written notice to the successful Proposer at least thirty days (30) prior to the expiration of the initial contract or any extension then in force.

D. The total duration of the contract, including the exercise of any options under this provision, shall not exceed five (5) years, unless agreed to in writing by both parties.

2.7. Total Contract Cost

Any contract resulting from this RFP will have three cost components: Target Cost, Non-Target Cost, and

Transition Cost. The Contractor’s proposal will contain an itemized cost proposal in the tabular format provided in Appendix B. Described below are the major cost components.

A. Target Cost

Target costs are those costs incurred by the Contractor to provide Target Services, as defined throughout this RFP. The Contractor will develop an annual fixed price cost proposal for the provision of all Target services that is inclusive of all Target costs and contractor fees. The City will pay up to the agreed Target amount, but any cost incurred for the provision of Target services exceeding the agreed amount on an annual basis will be borne entirely by the successful Proposer. The Target Budget for the first three years of the contract will be set by the successful Proposer’s cost proposal. Adjustments to the annual Target Budget in following years will be made pursuant to the conduct of the annual meeting between the City and the successful Proposer.

Items included in the target cost shall include:

o Personnel – The number of full-time personnel equivalents (FTEs) (one FTE = 2,080 hours per year) proposed for each personnel category listed on the Target Cost Schedule will be noted along with the corresponding total personnel cost for this category. Personnel costs must be broken down into wages and salaries and fringe benefits costs by job classification.

Any bonuses awarded by the Contractor to personnel because of cost savings realized under this agreement relative to the Target cost the City will not reimburse and should not be included in the cost to the City. Note that Personnel costs should not be burdened with any overheads or administrative costs.

o Parts, Supplies, and Outside Services Costs – All repair parts, supplies, materials, and vendor services required to provide Target services.

o Overhead Costs – General, administrative, and overhead costs included in the Target cost will include indirect expenses incurred for such items as, office supplies, uniforms, bonding costs, insurance, copying services, non-capitalized equipment shop tools and insurance.

Costs for maintenance and/or rental equipment used in delivering goods and services under the terms of this RFP are also overhead costs. The City will not reimburse any indirect costs in connection with the following: bad debts, donations, entertainment, fines and penalties, lobbying, defense of criminal charges, and alcoholic beverages.

o Corporate and Management Fee – Costs for central corporate services, management fees, and profit will be included in this cost line.

o Cost proposals should be well documented with a separate narrative discussion and explained to aid in evaluating the rationale and reasonableness of proposed costs. The City reserves the right to reject poorly documented cost proposals and/or follow-up with proposers to obtain required documentation.

B. Non-Target Costs

Non-Target costs are those costs incurred by the Contractor to provide Non-Target services as defined throughout this RFP. The Contractor will invoice for these services on a time and materials basis.

The Contractor will provide a fully- burdened labor rate for the various employee classifications in its staffing plan a well as appropriate markups on parts, materials, and sublet services. These markups will be based on the Contractor’s Target Services cost proposal (inclusive of an apportioned share of corporate overhead, general and administrative costs, management fees, labor costs, parts costs, anticipated sublet service costs, etc.). This rate will be used to charge Non-Target services to the City and to price all workorders in the Contractor provided fleet management information system so that the

City can track lifecycle costs for its fleet.

Respondents should assume Non-Target service costs will be equal to 15-percent of Target service costs.

However, no amount of Non-Target services are guaranteed to the Contractor and will be entirely at the discretion of City departments who will base their decisions on a combination of cost, convenience, and quality of such services provided by the Contractor.

Approximately 75% of non-target work are expected to result from accident damage repairs. All such repairs are currently sent to outside body and paint shops. The Contractor will manage all Non-Target work sent to outside contractors. The City will work with the selected Contractor to develop a schedule of fully burdened rates to bill all services to work orders and to invoice the City for Non Target services.

Rates will be based on the Target Services budget and estimates for Non-Target volumes of services

(such as labor hours, parts, third-party services).

Proposers should use the example rate calculation in the Non-Target cost form to complete estimated rates for this contract. Proponents should address their plans for providing these important services in their Technical Proposals including methods to control costs and to meet customer service expectations.

C. Transition Costs

• The transition period is that time between the execution of a contract and completion of the first three months of contract services.

• A successful transition to contract service is essential. This transition is one that provides for the provision of service throughout the transition period that is at least equal to the current level of service provided by the City's existing service providers, and that puts the Contractor in a position to meet all contract specifications after the transition period. The City appreciates the fact that resources in addition to the resources needed to provide Target services may be required to accomplish a successful transition. Consequently, the City requires Contractors to present in their proposals a Transition Plan, which includes the enumeration of resources needed to implement this plan.

• The City will establish a Transition Budget that provides funding for implementation of the

Contractor’s Transition Plan to the extent that such implementation requires the Contractor to incur costs beyond those proposed for the provision of agreement services in the first year of the agreement. The Contractor’s proposed Transition Plan cost proposal will reflect the transition budget, and the City will pay for transition costs up to this budgeted amount.

2.8. Contract Cost Adjustments

A. Unusual Costs

The Contractor may petition the City for an adjustment to the Target Budget at reasonable times based on unusual changes in the Contractors’ cost of doing business. For purposes of this section, unusual changes are items not covered by the agreement that occur because of external events and through no fault of the successful Proposer. Examples of such are changes in local, state, or federal laws, regulations, natural catastrophes, civil disturbances, or similar extraordinary events. Unusual costs will not include price increases occurring in the ordinary course of doing business.

B. Cost Adjustment for Contract Renewal

The Contractor’s cost proposal will set the Target Budget for the first three (3) years of the contract. Adjustments to the annual Target Budget in following years are pursuant to the conduct of the annual meeting between the City and the Contractor. The City will consider an adjustment of the Target Budget in each renewal year considering the following limitation: The change in all costs (non-Target labor rates and Target services) will not exceed the Consumer

Price Index – CPI-U, South Region for all items less food and energy for the prior year.

C. Cost Adjustment for Changes in Fleet Size

The Target Budget will be adjusted to correspond to increases or decreases in fleet size on a vehicle equivalent basis as specified by the Contractor in Appendix A. The City will calculate these adjustments quarterly and adjust the monthly Target Budget. Adjustments will take place only for the forthcoming and subsequent months. If the fleet increases in size, it is up to the contractor to apply for any increase in its Target Budget. It will be up to the City to notify the contractor of any decreases in the contractor’s Target Budget due to decreases in fleet size.

2.9. Continuity of Service

A. Notice of Intent Not to Renew

The Contractor must recognize that providing the services are vital to the City and required without interruption and that, upon expiration or termination of the contract, a successor will continue these services. Therefore, if the Contractor chooses not to renew the contract upon contract expiration, the Contractor is required to provide the City a written notice of such intent at least six (6) months before the expiration of the contract.

B. Phase In – Phase Out

If upon expiration or termination of the contract, the Contractor is not chosen to continue or elects not to renew the agreement, the Contractor will, upon written notification from the City, provide phase-in phase out services for up to sixty (60) days after terminated contract have been finalized with a successor Contractor. After notification, the Contractor will cooperate in good faith with a successor in determining the nature and extent of the services, including the development of a mutually accepted transition plan, subject to approval by the City. The

Contractor will provide sufficient, experienced personnel during the transition period to ensure that the services, called for by the contract, continue at the specified level of contract performance. The Contractor will receive reimbursement for all reasonable transition costs pre-authorized by the City, which incurred within the agreed period after agreement expiration or termination. The Contractor will cooperate with the successor in allowing as many personnel as practical to remain on the job to enhance the continuity and consistency of the services called for by the agreement. Toward this end, the Contractor will disclose necessary personnel records and allow its successor to conduct on-site interviews with its employees.

2.10. Target Services- Vehicle Maintenance and Repair

A. Service Location and Hours:

• The primary service location is the City-owned fleet maintenance facility at 3100

Communications Road, St. Cloud, Florida 34769, within the City’s Joint Use Facility. Normal on-site operating hours shall be Monday through Friday, 7:00 a.m. to 10:00 p.m., excluding the City-observed holidays listed below, unless the City approves a change in writing. The Contractor shall provide adequate staffing across the full operating window. Proposers shall provide a shift schedule, staffing levels by hour, coverage for absences, and a plan for peak demand.

The City observes the following holidays: New Year’s Day; Martin Luther King Jr. Day; Memorial

Day; Juneteenth; Independence Day; Labor Day; Veterans Day; Thanksgiving Day; the Friday after Thanksgiving; Christmas Eve; and Christmas Day. The City shall confirm the holiday calendar and any alternate observed dates annually.

The Contractor may propose an alternative facility only as an expressly identified option. The proposal shall describe location, ownership/control, capacity, security, equipment, accessibility, transportation arrangements, additional costs, and impact on response and turnaround times.

The City is not obligated to accept an alternative facility.

B. Staffing and Qualifications:

• The Contractor shall provide sufficient qualified personnel to meet all requirements and performance standards at no additional cost under the Target Price. The proposal shall identify minimum staffing by shift and job classification, FTEs, certifications, relevant experience, supervisory coverage, and contingency coverage. The City’s existing requirement is at least one

(1) ASE-certified mechanic and at least two (2) technicians holding EVT certification appropriate to fire apparatus, ambulances, and law-enforcement vehicles. Proposers shall identify the specific certifications held, renewal dates, and plan to maintain credentials.

The Contractor shall describe experience servicing emergency vehicles, heavy-duty vehicles, solid-waste vehicles, diesel engines, transmissions, hydraulic systems, aerial devices, and specialized equipment represented in Appendix A. The Contractor shall interview existing City

Fleet Technicians who apply for employment at this location but is not required to hire an applicant who does not meet its standards.

The Contractor shall not reduce the staffing levels proposed and accepted by the City without prior written approval. The Contractor shall promptly replace vacancies and maintain adequate service coverage. Salaried management and supervisory staff shall not receive additional overtime compensation from the City for meeting Target obligations.

C. Customer Intake and Work Orders:

• The Contractor shall greet customers at the designated service intake area, document the reported concern, confirm asset identity and contact information, open a time-stamped work order, classify the requested work, identify priority, and provide an estimated completion date/time. The system shall record appointment, check-in, diagnosis, authorization request, work-start, parts-order, repair-completion, quality-check, and customer-notification timestamps.

The Contractor shall provide customers with status updates when estimates change, when additional repairs are identified, and when a vehicle is ready. Completed work orders shall be available to the customer upon request and shall identify all work performed, labor, parts, subcontracted services, warranty work, and recommendations.

D. Preventive Maintenance:

• The Contractor will perform timely service on all fleet vehicles in accordance with each unit's original equipment manufacturer (OEM) recommended preventive maintenance (PM) services;

in accordance with NFPA standards for fire vehicles; and a 3,000-mile preventive maintenance schedule (including but not limited to oil changes, topping off fluids, tire rotation, check brakes, light checks, etc.) for law enforcement vehicles.

• All customers will be given a completion time estimate for PM. Work will begin on PM within fifteen (15) minutes for those vehicles less than 8,600 Gross Vehicle Weight Rating when a customer has made a time certain appointment and elects to wait at the shop for services to be completed. Work will begin within two hours on all PM when a customer elects to drop off their vehicle at a shop. The Contractor will notify customers by phone and/or email if they must extend the initial completion time estimates due to the inspection uncovering additional repair work. The Contractor must document all appointment, start, and completion times for services in the management information system.

• The Contractor will maintain a PM schedule for every vehicle in the fleet, and will describe, as an integral part of its proposal, how it will schedule preventive maintenance and monitor for preventive maintenance program compliance. The Contractor will provide customers with a monthly calendar that provides specific day and time appointment schedules for each vehicle in the fleet. The Contractor will cooperate with customers to set appointments that minimize disruptions to City work activities. Appointments will be set with a minimum of one week’s notice. The Contractor will also be responsible for monitoring reports from the fleet management information system to ensure vehicles that become due for service and may not appear on the monthly calendar are serviced on time. The Contractor will schedule these units for service with customers at a mutually agreeable time that occurs before the unit is overdue for service.

• The City expects that the Contractor will assume an active role to ensure a high level of PM

Program compliance and will consider favorably a proposal that includes specific methods of achieving this goal. Examples of such methods may include user training and education:

customer service as a "Quick Fix" service (see below); and others. The City will work with the

Contractor to provide enforcement of the preventive maintenance program.

E. Inspections and Certifications:

• The Contractor will be responsible for completing all Federal and State required vehicle inspections and certifications. These include but are not limited to crane and aerial device inspections. The Contractor will coordinate the scheduling of inspections and certifications with

Contract Administrator not less than one month prior to the expiration of the current inspection or certification. The contractor will affix the appropriate inspection stickers to the vehicles and maintain the proper vehicle inspection/certification records in the management information system.

F. Repairs and Prioritization:

• The Contractor will provide for all routine mechanical repairs to the fleet. By definition, all repairs are routine except for those specifically described in the Vehicle Maintenance and Repair

— Non-Target Services section below.

• Priorities can change daily depending on emergencies, work priorities, and the availability of backup units.

• The Contractor will be responsible for following repair priorities as set by the Contract

Administrator to meet the City’s expectations for vehicle availability. The Contractor will provide all customers a completion time estimate for repair services, and the estimate must be entered into the fleet management information system. The Contractor will notify the Contract

Administrator of any repair completion estimates that exceed 24 hours. Work will begin on services within fifteen minutes when a customer has made a time certain appointment and elects to wait at the shop for services to be completed. Work should normally begin within four hours when a customer elects to drop off their vehicle at a shop. The contractor must report to the Contract Administrator all repair services not begun within 24 hours of vehicle delivery to a shop. The City reserves the right to direct the Contractor to send vehicles to an outside commercial vendor at contractor’s expense when repair waiting time has exceeded 24 hours.

The Contractor will notify customers by phone and email if initial completion time estimates require more time if additional repair work becomes apparent during the inspection. The contractor must document all appointment, start, and completion times for services in the fleet management information system.

• The contractor will provide completed work orders to all customers who request them.

Completed work orders should be available at the time that the customer picks their vehicle up from a shop and must include complete details regarding the services performed including labor, parts, and sublet costs.

G. Repair Authorization Thresholds:

• The Contractor must analyze in advance the cost effectiveness of any Target repair exceeding

$1,500 for light duty (less than 8,500 lbs. GVWR) vehicles. The Contractor must analyze in advance the cost effectiveness of any Target repair exceeding $3,000 for heavy-duty vehicles

(greater than 8,500 lbs. GVWR) and other motorized equipment, or any repair where the cost estimate is more than the fair market value of the unit. These repairs require approval in advance by the City. In such cases, if the Contractor believes that replacement appears to be more cost-effective than repair then such recommendation shall be presented to the City. The

City, however, will make the final repair versus replace decision. The City will place in a suspended status any unit awaiting repair authorization relative to the performance standards and requirements of the RFP.

H. Quick Fix Repairs:

• The Contractor will provide a "Quick Fix" service for repairs that take less than one hour when the vehicle operator delivers the vehicle to the garage and chooses to wait for service. Examples of quick fix services include, but are not limited to, replacing wiper blades, fuses, and light bulbs;

topping-off fluids; and fixing flat tires. This service will be continuously available during normal hours of operation.

• The City will consider favorably proposals that include specific methods of maximizing the usefulness of quick fix services for improving user productivity and fleet availability. Examples may include user training and education programs; advance scheduling of quick fix services; and others.

I. Tire Services:

• The contractor will provide comprehensive tire services including tire replacement, repair, balancing, field tire services, and maintenance of an inventory of mounted spares. The contractor will replace tires when tires have reached 4/32 tread depths (as indicated by tread-wear indicators) or have failed, or are otherwise unacceptable due to weathering, irregular wear patterns, ply separations, bead separations or other unacceptable conditions that affect the safety and performance of vehicles and equipment.

• The Contractor may not plug, or patch speed pursuit rated tires for used on police vehicles. Damaged tires shall be replaced. The Contractor must remove and replace police vehicle tires at 6/32” remaining tread depth.

• The Contractor may not plug, or patch tires for used on fire trucks and ambulances. The

Contractor must remove and replace tires on these vehicles in accordance with NFPA standards. When a single tire is deemed to need to be replaced, all tandem tires on the same axel for these vehicles must be replaced.

• Any tire patching must conform to tire manufacturer protocols and recommended best practices.

• The Contract Administrator shall make all decisions regarding the makes and types of tires that the contractor will purchase and provide to the City. The Contract Administrator will also have the final decision regarding when contractor personnel or subcontractor must replace tires. Tire services will be available including field service during normal business hours and considered as a Target cost. Tire services provided after normal business hours on an emergency call out basis are a Non-Target service.

J. Lubricants and Parts:

• The Contractor shall specify all proposed tire, lubricant, brake, battery, and other major product lines before use. Products shall meet or exceed OEM specifications and be approved by the City.

No substitution or product-line change may be made without prior written City approval. The

Contractor shall provide procurement records, warranties, discounts, and credits. Parts used shall be new OEM or approved equivalent unless the City authorizes otherwise.

K. Warranties and Recalls:

• The Contractor will identify, administer and pursue all warranties and recalls offered by the vehicle manufacturers and on any subcontracted repairs. The Contractor shall seek and receive all applicable reimbursements for such work. The Contractor is responsible for the transport to and from the selected warranty repair facility. Payments or adjustments received by the

Contractor for warranty or recall work will be credited to the City. The Contractor is encouraged to obtain authorization from the various vehicle manufacturers to perform in-house warranty work on City vehicles.

L. Subcontracted/ Outside Repairs:

• The Contractor’s proposal will define the types of repairs that will be conducted by subcontractor outside of the city facility. The Contractor is responsible for the transport to and from the selected vendor. The Contractor will be responsible for arranging, managing, and paying for all outside repairs, and will assume full responsibility and liability for the quality of these repairs. The requirements of this section do not relieve the Contractor from the responsibility for meeting the requirements of the Standards of Performance section of this

RFP.

M. Road Calls:

• The Contractor will provide road service for all City vehicles. Response time is the time the call is received to arrival on the scene. During the Contractor’s normal business hours, and within the

City limits, response time will not exceed thirty minutes (30). Within a fifty-mile (50) radius of the City, response time will not exceed ninety minutes (90). During non-business hours, response times will not exceed sixty (60) and ninety minutes (90), respectively. The City will not be providing any service vehicles as part of this contract.

• The Contractor will provide road service substantially similar to the type of service provided under the Quick Fix requirements of this RFP (e.g., tire repair, dead battery replacement, broken light replacement, etc.). The Contractor may subcontract part, or all the services required under this section. The date, time, and cause of each road service provided under the terms of this section will be included on the next daily report submitted to the City.

N. Towing and Transportation:

• The Contractor will be responsible for providing appropriate towing and transporting services as needed to meet the terms of this contract, including meeting all service standards.

• The costs of towing and transportation services are a Target or Non-Target service depending on the circumstances of the tow:

Target Towing/Transporting Events:

Retrieving an out-of-service vehicle for a Target repair reason

Transporting vehicles to/from vendors for warranty service

Transporting vehicles to/from vendors for Target services outsourced by the

Contractor.

Non-Target Towing/Transporting Events:

Retrieving an out-of-service vehicle for a Non-Target repair reason.

Transporting vehicles to/from vendors for Non-Target services outsourced by the

Contractor.

O. Road Testing:

• The Contractor must conduct a road or appropriate operations test on all vehicles and equipment that have had safety related repairs or adjustments (e.g., brakes, steering, aerial lift, etc.). The Contractor must ensure the safety of these vehicles and equipment prior to returning to service. The Contractor’s employee must have the appropriate license for the type of vehicle under test.

P. Welding and Fabrication:

• Welding and fabrication related to vehicle repairs will be an integral part of the service provided by the Contractor. The Contractor must provide an American Welding Society (AWS) certified welder to complete work on steel and aluminum. Additionally, there may be requirements for the Contractor to provide welding services in the non-target category.

Q. Emergency and Severe Weather Support:

• The Contractor will be responsible for supporting the City during weather events such as hurricanes, heavy thunderstorms, floods, and other events.

• The Contractor will be responsible for maintaining all current and future equipment required for storm response by the City and assist City staff in pre-checking such equipment before forecasted storms have arrived.

• During the event, the Contractor will routinely inspect and maintain all equipment as needed.

R. New Vehicle Acceptance:

• The Contractor will prepare newly acquired vehicles and equipment for service. Routine services

– including receiving vehicles from dealers, inspections for compliance with purchase specifications, cleaning, and installation of decals and license tags, will be a Target service.

• Contractor will coordinate installation of radios, computer equipment and accessories with outside vendors as a Target service.

• The Contractor may provide full upfitting services for police, solid waste, or fire vehicles including installation of special equipment. This would be treated as a Non-Target service.

S. Vehicle Disposal:

• The Contractor will be responsible for coordinating sales of used vehicles and equipment.

Services will include taking pictures of each vehicle, answering questions, coordinating with the

Finance Department, and completing all necessary paperwork.

• The Contractor will also prepare vehicles for sale including removal of usable equipment, loose equipment, removal of license tags, decals and special equipment, minor repairs, and associated paperwork. The Contractor shall not remove any parts or components from vehicles waiting for auction without the written approval of the Contract Administrator.

2.11. Non-Target Services

Respondents will provide a thorough discussion of their approach to providing Non-Target services including staffing allocations, use of vendors, and management procedures.

A. The following defines what constitutes repairs considered as non-Target services and indicated as such on work orders. The Contractor must have the ability to assign a reason code to each work order that corresponds to one of the definitions listed below.

• Accidents - refer to physical damage to vehicles caused by operator error or by another vehicle that results in a completed accident report.

• Capital Improvement - refers to any requested modification to a vehicle or piece of equipment already in service that result in a change in the capital cost of the vehicle, including upfitting new vehicles and major refurbishment of chassis and/or bodies and attached equipment.

• Damage/Operating - refers to any physical damage to a City vehicle during its operation resulting from operator error, misuse, or unreported accidents. Contractors should be aware that certain types of City equipment including trash trucks, backhoes, and street sweepers operate in severe use conditions. The City will not accept normal damage in operation of this equipment as non-Target services.

• Damage/Physical - refers to any physical damage to a City vehicle resulting from vandalism, theft, natural disaster, weather, or unreported accidents when a vehicle is parked or unattended.

• Excluded Equipment - refers to repairs to equipment not specifically included in the fleet inventory covered by this agreement (i.e., non-licensed equipment, stationary generators, boats, and temporary units, etc.).

• Modifications - refers to changes to the equipment, configuration, and/or appearance of a vehicles requested specifically by the City, including changes required by statute, that are not capitalized into the cost of the vehicle.

• Other Services - refers to services provided by the Contractor at the request of the City not specifically defined in this agreement.

B. All Non-Target repairs estimated to cost more than $500 for vehicles less than 10,000 GVWR and

$1,000 for those over 10,000 GVWR, or any repair where the cost estimated is more than the fair market value of the unit, requires authorization by the City before proceeding. The City reserves the right to have all Non-Target repairs approved in advance by a designated City representative.

C. Non-Target services are generally not subject to performance standards under this contract, because of their unpredictable nature and not because these activities are not highly valued by the City. In fact, the City considers Non-Target services essential. The selected Contractor must give them appropriate priority and not relegate them to fill in work.

D. Non-Target Labor:

• The City will negotiate Non-Target services rates with the Contractor based on standard cost allocation practices and the Contractor’s Target Cost Proposal. All indirect and overhead costs will be allocated to the appropriate line of business which are expected to include Fleet

Administration (monthly fee per vehicle), labor rate (rate per hour with overtime billed at time and a half), parts markup (% fee on top of actual costs), and subcontract fee (% fee on top of actual costs).

E. Stand-By Labor:

• The Contractor will provide standby fleet maintenance and repair support during hours not normally worked by the Contractor. The City will notify the Contractor when a requirement exists, and the nature and anticipated duration of the response needed from the Contractor.

The Contractor will be on-site and providing service with an appropriate complement of personnel within one (1) hour of notification that such services are required.

F. Non-Target Labor Hours:

• The City will only pay overtime for hourly administrative and parts personnel when they are required to work overtime hours as part of a City declared emergency or are requested by the

City to work standby hours. The City will not pay overtime for any salaried management or supervisory staff. The City will not be responsible for any overtime required by the Contractor to meet the Target service requirements of this contract.

G. Non-Target Parts:

• The Contractor will provide parts procurement, stocking, and disbursement services during all emergencies and for all Non-Target repairs as defined in this RFP. The cost of Non-Target parts will include appropriate markups for Contractor’s overhead costs and handling expenses.

H. Non-Target Subcontracted Services:

• The Contractor may use sub-contractors for all Non-Target repairs as defined in this RFP. The

Contractor will be responsible for arranging, managing, and paying for all subcontracted outside repairs, and will assume full responsibility and liability for the quality of these repairs. The cost of subcontracted services will be at the Contractor’s cost (including fee, taxes, and any discounts) and will include any appropriate markups for Contractor’s overhead costs and handling expenses.

• Contractor will submit all sub-contractors to the City for approval before they are used.

I. Accident Repairs:

• The Contractor will be responsible for administering the mitigation of each accident on City vehicles from first report through return of the vehicle to service. The Contractor will arrange for towing of the vehicle (if required) to the City facility and reporting of the incident to designated

City personnel. The Contractor will work with Human Resources on accident subrogation, obtain three quotes from body shop vendors and aid in the selection of the preferred vendor, provide transportation of the vehicle to/from the repair site, monitor of the repair quality and timeliness; payment of repair invoices; inspection of the final repair; and authorization to return the vehicle to service.

• The Contractor will attach the appraisal, quotes, vendor invoices and all pictures of the damage to the work order in the Contractors fleet management information system.

• The City will pay the actual cost of accident repairs plus the Contractor’s proposed markup on contract services. The City will incur no additional charge for administration of the accident repair process.

J. Vehicle Damage:

• It is the responsibility of the Contractor to notify the City whenever a vehicle shows physical damage not associated with a reported accident. It will be the responsibility of the Contractor to identify the base cause for the damage.

• The Contractor has the responsibility to identify any evidence of abuse, misuse, or obvious error by the operator resulting in physical damage to the vehicle. In such cases, the Contractor will proceed to repair the vehicle (subject to limitations specified elsewhere in this RFP) and will provide the City with documentation of the suspected abuse as part of the next day daily report.

• Damage from normal operation to specific groups of vehicles defined as Severe Use under the

Target Services section of this RFP will not be considered a non-Target repair, unless the

Contractor can definitively prove that the damage was caused by obvious operator error, misuse, or abuse, or by a third party.

K. Vehicle Prep-For-Service:

• Installation of special equipment such as trailer hitches, toolboxes, lights, electronics, emergency equipment, etc. will be Non-Target services.

L. Vehicle Refurbishment:

• The City may decide to refurbish an existing unit to extend its life or alter its intended use in the fleet. The Contractor is required to assist the City with evaluating equipment under consideration, obtaining quotes to complete the services in accordance with the City's requirements and manage the completion of the project. The Contractor will classify refurbishment work orders as a Capital Improvement non-target service.

M. Excluded Vehicles:

• The City may exclude certain vehicles from the target budget and have all services provided on a time and materials basis.

N. Directed Work & Technical Advice:

• The City may direct the Contractor to perform additional tasks related to the proper management and upkeep of the fleet. If additional tasks are required, the Contractor will receive a written task order detailing the tasks to perform. The Contractor will submit a proposal to perform the specified tasks on a fixed price basis that itemizes the direct labor, parts, sub-contracted services, and materials. The City will accept or reject the proposal. If accepted, the

Contractor will perform such assignments in accordance with an agreed schedule.

2.12. Vehicle Equivalent Units

Each class of vehicle and equipment in the fleet will be assigned an appropriate number of Vehicle

Equivalent Units (VEU) to define the relative level of maintenance and repair effort the Contractor expects to expend on vehicles and equipment of that class.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .