This document is a Fiscal Year 2025 Notice of Funding Opportunity (NOFO) for the United States Marine Highway Program (USMHP) administered by the Maritime Administration within the U.S. Department of Transportation. The grant opportunity seeks to fund marine transportation projects that provide alternatives to landside transportation, mitigate congestion, and promote marine highway transportation, with $14,042,621 available for award, including $5 million in new appropriations and $9,192,621 in unexpended prior-year funding. Applications are due by July 15, 2025, and are open to eligible applicants including state and local governments, metropolitan planning organizations, port authorities, Tribal governments, and private sector marine highway project operators.
Eligible projects may include capital improvements, development phase activities, or marine highway transportation planning, with a focus on projects that use documented vessels, expand marine transportation services, and provide measurable benefits such as reduced vehicle miles traveled, improved transportation efficiency, and enhanced supply chain resilience. Applicants must provide a 20% non-federal cost share, though this requirement may be waived for Tribal governments or projects in rural areas. The selection process involves a multi-phase review evaluating projects based on merit criteria including demonstrating need, expanding benefits, measuring project support, and leveraging federal funding, with priority given to projects that include construction activities and align with workforce development and job quality objectives.
Notice of Funding Opportunity
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY 2025 - SF 424.pdf | ||
| FY 2025 USMHP Sponsor List Updated 6-26-25.pdf | ||
| FY 2025 USMHP Route Sponsors List (updated).pdf | ||
| Designated Route Sponsors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 2025 Notice of Funding Opportunity
United States Marine Highway Program
Maritime Administration
US Department of Transportation (DOT)
Table of Contents
A. Basic Information
B. Eligibility
C. Program Description
D. Application Content and Format
E. Submission Requirements and Deadline
F. Application Review Information
G. Award Notices
H. Post-Award Requirements and Administration
I. Federal Awarding Agency Contacts
J. Other Information
Appendix A: U.S. Marine Highway Program Routes and Route Sponsors
A. BASIC INFORMATION
SUMMARY OVERVIEW OF KEY INFORMATION: United States Marine Highway
Program (USMHP) Discretionary Grant Opportunity
Topic Description
Federal Agency Name Maritime Administration (MARAD)
Funding Opportunity
Title
Fiscal Year 2025 United States Marine Highway Program
(USMHP)
Announcement Type This is the announcement for the FY 2025 round of USMHP grants.
Funding Opportunity
Number
693JF725R000009
Assistance Listing
Number
20.816 United States Marine Highway Grants
Funding Details The Full-Year Continuing Appropriations and Extensions Act, 2025 (Pub. L. 119-4, March 15, 2025) (“FY 2025 Appropriations
Act”) appropriated $5 million for the USMHP in FY 2025.
MARAD will retain up to 3 percent, or $150,000, of that funding for grant administration and oversight. An additional $9,192,621 in unexpended prior-year USMHP funding is available for FY
2025 grant awards for eligible Projects and MARAD plans to make those unexpended prior-year funds available for award in the
FY 2025 funding opportunity. Therefore, a total of up to
$14,042,621 is available in funding for the FY 2025 USMHP.
If this Notice of Funding Opportunity (NOFO) does not result in the award and obligation of all available funds, MARAD may publish additional solicitations. There is no maximum or minimum award size under the USMHP.
Key Dates Applications Due: July 15, 2025 at 11:59:59 pm Eastern Daylight
Time.
Submission
Requirements and
Deadlines
All applications must be submitted through Grants.gov.
Complete instructions on how to register and apply may be found at Grants.gov. If applicants experience difficulties at any point during the registration or application process, please use the help available on Grants.gov, such as the Customer Support Hotline at
1-800-518-4726 or email.
Executive Summary The USMHP provides funding support to Marine Highway
Transportation Projects or components of Projects that: 1) provide a coordinated and capable alternative to landside transportation;
mitigate or relieve landside congestion; promote Marine Highway
Transportation; or use vessels documented under 46 U.S.C.
chapter 121; and 2) develop, expand, or promote Marine Highway
Transportation or shipper use of Marine Highway Transportation.
http://www.grants.gov/ http://www.grants.gov/
Eligible Applicants • State
• Political subdivision of a State or a local government
• United States metropolitan planning organization
• United States port authority
• Tribal government (as defined in Section B.5. of this notice)
• United States private sector operator of Marine Highway
Projects or private sector owners of facilities, including an
Alaska Native Corporation, with an endorsement letter from the current Marine Highway Route Sponsor.
Questions Email questions to mh@dot.gov. Due to the competitive nature of the program, during the application submittal period, MARAD is unable to accommodate individual questions or meeting requests to discuss specific project ideas.
MARAD posts Frequently Asked Questions as well as information about informational webinars at https://www.maritime.dot.gov/grants-finances/marine-highways/frequently-asked-questions-us-marine-highway-program-usmhp and https://www.maritime.dot.gov/grants-finances/2023-us-marine-highway-program-grant-program-webinars.
Agency Contact Email mh@dot.gov or call Fred Jones at 202–366–1123.
1. CHANGES FROM THE FY 2024 NOFO
The FY 2025 USMHP NOFO incorporates the following changes from the FY 2024 NOFO:
• Removes references to rescinded Executive Orders.
• Updates rating rubrics for selection criteria to better align with statutory requirements.
• Clarifies eligibility of, and provides a definition for, Marine Highway Transportation
Planning Activities.
• Clarifies what applicants must provide in order to demonstrate that Project funds will be spent efficiently and effectively.
• Updates the organization of the NOFO and references to comply with the recent changes to 2 CFR Part 200 Appendix I.
Other changes have been made throughout this notice to better illustrate application requirements.
Applicants who choose to re-apply using materials prepared for prior competitions should ensure that their FY 2025 USMHP application fully addresses the criteria described in this notice and that all relevant information is updated and submitted in the proper format outlined in Section D.
mailto:mh@dot.gov https://www.maritime.dot.gov/grants-finances/marine-highways/frequently-asked-questions-us-marine-highway-program-usmhp https://www.maritime.dot.gov/grants-finances/marine-highways/frequently-asked-questions-us-marine-highway-program-usmhp https://www.maritime.dot.gov/grants-finances/marine-highways/frequently-asked-questions-us-marine-highway-program-usmhp https://www.maritime.dot.gov/grants-finances/2023-us-marine-highway-program-grant-program-webinars https://www.maritime.dot.gov/grants-finances/2023-us-marine-highway-program-grant-program-webinars https://www.maritime.dot.gov/grants-finances/2023-us-marine-highway-program-grant-program-webinars mailto:mh@dot.gov https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/appendix-Appendix%20I%20to%20Part%20200
B. ELIGIBILITY
To be selected for a FY 2025 USMHP grant, an applicant must be an eligible applicant, and the
Project must be an eligible Project. In addition to this Section B, applicants should reference
Section C.3 for funding restrictions that apply to the USMHP and that may affect an applicant’s or
Project’s eligibility.
1. ELIGIBLE APPLICANTS
Eligible applicants for a FY 2025 USMHP grant are:
• a State,1
• a political subdivision of a State or a local government;
• a United States metropolitan planning organization;
• a United States port authority;
• a Tribal government (as defined in Section B.5. of this notice);
• or a United States private sector operator of Marine Highway Projects or private sector owners of facilities, including an Alaska Native Corporation, with an endorsement letter from the current Marine Highway Route Sponsor (if there are multiple route sponsors, the private sector applicant is only required to submit an endorsement letter from one of the route sponsors).
Federal agencies and individuals are not eligible applicants for the FY 2025 USMHP.
Private sector applicants, including Alaska Native Corporations, should refer to Section D.3.d. on additional application information necessary when applying under this notice.
Eligible applicants are encouraged to develop coalitions, which might include vessel owners and operators; third-party logistics providers; trucking companies; shippers; railroads; port authorities;
state, regional, and local transportation planners; impacted communities; or any combination of entities supporting the Project.
If submitting a joint application, applicants must identify in the application the eligible lead applicant as the primary point of contact, who will also be responsible for financial administration of the Project and ensuring that all funds are expended in accordance with Federal requirements.
Joint applications should include a letter of support signed by each applicant as an attachment and include a description of the roles and responsibilities of each entity. If a joint applicant is providing some or all of the required non-Federal matching funds, a Letter of Financial
Commitment from that joint applicant must be provided as an attachment to the application. See
Section D.3.c. for more information.
MARAD expects the lead applicant submitting the application will administer and deliver the
Project. If the lead applicant intends to act as a pass-through entity for disbursing funds to a subrecipient (including a private-entity joint applicant, if applicable) who will deliver all or a
1 State means any state of the United States, the District of Columbia, the Commonwealth of Puerto Rico, the U.S.
Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and any other territory or possession of the United States.
portion of the Project, that intention should be made clear in the application and a letter of support from the intended subrecipient should be included as an attachment to the application.
Lead applicants intending to make subawards under their proposed FY 2025 USMHP Project should refer to 2 CFR 200.331-333 on how to make subrecipient determinations and what requirements apply to pass-through entities. Applicants should be aware that all contracts executed under the USMHP award that create procurement relationships must follow the procurement standards at 2 CFR 200.317-327, including requirements regarding competition.
To be eligible for award, eligible applicants must provide a brief written statement describing their authority to plan, carry out, own, operate, or maintain the grant-funded Project. In the case of joint applications, at least one of the eligible applicants must demonstrate this authority. See Section
D.3.a. for more information. Please note that any joint applicants, whether they are public or private entities, must comply with all applicable Federal requirements.
2. APPLICATION LIMIT
Each eligible applicant may submit no more than one application. If an applicant submits multiple applications, only the last one received by MARAD will be considered.
3. COST SHARING
Cost sharing means the portion of the Project’s cost that is not paid by Federal funds. Cost share funds are typically stated as a percentage of the total project cost. Per 46 U.S.C. 55601(d)(4), the
Federal share of the total costs of an eligible USMHP Project may not exceed 80 percent;
however, the Secretary may increase the Federal share of costs above 80 percent for:
(1) a grant to an eligible entity that is a Tribal government; or
(2) a grant for a Project that is located in a rural area.
“Tribal government” and “rural area” are defined in Section B.5 of this notice.
Additionally, consistent with 48 U.S.C. 1469a, for grants to American Samoa, Guam, the Virgin
Islands, or the Northern Mariana Islands (collectively, the “Insular Areas”), MARAD will waive any cost share requirement for local matching funds under $200,000 (including in-kind contributions) that otherwise would have applied to a grant under the USMHP.
Applicants should use the following equation when determining the cost share for their Project:
(𝑈𝑆𝑀𝐻𝑃 𝐺𝑟𝑎𝑛𝑡 𝑅𝑒𝑞𝑢𝑒𝑠𝑡 + 𝑂𝑡ℎ𝑒𝑟 𝐹𝑒𝑑𝑒𝑟𝑎𝑙 𝐹𝑢𝑛𝑑𝑠)
𝑇𝑜𝑡𝑎𝑙 𝑃𝑟𝑜𝑗𝑒𝑐𝑡 𝐶𝑜𝑠𝑡 = 𝐹𝑒𝑑𝑒𝑟𝑎𝑙 𝐶𝑜𝑠𝑡 𝑆ℎ𝑎𝑟𝑒
Total Project Cost means the sum of future eligible Federal and non-Federal costs that have not yet been incurred. MARAD will not consider previously incurred costs or previously expended or encumbered funds towards the non-Federal cost-share requirement.
Eligible sources of non-Federal funds include:
• State funds originating from programs funded by State revenue;
https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR031321e29ac5bbd https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d https://uscode.house.gov/view.xhtml?hl=false&edition=prelim&req=granuleid%3AUSC-prelim-title46-section55601&num=0&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0Ni1jaGFwdGVyNTU2LWZyb250%7C%7C%7C0%7Cfalse%7Cprelim https://uscode.house.gov/view.xhtml?req=(title:48%20section:1469a%20edition:prelim)#amendment-note
• Local funds originating from State or local revenue-funded programs;
• Private funds.
The application must demonstrate in its Letter(s) of Financial Commitment, the sources of the non-Federal funds. Unless otherwise authorized by statute, funds used to satisfy the non-Federal cost-share requirements of a different Federal program may not be counted as the non-Federal cost share for both the FY 2025 USMHP grant award and another Federal grant program. All non-
Federal cost-share funds are subject to the same Federal requirements described in Section H.1 as awarded funds.
For the purpose of eligibility, the proceeds of Federal assistance under chapter 6 of Title 23, United States Code (“TIFIA”) or Sections 501 through 504 of the Railroad Revitalization and
Regulatory Reform Act of 1976 (Public Law 94-210) (“RRIF”), as amended, shall be considered to be part of the non-Federal share of Project costs if the loan is repayable from non-Federal funds, unless otherwise requested by the Project sponsor. See Section B.3. for information about documenting cost sharing in the application.
In addition to these cost-share requirements, cost share will be evaluated according to the
“Leveraging Federal Funding and Financial Viability” merit criterion described in Section F.1.a
(4).
For each Project that receives a USMHP grant award, the terms of the award will require the recipient to complete the Project using at least the amount of non-Federal funding that was specified in the application. If the actual costs of the Project are greater than the costs estimated in the application, the recipient will be responsible for addressing the funding shortfall by providing additional funds. If the actual costs of the Project are less than the costs estimated in the application, MARAD will generally reduce the Federal contribution to ensure the recipient maintains the level of non-Federal funding stated in the application.
4. PRE-AWARD AUTHORITY
Unless authorized by the DOT in writing after announcement of FY 2025 USMHP awards, any costs incurred prior to MARAD’s obligation of funds for a Project (“pre-award costs”) are ineligible for reimbursement and cost share requirements. USMHP funds are administered on a reimbursement basis. Grant recipients will generally be required to pay Project costs upfront using their own funds, and then request reimbursement for those costs. If a recipient cannot complete a
Project on reimbursement basis, MARAD will—on a case-by-case basis—consider recipient requests to use alternate payment methods as described in 2 CFR 200.305(b), including advance payments.
5. DEFINITIONS
Alaska Native Corporation: Any Regional Corporation, any Village Corporation, any Urban
Corporation, and any Group Corporation, as those terms are defined under Section 3 of the Alaska
Native Claims Settlement Act (43 U.S.C. 1602).
Construction activities: Includes construction, reconstruction, rehabilitation, or acquisition of property (including land related to the Project and improvements to the land) and right of ways, https://uscode.house.gov/view.xhtml?path=/prelim@title23/chapter6&edition=prelim https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/section-200.305 https://uscode.house.gov/view.xhtml?path=/prelim@title43/chapter33&edition=prelim https://uscode.house.gov/view.xhtml?path=/prelim@title43/chapter33&edition=prelim environmental mitigation, construction contingencies, equipment acquisition, vessel acquisition, modification, or rehabilitation, and operational improvements.
Development phase activities: Includes planning, feasibility analysis, revenue forecasting, environmental or other permitting-related reviews, preliminary engineering and design work, and other preconstruction activities intended to support construction activities for a capital project.
Documented vessel: A vessel documented under 46 U.S.C. chapter 121.
Facility: A specific location in a port where passengers or commodities are transferred between land and water carriers or between two water carriers, specifically including: wharves, piers, sheds, warehouses, yards, and docks.
Letter of Financial Commitment: A letter that demonstrates the funding source(s) for the non-
Federal funds are stable, dependable, and dedicated to the Project and that is signed and certified by an authorized representative of the organization(s) providing the non-Federal funds. The letter must be submitted on the organization(s) letterhead, specify the exact dollar amount committed to the Project, and include proof that the matching funds (i.e., exact dollar amount specified in the letter) will be available and/or committed prior to obligation of funds, regardless of the source of funding.
Marine Highway Transportation: The carriage by a documented vessel of cargo (including such carriage of cargo and passengers), if such cargo is: 1) contained in intermodal cargo containers and loaded by crane on the vessel; loaded on the vessel by means of wheeled technology, including roll-on roll off cargo; shipped in discrete units or packages that are handled individually, palletized, or unitized for purposes of transportation; bulk, liquid, or loose cargo loaded in tanks, holds, hoppers, or on deck; or freight vehicles carried aboard commuter ferry boats; and 2) is loaded at a port in the United States and unloaded either at another port in the United States or at a port in Canada or Mexico; or loaded at a port in Canada or Mexico and unloaded at a port in the
United States.
Marine Highway Transportation Route: A Marine Highway Transportation Route previously designated by the Secretary.2
Marine Highway Transportation Route Sponsor: The requester of a Marine Highway
Transportation Route designation or modification of a designated route approved by the Secretary.
See Appendix A: U.S. Marine Highway Program Routes and Route Sponsors.
Marine Highway Transportation Project: The proposed Project for which the applicant is seeking
FY 2025 USMHP funding. The Project must be part of an existing or proposed Marine Highway
Transportation Service and must serve a designated Marine Highway Transportation Route.
Marine Highway Transportation Service: The overall Marine Highway Transportation Service and operation that is proposed, expanded, or promoted by the Marine Highway Transportation Project.
The service must have a point of origin or destination on a designated Marine Highway
Transportation Route.
2 https://www.maritime.dot.gov/grants-finances/us-marine-highway-route-designation-process https://uscode.house.gov/view.xhtml?path=/prelim@title46/subtitle2/partH/chapter121&edition=prelim https://www.maritime.dot.gov/grants-finances/us-marine-highway-route-designation-process
Performance Measures: Verifiable information to measure the benefits of the Project, such as volumes of cargo (e.g., TEUs, tons, cubic meters, etc.) moved, contribution to environmental mitigation, safety, reduced vehicle miles traveled, or reduced road maintenance and repair costs.
Marine Highway Transportation Planning Activities: Activities that are intended to develop strategies, plan for, or research the development, expansion or promotion of Marine Highway
Transportation on one or more designated Marine Highway Transportation Routes (including activities that consider the potential expansion or modification of designated Marine Highway
Transportation Routes), but that are not intended to directly support construction activities for a specific capital project or an existing Marine Highway Transportation Service.
Rural area: An area located outside a 2020 Census-designated urban area.3
Shipper: The Beneficial Cargo Owner (BCO), i.e., the party that ultimately owns the product or cargo being shipped.
Tribal government: The recognized governing body of any Indian or Alaska Native Tribe, band, nation, pueblo, village, community, component band, or component reservation, individually identified (including parenthetically) in the list published most recently, as of the date of enactment of the FY 2025 National Defense Authorization Act, pursuant to Section 104 of the
Federally Recognized Indian Tribe List Act of 1994 (25 U.S.C. 5131).
Urban area: An area located within (or on the boundary of) a 2020 Census-designated urban area.4
6. ELIGIBLE PROJECTS
Eligible Projects may be either capital Projects, development phase, or Marine Highway
Transportation Planning Activities. Eligible Project activities include Projects or components of
Projects that 1) provide a coordinated and capable alternative to landside transportation; mitigate or relieve landside congestion; promote Marine Highway Transportation; or use vessels documented under 46 U.S.C. chapter 121; and 2) develop, expand, or promote Marine Highway
Transportation or shipper use of Marine Highway Transportation.
Development phase activities—such as planning, feasibility analysis, revenue forecasting, preliminary engineering and design work, development of master plans, and other preconstruction work—may be eligible Projects if they satisfy all other eligibility requirements and merit criteria described in this notice. Similarly, Projects involving Marine Highway Transportation Planning
Activities may be eligible Projects if they satisfy all other eligibility requirements and merit criteria described in this notice. However, Projects for development phase or Marine Highway
Transportation Planning Activities that do not include any construction activities as defined in
3 For the purpose of this NOFO, the definition of rural is based on the 2020 Census. The Census Bureau delineates urban areas after each decennial census by applying specified criteria to decennial census and other data. Rural encompasses all population, housing, and territory not included within an urban area. This website will be used to determine whether a Project is in an urban or rural area: https://tigerweb.geo.census.gov/tigerweb2020/.
4 Lists of 2020 urban areas as defined by the Census Bureau are available on the Census Bureau website at https://www.census.gov/programs-surveys/geography/guidance/geo-areas/urban-rural.html. This website will be used to determine whether a Project is in an urban or rural area: https://tigerweb.geo.census.gov/tigerweb2020/.
https://uscode.house.gov/view.xhtml?path=/prelim@title46/subtitle2/partH/chapter121&edition=prelim https://tigerweb.geo.census.gov/tigerweb2020/ https://www.census.gov/programs-surveys/geography/guidance/geo-areas/urban-rural.html https://tigerweb.geo.census.gov/tigerweb2020/
Section B.5. will be less competitive than those Projects that will result in construction with FY
2025 USMHP funding.
Ineligible Project activities are:
• Improvements to port or land-based infrastructure, including equipment, outside the United
States.
• Raising sunken vessels, constructing buildings or other physical facilities, or acquiring land, unless the Secretary determines that such activities are necessary to carry out the
Marine Highway Transportation Project for which such assistance is provided. If an applicant requests funding to raise sunken vessels, construct buildings or other physical facilities (as “facility” is defined in Section B.5.), or acquire land, it must explain why the activities are necessary to carry out the Marine Highway Transportation Project. Refer to
Section D.3.a. of this notice for further information on documentation needed to justify these activities.
• Improvements to Federally owned facilities.
• The purchase or installation of fully automated cargo handling equipment remotely operated or monitored, with or without the exercise of human intervention or control, if the
Secretary determines that such equipment would result in a net loss of jobs within the port or port terminal. Applicants that propose Projects that include the acquisition of eligible cargo handling equipment must indicate in their application whether the equipment is fully automated. If fully automated equipment is proposed to be acquired, the applicant must provide information demonstrating that the Project will not directly result in a net loss of jobs.
Additionally, applications that receive a “Non-Responsive” rating in Demonstrating the Need to
Develop, Expand, or Promote Marine Highway Transportation or shipper use of Marine Highway
Transportation; Expanding the Benefits of Marine Highway Transportation; or Leveraging Federal
Funding and Financial Viability merit criteria will not be recommended for award.
7. PROJECT COMPONENTS
An application must describe only one Project, but that Project may contain more than one component and may describe components that may be carried out by parties other than the applicant. MARAD expects, and will impose requirements on funding recipients to ensure, that all components included in an application will be delivered as part of the USMHP Project, regardless of whether a component includes Federal funding. The status of each component should be clearly described (for example, in the Project schedule and budget).
MARAD may award funds for a component, instead of the larger Project, if that component:
• Independently satisfies eligibility requirements.
• Independently aligns with selection criteria.
• Meets National Environmental Policy Act (NEPA) requirements with respect to independent utility, meaning the component must be a usable improvement on its own and ready for use upon completion.
Independent utility means that the component will represent a transportation improvement that is usable even if no other improvement is made in the area and will be ready for intended use upon completion of that component’s construction. All Project components that are presented together in a single application must demonstrate a relationship among them related to the overall benefits and objectives of the Project.
MARAD strongly encourages applicants to identify in their applications the Project components that have independent utility and separately detail costs and requested USMHP funding for those components. If the application identifies one or more independent Project components, the application should clearly identify the applicant’s priority for funding among the components, how each independent component addresses the selection criteria and produces benefits on its own and describe how the full proposal of which the independent component is a part addresses the selection criteria described in Section F.
Applicants should be aware that, depending upon the relationship between Project components and applicable Federal law, DOT funding of some Project components may make other Project components subject to Federal requirements as described in Section H.1.
8. REDUCED AWARDS
If selected for award, MARAD may decrease the funding amount from the applicant’s request if some elements of the Project are ineligible.
9. PREVIOUS USMHP AWARDS
Recipients of prior USMHP grants including grants formerly referred to as America’s Marine
Highway (AMH) may apply for funding to support additional phases or components of a project previously awarded funds under 46 U.S.C. 55601. However, to be competitive, the applicant should demonstrate the extent to which the previously funded project phase or component has met estimated project scope, schedule, and budget milestones, as well as how the new phase or component will enhance the ability to achieve the benefits expected for all phases of the Project.
C. PROGRAM DESCRIPTION
1. PROGRAM HISTORY AND AUTHORIZATION
The USMHP, codified at 46 U.S.C. 55601, was originally established by Section 1121 of the
Energy Independence and Security Act of 2007 to reduce landside congestion through the designation of Marine Highway Routes. The USMHP statute authorizes the Department to make grants to implement Projects or components of Projects that 1) provide a coordinated and capable alternative to landside transportation; mitigate or relieve landside congestion; promote Marine
Highway Transportation; or use vessels documented under 46 U.S.C. chapter 121; and 2) develop, expand, or promote Marine Highway Transportation or shipper use of Marine Highway
Transportation.
Since this program was established, the Department has awarded $107.8 million through competitive grants to eligible entities for Marine Highway Projects that have supported the development and expansion of documented vessels and port and landside infrastructure.
https://uscode.house.gov/view.xhtml?hl=false&edition=prelim&req=granuleid%3AUSC-prelim-title46-section55601&num=0&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0Ni1jaGFwdGVyNTU2LWZyb250%7C%7C%7C0%7Cfalse%7Cprelim https://uscode.house.gov/view.xhtml?hl=false&edition=prelim&req=granuleid%3AUSC-prelim-title46-section55601&num=0&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0Ni1jaGFwdGVyNTU2LWZyb250%7C%7C%7C0%7Cfalse%7Cprelim
2. PROGRAM GOALS AND OBJECTIVES
The goal of the USMHP is to fund eligible Projects to relieve landside congestion and generate other public benefits by increasing the efficiency of the surface transportation system. Projects selected under this Notice are intended to further the program’s goals and objectives.
3. RESTRICTIONS ON FUNDING
Assistance provided under this notice may not be used to improve port or land-based infrastructure outside the United States or, unless the Secretary determines that such activities are necessary to carry out the Marine Highway Transportation Project for which such assistance is provided, to raise sunken vessels, construct buildings or other physical facilities, or acquire land. Grant funds may only be used for the purposes described in this Notice and may not be used as an operating subsidy.
MARAD will not consider previously incurred costs or previously expended or encumbered funds towards the matching requirement for any Project prior to MARAD’s announcement of Project selections. Consistent with 2 CFR 200.458, unless “pre-award costs” are authorized by MARAD in writing after MARAD’s announcement of FY 2025 USMHP awards, any costs incurred prior to
MARAD’s obligation of funds for a Project are ineligible for reimbursement and are ineligible to count as match for cost-share requirements5.
As proscribed in Section 825 of the National Defense Authorization Act for Fiscal Year 2024
(Pub. L. 118-31, December 22, 2023), no funds may be awarded to an entity that utilizes or provides in part or in whole: the national transportation logistics public information platform
(commonly referred to as ‘LOGINK’) provided by the People’s Republic of China, or departments, ministries, centers, agencies, or instrumentalities of the Government of the People’s
Republic of China; any national transportation logistics information platform provided by or sponsored by the People’s Republic of China, or a controlled commercial entity; or a similar system provided by Chinese state-affiliated entities.6
Federal funds may not be used to support or oppose union organizing, whether directly or as an offset for other funds.
4. AVAILABILITY OF FUNDS
The FY 2025 Appropriations Act appropriated $5 million for the USMHP in FY 2025. MARAD will retain up to 3 percent, or $150,000, of that funding for grant administration and oversight. An additional $9,192,621 in unexpended prior-year USMHP funding is available for FY 2025 grant awards for eligible Projects, and MARAD plans to make those unexpended prior-year funds available for award in this FY 2025 funding opportunity. Therefore, a total of up to $14,042,621 is available in funding for the FY 2025 USMHP.
5 Pre-award costs are costs incurred directly pursuant to the negotiation and anticipation of the USMHP award where such costs are necessary for efficient and timely performance of the scope of work, as determined and pre-approved in writing by MARAD.
6 For more information on LOGINK, including information about potential vulnerabilities to maritime port equipment and networks, see the advisory on Worldwide Foreign Adversarial Technological, Physical, and Cyber Influence on the Maritime Security Communications Industry portal: https://www.maritime.dot.gov/msci-advisories.
https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRed1f39f9b3d4e72/section-200.458 https://www.maritime.dot.gov/msci-advisories
The table below outlines the obligation and expenditure deadlines for FY 2025 funding.
Fiscal Year Funding Obligation Deadline Funding Expenditure Deadline
FY 2025 September 30, 2028 Five years after funds obligation for each individual award.
MARAD seeks to obligate FY 2025 USMHP grant funds by September 30, 2028.
Obligation occurs when a selected applicant and MARAD enter into a written grant agreement after the applicant has satisfied applicable administrative requirements, including transportation planning and permitting review requirements, such as those under the National Environmental
Policy Act (NEPA).
MARAD reserves the right to revoke any award of USMHP grant funds and to award such funds to another project to the extent that such funds are not obligated or expended in a timely or acceptable manner and in accordance with the Project schedule and requirements detailed in the grant agreement.
5. PERFORMANCE MEASURES
Each applicant selected for USMHP grant funding must collect and report information to MARAD on the Project’s observed performance with respect to the relevant long-term outcomes that are expected to be achieved through construction of the Project. Performance reporting continues for three years after Project construction is completed. MARAD does not provide USMHP grant funding specifically for performance reporting.
6. PREVIOUS AWARDS
Previous program awards may be found on the USMHP website.
D. APPLICATION CONTENT AND FORMAT
MARAD requires the application to include the Standard Form (SF) 424 (Application for Federal
Assistance) and a Project Narrative. Applicants are encouraged to also complete the SF-424C
(Budget Information – Construction Programs) if applicable. The SF-424 and SF-424C may be found at Grants.gov.
MARAD expects the Project Narrative to be prepared with standard formatting preferences as follows: a single-spaced, 12-point standard font (e.g., Times New Roman), with 1-inch margins and the narrative text in one column only. Files should be submitted in PDF format unless otherwise specified.
The Project Narrative may not exceed 20 pages in length, excluding cover pages, table of contents, and a list of supporting documents. Information that may exceed the 20-page limit are supporting documents that further substantiate assertions or conclusions made in the 20-page Project
Narrative and documentation related to the required determinations. If possible, website links to these documents should be provided rather than copies. It is important to ensure that website links are currently active and working.
https://www.maritime.dot.gov/grants/marine-highways/marine-highway
Supporting documents may be included but are not required to be reviewed by evaluators. If including supporting documents, all documents should be dated and attached to the application or referenced via website link. MARAD expects appropriately descriptive file names for all attachments and/or links (e.g., “Project Narrative,” “Letters of Support” etc.) using a file naming format of “[Applicant Name_2025USMHP_Descriptive File Name]” where “Applicant Name reflects the applicant’s legal name, abbreviated as appropriate. If supporting documents are submitted, applicants should clearly identify within the Project Narrative the relevant portion of the Project Narrative that each supporting document supports.
Applicants are strongly encouraged to include a list of the supporting documents after the last page of their Project Narrative and to attach, as applicable, the supporting documents to their application package in the following order: Project Narrative; Attachments Form; Project Cost;
documentation of funding commitments for non-Federal funds; Project Schedule; SF-424C form if applicable; Letters of Support; Other Documentation.
Different evaluation teams may review different parts of the application.
MARAD recommends that the Project Narrative follow the basic outline below to ensure applications address all applicable requirements and to assist evaluators in locating relevant information.
Project Narrative Outline Section
Narrative Section I: Project Description See D.3.a
Narrative Section II: Project Location See D.3.b
Narrative Section III: Grant Funds, Sources, and Uses of Project Funds See D.3.c
Narrative Section IV: Additional Application Information Needed from All
Private Sector Applicants
See D.3.d
Narrative Section V: Merit Criteria See D.3.e
Narrative Section VI: Selection Considerations See D.3.f
The Project Narrative should include the information necessary for MARAD to determine that the
Project satisfies requirements described in Sections B and D and to assess the selection criteria specified in Section F. In addition to a detailed statement of work, detailed Project schedule, detailed Project budget, and identification of the Marine Highway Transportation Route(s) served, the Project Narrative should include a table of contents, maps, photographs, and graphics, as appropriate, to make the information easier to review and the Project location and scope easier to understand. Applicants should provide data and documentation in a form that is verifiable by
MARAD. MARAD will evaluate the application based upon the information submitted and may ask any applicant to supplement data in its application but is not required to do so. Lack of supporting information that substantiates assertions or conclusions made in the Project Narrative negatively affects competitiveness of the application, as described in Section F.
MARAD expects applications that include the following content:
1. STANDARD FORM 424
The SF-424 Application for Federal Assistance must be completed. The form may be found at
Grants.gov.
2. FY 2025 USMHP COVER PAGE
Each application should include a cover page with information about the Project as presented below:
Field Name Guidance
Name of lead applicant
Is the applicant applying as a lead applicant with any joint applicants?
If yes, identify by name each of the joint applicants.
Project name Provide a concise (five- to seven-word) name of the Project.
Project description Provide a brief (no more than 100 words) description of the Project that focuses on what the Project consists of.
Is this a Project for either development phase activities or Marine Highway Transportation
Planning Activities?
Yes or No.
Is the applicant a United States private sector operator of marine highway Projects or private sector owners of facilities, including an Alaska Native Corporation?
If yes, identify the U.S. Marine Highway
Transportation Route Sponsor endorsing the application (this should be one of the sponsors as indicated below in “Marine Highway Route served”).
U.S. Marine Highway Route served Specify the designated U.S. Marine Highway
Transportation Route the Project serves and the
U.S. Marine Highway Transportation Route
Sponsor(s).
Project location address Specific location of the Project, located on a specific street, in a specific town or city, inside of a specific county, etc. This is not the headquarters, corporate office, or other main office of the applicant. If assistance for Projects at multiple sites is requested, list the address for each site.
Geographic coordinates (in latitude and longitude format)
Provide the coordinates of the approximate geographic center of the Project. The latitude and longitude of the Project are to be reported as decimal degrees with a minimum of five decimal places. Coordinates are the location of the Project, not the headquarters, corporate office, or other applicant office. If assistance for
Projects in multiple sites is requested, list the coordinates for each site.
Is this Project in an urban or rural area? Refer to definitions of “urban area” and “rural area” in Section B.5. This designation is the specific location(s) of the Project, not the headquarters, corporate office, or other applicant office. If the assistance for Projects in multiple sites is requested, the designation should be based on whether the majority of funds are being spent in an urban or rural area.
Field Name Guidance
Is the applicant a Tribal government? Refer to definition of “Tribal government” in
Section B.5. of this notice.
Project Zip Code Identify the zip code that corresponds to the geographic coordinates identified above. If the application is requesting assistance for Projects in multiple sites, list the zip code for each site.
Has the same Project been previously submitted for AMH/USMHP funding?
Identify the program and year of the prior submission (such as “AMH FY 2022”, “USMHP FY 2023”).
Is the applicant applying for other discretionary grant programs in 2025 for the same work or related scope of work?
If so, identify the program, amount of funding requested and scope (such as “PIDP FY 2025, $25 million, components 1 and 2 of this
USMHP Project”).
Has the applicant previously received DOT, Environmental Protection Agency (EPA), Department of Energy (DOE) or other
Federal funding for the same work or related scope of work?
If so, identify the program, amount of funding received and scope (such as EPA Clean Ports
FY 2024, $2 million, phase 1 of this USMHP
Project), and status of the NEPA review for the previously funded project.
Has the applicant previously received PIDP, TIGER, BUILD, RAISE, FASTLANE, INFRA Mega, or AMH/USMHP funding?
Identify the program, amount of funding received, and year of the prior award (such as
“INFRA FY 2023”).
USMHP FY 2025 Grant Amount Requested Enter the total amount of USMHP FY 2025 grant funds requested.
Total Project Cost Total Project Cost will be equal to the Total
Future Eligible Project Cost, including the
USMHP grant amount requested.
Total Federal Funding Enter the amount of Federal funding from ALL sources that will be used for this Project and list each source of Federal funding.
Total Non-Federal Funding Enter the amount of funds committed to the
Project from non-Federal sources.
Will the applicant be seeking approval to expend funds prior to grant agreement execution?
Yes or No.
Will RRIF or TIFIA funds be used as part of the Project financing?
Indicate whether RRIF or TIFIA funding will be used for the Project. If so, indicate the amount of funds that will be used.
Does the applicant use LOGINK or a similar logistics platform provided or sponsored by the People’s Republic of China or Chinese state-affiliated entities?
Yes or No. See Section C.3. of this notice.
3. PROJECT NARRATIVE
a. Narrative Section I: Project Description
This section of the Project Narrative should include a detailed statement of work and describe the proposed USMHP Project, focusing on the technical and engineering aspects of the Project as well as the current design status of the Project. This section should discuss the Project’s history, including a description of any previously completed components, and be used to place the Project into a broader context of other transportation investments being pursued by the Project sponsor;
however, the applicant should make clear which investments are outside the scope of the Project.
If the Project includes the purchase of equipment, the application should provide a description as to how each piece of equipment is intended to be used for the Project and any specific features that the equipment must have to satisfy that intended use (e.g., minimum lifting capacity). Applicants should be aware that equipment must be purchased using open competition in accordance with the procurement standards at 2 CFR 200.317-327, unless one of the exceptions in 2 CFR 200.320(c) applies. In most cases, requiring a specific brand of equipment when other brands could also satisfy the intended use would be considered unduly restrictive of competition and therefore inconsistent with the procurement standards. Given this, applicants should describe the equipment generally, focusing on the operating requirements and features that are required to achieve the intended Project benefits and objectives, as opposed to just describing a specific brand of equipment.
This section should also discuss how the Project promotes, expands, or develops a Marine
Highway Transportation Service as defined in Section B.5. This includes a description of the type of cargo moved by the Project or Marine Highway Transportation Service supported by the
Project and ports served by the Marine Highway Transportation Service.
If submitting a joint application, applicants should also identify in this section the lead recipient of the award, who will also be responsible for financial administration of the Project and ensuring
Project compliance with all Federal requirements, and a description of the roles and responsibilities of each applicant. Applications should include a signed letter of support from all eligible non-lead joint applicants as an attachment. If the lead recipient determines that a joint applicant is classified as a “subrecipient” as that term is defined at 2 CFR 200.1, the lead recipient must ensure that it complies with the requirements applicable to pass-through entities at 2 CFR
200.331, 2 CFR 200.332, and 2 CFR 200.333.
Applicants should also include in this section citations of authority or other supporting documentation necessary to establish an applicant’s authority to carry out the Project, so that
MARAD can make the statutory determination necessary for award at 46 U.S.C. 55601(d)(7)(C) and discussed further in Section B.1. The citations should be of sufficient detail to demonstrate that the applicant is an eligible applicant and to show how the applicant is related to the work on the property where the grant funds will be spent. Examples of information that could assist with making this determination include: the citation of specific sections or chapters of state or local statutory language that demonstrate relevant authority; the inclusion of a narrative outlining the authority of the eligible entity applying for grant funding; or a description of the relationship between the applicant and the owner of the property that links the Project to the authority to carry out the Project (e.g., through a lease agreement).
In the case of a joint application, only one of the joint applicants need demonstrate that they have authority to carry out the Project.
If an applicant requests funding to raise sunken vessels, construct buildings or other physical facilities (as defined in Section B.5.), or acquire land, it must explain in the application why the https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d/section-200.320 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-A/subject-group-ECFR2a6a0087862fd2c/section-200.1 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR031321e29ac5bbd/section-200.331 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR031321e29ac5bbd/section-200.331 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR031321e29ac5bbd/section-200.332 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR031321e29ac5bbd/section-200.333 https://uscode.house.gov/view.xhtml?hl=false&edition=prelim&req=granuleid%3AUSC-prelim-title46-section55601&num=0&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0Ni1jaGFwdGVyNTU2LWZyb250%7C%7C%7C0%7Cfalse%7Cprelim activities are necessary to carry out the Project. Funding cannot be awarded for one of these uses unless the Secretary determines that such activities are necessary to carry out the Project.
b. Narrative Section II: Project Location
This section of the application should describe the Project’s location and, if available, provide photographs of the location. This section should also describe the Marine Highway Transportation
Route served by the Project and whether the Project is located in a rural or urban area (as defined in Section B.5.), including the relevant census tracts. 7, 8
Applicants should submit a Project map that clearly indicates the Project’s location in the local area and the State or territory, and its connections to existing transportation infrastructure. The map is needed to verify urban/rural areas. The location should only include the direct physical location of the Project. It should not include a broad service area or area of Project impact. The location is where the requested grant funds will be used, not the headquarters, corporate office, or other office of the applicant. If the Project includes multiple sites, include location information for all sites.
Applicants must ensure that the location and address of the Project are correctly identified in the application.
c. Narrative Section III: Grant Funds, Sources, and Uses of Project Funds
This section should present the budget for the USMHP Project (i.e., the Project scope that includes
USMHP funding and matching funding). The budget should not include any previously incurred expenses that are incurred prior to MARAD’s announcement of Project selection. Project budgets should show how different funding sources will share in each activity and present those data in dollars, rounded up or down to the nearest dollar, and percentages. The budget should identify other Federal funds the applicant is applying for, has been awarded, or intends to use.
Funding sources should be grouped into three categories: non-Federal, USMHP, and other
Federal, with specific amounts from each funding source. The Project budget should include total
Project Costs for the FY 2025 USMHP Project (see Section B.3. for definition of Total Project
Cost); FY 2025 USMHP grant funding request; specific source, amount, type, e.g. grant, loan, etc.), and match requirements of any other Federal funds to be used for eligible Project costs; and specific sources and amounts of non-Federal funds, if included, to be used for eligible Project costs.
For MARAD to make the determination required by 46 U.S.C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .