Fitness Center SOW.pdf
PDF 209 KB Posted
- Attached to
- Cape Gym Flooring Federal contract opportunity
- Solicitation number
- FA252125QB200
About this file
This Statement of Work (SOW) details a fitness center flooring replacement project for the 45th Force Support Squadron at Cape Canaveral SFS. The project requires procuring and installing 6,195 sq ft of high-performance commercial-grade rubberized flooring, including high-performance rolled rubber flooring with 14.5 mm total thickness, multi-purpose flooring adhesive, reducer transition strips, and custom inlaid USSF Delta logos. Services encompass flooring demolition and removal of approximately 5,632 sq ft, base installation of a 300 linear foot rubberized cove base, professional installation, equipment relocation, and debris removal.
The work will be performed at the Cape Canaveral SFS Fitness Center, with installation conducted between 0730-1630 hours, Monday through Friday, excluding federal holidays. Contractors must comply with base access procedures, including presenting valid REAL ID-compliant identification starting May 7, 2025, providing vehicle documentation, and completing a Cape Canaveral Badge Request Form. Additional requirements include adhering to OSHA standards, using provided electricity and facility access, supplying own tools, and following the base's no-smoking policy.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WR2.jpg | JPG image | |
| FA252125QB200 Questions and Answers.pdf | ||
| CR2.jpg | JPG image | |
| Logo 4_Space_Launch_Delta_45_emblem.png | PNG image | |
| WR3.jpg | JPG image | |
| Logo 2_45 FSS.png | PNG image | |
| Logo 3_Fitness-Logo-2022.png | PNG image | |
| Logo 1_USSF_Vertical.png | PNG image | |
| Layout.pdf | ||
| CR1.jpg | JPG image | |
| WR1.jpg | JPG image | |
| Badge Request.pdf | ||
| FA252125QB200 CSS.pdf | ||
| Clauses FA252125QB200.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Cape Canaveral Fitness Equipment
August 13, 2025
1. Objective The 45th Force Support Squadron (45FSS/FSV) has a requirement to procure and install new commercial-grade rubberized flooring at the Cape Canaveral SFS Fitness Center. This acquisition replaces the ageing flooring and enhances physical readiness training capabilities for service members and patrons. The project includes delivery, unpacking, installation, removal of all packaging debris, and internal relocation of select existing equipment within the facility.
2. Technical Requirements This requirement includes all labor, transportation, equipment, and services to provide a fully installed and operational rubberized flooring. The final delivery shall match the specifications below and be installed according to commercial standards, in a layout directed by the Fitness Center staff.
• Equipment list includes:
• High-Performance Rolled Rubber Flooring
· Commercial-grade rolled rubber flooring
· Total thickness: 14.5 mm (± tolerance)
· Width: 48 in rolls
· Top layer: ~2.5 mm vulcanized composition rubber surface, designed for traction and durability
· Base layer: ~12 mm vulcanized composition rubber base, engineered for shock absorption and impact reduction
· Designed to withstand extreme weight impacts while minimizing bounce
· Color: Black with approximately 20% light-gray fleck (or similar contrast pattern)
· Estimated Coverage: 6,195 sq ft
• Multi-Purpose Flooring Adhesive
· Commercial-grade flooring adhesive
· Packaging: 4-gallon pail
· Suitable for secure bonding of rubberized flooring products
· Low-VOC, indoor safe, and compliant with commercial installation standards
• Rubber Flooring Reducer Transition Strips
· Rubberized reducer/transition piece
· Dimensions: 48 in length x 4.75 in width x 0.75 in height
· Designed to provide a smooth transition between rubber flooring and adjacent surfaces
• Custom Inlaid Flooring Logos
· USSF Delta Logo
· Custom-designed, inlaid rubber flooring logos/platform inserts
· Integrated directly into flooring during installation for durability
· Designed to enhance facility branding and unit morale
2.2 Services
- Flooring Demolition and Removal
• Removal and disposal of existing rubber flooring
• Estimated area: ~5,632 sq ft
• Includes labor, equipment, and debris disposal
- Base Installation
• Rubberized cove base for perimeter finishing
• Installation length: ~300 linear feet
• Includes adhesive, labor, and cleanup
- Delivery and Unpacking
- Professional Installation
- Relocation of Existing Equipment
- Trash and Packaging Removal
3. Place of Performance Cape Canaveral SFS Fitness Center
51 LIGHTHOUSE RD (AREA 55)
Cape Canaveral Air Force Station, FL 32920
4. Work Hours and Coordination Work must be conducted between 0730–1630, Monday through Friday, excluding federal holidays. Installation must be coordinated at least 7 business days in advance. Delays due to base access requirements or working on an active military installation are the responsibility of the contractor.
5. Government-Furnished Utilities Electricity and reasonable facility access will be provided at no cost to the contractor. The contractor is responsible for supplying all tools and extension cables needed to complete the work.
6. Safety and Access Requirements Contractors must comply with all OSHA standards. Contractor personnel and vehicles must comply with base access procedures. Valid driver’s license, registration, and insurance are required for base entry.
All personnel must fill out attached Cape Canaveral Badge Request Form prior to delivery.
7. Base Entry Identification: Visitors must present a valid government-issued photo ID, such as a driver's license or passport. Starting May 7, 2025, the REAL ID Act will be fully enforced, meaning only REAL ID-compliant licenses or other approved identification will be accepted for access Vehicle Requirements: Drivers will need proof of insurance, vehicle registration, and a valid driver's license. Vehicles are subject to inspection by security personnel. All personnel must fill out attached Cape Canaveral Badge Request Form prior to delivery.
8. No Smoking Policy Per AFI 40-102, smoking is prohibited in all government buildings and vehicles. Contractors must comply with posted signage and policies.
| 1. Objective |
| 2. Technical Requirements |
| 3. Place of Performance |
| 4. Work Hours and Coordination |
| 5. Government-Furnished Utilities |
| 6. Safety and Access Requirements |