This document is a Statement of Work (SOW) for a new fish cleaning station at the New Melones Lake recreation area. The SOW outlines the requirements for a turnkey fish cleaning station, including a grinder capable of handling bony fish, a stainless steel cleaning table with sink and sprayers, and a motor controller enclosure. The station must be delivered within 125 days and will replace the existing, outdated station.

The related federal contract opportunity is a sources sought notice from the Bureau of Reclamation, seeking information and capabilities from vendors for the purchase of a fish cleaning station with the specified accessories. Interested vendors are requested to submit capability statements by April 26, 2024. This sources sought notice is for information and planning purposes only and does not constitute a formal request for quote.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fish Cleaning Station Statement of Work (SOW)

1.0 Background

New Melones Lake is a popular destination for recreation, particularly fishing. Two fish cleaning stations, put in decades ago, have outlived their service life, with one located in the Tuttletown Recreation Area completely inoperable. Rebuilding this station is cost prohibitive and impractical because its present location is difficult to find and drive to with a boat and trailer. The original placement of the station was not adequately considered, placing it well away from the boat launch at lake itself. Additionally, the old station has a grinder incapable of fully masticating especially bony fish (like catfish) creating issues to Tuttletown’s plumbing and sewage system.

A new fish cleaning station will be centrally located within the parking area of the Tuttletown boat launch. The station will also have an improved grinder capable of handling the boniest of fish to be found in the lake.

A new fish cleaning station supports Reclamation’s desire to provide enhanced amenities to the public. New Melones incorporates the Federal Lands Recreation Enhancement Act (FLREA) into its operation, allowing for the collection of fees to improve recreational services. Fish cleaning stations are an expectation, an amenity supported through revenue generated and retained by the park.

2.0 Scope

The new fish cleaning station will be purchased as a unit, comprised of equipment necessary to clean the parts of the fish retained, while ably masticating the parts to be discarded.

3.0 Task

The contractor will provide one fish cleaning station: including grinder, motor controller, and fish cleaning table and control enclosure. This project will require the contractor to supply all parts & equipment, to replace the current fish cleaning station with an equivalent. The contractor shall supply a turnkey system that will be capable of integrating with our current water and drain line system.

Contractor will be responsible for initial startup testing to ensure operability and familiarization training upon completion of the in-house installation by the Bureau of Reclamation.

The unit will be shipped and partially assembled onsite. Manuals on maintenance and operation to be included. The vendor will provide one, post install, onsite visit to ensure proper operation and training to staff on maintaining and repairing the unit as needed.

4.0 Specifications

The Fish Cleaning Station and identified accessories must meet or exceed the following specifications;

Grinder Specifications:

One (1) 3-HYDRO-I-1206: inline grinder with 12” stack using 7-tooth (.310”) thick cam cutters and spacers in alloy steel, alloy steel drive and driven shafts, cartridge-style tungsten carbide mechanical seals with BUNA-N elastomers rated for 90psi, Industrial Coal Tar Epoxy coated gray ductile iron end housings and side rails with 6” pipe flanges, 29:1 reducer with a 5 HP - TEFC 230v/3ph/60Hz electric motor – all mounted and contained within the below scope of supply. The grinder must be able to handle boniest of fish that are found in the lake.

Fish Cleaning Table Specifications:

One (1) Table: 88” long x 55” wide x 40” tall fabricated in 304 stainless steel with hinged access doors that are lockable.

Side/end mounted work surface, minimum 60 inches X 19 inches X maximum 34 inches high. Americans with Disabilities Act Compliance (ADA) mandates a maximum 34-inch work surface height.

One (1) Sink fabricated in 304 stainless steel; with swirl spray nozzles for rinsing

Two (2) polyethylene UHMW cutting boards 88” long

Two (2) overhead spray wash wands

One (1) 14-Guage 304 Stainless Steel Angled Feeding Tube Incorporated drain valves for seasonal storage

Controller Enclosure Specifications:

One (1) PC2220 motor controller: in a NEMA 4X 304 stainless steel flush mounted enclosure accepting 230v/3ph/60Hz input power, includes IEC starter with over-current protection, timed spray wash, jam-sensing current transformer and micro-PLC. To Include E-Stop on face of enclosure and lockable disconnect.

5.0 Delivery

The delivery must be made within 125 days ARO. The delivery will be made to the following address:

New Melones Recreation and Resource Branch 6850 Studhorse Flat Road Sonora, CA 95370

The Contracting Officer Representative (COR) or Civil Maintenance Supervisor for New Melones will receive shipment, verifying arrival of a complete, intact unit with all associated paperwork.

The contractor shall coordinate the exact dates of delivery at least one (1) week in advance.