FIRE_W56HZV20R0178.pdf
PDF 138 KB Posted
- Solicitation number
- W56hzv
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Carl_Gustav_recoilless_rifle.jpg | JPG image | |
| 59b055bb6eac400d4a8b7b9c-750_png.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W56HZV-20-R-0178
COLETTE THOMAS (586)282-6304
COLETTE.F.THOMAS.CIV@MAIL.MIL
2020JUN01 03:00am
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
X
333314
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 50
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: COLETTE THOMAS
Buyer Office Symbol/Telephone Number: CCTA-HCP-A/(586)282-6304
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Solicitation W56HZV-20-R-0178 is to procure a one time, Firm Fixed Price (FFP), production contract, for a quantity of 100 EA Fire, Control Device (NSN: 1015-01-465-9190) Part Number: 12950891) with a 100% option quantity for an additional 100 EA Fire, Control Device.
With the recent transition from www.FBO.gov to www.beta.sam.gov the site have been experiencing a number of issues.
The purpose of this provision is to update the proposal submittal method. Interested Offerors shall submit a proposal via email to the
Contract Specialist (colette.f.thomas.civ@mail.mil) and cc the corresponding Contracting Officer (patricia.pierce3.civ@mail.mil) with the subject header: W56HZV-20-R-0178 (company name). Once a proposal is received, the Contract
Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.1 Electronic Contracting
(a) All Army Contracting Command Warren solicitations will be publicized on the System for Award Management website (https://www.sam.gov
). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via SAM. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry
Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online SAM bid submission:
(1) Vendors must log into SAM to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in SAM at www.sam.gov (a Federal Government owned and operated free web site) and have a
CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into SAM, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) SAM will send an email to vendors registered email address confirming the electronic submission.
Note to offerors:
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
(f) Solicitations may remain posted on SAM after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the
Governmentsintention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the
2 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.2 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
W56HZV-20-R-0178
Amendment Number: Date:
A.3 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
A.4 ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
*** END OF NARRATIVE A0001 ***
3 50
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 FIRE, CONTROL DEVICE
NSN: 1015-01-465-9190
Mfr CAGE: 19200
Mfr Part Number: 12950891
0001AA PRODUCTION QUANTITY $ $ _____________________ ______________ __________________
COMMODITY NAME: FIRE, CONTROL DEVICE
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
4 50
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB FIRST ARTICLE TEST $ $ __________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0002 FIRE CONTROL DEVICE
0002AA UNEXERCISED OPTION $ $ ____________________ ______________ __________________
COMMODITY NAME: FIRE CONTROL DEVICE
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED OPTION
FOR INCREASED QUANTITY---SEPARATELY PRICED LINE ITEM
(52.217-7).
The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the
Government.
If the option quantity is exercised, the level of maintenance is IAW Section C.4.2.1.3.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
5 50
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0003 DATA ITEM _________
A001 SERVICE REQUESTED: ENGINEERING CHG PROPOSAL 1 LO $ ** NSP ** ___________________________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
See CDRL A001 Engineering Change Proposal
(End of narrative F001)
A002 SERVICE REQUESTED: REQUEST FOR VARIANCE 1 LO $ ** NSP ** _______________________________________ __________________
SERVICE REQUESTED: DATA ITEM: REQ FOR VARIANCE
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
See CDRL A002 Request for Variance
6 50
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative F001)
A003 SERVICE REQUESTED: NOTICE OF REVISION 1 LO $ ** NSP ** _____________________________________ __________________
SERVICE REQUESTED: DATA ITEM: NOTICE OF REVISION
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
See CDRL A003 Notice of Revision
(End of narrative F001)
A004 SERVICE REQUESTED: ACCEPTANCE SPEC EQUIP INSPECT 1 LO $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: ACCEPTANCE/SPECIAL INSP EQUIP
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
See CDRL A004 Acceptance/Special Inspection Equipment
(End of narrative F001)
A005 SERVICE REQUESTED: TEST/INSPECTION REPORT 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: DATA ITEM: TEST/INSP PLAN
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
7 50
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See CDRL A005 Test/Inspection Plan
(End of narrative F001)
A006 SERVICE REQUESTED: TEST/INSPECTION RPT 1 LO $ ** NSP ** ______________________________________ __________________
SERVICE REQUESTED: DATA ITEM: TEST/INSP REPORT
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
8 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 STATEMENT OF WORK
STATEMENT OF WORK
FOR THE PROCUREMENT OF
MULTI ROLE ANTI ARMOR WEAPON SYSTEM
PICATINNY FIRE CONTROL DEVICE
AND SPARE PARTS
1. Scope. This Statement of Work (SOW) defines contractor technical tasks required for the production one variant of the Picatinny Fire
Control Device (PFCD).
1.1 Background. The Picatinny Fire Control Device (PFCD) is a mechanical system that provides the super elevation for the family of ammunition fired from the M3. The PFCD has a series of cams, each corresponding to a particular round of ammunition, mounted on a spindle. Two variants of the PFCD have been designed. One variant is for Army applications while the second variant is for Navy applications. There are only minor selector knob while the Navy variant has a triangular shaped selector knob. The Army variant has a different set of cams than the Navy variant.
2. Applicable Documents. The following documents are applicable to this Statement of Work and attached appendices to the extent specified herein. If a conflict exists between these documents and this SOW, the SOW takes precedence.
2.1 Department of Defense Specifications.
DI-QCIC-80553A Acceptance Test Plan
DI-NDTI-80809B Test/Inspection Report
DI-QCIC-80906 Calibration System Description
DI-QCIC-81960, Measurement System Evaluation (MSE)-Measurement and Inspection Equipment System Design Documentation for Acceptance of
Product
DI-SESS-80639D, Engineering Change Proposal (ECP), DI-SESS-80640D, Request for Variance (RFV)
DI-SESS-80642D, Notice of Revision (NOR)
2.2 Drawings.
12950891 Picatinny Fire Control Device Army Variant
3.1 General. The work required by this contract shall be performed in accordance with this Statement of Work (SOW).
The contractor shall produce one variant of the Picatinny Fire Control Device (PFCD). The contractor shall pass First Article Testing
(FAT) prior to production. FAT is due 90 days after award.
3.2 Detailed Tasks.
3.2.1 Production of PFCD Army variant. The contractor shall produce 100 of part number 12950891, with an opportunity to exercise the option for an additional 100.
4. Government Furnished Information (GFI) N/A
5.0 Data Deliverables
5.1 Acceptance Test Plan. The contractor shall develop a Lot Acceptance Test Plan to ensure that the accuracy of the PFCD is within +/-
1 mils (360\'ba = 6400 mils). The LAT shall be in accordance with DI-QCIC-80553A (Acceptance Test Plan).
5.2 First ArticleTest Report. The contractor shall provide a report detailing the results of any first article acceptance testing in accordance with DI-NDTI-80809B Test/Inspection Report. The requirement entitled First Article Test in Sections C and Section E of this solicitation may be waived by the Government provideed that the offeror meets the conditions outlined in Section L.1, entitled Provision
For Waiver of Required First Article Test Approval.
5.3 Acceptance Inspection, Equipment (AIE), and Documentation. The contractor shall provide Acceptance Inspection Equipment and develop a calibration system description in accordance with DI-QCIC-80906 (Calibration System Description) and DI-QCIC-81960, Measurement System
Evaluation (MSE)-Measurement and Inspection Equipment System Design Documentation for Acceptance of Product.
5.4 Additional Data Item Number Deliverables in accordance with CDRL A001 for an Engineering Change Proposal, CDRL A002 for a Request for Variance, and CDRL A003 for a Notice of Revision.
6.0 Special Considerations - None
9 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
7.0 Contract and Technical Points of Contact
7.1 Kristina Wagoner, (812) 854-3990, kristina.beaton@navy.mil
7.2 Tyler Caudell, (812) 854-8605, tyler.caudell@navy.mil
7.3 Carl Jarvis, (812) 854-5798, carl.jarvis@navy.mil
8.0 Place and Period of Performance
8.1 Contractors Facility
8. 2 5 years after contract award
9.0 Acronym List
AIE Acceptance Inspection, Equipment
GFI Government Furnished Information
LAT Lot Acceptance Test
PFCD Picatinny Fire Control Device
SOW Statement of Work
10.0 Start of Work
10.1. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within 30 days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
10.2. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall provide the Government with minutes of the Start of Work Meeting within 7 days after the meeting is held.
*** END OF NARRATIVE C0001 ***
10 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. 12950891
(a) REVISION A
(b) DATE OF REVISION -13 JAN 10
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: n/a
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ ) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.
Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see "http://www.acq.osd.mil/log/sci/ait.html " l (best viewed with Internet Explorer 11 or higher) for the current DoD
Suppliers Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see
URL:http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained
11 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/
MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the
SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: n/a
*** END OF NARRATIVE D0001 ***
12 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
E.1 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) CAGE)
(Address) (City) (State) (Zip)
*** END OF NARRATIVE E0001 ***
E.2 ACCEPTANCE INSPECTION EQUIPMENT (AIE)
(a) The contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.
(b) The contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.
(c) AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.
(d) Contractor furnished AIE shall be made (i) to the AIE designs specified in Section C, or (ii) to any other design provided the contractor's proposed AIE design is approved by the Government. Contractor's proposed AIE design for inspection of characteristics listed as "Critical, Special or Major" shall be submitted to the Government for review and approval as directed on the Contract Data
Requirements List, DD Form 1423. Government approval of AIE design shall not be considered to modify the contract requirements.
(e) When the contractor submits its proposed AIE on commercial off the shelf equipment, the contractor shall include the manufacturer's name and model number, and sufficient information to show capability of the proposed AIE to perform the inspection required. When submitting proposed AIE design documentation on commercial computer controlled test and measuring equipment include information on (1) test program listing (2) flowcharts showing accept and reject limits and computer generated test stimuli (3) calibration program listing
(4) sample of the printout of an actual test and calibration (5) test plan to verify accuracy of inspection and correctness of accept or reject decision (6) identification of the equipment by model name and number.
(f) Resubmission of the contractor's proposed AIE design for Government approval on a follow on Government contract is not required, provided the inspection characteristic parameters specified in the technical data package and the previously Government approved AIE designs have not changed. In this situation, the contractor shall provide written correspondence in the place of the AIE designs that indicates the prior Government approval and states that no changes have occurred.
(g) The Government reserves the right to disapprove, at any time during the performance of this contract, any AIE that is not accomplishing its intended use in verifying an inspection or test characteristic.
(h) If the contractor changes the design after the initial approval, the modified design must be submitted for approval prior to use.
*** END OF NARRATIVE E0002 ***
E.3 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)
(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval
13 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to Thehue Tran at thehue.tran.civ@mail.mil. ________________________________________
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the
Government shall be borne by the Contractor.
*** END OF NARRATIVE E0003 ***
E.4 ALTERNATIVES TO FIRST ARTICLE SAMPLING (INCLUDING STATISTICAL PROCESS CONTROL (SPC))
(a) Offerors are encouraged to propose a defect prevention strategy in lieu of First Article acceptance inspection and testing requirements cited in the technical data package. The Government recognizes that industry has developed numerous prevention based strategies which result in reduced process variation and promote continuous process improvement initiatives. Use of alternatives to lot acceptance sampling can provide offerors the latitude of implementing prevention based programs that are suitable to their particular mode of operation.Offerors are encouraged to submit their alternative proposals prior to award. Although the Government will entertain post award requests, there is no guarantee such requests will be accepted.
(b) Requests to use alternatives to lot acceptance sampling shall be provided to the Contracting Officer for review and approval or disapproval. Such requests shall include:
14 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Identification of the specific inspections and tests to be reduced or eliminated.
(2) A description of your prevention based program. This should include such topics as a training program and the performance of audits.
(3) A description of the tools used to monitor and control the specific processes being evaluated. This should include such topics as criteria for determining out of control conditions and procedures to be used when an out of control condition is detected.
(4) The results of a process performance study, and if available, the results of a process capability study.
(5) For SPC data to be used as an alternative to lot acceptance sampling, the following conditions shall be met:
(i) The process is in a state of statistical control using SPC control chart methods.
(ii) Variable data: for Critical characteristics a CPK =/> 2.00 (or equivalent capability) is achieved; for Major characteristics a
CPK =/> 1.33 (or equivalent capability) is achieved.
(iii) Attribute data: for Critical Characteristics a process average of 100% of the product conforming to the specification; for
Major Characteristics a process average of 99.9937% of the product conforming to the specification.
(c) Proposals offered after award. The Contracting Officer is responsible for accepting or rejecting the alternate First Article procedure submitted by the contractor. The contractor may submit an alternate lot acceptance procedure at any time during the performance of this contract. The Contracting Officer is responsible for accepting or rejecting the alternate procedure within 30 days of receipt. If the Government needs more time to evaluate the alternate procedure, the Contracting Officer shall notify the contractor in writing, giving the reasons and the anticipated decision date. The contractor may withdraw its proposal at any time prior to its incorporation by contract modification. Because offerors may withdraw their proposal at any time, the Contracting Officer's failure to timely accept or reject the proposal shall not constitute grounds for claim against the Government. Any proposed and accepted procedure must be incorporated by contract modification. If the alternate procedure is not accepted, the Contracting Officer shall provide the contractor with written notification, explaining the reasons for rejection.
(d) Any equitable adjustment resulting from approval of an alternate lot acceptance procedure described in paragraph (c) above will be handled in accordance with the Changes clause of this contract.
(e) Until notification is received, the contractor is required to perform under this contract in accordance with the requirements herein, including lot acceptance inspection and testing.
*** END OF NARRATIVE E0004 ***
15 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
H.1 Demilitarization (Demil) and/or Trade Security Controls Clause for Procurement of Munitions List Items (MLI) and Commerce Control
List Items (CCLI)
DEMILITARIZATION AND TRADE SECURITY CONTROL REQUIREMENTS AND PROCEDURES
I. Demil and/or Trade Security Controls (TSCs) Summary:
A. This procurement action has a demil and/or TSC consideration requirement. The demil and trade security control provisions in this solicitation implement the policy and requirements of the Arms Export Control Act, 22 United States Code (U.S.C.), Section 2778, the
International Traffic in Arms Regulations (ITAR) at 22 Code of Federal Regulations (CFR), Parts 120-130, the Export Administration
Regulations (EAR), at 15 CFR 730-774 and the Export Administration Act. Regulatory requirements and guidance are contained in Federal
Acquisition Regulation (FAR) 45.6, Reporting, Redistribution, and Disposal of Contractor Inventory and Defense Federal Acquisition
Regulation (DFAR) 245.604, Restrictions on Purchase or Retention of Contractor Inventory.
B. Demil and TSC policy is promulgated via Department of Defense (DoD) regulations and in the establishment of contract requirements.
Accordingly, the governments right to require demilitarization under this clause is a contractual right, subject to the authority and discretion of the Procuring Contracting Officer (PCO). Therefore the PCO may or may not forward contractor demilitarization waiver request for review and approval, even when there is certifiable contractors compliance with all existing TSC regulations. The waiver approval process is described in paragraph VI of this clause.
C. The DoD policy and requirements for demil and TSCs are contained in the DoD 4160.21-M-1, Demil and TSCs Manual. This manual is hereby incorporated by reference, and its terms, conditions, and procedures are valid and enforceable as contractual requirements. If there is a conflict between the Demil and TSCs Manual and the Demil and TSC Clause herein, the Demil and TSCs Manual takes precedence.
D. This contract requires the manufacture, assembly, test, maintenance, repair, and/or delivery of military/defense items. This clause sets forth the requirements for the control and corresponding certification and verification of disposition of contract excess property.
The requirements under this clause are applicable to any contractor and/or subcontractor who perform work under this contract. This clause is a mandatory flow-down clause; accordingly, contractor/subcontractor must include this clause in subcontracts for work under this solicitation and resulting contract.
E. The demil and TSC requirements apply to all materials and property (government furnished equipment (GFE), special tools and special test equipment, manufactured parts in whatever stage of assembly, and associated technical data including technical manuals, drawings, process sheets, and working papers) bought, assembled, produced, or provided by the government under this contract regardless of the type of contract and regardless of who has title to the material. The intent is to control military/defense items in accordance with statutory and regulatory requirements. Bidders/offerors proposed prices under this solicitation and any resulting contract should include any and all cost(s) to comply with this clause and the governments demil and TSC requirements.
F. In general, the demil requirements must be met upon completion of the contract.\~For indefinite delivery contracts as defined by FAR
16.501-2, demil requirements must be met upon the expiration of the potential contractual performance period as described in section A of the contract and/or in section B (the schedule) of the contract; or upon contract termination if the contract is earlier terminated.
Contractor(s) awarded a contract with demil requirements shall be responsible for maintaining an inventory system capable of recording, safeguarding and tracking all material, work in process, components associated or related to the performance of the contract for the purpose (not intended to be exclusive) of enabling the contractor to fulfill its demil obligations under this clause. The contractor will provide a copy of demil certificates to the PCO within 30 days for inclusion in the contract file.
G. Paragraph VIII. c. of this clause applies to the demil of excess U.S. Government furnished equipment/technical data (GFE) provided to a contractor in support of this contract; see excess GFE definition II. b. below. If the contractor is not using GFE in performance of this contract, disregard this paragraph.
H. The contractor agrees that demil performed under this contract will be conducted in accordance with this clause or DoD 4160.21-M-1, Demil Manual, and all demilitarized material will meet or exceed the definition of scrap as defined by this clause.
II. Definitions:
A. Contract excess property is property of the type covered by this contract for which the contractor does not claim payment or has been denied payment and all GFE not returned to the government upon completion of the contract. This includes, but is not limited to, rejects and overruns. Contract excess property (whether title to the property is in the Government or not) includes completed or partially completed parts, components, subassemblies, assemblies, end items, special tools and test equipment, and all associated technical manuals, technical data, packaging and labeling. Contract excess property shall be controlled and final disposition determined by assigned demil code unless waived.
B. Excess GFE is equipment/technical data provided by the U. S. Government to the contractor that the contractor no longer needs to satisfy the contracts requirements, which the government does not want returned during or at the completion of the contract.
C. Demilitarization is the act of destroying the military offensive and defensive characteristics inherent in certain types of equipment and material to the degree necessary to preclude its restoration to a usable condition.\~The term includes mutilation, dumping at sea, cutting, crushing, shredding, melting, burning or alteration designed to prevent the further use of this equipment and material for its originally intended military purpose. It applies equally to material in unserviceable and serviceable condition.
D. Scrap is material that has no value except for its basic material content.
E. Munitions list item (MLI) is any item contained in the U. S. Munitions List, 22 CFR 120-130.
F. Commerce control list item (CCLI) is a multi-use (military, commercial and other strategic use) item under the jurisdiction of the
Bureau of Export Administration, U. S. Department of Commerce, through the Export Administration Regulations, 15 CFR 730-774. The types of items on the CCL may be commodities (i. e., equipment, materials, electronics), software, or a particular technology.
G. Trade security control (TSC) is control procedures designed to preclude the sale or shipment of Munitions List or Commerce Control
16 50
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
List items to any entity whose interests are inimical to those of the United States. These controls are also applicable to such other selected entities as may be designated by the Deputy Under Secretary of Defense (Trade Security Policy).
H. Commercial type property is material, equipment, software, or technology not generally considered to be unique and peculiar to DoD and possessing commercial marketability.
I. Significant military equipment (SME) is material for which special export controls are warranted because of their capacity for substantial military utility or capability. Items designated as SME require worldwide demil as prescribed in DoD 4160.21-M-1, Demil
Manual, appendix 4.
J. Ammunition, explosives, and dangerous articles (AEDA) is any substance that by its composition and chemical characteristics, alone or when combined with another substance, is or becomes an explosive or propellant or is hazardous or dangerous to personnel, animal or plant-life, structures, equipment or the environment as a result of blast, fire, fragment, radiological or toxic effects. AEDA is not a criterion for demil. AEDA items not on the Munitions List would be coded A or Q.
III. Applicability:
This solicitation/contract is for the production of MLIs or CCLIs and contract excess may require demil and/or TSCs. This clause is applicable to prime and subcontractors.
IV. Contractor Demil and TSCs:
A. The contractor will demil and apply TSCs as required on all contract excess property as dictated by the government assigned demil code and its definition and the demilitarization and trade security controls matrix in paragraph IX of this clause. Demil codes and definitions can be accessed per paragraph VIII of this clause.
B. The contractor will contact the PCO for declassification, safety and demil instructions for contract excess property with an assigned demil code of P, F, or G.
C. The contractor will demil all associated excess technical data.
V. Demil Certification and Verification (DC&V):
A. During or upon completion of manufacturing under this contract, the prime contractor shall notify the PCO in a timely manner that a government representative is required to witness demil of contract excess property produced under this contract whether the prime contractor or a subcontractor is performing the demil.
B. Subcontractors shall notify the prime contractor in a timely manner who shall notify the PCO that a government representative is required to witness demil of contract excess property produced under this contract.
C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .