FLAGSTAFF POT.pdf
PDF 50 KB Posted
- Attached to
- 8 ft Flag Staff
- Solicitation number
- SPE1C124RFLAGSTAFF
About this file
This document is a pre-solicitation notice for a federal contract opportunity to provide 8-foot flag staffs. The key details are:
The solicitation number is SPE1C1-24-R-XXXX, and the item is the 8-foot Flag Staff, NSN 8345002149125. The procurement will be an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a 3-year ordering period and tiered pricing. The minimum purchase quantity is 3,600 units over the life of the contract, with an anticipated quantity of 4,800 units per tier and a maximum of 18,000 units. First article samples must be submitted within 30 days of award, and the first delivery order is due 180 days after award. The items will be shipped FOB Destination to Arizona Industries for the Blind in Phoenix, AZ. This is an unrestricted acquisition that will be awarded based on best value, evaluating past performance. All materials must be domestically sourced and produced in the United States.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"FLAGSTAFF, WOOD, JOINTED, VARNISHED FINISH "
"ARMY TYPE IV, COMPONENTS A AND B (BRASS "
"COUPLING, FERRULE AND SPEARHEAD, EACH WITH "
MIRROR-LIKE POLISHED CHROME PLATED FINISH.
8 FT. LONG
MADE IAW B-7-10; B-7-10A AND B-7-10B
MADE IAW SPEC MIL-F-40048
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA
MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE
SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE
ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE
APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION,
IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
Casting/forging may be required to manufacture this NSN and tooling is typically involved. The government may not have this special tooling. For sourcing, tooling, materials or other information, please submit a Casting and Forging Assistance Request at either https://www.dla.mil/Aviation/Offers/Engineering/Forging-and-Casting/ or Land & Maritime Supply Chains DSCC.cast.forge@dla.mil.
RD002, COVERED DEFENSE INFORMATION APPLIES
INSPECTION OF SUPPLIES SHALL BE IN ACCORDANCE WITH FAR PART 52.246-2
STANDARD INSPECTION.
ADDITIONAL INFORMATION FOR MIL-STD-105E:
MIL-STD-105E, dated 10 May 1989, is hereby canceled.
Future acquisitions may refer to: MIL-STD-1916, "DoD Preferred Methods for Acceptance of Product," or ANSI/ASQ Z1.4, "Sampling Procedures and Tables for Inspection by Attributes."
Users are cautioned to evaluate these documents for their particular application before citing it as a replacement document.
(Copies of MIL-STD-1916 are available online at http://assist.daps.dla.mil or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.)
(Copies of ANSI/ASQ Z1.4 are available online at www.asq.org or ASQ Distribution Center, 5131 S. Third Street, Milwaukee, Wisconsin 53207- 6028.)
ADDITIONAL INFORMATION FOR ANSI/ASQC Z1.4:
NOTE: THE MOST RECENT VERSION OF THIS DOCUMENT SHOULD BE USED.
APPLICATION FOR COPIES SHOULD BE ADDRESSED TO:
AMERICAN SOCIETY FOR QUALITY
600 NORTH PLANKINTON AVENUE
MILWAUKEE, WISCONSIN 53203
(Ref. T0795 - May 17, 2006)
IT IS RECOMMENDED THAT TWO EACH FIRST ARTICLE SAMPLES OF THE END ITEM(S)
BE SUBMITTED TO THIS CENTER FOR VISUAL, DIMENSIONAL AND SHADE
EXAMINATIONS. THIRTY DAYS WILL BE REQUIRED TO EXAMINE AND EVALUATE THE
SAMPLES AND TO FURNISH THE RESULTS AND DIRECTIONS REGARDING PRODUCTION TO
THE CONTRACTOR.
Two (2) First Article samples are required. First Article Testing shall be performed and the contractor will be notified in writing within thirty
(30) calendar days after Contracting Officer's receipt of First Article samples.
File details come from the government source that posted it. Updated .