Flatbed Tilt Deck Trailer_cjd.pdf
PDF 419 KB Posted
- Attached to
- PUEBLO WATER - FLATBED TILT DECK TRAILER
- Solicitation number
- ITB-25-053 Flatbed Tilt Deck Trailer
- Issued by
- Pueblo County, Colorado
About this file
The document is an Invitation to Bid (ITB-25-053) issued by the Board of Water Works of Pueblo, Colorado, seeking proposals for a Flatbed Tilt Deck Trailer for the Facilities, Operations, and Maintenance department. The solicitation is for one new tandem axle, full bed tilt deck, bumper pull trailer, with specific technical requirements including a GVWR between 9,980 and 11,000 lbs, 2 axles with electric brakes, a 12' x 7' tilt deck with treated lumber, and various standard features. The bid is scheduled to be issued on August 18, 2025, with proposals due by 2:00 p.m. MST on September 3, 2025. The contract period will run from September 3, 2025, through December 15, 2025.
Bidders are required to submit a comprehensive proposal including a bid form, proposal acknowledgement, and any applicable addendums or product literature. The award will be made on an all-or-none basis, with Pueblo Water reserving the right to negotiate if only one responsive proposal is received. Payment terms include options for Net 15, Net 30, Net 60, and acceptance of procurement cards (P-Card). The document includes provisions for potential price adjustments due to market conditions, with strict requirements for documentation and justification. Pueblo Water will consider price changes only for contracts lasting 6 months or longer and views such adjustments as pass-through costs without additional vendor markup.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Department
Invitation to Bid
ITB-25-053
Flatbed Tilt Deck Trailer for
Facilities, Operations, and Maintenance
ITB-25-053 Flatbed Tilt Deck Trailer Page | 2
INVITATION TO BID (ITB)
#ITB-25-053 - Flatbed Tilt Deck Trailer
Procurement Specialist: Lottie Delgado Email Address: purchasing@pueblowater.org Telephone Number: 719-584-0201
Proposals must be received no later than:
2:00 p.m. MST, Wednesday, September 3, 2025 Proposals received after this date and time will not be considered for award.
II. INSTRUCTIONS TO BIDDERS:
Public Bid Openings will be conducted via conference call at the bid closing time. To participate:
1. Dial 1-650-479-3208
2. Enter the access number: 26638488862
3. You will then be placed on the conference call joined by the Procurement Specialist who will begin reading the submitted bid proposals.
Price quoted shall include any charges for packaging, containers, freight and delivery to:
Pueblo Water Warehouse, 707 W. 3rd Street, Pueblo, CO 81003
The Board of Water Works of Pueblo, CO (Pueblo Water) accepts proposals via;
email, submitted online using Rocky Mountain E-Purchasing System (https://www.bidnetdirect.com/colorado), hard copy mailed or dropped off. Pueblo Water is not obligated to accept quotes from offerors that are not submitted on time for any reason.
If submitting the proposal via mail or drop off, they are to be submitted in a sealed package with the following on the outside of the envelope:
Company Name ITB Title Due Date and Time Purchasing Department
Package must include:
• One Original Proposal, identified as “Original.”
Deliver proposals to:
Board of Water Works of Pueblo, CO Purchasing Department 319 W. 4th Street Pueblo, Colorado 81003
ITB-25-053 Flatbed Tilt Deck Trailer Page | 3
Schedule of Events (subject to change) All times are given in local Colorado time ITB Issued Monday, August 18, 2025 Inquiry Deadline Wednesday, August 27, 2025, 2:00 pm, MST Proposal Due Date and Time Wednesday, September 3, 2025, 2:00 pm, MST
ITB-25-053 Flatbed Tilt Deck Trailer Page | 4
Table of Contents Section Title Page I. Specifications 5 II. Statement of Work 5 III. Special Conditions 5 - 11 IV. Response Format 12
Attachments Section Title Page A. Bid Form 13 B. Proposal Acknowledgement Form 14 C. Sample Acceptance Form 15
ITB-25-053 Flatbed Tilt Deck Trailer Page | 5
SECTION I. – Specifications
A. General Specifications Pueblo Water is seeking bids for a Flatbed Tilt Deck Trailer inclusive of one (1) new tandem axle, full bed tilt deck, bumper pull trailer. Trailer shall be equal or equivalent to a CAM Superline model# P-FTT8212-110 or a Felling model# FT-10 DDPT. Similar trailers will be considered. Vendor must provide trailer specifications if bidding an alternate. Bid shall include lead time and delivery fee for trailer.
B. Technical Specifications
• GVWR: 9,980lbs to 11,000lbs
• Capacity: 7,380lbs to 8,650lbs
• Frame: Pan Style or 6” x 4” x 5/16” Steel angle with 3” Channel crossmembers
• Tongue: 5” Steel channel
• Axles: 2 - 5200lbs to 6,000lbs drop with EZ lube hubs and electric brakes
• Suspension: Slipper Spring
• Hitch: 2 5/16” ball with adjustable plate mount
• Hitch length: 5’(center of coupler to headboard)
• Jack: 7,000lb with drop leg
• Plug: 7 pole RV
• Tilt Deck: 12’ x 7’ with single cushion cylinder
• Deck Type: 2” Treated Lumber
• Wheels: 15”, 6 hole steel
• Tires: 225/75R 15 D
• Tie downs: 4 to 6 5/8” D-rings, Banjo tie-downs, Corner ties
• Lights: DOT approved LED with Sealed wiring harness
• Spare Tire Mount: Included with Matching Spare Tire
• Color: Black
• Safety Chains: 3/8”, Grade 70 with hooks
• Document Holder Installed
• Warranty: 3 to 5 year factory. Must have ability to provide local support for warranty claims. Bid shall include all standard features and options stated in the technical specifications.
SECTION II. – Statement of Work
A. Period of Award The effective date for providing the required product and services shall be from September 3, 2025, through December 15, 2025.
SECTION III. – Special Conditions
A. Issuing Office Pueblo Water’s Procurement Specialist listed herein is to be the sole point of contact concerning this ITB. Bidders shall not directly contact other personnel regarding matters concerning this ITB or to arrange meetings related to such.
ITB-25-053 Flatbed Tilt Deck Trailer Page | 6
B. Official Means of Communication All official communication from Pueblo Water to Bidders will be via postings on an electronic solicitation notification system, the Rocky Mountain Bid System (www.rockymountainbidsystem.com). The Procurement Specialist will post notices that will include, but not be limited to, any modifications to administrative or performance requirements, answers to inquiries received, clarifications to requirements, and the announcement of award. It is incumbent upon Bidders to monitor the Rocky Mountain Bid System carefully and regularly for any such postings. In addition, communications may be sent to attendees of the pre-proposal conference, if any, via email.
C. Inquiries Prospective Bidders may make written inquiries by e-mail before the written inquiry deadline concerning this ITB to obtain clarification of requirements. There will be an opportunity to make inquiries during the pre-proposal conference, if any. No inquiries will be accepted after the deadline. Inquiries regarding this ITB (be sure to reference ITB number) should be referred to:
E-Mail: purchasing@pueblowater.org Subject Line: ITB-25-053 - Flatbed Tilt Deck Trailer
Response to Bidders inquiries will be published as a modification on the Rocky Mountain Bid System in a timely manner. Bidders cannot rely on any other statements that clarify or alter any specification or other term or condition of the ITB.
Should any interested Bidder, sales representative, or manufacturer find any part of the listed specifications, terms and conditions to be discrepant, incomplete, or otherwise questionable in any respect, it shall be the responsibility of the concerned party to notify the Procurement Specialist of such matters immediately upon discovery.
D. Hold Harmless and Indemnification:
Successful Bidder (Contractor) agrees to defend and hold harmless the Purchaser, its customers and users of the material provided, against all loss, expense and damages, arising from bodily injury to any person, including death there from, and damage to property caused by any defective products supplied hereunder by the negligence or by the willful acts of Contractor, its agents or employees engages in the manufacture, installation, delivery, erection, repair or operation of any equipment or material covered hereunder.
The Contractor shall indemnify and save harmless Pueblo Water against all claims for damages and any loss or expense, including attorney's fees, sustained by reasons of royalties, patent, trademark, or copyright infringement which may be involved in the manufacture or use of the material to be furnished.
E. Modification or Withdrawal of Proposals:
Proposals may be modified or withdrawn by the Bidder prior to the established due date and time.
F. Changes Clause:
No change will be made to the requirements of this order without the express written consent of Pueblo Water. Any excess cost incurred by the Contractor, in the event an unauthorized change is made, will be at the Contractor’s expense and not chargeable to Pueblo Water. Any change made without the consent of Pueblo Water may result in the cancellation of this order. Pueblo Water reserves the right to procure any/all emergency requirements on the open market.
Please note in your proposal exceptions and modifications to the contract you desire be made.
Any exceptions or modifications to the contract may be grounds for considering a proposal non-
ITB-25-053 Flatbed Tilt Deck Trailer Page | 7 responsive.
G. Inspection and Acceptance:
Pueblo Water will inspect each item delivered under this order at the time of delivery or as soon thereafter as possible. Any item found not to meet the specifications of this order will be returned to the Contractor for alteration or repair. Any item will be considered accepted by Pueblo Water after a satisfactory inspection has been made and any alterations or repairs required have been accomplished.
H. Acceptance:
A proposal submitted in response to this ITB shall constitute a binding offer. The autographic signature of a person who is legally authorized to execute contractual obligations on behalf of the Bidder shall indicate acknowledgment of this condition. A submission in response to this ITB acknowledges acceptance by the Bidder of all terms and conditions as set forth herein. A Bidder shall identify clearly and thoroughly any variations between its proposal and the ITB in the cover letter. Failure to do so shall be deemed a waiver of any right to subsequently modify the terms of performance, except as outlined or specified in the ITB.
In submitting the proposal, Bidder agrees that acceptance of any or all bids by the Procurement Specialist within a reasonable time period does not constitute a contract. No delivery shall become due or be accepted unless a purchase order has been issued by the Purchasing Department.
Any goods shall remain the property of the Contractor until delivered to and accepted by Pueblo Water.
I. Invoice and Payment:
Invoices shall contain a non-duplicated number. Invoices can be sent electronically to accounting@pueblowater.org or a hardcopy to the following address:
Board of Water Works Accounts Payable P.O. Box 400 Pueblo, Colorado 81002-0400
Pueblo Water has the ability to remit payment via the following methods:
Procurement-Card (P-Card): Pueblo Water utilizes a corporate procurement card (Visa) to transact smaller dollar payments by Pueblo Water staff. This provides benefits and efficiencies associated with credit card purchases and vendor reimbursements.
Check/ACH: With this option Pueblo Water will remit payment 30 days after receiving an invoice.
J. Exceptions:
All prospective Bidders shall separately record any proposed specification deviations from those herein provided. Bidders must also be aware that bids submitted to Pueblo Water which are not in full compliance with the published specifications may be rejected as non-responsive. Pueblo Water shall be the sole judge in determining which exceptions, if any, to the published specifications are acceptable based on Pueblo Water’s intended use.
K. Estimate of Quantities/Amounts:
The estimates of quantities/amounts noted are based on past procurement records and/or projection for the next twelve (12) month period. Quantities/amounts shown on the Bid are for mailto:accounting@pueblowater.org
ITB-25-053 Flatbed Tilt Deck Trailer Page | 8 bid evaluation only and constitute no guarantee what quantities/amounts, if any, may actually be ordered.
Upon award of the contract, the Contractor hereby expressly agrees to furnish the designated bill of material required by Pueblo Water in each of the quantities listed on the “Bill of Material” and for which has quoted prices, for the duration of the contract and at the prices shown.
Pueblo Water agrees to purchase all of its requirements for designated materials in each of the categories listed on the “Bill of Material” from the awarded Contractor.
L. Over shipment:
Material shipped in excess of quantity ordered may be returned at Contractor’s expense.
M. Freight (F.O.B. Destination):
Contractor assumes full responsibility for all transportation, transportation scheduling, packing, handling, insurance and other services associated with delivery of all products under this Contract.
N. Protested Solicitations and Awards:
Any actual or prospective Contractor who is aggrieved in connection with either the solicitation or award of a contract may protest in writing to the Procurement Specialist. The protest shall be submitted within three calendar days after such aggrieved person knows, or reasonably should have known, of the facts giving rise thereto.
With regard to requirements or specifications set forth in this ITB, it is important for Contractors to note that a challenge should be made within three (3) calendar days of when the item being protested is known.
O. Confidential/Proprietary Information:
Pueblo Water neither requests nor encourages the submission of confidential/proprietary information in response to this Invitation to Bid. All proposals will be confidential until a contract is awarded and fully executed. At that time, all proposals and documents pertaining to the proposals will be open for public inspection, except for material that is proprietary or confidential. However, requests for confidentiality can be submitted to the Procurement Specialist provided that the submission is in accordance with the following procedures. This remains the sole responsibility of the Contractor. The Procurement Specialist will make no attempt to cure any information that is found to be at a variance with this procedure. The Contractor may not be given an opportunity to cure any variances after proposal opening.
Neither a proposal in its entirety, nor proposal price information will be considered confidential/proprietary.
P. Informalities and ITB Cancellation:
The Procurement Specialist reserves the right to reject any and all bids for any or all items covered in the bid request, to waive informalities or defect in bids or to accept such bids as shall be deemed in the best interest of Pueblo Water. Pueblo Water reserves the right to cancel this ITB at any time, without penalty.
Q. Negotiation of Award:
In the event only one (1) responsive proposal is received by Pueblo Water, Pueblo Water reserves the right to negotiate the award for the services with the Contractor submitting the proposal in lieu of accepting the proposal as is.
R. Annulment Without Fault of Contractor:
ITB-25-053 Flatbed Tilt Deck Trailer Page | 9
Pueblo Water shall have the right at any time, for reasons which appear good to it, to annul this contract upon giving written notice “Notice of Termination” to the Contractor, in which event the Contractor shall be entitled to the full amount of the Material provided by him under this contract up to the time of such annulment. The Notice of Termination will specify the extent to which performance of the work is terminated and the date upon which termination becomes effective.
The contractor may only terminate this contract with cause.
T. Notice to Cure:
Pueblo Water shall have the right to issue the Contractor a Notice to Cure in the event conditions of the contract are not being satisfied and are endangering performance of the contract. The failure shall be cured within the time allotted by Pueblo Water or will face termination of the contract for default.
U. Termination for Default:
Pueblo Water may terminate this Contract for default if Pueblo Water in its sole discretion determines that the Contractor has failed to comply with the Contract Documents; fails to make progress, so as to endanger performance; acts or fails to act so that it reasonably appears Contractor’s future performance is uncertain; or fails to perform the Work within the time specified or any written extension; and does not cure such failure within a reasonable period of time after written notice. In the event of termination for default, Pueblo Water may purchase replacement Work or Materials, and the Contractor shall reimburse Pueblo Water for any excess costs incurred by Pueblo Water. Pueblo Water shall pay to the Contractor, as full compensation, the unit or prorated Contract Price for the performance and accepted portion of the Work or Materials. Termination for default will result in the removal of the Contractor’s name from the approved Bid list for two (2) years or a different period of time, at Pueblo Water’s discretion.
If, after notice of termination for default, Pueblo Water determines that the Contractor was not in default or that the Contractor’s failure to perform was due to cause beyond the control and without the fault or negligence of the Contractor, the termination shall be deemed “Annulment without Fault of Contractor” per clause above.
V. Force Majeure:
The parties shall not be responsible for any failure or delay in the performance of any obligations under this Contract caused by natural disasters, flood, fire, war or public enemy. (Economic conditions and labor strikes shall not be considered force majeure events.) If a party asserts force majeure as an excuse for failure to perform the party’s obligation, then the nonperforming party must provide that the party took reasonable steps to minimize delay or damages caused by the force majeure, that the party substantially fulfilled all non-excused obligations, and that the other party was timely notified of the likelihood or actual occurrence of a force majeure. In the event of a force majeure is declared and in effect for more than ten (10) Days, Pueblo Water may terminate this Contract without any further obligation or liability.
W. Subcontracting and Assignment:
The Contractor shall not assign or subcontract the work, or any part thereof, without the previous written consent of Pueblo Water, nor shall they assign, by power of attorney or otherwise, any of the money payable under the Contract unless written consent of Pueblo Water has been obtained.
No right under the Contract, nor claim for any money due or to become due shall be asserted against Pueblo Water, or persons acting for Pueblo Water, by reason of any so-called assignment of the Contract or any part thereof, unless such assignment has been authorized by the written consent of Pueblo Water. In case the Contractor is permitted to assign moneys due or to become due under the Contract, the instrument of assignment shall contain a clause subordinating the claim of the assignee to all prior liens for services rendered or materials supplied for the
ITB-25-053 Flatbed Tilt Deck Trailer Page | 10 performance of the work.
X. Damages for Breach of Contract:
In addition to any other legal or equitable remedy Pueblo Water may be entitles to for a breach of this Contract, if Pueblo Water terminates this Contract, in whole or in part, due to Contractor’s breach of any provision of this Contract, Contractor shall be liable for actual and consequential damages to Pueblo Water.
Y. Incurring Costs:
Pueblo Water is not liable for any cost incurred prior to the issuance of a legally executed contract and/or purchase order.
Z. Non-Discrimination:
The Contractor shall comply with all applicable state and federal laws, rules and regulations involving non-discrimination on the basis of race, color, religion, national origin, age or sex.
AA. Taxes:
Pueblo Water certifies that the material covered by this proposal is for its exclusive use in its official capacity and that it is exempt from Federal excise taxes, State and County sales and use taxes. Certificate(s) available upon request.
BB. Access and Security:
Pueblo Water shall provide reasonable means of access to all Pueblo Water locations covered under this Contract if applicable. The Contractor shall comply with all Pueblo Water’s access and building security policies that are available by contacting the Purchasing Department.
CC. Proposal Price:
Estimated proposal prices are not permitted unless specifically requested herein. Bidders are urged to submit prices that reflect accurate and reasonable predictions of costs insofar as possible.
Bidders are alerted that Pueblo Water reserves the right to request a Best and Final Offer, any revisions, including costs, will be closely evaluated by the evaluation committee to insure the elimination of any perceived inequities and unacceptable conditions.
DD. Bidding Procedure:
Pueblo Water specifically reserves the right to award a contract on the basis of the low total bid for all items listed on the “Bill of Material”.
EE. Confidentiality/Records Request:
All materials submitted to the Board of Water Works of Pueblo, Colorado (Pueblo Water) are public records. The language on each page containing information the entity or individual does not want disclosed because it is considered confidential commercial or financial information must be identified and marked “Confidential” at the time of submittal. Failure to identify confidential information will result in all unmarked sections being deemed non-confidential and subject to public disclosure. Entire submissions may not be marked as Confidential. Pueblo Water will evaluate the information marked Confidential pursuant to Colorado law in determining whether to deny public disclosure of such information. The final decision as to what information will be disclosed, however, lies with Pueblo Water.
FF. Procedure for Price Adjustments:
In the event of a price increase due to tariffs, supply chain disruptions, or other unforeseen market conditions, the vendor must provide supporting documentation, including references to relevant indices such as the Consumer Price Index (CPI) or Producer Price Index (PPI), to
ITB-25-053 Flatbed Tilt Deck Trailer Page | 11 justify the adjustment including but not limited to delivery, materials, transportation, labor, unforeseen statutory or regulatory mandates, or other impacts. Pueblo Water will require a comprehensive breakdown detailing the price increase and impact on the finished product as well as official importer receipts or customs documentation showing proof of payment and transaction date. Pueblo Water, at its sole discretion, shall have the right to approve or deny the request based on the demonstration of the direct impact of the increase for the specific goods or components being purchased under this contract and shall have the right to renegotiate pricing or seek alternative suppliers. Pueblo Water has the right to require additional documentation and evidence from the vendor pertaining to the requested increase, and the vendor must comply with Pueblo Water’s request. Failure to provide the requested documentation, denial of the request, or failure to renegotiate pricing shall deem the contract noncompliant and subject to Section U.
Termination for Default. Increases solely to increase profit margins shall not be considered. If an increase is requested, no additional increases shall be accepted for a term of 6 months.
Otherwise, all required documentation shall be provided within 30 days of request.
The vendor must clearly identify any components within their bid proposal that are subject to tariffs or potential price increases. For transparency, the vendor must provide the associated cost values as of a date no later than five (5) business days after the bid opening. Supporting documentation demonstrating the basis for these cost values must also be included. Any subsequent price adjustments must be justified with verifiable evidence and, where applicable, aligned with recognized economic indices.
If market conditions result in a price decrease, the vendor must adhere to the revised pricing and pass the reduction along to the purchaser within 30 days for all orders on the effective date of the decrease and thereafter. Periodically throughout the term of the contract, Pueblo Water shall have the right to conduct market research, review pricing indexes, and use other resources to review and verify contract pricing, vendor requested increases, and vendor provided information.
Pueblo Water will only consider price adjustments to contracts that are stated as a 6 month or longer contract. Contracts awarded as a “supply of” contract will not be considered for price adjustments as the vendor should stipulate required timeframes for orders to hold prices on these types of bids. Pueblo Water will consider all price adjustments to be a pass-through cost from the vendor, with no added profit or markup to the vendor for additional costs stemming from tariffs, supply chain disruptions, or other unforeseen market conditions.
ITB-25-053 Flatbed Tilt Deck Trailer Page | 12
SECTION IV. – Response Format
The following items are to be included in your proposal, in the order listed. Deviation from this may render your proposal non-responsive.
A. Proposal Acknowledgement
B. Bid Form (Attachment A.)
C. Addendums, if applicable
D. Samples or Product Literature
E. Material Safety Data Sheets, if applicable If this product requires Material Safety Data Sheet literature, the current MSDS, product literature, and any NSF/ANSI 60 or 61 material information must be included with your bid.
ITB-25-053 Flatbed Tilt Deck Trailer Page | 13
Board of Water Works of Pueblo, Colorado Bid Form Attachment A.
RFP-25-053 - Flatbed Tilt Deck Trailer
Description Unit Price Total
Tilt Deck Trailer Tandem axle Bumper pull Full bed tilt deck ___________ ___________
Including all standard features and options ___________ ___________
GRAND TOTAL
Award will be made on an all or none basis for both items shown above. Bidder shall indicate below if a minimum order quantity is required.
PLEASE STATE THE FOLLOWING:
Manufacturer:
Make/Model:
FOB Destination:
Pueblo Water Warehouse, 707 W. 3rd Street, Pueblo, CO 81003
Delivery time required:
Terms of Sale (check all that apply):
Net 15, Net 30, Net 60
Due on Receipt
P-Card
Check/ACH
Are the prices based on a minimum order quantity:
No (check here)
Yes (min.order is):
Exceptions:
ITB-25-053 Flatbed Tilt Deck Trailer Page | 14
ATTACHMENT B
PROPOSAL ACKNOWLEDGEMENT
The undersigned Bidder warrants that the material or services offered for sale hereunder complies in all respects with the instructions and specifications for said item(s) incorporated herein.
Falsifying this information is cause to deem your proposal nonresponsive and therefore ineligible for consideration. In addition, falsification of this information is cause to cancel a contract awarded based on one or both of the above preferences.
Bidder hereby acknowledges receipt of Addendum No. _________________________
IN WITNESS WHEREOF, this offer is made this ___________ day of ____________, 2025.
Name of Firm
By:
Signature of Authorized Agent Print or type name of authorized agent
Title of Authorized Agent whose permanent mailing address is:
Street or P.O. Box City State Zip
Phone Number Fax Number
Email Address
ITB-25-053 Flatbed Tilt Deck Trailer Page | 15
SAMPLE – ATTACHMENT C.
ACCEPTANCE
The BOARD OF WATER WORKS OF PUEBLO, COLORADO, (PUEBLO WATER), hereby accepts the offer submitted by:
Name of Firm Mailing Address
For:
Name of Material or Service Contract and Term
As submitted at the public bid opening held on:
Day, Month, Date, Year
The Contractor listed above hereby expressly agrees to furnish:
required by Pueblo Water as listed on the Proposal, for the duration of the contract period in accordance with the specifications prepared by Pueblo Water.
Dated at Pueblo, Colorado this day of ________, 2025.
BOARD OF WATER WORKS OF PUEBLO, CO
By __________________________________ Lottie Delgado, PPA Procurement Specialist
File details come from the government source that posted it. Updated .